Laserfiche WebLink
3 <br />m <br />rn <br />N <br />rn <br />O <br />P7 <br />a <br />0 <br />Cn <br />N <br />0 <br />I <br />N <br />m <br />N <br />L <br />7 <br />0 <br />a <br />0 <br />0 <br />N <br />Ln <br />I <br />M <br />i <br />0 <br />.a <br />3 <br />a <br />rrn <br />0 <br />CI_ <br />E <br />E <br />O <br />V <br />0 <br />J <br />2 <br />r <br />0 <br />U <br />v <br />0 <br />UI <br />rn <br />0 <br />a <br />6 <br />-9 <br />IV <br />N <br />0 <br />00 <br />0 <br />0 <br />0 <br />a <br />0 <br />000 <br />M <br />0 <br />0 <br />w <br />a <br />m <br />CROSS BRACING DETAIL (TYP.) <br />SCALE:NTS <br />TRUSS NOTES: <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 CONY. FRAMED RIDGE <br />TRUSS PLATE INSTITUTE NOTE THATCOMAY BE(NAILED <br />() THE COMBINED WIND AREA IS GREATER <br />w/ MIN. 4 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. pg <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />vvr c- r vu L r I 11v v v I_" <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />-EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />IT IT 14 <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />MAX &EACH END ALTERNATE BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />----LWOOD TRUSS <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE:NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL r7 <br />SCALE:NTS <br />DIAGONAL - <br />AT 8'-0" <br />MAX <br />TRUSS <br />SEE ROOF <br />PLAN SHEATHING <br />4 <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />,/A TRUSS <br />USSES <br />(2) 12D NAILS —I <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL 2 <br />SCALE:NTS <br />HIP <br />G.T <br />(2) 2x8 #2 SYP wj <br />O.S.B. FLITCH PI <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM @ RAISED ENTRY <br />MASONRY WALL r4 <br />SCALE:NTS <br />SIMPSON LSTA18 SEE PLAN <br />VERTICAL SCAB 2 x 6 w/ (12) 10d NAILS L. <br />SIMPSON HUC410 w/ (14) <br />#2 SPF 48" O.C. W/ (4) CENTERED AT 16d INTO HEADER & (6) FOR CANT. <br />10d TOP & BOTTOM SPLIT TO TIE <br />BEAM - SEE <br />OR SIMPSON H2.5A w/ BEAMS TOGETHER ROOF P10dOLAN FOR MORE <br />(10) 8d NAILS INFO <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />2x8 #2 SPF RIDGE BEAM <br />* * 2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO TIE BEAM <br />2X4 CONT. AT- / CONC. MASONRY <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT <br />A -A ALTERNATE BLOCKING <br />DETAIL a@ INTERIOR BEARING <br />SCALE:NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />VARIES <br />ROOF SHEATHING <br />_ <br />ATTACHED PER <br />2x4 #2 SPF BRACING @ <br />NAILING SCHEDULE <br />16" O.C. W/ (4) 12d <br />COMMON TRUSSES. <br />TOENAILS TO TOP <br />SEE TRUSS PLAN <br />PLATE & (2) 12d END <br />NAILS TO TRUSS <br />MIN. (2) 2x4 <br />SPF TOP <br />FOR CONNECTION <br />INFORMATION. <br />BOTTOM CHORD <br />PLATE <br />OILVARIES SEE PLAN <br />FOR WALL LOCATION <br />�— MIN. 2X4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />SEE PLAN FOR <br />PLATE BELOW <br />TOP OF WALL <br />o <br />MIN. 2x4 #2 SYP P.T. PLATE <br />°. <br />W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />PLAN FOR MORE <br />16" O.C. MAX. <br />INFO. <br />° r <br />SECTION <br />@ ENTRY <br />r8 <br />SCALE:NTS <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE OSB FLITCH PLATE <br />SEE FLOOR PLAN CONNECTION INFO REQ'D ONLY WHEN <br />FOR COLUMN SIZE INDICATED ON BM. <br />& ADDITIONAL INFO. 7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A SCHEDULDE/PLANM OPTION B CONNECTION INFO OPTION C <br />COMMON BM. TO POST ATTACHMENT KA <br />SEE ROOF PLAN <br />FOR BEAM SIZE & SCALE: 3/4"=1'-0" <br />CONNECTION INFO. BM. SPLICE OVER <br />q� CENTER OF POST <br />A A <br />SEE PLAN FOR <br />SIMPSON MTS18 w/ (14) <br />10d NAILS TYP. U.N.O. SEE PLAN FOR <br />CANTILEVER IF <br />SEE FLOOR PLAN FOR INDICATED <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />CORNER SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />�X <br />COMMON BM. ATTACHMENT <br />SCALE:NTS <br />2x4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2x4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />I <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />- <br />(14) 10d x 1 1/2" NAILS <br />j <br />TO FLOOR GIRDER <br />II <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM <br />FLOOR GIRDER <br />SEE PLAN FOR <br />SEE PLAN FOR <br />DIRECTION <br />CONNECTION <br />SECTION