Laserfiche WebLink
EROSION CONTROL NOTES <br />0 <br />ui <br />ui <br />.21 <br />0 <br />E <br />04 <br />0 <br />CINI <br />04 <br />0 <br />0 <br />01 <br />V) <br />0 <br />z <br />z <br />Ld <br />Ld <br />w <br />LL- <br />I <br />N <br />I <br />04 <br />0 <br />0 <br />C <br />0 <br />(n <br />C <br />0 <br />a <br />-0 <br />0 <br />0 <br />m <br />0 <br />4- <br />V) <br />LL- <br />N <br />Lo <br />0 <br />E <br />CP <br />.0 <br />3: <br />0 <br />GENERAL <br />1. IT IS INTENDED THAT THE FLORIDA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" <br />(LATEST EDITION) BE USED WERE APPLICABLE FOR VARIOUS WORK, AND THAT WERE SUCH WORDING THEREIN REFERS TO THE STATE OF FLORIDA <br />AND ITS DEPARTMENT OF TRANSPORTATION AND PERSONNEL, SUCH WORDING IS INTENDED TO BE REPLACED NTH THAT WORDING WHICH WOULD <br />PROVIDE PROPER TERMINOLOGY, THEREBY MAKING SUCH "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTIONN AS THE STANDARD <br />SPECIFICATIONS FOR THIS PROJECT. THE CONTRACTOR AND SUBCONTRACTORS SHALL OBTAIN A COPY OF THE FLORIDA DEPARTMENT OF <br />TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" (LATEST EDITION) AND BECOME FAMILIAR NTH THE CONTENTS <br />PRIOR TO COMMENCING WORK. <br />2. IF WITHIN THAT PARTICULAR SEC11ON ANOTHER SECTION, ARTICLE OR PARAGRAPH IS REFERRED TO, IT SHALL BE PART OF THE STANDARD <br />SPECIFICATIONS ALSO. <br />3. ALL WORK SHALL BE PERFORMED IN A WORKMANUKE MANNER AND SHALL CONFORM NTH ALL APPLICABLE CITY, COUNTY, STATE AND FEDERAL <br />REGULATIONS AND/OR CODES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND LICENSES REQUIRED TO BEGIN <br />WORK. <br />4. THE CONTRACTOR SHALL GIVE THE ENGINEER 48 HOURS NOTICE PRIOR TO REQUESTING REQUIRED INSPECTIONS AND SHALL SUPPLY ALL <br />EQUIPMENT NECESSARY TO PROPERLY TEST AND OBSERVE THE COMPLETED WORK. THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS <br />FOR A PERIOD OF ONE YEAR FROM THE DATE OF PROJECT ACCEPTANCE, DURING MICH 11ME ALL FAULTY CONSTRUCTION AND/OR MATERIALS SHALL <br />BE CORRECTED AT THE CONTRACTOR'S EXPENSE. <br />5. THESE PLANS DO NOT INCLUDE ANY COMPONENTS FOR CONSTRUCTION SAFETY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION <br />SITE SAFETY INCLUDING MEANS AND METHODS. <br />6. ALL ELEVATIONS SHOWN ON THESE PLANS BASED ON BENCHMARK AS ESTABLISHED BY THE PROJECT SURVEYOR, UNLESS OTHERWISE INDICATED. <br />SEE SURVEY FOR BENCHMARK INFORMATION. <br />GENERAL NOTES_ <br />1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING ABOVE -GROUND, UNDERGROUND, AND ON THE SURFACE STRUCTURES <br />AND U11LITIES AGAINST ANY CONSTRUCTION OPERATION THAT MAY CAUSE DAMAGE TO SAID FACILITY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />CONSEQUENTIAL DAMAGES RESULTING FROM LACK OF PROTECTION. <br />2. SOME, BUT NOT NECESSARILY ALL, EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN <br />INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING <br />UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES MICH MIGHT BE OCCASIONED BY THE <br />CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. <br />3. THE CONTRACTOR SHALL GIVE ADEQUATE NOTIFICATION TO ALL AFFECTED U11UTY OWNERS FOR REMOVAL, RELOCATION, AND ALTERATION OF THEIR <br />EXISTING FACILITIES. <br />4. WERE ENCOUNTERED, UNSUITABLE MATERIAL SHALL BE REMOVED TO A DEPTH AND AREA DETERMINED BY THE ENGINEER AND BACKFILLED WITH <br />CLEAN GRANULAR SAND OR SELECT MATERIAL APPROVED BY THE ENGINEER. BACKFILLING SHALL BE IN LAYERS NOT GREATER THAN 8* THICKNESS <br />AND COMPACTED TO 100 PERCENT OF THE MAXIMUM DENSITY AS DETERMINED BY AASHTO T-99-C. <br />5. CONTRACTOR IS RESPONSIBLE FOR CHECKING ACTUAL SITE CONDITIONS BEFORE STARTING CONSTRUCTION. <br />6. STREET OR HIGHWAY RESTORATION WORK IS TO BE DONE AS PER LOCAL, COUNTY OR STATE AGENCY HAVING JURISDICTION. <br />7. THE CONTRACTOR SHALL COMPLY WITH ALL RULES AND REGULATIONS OF THE LOCAL, COUNTY, OR STATE AUTHORITIES REGARDING CLOSING OR <br />RESTRICTING THE USE OF PUBLIC STREETS OR HIGHWAYS. <br />8. TRAFFIC CONTROL ON ALL LOCAL, COUNTY AND STATE HIGHWAY RIGHTS -OF -WAY SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM <br />TRAFFIC CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS OF THE LOCAL, COUNTY OR STATE AGENCY HAVING JURISDICTION. <br />BURNING_ <br />1. PRIOR TO BURNING ANY MATERIAL ON SITE, CONTRACTOR SHALL OBTAIN PERMIT FROM PROPER AUTHORITY AND SUBMIT TO ENGINEER. <br />DISTURBED AREAS. <br />1. ALL AREAS DISTURBED WITHIN RIGHT OF WAY BY CONSTRUCTION SHALL BE SEEDED AND MULCHED OR SODDED AS SPECIFIED BELOW - <br />SEEDING AND MULCHING: <br />UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL, AFTER FINAL GRADING AND CLEANUP OF ALL DISTURBED AREAS, ESTABLISH A STAND OF <br />GRASS BY SEEDING AND MULCHING IN ACCORDANCE NTH SECTION 570 OF THE STANDARD SPECIFICATIONS. THE CONTRACTOR SHALL WATER <br />THE SEEDED AREA TO MAINTAIN MOISTURE LEVELS FOR OPTIMUM GROWTH FOR AT LEAST 2 WEEKS OR UNTIL THE GRASS IS ESTABLISHED. <br />WITHIN THE LIMITS DELINEATED IN THE PLANS. THE CONTRACTOR SHALL., AFTER FINAL GRADING AND CLEANUP, ESTABLISH A STAND OF GRASS <br />BY FURNISHING AND PLACING SOD IN ACCORDANCE WITH SECTION 575 OF THE STANDARD SPECIFICATIONS. THE CONTRACTOR SHALL WATER <br />THE SODDED AREA TO MAINTAIN MOISTURE LEVELS FOR OPTIMUM GROWTH TO ASSURE A HEALTHY STAND OF GRASS. SOD SHALL BE ROLLED <br />AND TOP DRESSED AS REQUIRED BY THE ENGINEER. <br />GRADING <br />1. REFER TO PLANS FOR CLEARING LIMITS AND TEMPORARY EROSION CONTROL DEVICES TO BE INSTALLED PRIOR TO COMMENCING