Laserfiche WebLink
t7l <br />U I j <br />20 <br />Cl <br />11.0 <br />ci <br />E <br />X <br />CL <br />-2 <br />a_ <br />C*4 <br />;:z- <br />C-4 <br />00 <br />1x4 1/2" DRYWALL DOOR JAMB (REFER F-1 X4 1/2" DRYWALL DOOR JAMB (REFER 1 x4 F 1/2" DRYWALL MAX. 8" UNACCEPTABLE INSTALLTION <br />DOOR JAMB (REFER P.T. TO PRODUCT F TO PRODUCT PROPER INSTALLATION DO NOT DO THIS. 2"x BOT, PLATE W/ (2) 10d @ 6" O.C.. <br />Tt-1 DDr)r)H(T APPPOVAI FOR CONN ATTACHED WALL SHEATHING TO <br />APPROVAL FOR CONN. APPROVAL FOR CONN. x4 X 4 <br />x4 P.T. I I I I [ FURRING <br />3/16"0 X 3" LONG E FURRING <br />110 (2) ROWS 3/16" x 3�1/2" <br />3-1/4" LONG X 3/16 14 FURRING TAPCONS V. <br />71 TAPCON @ 16" O.C. &,"4 2X8 <br />IkI y <br />1,2 <br />TAPCON. INTO STAGGERED @ 16" P.T. FROM EACH END w/ MIN. 1X8 <br />BLOCK@ SPACING O.C. 2-ROWS INTO <br />PER MANUFACTURE 1 11DETAIL MASONRYTHROUGH 2" EDGE DIST. ATTACH <br />1 x4 P.T. & 1 x8 P.T. 1-1/211 DETAIL— 1x8 w/ (2) ROWS 8d NALS 3" DETAIL <br />STAGGERED @ 12" O.C. <br />3/16" x 3 -1/2" 1X4 P.T. DOOR JAMB (REFER <br />TAPCON @ 16" TO PRODUCT <br />O.C. & 4" FROM DOOR JAMB (REFER APPROVAL FOR CONN. 1x4 1/2" DRYWALL <br />TO PRODUCT <br />TA <br />0 <br />P <br />C ' <br />CO <br />EACH END W/ MIN <br />E <br />4 <br />N <br />N <br />DOOR JAMB (REFER NJ 1x4 il/2",DF <br />2 EDGE N.: 316 <br />TO PRODUCT 2" EDGE DIST. APPROVAL FOR CONN. 2x8 P.T. wl (2) ROWS 3/16" <br />APPROVAL FOR CONN. x 3-1/2" TAPCON @ 16" 1x4 <br />(2) ROWS 3/16" x 3-1/2" O.C. & 4" FROM EACH <br />FURRING <br />TAPCON @ 16" O.C. END w/ MIN. 2" EDGE DIST zzzzz, <br />& rzzz <br />I R ' L <br />4" FROM EACH END w/ 2x8 P.T. ATTACH SECOND PLY w/ <br />., . 2 T MIN. 2" EDGE DIST. (2) ROWS 10dx3" 2x8 <br />x P.T. AS REQ'D <br />2x DETAIL 2 1/4" DETAIL STAGGERED @ 12" 0-c. 3-1/411 DETAIL <br />#5 REB <br />(TYP.) <br />STD. 90 <br />FILL SOLID <br />HOOK (I <br />BOTH CELLS <br />2 <br />MAN <br />NOTCH WEB AT <br />±5 A <br />FIRST 2 COURS <br />#5 REBAR k I T r,) 3/4" PLYWOOD DECKING GLUED <br />AND NAILED W/ 8d COMMON @ 2X BOTTOM PLATE W/ 8d @ 4" <br />AR 041, -. -, / O.C., 2 ROWS STAGGERED <br />41% 6" O.C. EDGES AND 12" O.C. FIELD <br />4 14 90- HOOK (TYP.) 2x BAND JOIST W/ FACE NAIL 1 Od <br />A @ TOP & BTTM CHORD, AND (8) <br />YP.) FACE NAILS 10d @ TRUSS VERT. <br />WEB <br />METAL SEAT PLATE <br />NOTE: <br />LAP SHEATHING TO <br />B TTOM OF BAND <br />L <br />B <br />E <br />0 <br />A <br />0 <br />1 <br />I <br />#4 JO <br />JOIST TYPICAL <br />4% <br />SIMPSON HGAM10KTA @ 12" O.C. <br />FIRST COURSE <br />w/ (4) 1/4xl 1/2" SDS SCREWS <br />1 <br />41*1 INTO BAND JOIST & (4) 1/4"x2 3/4" <br />T11 <br />THE TITEN INTO K.O. BLOCK <br />4%* <br />ES <br />ER SIZE DOOR -WINDOW ROUGH OPE <br />BUILDOUT �'dv` OV NINGSK`CC <br />LED CELL PER <br />FOUNDATION PLAN FILLED CELL INSTALLATION <br />KH RETROFIT FOR MISSING EMBEDDED STRAP <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />� �s SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S.