a@ FLOOR <br />CONNECTION <br />22 <br />SCALE:NTS <br />SEE 1/S5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />TRUSS <br />1/2" PLYWOOD <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />MIDDLE <br />SEE PLAN FOR <br />8d NAILS AT VALLEY TRUSS <br />4" O.C. INFO. <br />`—• MASONRY WALL BELOW: SIMPSON <br />'.. HETA16 w/ (9) 10d x 1 1/2" NAILS @ <br />MASONRY WALL 4'-0" O.C. TO GABLE TRUSS <br />OR BEAM • BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN a° (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />TO GABLE TRUSS <br />e COMMON TRUSS <br />° SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE <br />SCALE:NTS <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL @ ENTRY FRONT WALL <br />SCALE:NTS <br />2X4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3) 16d AT <br />EACH STUD - TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />W/ (3) 10d PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />W/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />• <br />• <br />• <br />SIMPSON LUS26 w/ (8)10d NAILS <br />OR IF 2 PLY TRUSS SIMPSON <br />LUS26-2 w/ (8) 16d NAILS TO <br />SEE FLOOR FRAMING PLAN <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />VERIFY WITH PLAN FOR <br />2X10 #2 SYP CONT. LEDGER w/ (3) <br />LOCATION AND DIRECTION <br />1/2" X4 1/2" LAG SCREWS ATTACH <br />(IF PARALLEL SEE 2/D2 FOR <br />LAG SCREWS INTO END OF EACH <br />BLOCKING INFO) <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />SECTION AT LOW ROOF g <br />SCALE:NTS <br />LOW ROOF/WALL <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />2x STUDS @ <br />W/ SIMPSON SP1 w/ (10) 10d <br />NAILS AT BASE & SIMPSON <br />SP2 w/ (12) 10d NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END ( BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS12 w/ (14) 1 Old x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />PLYWOOD <br />FLOORING <br />LOW ROOF TRUSS W/—/ L (2) 2x6 BLOCKING UNDER`- FLOOR G.T. <br />RAISED BOTTOM CHORD 2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS SIMPSON LUS24-2 w/ (16) <br />MANUF. SPEC'S FOR 16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION BUMP OUT r39 <br />SCALE: NTS <br />DETAILS &SECTIONS <br />na <br />N <br />0 <br />_ <br />® <br />:. <br />t69 og <br />8... <br />_ <br />_ <br />M <br />O <br />N <br />CID <br />O <br />n!l'ts_ M <br />J rNO <br />`i. <br />PE 7 8- 0 <br />• <br />'L7 <br />r, <br />•.J <br />r �w <br />M' (.�rr <br />7 <br />``v�r7iir3le:Y4'r <br />To the best of the Engineer's knowledge, information and belief, <br />the structural <br />plans and specifications contained within these <br />drawings comply with the 2020 <br />Florida Building Code - <br />Residential <br />7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's <br />signature and seal, <br />T <br />W <br />a <br />E 9 N <br />O a 8 `° <br />v <br />5 <br />N <br />N rT # <br />N <br />O C u- <br />_§ <br />M <br />0 <br />w o, <br />���NLLLL <br />N <br />cn ti° W W <br />v <br />4 <br />aiM <br />_ <br />0Z <br />J�� <br />3: 10 <br />x . . <br />§2 <br />W <br />r°°'°' J z <br />'x. n <br />W <br />3M <br />IL <br />— <br />w <br />z <br />G H <br />N U <br />0 <br />Z <br />0 ❑❑❑ <br />W <br />N M <br />O � <br />Co N <br />Q <br />Q Q <br />J <br />a <br />a)-I-- <br />LL <br />w m <br />0 <br />Z <br />/ <br />o <br />Lv N <br />lL^ <br />v I <br />o <br />U <br />LU <br />- e <br />U <br />Q <br />o <br />w <br />M <br />M <br />i <br />10 Sz <br />Z <br />4 <br />o <br />zo <br />z� <br />z® <br />;d <br />as <br />ca <br />F_ <br />_C1�¢ <br />.0 <br />o <br />a1 <br />�o <br />¢z <br />Wz <br />wZ <br />c <br />Qo <br />m3 <br />° o <br />m <br />oo <br />aw <br />-' <br />0� <br />�Z <br />S <br />�< <br />zo <br />U <br />W <br />T 3 <br />)CIO <br />o LL <br />a Z <br />N F <br />dz <br />=� <br />r <br />o <br />< <br />� <br />>° <br />M <br />V <br />w <br />ol¢ <br />d F. <br />UU <br />O <br />= <br />>� <br />J <br />Ln <br />LO <br />cc <br />M <br />O <br />Cn U <br />" <br />C0 <br />120 <br />LLO <br />r <br />U) <br />- <br />CID <br />cY <br />0 <br />Lo <br />L f') <br />CD N <br />� <br />CV <br />Q <br />M00 <br />r <br />a� <br />E <br />= <br />E <br />cY) CV) <br />o <br />z <br />ICU <br />z <br />E Q <br />" <br />m <br />a <br />ci _° <br />°= <br />a o <br />JOB <br />NO: <br />23-02469 <br />SCALE: <br />AS NOTED <br />SHEET NO. <br />D1 <br />