My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38410 6th Ave (2)
Zephyrhills
>
Building Department
>
Building Plans
>
38410 6th Ave (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 7:27:44 PM
Creation date
2/18/2025 4:19:27 PM
Metadata
Fields
Template:
Building Plans
Street #
38410
Location
6th Ave
Contractor
Pillar Construction Group
Building Plans - Permit #
14813
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING <br />MEMBRANE ON BONDING ADHESIVE ON 5/8" <br />M.R. COVER BOARD ON TAPERED R-24 RIGID <br />INSULATION ON NEW I 1/2"METAL DECK <br />SEALANT <br />SLOPE DN. MIN. <br />1/4"PER FT. <br />ADHERED OR WELDED FLASHING MEMBRANE. <br />EXTEND APPROX. 30 BEYOND FLANGE. <br />FASTENERS AT APPROX. 3" TO 6"O.C., <br />STAGGER <br />SEALANT <br />ALUM DRIP EDGE. COLOR TO BE SELECTED <br />BY ARCHITECT A <br />2 x 4 P.T. CONT. WOOD BLOCKING <br />EXTEND TPO FIELD SHEET BELOW WOOD <br />BLOCKING <br />ge <br />CONT. CLEAT <br />2 x P.T. CONT. WOOD NAILER <br />IW M.R. GYPSUM BOARD, PAINTED <br />J-BEAD AND SEALANT <br />Apparatus EXIST. 8"CMU <br />Bay <br />40 <br />DRAINING PERIM <br />3H = 1 I -On <br />DETAIL <br />POLYOLERN CIPO) ROOFING <br />MEMlBRANE ON BONDING ADHEWA ON &V <br />M.R. OOVER BOARD ON TAPERED R-24 RKND <br />INSULATIlON ON EXIST. METAL DECK <br />SEALANT-------\ <br />OT USED) (--5'� RAISED PERIMETER EDGE DETAIL <br />3" = 1 1-0" <br />CMU PILASTER, BEYOND <br />7/8* THK CEMENT PLASTER ON GALV. <br />METAL LATH <br />ADHERED OR VVELDED FLASHING MIENSPIANE. <br />EXTEND APPROX. 30 BEYOND FLANGE <br />FASTENERS AT APPROX. 3w TO W O.C., <br />STAGGER <br />SEALANT <br />ALUM DRIP EDGE. COLOR TO BE SELECTED <br />BY ARCHITECT <br />2 x P.T. WOOD BLOCKING <br />EXTEND TPO FIELD SHEET OR PROVIDE A <br />SEPARATE MEMBRANE SHEET <br />7/8" THK CEMENT PLASTER ON GALV. METAL <br />LATH ON 40 MIL. THICK SELF -ADHERING <br />SHEET WATERPROOFING <br />EXISTING STRUCTURE BEYOND <br />5/8- DENS -GLASS GOLD (OR APPROVED <br />EQUAL) <br />R-1 I BATT INSULATION <br />6" STRUCTURAL METAL STUDS AT MAX. 16" <br />O.C. <br />5/80 M.R. GYPSUM BOARD <br />CASING BEAD <br />CASING BEAD AND SEALANT <br />CEMENT PLASTER ON GALV. METAL LATH <br />ON EXIST. 80 CMU <br />THERMOPLASTIC POLYOLEFIN (TPO) ROOFING <br />MEMBRANE ON BONDING ADHESIVE ON 5/80 <br />M.R. COVER BOARD ON TAPERED R-24 RIGID <br />INSULATION ON NEW 1 1/2" METAL DECK <br />SEALANT <br />6# 30 <br />SLOPE DN. MIN. <br />4;; <br />1/4"PER FT. <br />.......... <br />Apparatus <br />Bay <br />ROOF TRANSITION DETAIL <br />3" = 011-0" <br />ADHERED OR WELDED FLASHING MEMBRANE. <br />EXTEND APPROX. 30 BEYOND FLANGE. <br />FASTENERS AT APPROX. 3" TO 60 O.C., <br />STAGGER <br />SEALANT <br />ALUM DRIP EDGE. COLOR TO BE SELECTED <br />BY ARCHITECT <br />2 x 4 P.T. CONT. WOOD BLOCKING <br />TPO FLASHING SHEET <br />so <br />CONT. CLEAT <br />CO) <br />2 x P.T. CONT. WOOD BLOCKING Uj <br />R-19 BATT INSULATION THERMOPLASTIC POLYOLEFIN �PO) <br />ROOFING MEMBRANE ON BONDING <br />CONT. CANT SEALANT ADHESIVE ON 5V M.R. COVER BOARD <br />ON R-24 RIGID INSULATION ON EXIST. <br />4 METAL DECK <br />----------- ---------- -- <br />THERMOPLASTIC POLYOLEFIN (TPO) ROOFING <br />MEMBRANE ON BONDING ADHESIVE ON 5/8' <br />M.R. COVER BOARD ON TAPERED R-24 RIGID <br />INSULATION ON EXIST. METAL DECK <br />SEALANT-----\ <br />MIN. <br />F, <br />4 <br />to <br />ADHERED OR WELDED FLASHING MEMBRANE. <br />EXTEND APPROX. 3" BEYOND FLANGE. <br />FASTENERS AT APPROX. 38 TO 6" O.C., <br />STAGGER <br />SEALANT <br />ALUM DRIP EDGE. COLOR TO BE SELECTED <br />BY ARCHITECT <br />2 x P.T. WOOD BLOCKING <br />A <br />LEANDRO A. ARROYO <br />— — — — — — — — — — — — — — — — — — — — — — — <br />A <br />FL. REG. NO. 12325 <br />7 <br />EXIST. STRUCTURE TO REMAIN <br />A <br />EXISTING M.R. COVER BOARD ON <br />METAL STUDS (FIELD VERIFY) <br />A <br />> <br />r <br />TPO FLASHING MEMBRANE ON <br />BONDING ADHESIVE CITY OF ZEPHYRHILLS <br />5180 GYPSUM BOARD <br />A <br />SEAM PLATE & FASTENER RENOVATION <br />OF <br />R-1 1 BATT INSULATION <br />FIRE RESCUE <br />CONT. CANT STATION NO. 2 <br />THERMOPLASTIC POLYOLEFIN "0) <br />ROOFING MEMBRANE ON BONDING <br />ADHESIVE ON 5ffiw M.R. COVER BOARD CONSTRUCTION <br />ON TAPERED R-24 RIGID INSULATION <br />ON EXIST. METAL DECK DOCUMENTS <br />SEALANT <br />------------ m"wommm"m <br />12-07-2012 <br />CB+A #1202 <br />m <br />R-19 BATT EXIST. STEEL JOIST <br />INSULATION TO REMAIN CANERDAY <br />(Area Above) <br />BELFSKY <br />(Area Above) <br />Kitchen <br />Corridor <br />120 <br />ARROYO <br />107 <br />ARCHITECTS <br />800 SECOND AVENUE SOUTH <br />ST. PETERSBURG. FL 33701 <br />(727) 823-W75 <br />'-'� <br />AA2WM7 <br />6 ROOF TRANSITION DETAIL <br />0 <br />ROOF DETAILS A804 <br />�A8� 3 "=11-0" <br />SCALE: AS NOTED <br />m <br />
The URL can be used to link to this page
Your browser does not support the video tag.