- <br />2x8 P.T. BUCK -CONNECT TO BLOCK SECTION <br />A -A <br />UPLIFT CAPACITY = 805 # FOR 1 STRAP <br />FILL 1 st 4 COURSES <br />W/ 1/4" x 3 1/4" TAPCON ( 1 1/4" MIN. <br />= 1610 # FOR 2 STRAPS <br />SOLID W/GROUT <br />EMBEDMENT INTO BLK.) 1/4" MAX 8-1 <br />1 PLY PRE-ENGINEERED TRUSS <br />SEE ARCH PLAN AND <br />1 X4 FURRING SOLID BLKG. AT TOP BTWN. 1/4" x 3 1/4" TAPCONS <br />PRE-ENG TRUSS DESIGN <br />SEE NOTE 1 BELOW <br />BLOCK HEADER ARCH BLKG. & BUCK <br />SIMPSON HM9KT w/ (4) 1/4"xl 1/2" SDS <br />01 <br />SCREWS & (5) 1/4" x 2 1/4" TITEN (IF TRUSS <br />1/2" DRYWALL <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16) 16d <br />8d NAILS AT 8" O.C. AT BUCK <br />SINKERS AND (7) 1/4"x2 114" TITEN = 2150 #) <br />2x SUB FASCIA <br />'A,: <br />2 x 8 45' DIAGONAL (4) 10d NAILS INTO —,LEAVE A CUTOUT IN O.S.B. ONTHE <br />INTO <br />ALUM DRIP EDGE <br />INSIDE TO ALLOW FOR INSULATION <br />B KG <br />L <br />BRACE(S) 2 x 8 BRACE/ BLKG. TO BE INSTALLED <br />7/16" OSI3 <br />BOND BEAM OR CAST IN PLACE BEAM <br />BRG WALL TYPE ALUM FASCIA <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />CONTACT ENGINEER OF RECORD FOR <br />i0LE IN 13 FOR <br />CUT HOLE IN O.S.B. FOR <br />BUILT UP PLWD. BUCK _CELL INO�H AREA 2 x 8 45 DtAGONAL BRACE AT EA. <br />ARCH PANEL S S <br />POLY -CELL IN THIS AREA <br />PER PLAN 1-3/4" TRIM PAINTED <br />FURTHER INSTRUCTIONS. <br />A <br />SCRIBE (NOTCH) FACE OF ARCH W/ (3) 1 Od NAILS <br />1 AA m &It Q 1pdTr) 1z <br />BACKSIDE TO FIT ARCH (4) 1 Od NAILS INTO 2 x 8 AT EA. END <br />RETROFIT TRUSS DETAIL <br />F CHANNEL, SS NAIL w/ 5/16" HEAD <br />FASTENED PER DIA, @ 24". O.C. <br />OVERHANG—'.'. <br />4 <br />CONNECT W1 8d NAILS BRACE/ BLKG. <br />\\\-2 <br />N.T.S. <br />NOTE 2 BELOW . .... . L co NT VENTED OR SOLID SOFFIT <br />72x <br />I <br />L <br />x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />INSTALL WDW. SCREW ANCHOR]y ARCH FACES W (4) 10d NAILS THRU OSB INTO 2 x 8 PROVIDE TAPCON WITHIN <br />CONT2x4NAILEDTO BLOCKING NAILED TO TOP <br />BLOCKING w/ 2-12d NAILS CHORD EVERY OTHER TRUSS <br />RETROFIT WALL OVERHANG DETAIL (NTS) <br />INTO ARCH BLKG. PER 4" MIN. OF BRACE <br />w/ 3-12d NAILS, TYP. <br />FOR OVERHANGS BETWEEN 3/4" TO 11/2" <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />-1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />IF TRUSSES USED) W/ (3) #6 X 4Y2" WOOD <br />1 G.C./ BUILDER TO VERIFY/PROVIDE SOFFIT MATERIAL SPAN CAPACITIES BASED <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D. <br />START OF ARC <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL <br />. <br />ON THE DESIGN PRESSURES SPECIFIED FOR COMPONENTS AND CLADDING <br />4'MAX. RAD. <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ <br />LISTED IN THE DESIGN CRITERIA ON SHEET SN. <br />ARCH DETAIL <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />2. FOR