My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Valley Oaks Cir
Zephyrhills
>
Building Department
>
Building Plans
>
Valley Oaks Cir
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 1:19:56 PM
Creation date
2/18/2025 4:06:39 PM
Metadata
Fields
Template:
Building Plans
Location
Valley Oaks Cir
Contractor
First Florida Bldg Corp
Building Plans - Permit #
10902-10910
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cs� <br />u <br />M <br />U <br />a <br />CU <br />0 <br />04 <br />N <br />N <br />C <br />O <br />70 <br />O <br />a <br />3 <br />N <br />N <br />co <br />O <br />00 <br />LO <br />N <br />C <br />O <br />a- <br />U <br />O <br />IL <br />co <br />LO <br />N <br />12 <br />5 <br />12 <br />5 ��� 12 <br />5 <br />18 <br />LLI <br />Z <br />.J <br />r <br />Q <br />Type 11 - Partial Rear Elevation <br />X4 <br />SHEET NOTES <br />MAY NOT BE REFERENCED ON THIS SHEET <br />A REFER TO SHEET A1.03 FOR GENERAL NOTES <br />B REFER TO SHEETS A1.04 & Al.05 FOR CONSTRUCTION <br />ASSEMBLIES <br />C ALL TRIM TO BE SMOOTH TEXTURE, ALL HORIZONTAL <br />LAP SIDING TO BE WOOD GRAIN TEXTURE <br />D REFER TO SHEETS A9.11 & A9.21 FOR DOOR & <br />WINDOW DETAILS <br />® KEY NOTES <br />MAY NOT BE REFERENCED ON THIS SHEET <br />01 TYPICAL FASCIA TRIM: 2x8 ALUM. CLAD <br />CONTINUOUS FASCIA BOARD W/ ALUMINUM DRIP <br />EDGE ABOVE @ ROOF PERIMETER. SEE SHEET <br />A7.03 FOR SOFFIT DETAILS. <br />02 ROOF SYSTEM PER SPECS. <br />03 FIBER CEMENT HORIZONTAL LAP SIDING AS PER <br />ELEVATION: 6" EXPOSURE <br />04 FIBER CEMENT HORIZONTAL LAP SIDING AS PER <br />ELEVATION: 4" EXPOSURE <br />05 FIBER CEMENT SHINGLE SIDING AS PER <br />ELEVATION <br />06 FIBER CEMENT TRIM BOARD: WIDTH AS <br />z INDICATED. PROVIDE FLASHING AS NECESSARY <br />v 07 WINDOWS & DOORS PER SCHEDULES. PROVIDE <br />Q 1x4 TRIM AROUND WINDOWS & DOORS, UNO <br />06 1X4 BELOW SOFFIT 08 ALUM. GUTTERS & DOWNSPOUTS WHERE <br />INDICATED. COLOR TO BE SELECTED BY OWNER. <br />OL 34'-10 1/81, COORDINATE LOCATIONS WITH ROOF PLAN AND <br />TRUSS BRG SITE CONDITIONS. <br />OL 09 ONE-PIECE CORNER TRIM: 1X4X4 <br />28'-7" <br />TRUSS BRG <br />10 FIBER CEMENT PANEL � <br />11 BUILDING SIGN & LIGHT. CONTRACTOR TOOL r' <br />20'-31/4" VERIFY & COORDINATE BUILDING SIGN & LI HT <br />FIN FLR LOCATION <br />OL 18'-5 314' <br />--t — - TRUSS BRG <br />12 BALCONY RAILING: PROVIDE 42" HIGH ALUM RAIL <br />- SYSTEM WITH ELECTROSTATIC PAINT (ESP) <br />FINISH. COLOR TO BE SELECTED BY OWNER <br />_ FIN FLR <br />o <br />8' 4112° 13 DECORATIVE ALUMINUM FRAME <br />- TRUSS BRG <br />14 12" ROUND DECORATIVE FOAM LOUVER <br />o o„ 15 18 ROUND DECORATIVE FOAM LOUVER <br />FIN FLR <br />Q7 16 DECORATIVE FOAM BRACKET <br />17 STEEL GUARDRAIL <br />rBEHIND <br />FIBER CEMENT TRIM ON MAIN FLAT WALL <br />1/8"=1'-0" COLUMN TO ALLOW FOR PAINT COLOR <br />ANGE (INSTALL AT ALL FLOORS). ALIGN TRIM <br />RECEIVE RAILING. SEE 7/A7.71. <br />1X4 BELOW SOFFIT <br />1 /8"=1'-0" <br />L <br />ONS REVISED - <br />OOR & <br />REPLACED <br />GLASS DOORONIES 3 <br />ELEVATIONS REVISED FOR <br />ACTUAL 8' STUD CHANGE. <br />A <br />® KEY PLAN <br />1 2 <br />1w_ I — <br />FORUME <br />ARCHITECTURE & <br />INTERIOR DESIGN, INC. <br />PLANNING I ARCHITECTURE I INTERIOR DESIGN <br />745 orienta avenue, suite 1121 <br />altamonte springs, fl 32701 <br />phone:407.830.1400 <br />fax: 407.830.4143 <br />AA0002731 <br />www.forumarchitecture.com <br />3 Meetinghouse <br />E at Zephyrhills <br />Senior <br />Apartments <br />0 <br />C <br />0 <br />N <br />U <br />V <br />El`City of Zephyrhills, FL <br />0 <br />0 <br />C <br />0 <br />SAT DISTRIBUTIONS: <br />11125109 <br />_ _Progress Set , <br />12/09109 <br />60% Progress Set _ <br />12/17109 <br />_ Bid Set <br />03/02/10 <br />Permit Set <br />Q SHEET REVISIONS: <br />01/25/10 , <br />; 1 Misc. Coordination <br />06/02110 <br />2 Misc. Coordination 2 <br />08/25110 <br />3 Misc. Coordination 3 <br />EDITED BY: <br />z PROJECT NO. 09-2587 <br />z <br />0 <br />0 <br />Building Type 11 <br />W <br />Elevations <br />z <br />W <br />F_ <br />U <br />0! <br />W <br />H <br />I <br />U <br />D: <br />A6.22 <br />0 <br />it T I I lam, I - 1 11 1" <br />
The URL can be used to link to this page
Your browser does not support the video tag.