Laserfiche WebLink
A REFER TO SHEETS A1.04 & A1.05 FOR CONSTRUCTION <br />ASSEMBLIES. A COMPLETE APPROVED ROOFING <br />SYSTEM SHALL BE PROVIDED AND INSTALLED PER <br />MANUFACTURER SPECIFICATIONS AND DETAILS <br />ARCHITECTURE & <br />co <br />N <br />II <br />N <br />Cn <br />LO <br />LO <br />ti <br />0 <br />N <br />O <br />0) <br />0 <br />-o <br />0 <br />1 SIG:TOTHE <br />T REVISIONS HAVE BEEN MADE TO THIS SHEE <br />DUCHANGE TO A WOOD FRAME STRUCTUREANSING THE CORRIDORS <br />3/32" v 1'-0., <br />B ROOF IS DESIGNED TO PREVENT THE ACCUMULATION <br />OF WATER. ROOF TRUSS TOP CHORD SHALL BE <br />PITCHED 1/4" (MIN.) PER FOOT TO ROOF DRAIN. <br />OVERFLOW ROOF DRAINS SHALL BE 2"-4" ABOVE THE <br />LOW POINT OF THE ROOF, AT THE MAIN ROOF DRAIN, <br />FOR EACH DRAINAGE AREA <br />C PROVIDE ROOF MANUFACTURER APPROVED <br />FLASHING FOR ALL PENETRATIONS <br />D ROOFING TO BE ENERGY STAR QUALIFIED <br />KEY NOTES <br />01 MAIN ROOF DRAIN, REFER TO PLUMBING PLANS. SET <br />AT LOW POINT OF ROOF, MAINTAINING MINIMUM <br />INSULATION PER ROOF ASSEMBLY <br />02 OVERFLOW ROOF DRAIN, REFER TO PLUMBING <br />PLANS, DISCHARGE OVERFLOW AT A <br />CONSPICUOUSLY LOCATED WALL NOZZLE (REFER TO <br />ELEVATIONS FOR PROPOSED LOCATIONS. <br />03 PARAPET WALL: REFER TO BUILDING ELEVATIONS <br />FOR HEIGHT <br />04 TRASH CHUTE CHIMNEY PER MANUFACTURER <br />05 METAL ROOF PER ASSEMBLY <br />LEGEND <br />KEY PLAN <br />iNTERIOR DESIGN, INC. <br />745 orienta avenue, suite 1121 <br />altamonte springs, fl 32701 <br />phone: 407.830.1400 <br />fax: 407.830.4143 <br />AA0002731 <br />www.forumarchitecture.com <br />BENEFICIAL <br />COMMUNITIES <br />3550 S. Tamiami Trail Suite 301 Sarasota, FL 34239 <br />Zephyrhills, FL <br />09/04/2015 <br />0 SHEET REVISIONS: <br />EDITED BY: KG <br />PROJECT NO. 14-2984 <br />Building <br />Ws <br />