SOFFIT ATTACHMENT AT WALL (PER ALPHA ALUM. INC. FL# 16544 R5 FL <br />11-011 51-011 <br />SCALE: N.T.S. <br />Ss <br />12 <br />PRODUCT APPROVAL) F CHANNEL FASTENED TO: <br />JACK TRUSS PROVIDED BY <br />- CMU w/ T NAIL.097" DIA. @ 24" O.C. w/ 5/8" MIN. EMBEDMENT <br />TRUSS COMPANY OR PLAN <br />- WOOD w/ (3) 16 GA. 3/4"x1/4" CROWN STAPLES @ 24" MAX. O.C. IN DIAMOND <br />Ai-IFINISH FLOQ R <br />2x6 #2 SYP @ 24" O.C. <br />PATTERN <br />2 <br />x 8 BUCK - CONNECT TO BLOCK SECTION <br />ROOF SHEATHING ATTACHED <br />SUB FASCIA w/ 16 GA. 3/4"x1/4" CROWN STAPLE @ EACH GROOVE <br />WITH <br />1/4" x 3 1/4" TAPCON (1 1/4" MIN B-B <br />EMBEDMENT INT��K. <br />PER NAILING SCHEDULE LL <br />#5BAR <br />/4" MAX 2-4- 8" <br />STRUCTURAL SOFFIT <br />CENTERED W/ <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />(5) 12d NAILS SIMP ON <br />2X6 TO 2X4 H2.5A w/ (10) <br />SF01 SCALE: 3/4" = V-0" FOR ALUMINUM SOFFITS �IITH SPANS <br />I HWK� IN TOP <br />r- �- <br />KNOCKOUT/ N <br />1 X 4 FURRING <br />BLKG. & BUCK <br />8d NAILS <br />REV. 09.23.2021 > V-4", INSTALL MID SPAN BLOCKING PER <br />CHAIR BLOCK <br />THE SOFFIT FL PA INSTALLATION CRITERIA <br />8d NAILS @ 8" O.C. AT BUCK <br />2 x 8 VERT. W/ (2) 1 Od <br />PROVIDE 2x <br />*REFER TO THE PRODUCT APPROVAL FOR INSTAL LATION DETAILS.* <br />MONO FOOTING <br />_zj_� <br />PROVIDE 2 x 8 DIAG. BRACE B <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />CONT. W/ (3) <br />SIZE AND REINF. PER PLAN <br />VERT. BRACES WHEN HGT. OF <br />TAPCON AT EA. SIDE <br />12d NAILS <br />AND SECTION DETAILS <br />BRACE EXCEEDS 24" <br />BUCK - (1) WITHIN 4" <br />JACK TRUSS PROVIDED BY <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />CLEAN FILL <br />2 x 8 VERT. BRACE(S) -------- <br />INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24" O.C. <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />DIRT <br />TO BE INSTALLED <br />00, <br />0 TRUSS AS SHOWN FOR O.H. UP TO Z-16" <br />4' -0" MAX SEE PLAN <br />DOUBLE 2x4 SCAB FOR Z-16" TO 4'-0" O.H. <br />9STANDARD <br />r HOOK <br />BUILT UP PLWD, BUCK - <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />+ + 4 (2) 10d NAILS @ 8" O.C. <br />+ 7'/Y <br />#5 BAR IN <br />TO FIT ARCH CONNECT W/ <br />NOTE: IF TRUSSES USED) W/ (2) #6 X 4%" WOOD <br />+ TO TRUSS TOP CHORD <br />FILLED CELL L <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />4'MAX. RAD. <br />SHED ROOF ENDS TO BE SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />+ + <br />.1L <br />LL , IIII; , lit- 1'. <br />BTWN. OSB ARCH FACES W/ (4) 1 Od NAILS EQUAL EQUAL <br />GABLE ONLY, CORNERS WALL USE (2) 1/4" X 3 1/2" TAPCONS AT 16" <br />+ + PLYWOOD SHEATHING <br />Sk- <br />INSTALL WDW, SCREW---�'� <br />THRU OSB INTO 2 x 8 <br />SHALL NOT BE FRAMED AS O.C. <br />+ + <br />STEMWALL FOOTING SIZE AND <br />ANCHOR INTO ARCH BLKG. <br />PER INSTALLATION DETAILS <br />ARCH DETAIL rK <br />HIP. SECTION @ ENTRY <br />DESIGNED ONLY FOR THE <br />+ <br />BLOCKING AS <br />+ <br />TRUSS REQUIRED TO <br />REINF. PERLAN AND STEMWALL <br />MONO TO STEMWALL FOOTING <br />B-B <br />SCALE: N.T.S. <br />INSTALLATION OF SHINGLE - 1. <br />SCALE: 3/4" -011 <br />1\ <br />+ + <br />+ SUPPORT SOFFIT <br />SECTION DETAILS <br />�S <br />AND METAL ROOF FINISH �S <br />SCALE: 3/4" = V-0" <br />2X4 SYP <br />EACH TRUSS <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJECT, <br />GLASS BLOCK INSTALLATION NOTES <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />CONNECTOR <br />CONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />SEE LINTEL <br />EXISTING BOND BEAM. <br />EXTENDS TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />SCHED. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />REINFORCING. PROVIDE LOWER <br />%L <br />tENTER SOOIT <br />DRILL 3/4"x5" MIN. HOLE SET BAR IN <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />HOOKED DOWEL <br />EPDXY CAP TO PREVENT LEAKAGE <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE EXPANSION STRIP <br />PRECAST LINTEL % <br />—SEE <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT 20 ga. PANEL <br />ELEVATION <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY 2") <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS ANCHOR <br />IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />W W M AT PERIMETER <br />FOR OVER HANG <br />BLOCK <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. 1/4" EXPANSION BOLT (2 <br />Wi <br />HE E THIS CONDITION <br />(MAX. 4'-0") <br />rM <br />#5x6'EMBEDDED INTO EXISTING BOND BEAM <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS 9 ga. PANEL PER ANCHOR) <br />OCCURS <br />#5 CONT. TOP & MID <br />SECTION @ ROOF EXTENSION <br />z <br />0 <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING REINFORCING <br />WITH MIN. 3" COVER 6-0" <br />SCALE: 3/4" = V-0" <br />�S <br />a) <br />FILL CELL FULL HEIGHT W/ <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL (EVERY OTHER <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. COURSE) EXPANSION STRIP <br />U_ LU NON SHRINK GROUT. <br />0 <br />SEE SHEET D2 AND <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />J <br />Uj <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />SIMPSON HTT4 w/ (18) 10d x 1 FLOOR PLAN FOR <br />Cn <br />I <br />REINFORCING AS FOLLOWS: <br />SEALANT <br />1/2" NAILS TO STUDS & (1) - MORE INFO <br />ROD <br />INTO <br />PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />kP <br />5/8" DIA. ALL THREAD <br />#5x6'EMBEDDED <br />PRESS PANEL REINFORCING INTO PLACE. 6" MIN. LAP SPLICE W/ <br />EPDXIEDw/ SIMPSON "SET" <br />EPDXY MIN. 6" EMBEDMENT & <br />EXISTING FOOTING (2) #5x6'IN CONC. <br />COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL REINFORCING PANEL <br />3" MIN. EDGE DISTANCE <br />0 FILLED CELL <br />C14 <br />DRILL 3/4"x5" MIN. HOLE <br />SMOOTH. DO NO FURROW. <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />GRADE <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. 6" MIN. LAP <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST SPLICE <br />NOTE: <br />C14 I� <br />z <br />REMAIN FREE OF MORTAR. SEE GLASS BLOCK INSTALLATION NOTES. <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <SEALANT <br />z -4 <br />C <br />SAW CUT <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />I--," <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. GLASS BLOCK DETAIL <br />BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />% <br />N-1 (2) #5 REBAR. (1-STORY) <br />#5 REBAR. <br />SECTION <br />TOOL JOINTS SMOOTH AND CONCAVE, <br />16" MIN. (1-STORY) (3) (2-STORY) <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />20" MIN. (2-STORY) WITH MIN. 3" COVER EA. WAY <br />EXISTING FOOTING <br />I) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />OF <br />SCALE: N.T.S. <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />SECTION AT DEEP MONO FOUNDATION <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />RETROFIT FILLED CELL DETAIL <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />REV. 07.28.21 SCALE: 3/4" = V-0" <br />RETROFIT FOR MISSING "0 <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />MSTAM STRAP <br />SCALE: N.T.S. <br />FOR WIND SPEEDS UP TO 110 MPH", PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />INSTALLATION OF GLASS BLOCK. <br />SCALE: 3/4" = V-101" <br />C-i <br />Go <br />C%A <br />C2 <br />C:3 <br />ra- <br />­C <br />cc W Co <br />CP co <br />cii- <br />CA <br />cc 0 <br />"Me 11%, <br />CL VVIV <br />V. <br />C* <br />C <br />< <br />Ul <br />W <br />0- <br />N <br />C-1 <br />F <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specificallions contained within <br />these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal is <br />only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />W <br />E <br />4 8 -,58 <br />5 Cis OF <br />0 C.0 <br />(A <br />1r.0- rz. <br />04 C) <br />u. <br />LL <br />z <br />0 j 1 ICE <br />,5,Fu - 0 <br />0 2 t, x <br />W (n T <br />0 <br />z z <br />ce) <br />IL <br />LL <br />04 <br />< 0 <br />0 0 <br />(5 U <br />z 0 Ch <br />W <br />0 <br />V) 0 .8 <br />al <br />(L) <br />4­0 u-3 <br />(10 LU <br />) <br />G 0 <br />V) <br />V) <br />(n <br />YZ <br />C0 <br />Cn <br />< <br />—j <br />E <br />E <br />M <br />t-- <br />10 <br />00, <br />. M <br />00 <br />00 <br />C), E <br />C141 <br />CO C <br />0. <br />O� <br />Z, <br />T. <br />2 <br />X <br />> <br />0 <br />r-- >1 <br />ca <br />=3 C) <br />CU <br />U) <br />LO <br />0 <br />it <br />cc <br />0 <br />c) <br />r�- <br />C:) <br />CJ <br />0 CD <br />0) <br />LO <br />CN <br />00 04 <br />E <br />A-V cle) 04 <br />0 <br />z <br />z <br />E <br />E <br />CL <br />0 <br />0 <br />JOB <br />NO: 22-09405 <br />SCALE : - AS NOTED_ <br />SHEET NO. <br />SS <br />