GRADING. <br />2. THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE. AND PLACE. COMPACT, AND MOISTURE CONDITION ALL FILL PER THE PROJECT <br />GEOTECHNICAL ENGINEER'S SPECIFICATIONS. THE FILL MATERIAL TO BE USED SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR To <br />PLACEMENT. <br />3. ALL MATERIALS USED FOR BACKFILL SHALL BE FREE OF WOOD, ROOTS, ROCKS, BOULDERS OR ANY OTHER NON -COMPATIBLE SOIL TYPE MATERIAL. <br />UNSATISFACTORY MATERIALS ALSO INCLUDE MAN-MADE FILLS AND REFUSE DEBRIS DERIVED FROM ANY SOURCE. <br />4. PROPOSED CONTOURS AND GUTTER GRADIENTS ARE APPROXIMATE. PROPOSED SPOT ELEVATIONS ARE TO BE USED IN CASE OF DISCREPANCY. <br />STAKING_ <br />1. IF CONSTRUCTION STAKING IS PERFORMED BY THE OWNER, LOSS OR DISTURBANCE OF CONTROL POINTS DUE TO NEGLIGENCE BY THE <br />CONTRACTOR WILL BE REPLACED AT THE CONTRACTOR'S EXPENSE. <br />STABILIZING_ <br />1. STABILIZED SUBGRADE SHALL BE CONSTRUCTED TO THE FLORIDA BEARING VALUE (FBV) OR UMEROCK BEARING RATIO (LBR) AS PER PLAN FOR <br />THE DEPTH AND LIMITS SHOWN ON THE PLAN AND AS SPECIFIED BY THE GEOTECHNICAL ENGINEER. STABILIZED SUBGRADE SHALL BE CONSTRUCTED <br />IN ACCORDANCE NTH SECT10N 160 OF THE STANDARD SPECIFICATIONS. <br />2. ALL STABILIZED AREAS SHALL BE COMPACTED TO AT LEAST 98% OF THE MAXIMUM DENSITY AS DETERMINED BY AASHTO T-180. <br />ROCK BASE <br />1. ROCK BASE SHALL BE CONSTRUCTED PER THE GEOTECHNICAL ENGINEER'S RECOMMENDA11ON OF EITHER LIMEROCK MATERIAL IN ACCORDANCE <br />WITH SECTION 911 OF THE STANDARD SPECIFICATIONS. <br />2. LIMEROCK BASE SHALL BE CONSTRUCTED IN ACCORDANCE NTH SECTION 200 <br />3. ROCK BASE SHALL BE CONSTRUCTED TO THE DEPTH AND LIMITS AS SHOWN ON THE PLAN AND AS PER THE GEOTECHNICAL ENGINEER'S <br />RECOMMENDATIONS. THE ROCK BASE SHALL BE COMPACTED TO AT LEAST 98% OF THE MAXIMUM DENSITY AS DETERMINED BY AASHTO T-180 AND <br />SHALL BE PRIMED. <br />PRIME AND TACK COAT. <br />1. PRIME AND TACK COATS FOR THE BASE COURSE SHALL BE IN ACCORDANCE WITH SEC11ON 300 OF THE STANDARD SPECIFICATIONS. <br />ASPHALTIC CONCRETE SURFACE COURSE (A <br />1. ACSC (SEE PLAN FOR TYPES) SHALL BE CONSTRUCTED TO THE DEPTH AND LIMITS SHOWN ON THE PLAN IN ACCORDANCE WITH SECTIONS 320, <br />330, AND 331 OF THE STANDARD SPECIFICATIONS UNLESS OTHERWISE SPECIFIED. <br />SIGNING AND PAVEMENT MARKING_ <br />1. ALL PARKING SPACES, NTH THE EXCEPT10N OF THE HANDICAPPED PARKING SPACES, SHALL BE MARKED IN NAITE, RETRO-REFLEC11VE TRAFFIC <br />PAINT AND BE IN ACCORDANCE WITH SECTION 710 OF THE STANDARD SPECIFICATIONS. <br />2. ALL HANDICAPPED PARKING SPACES SHALL BE PROPERLY SIGNED AND MARKED IN ACCORDANCE WITH THE FDOT STANDARD INDEX 17346. <br />3. WHERE APPLICABLE, ALL COMPACT SPACES SHALL BE MARKED "COMPACT" ON THE STALL OR WHEEL STOP. <br />PAVEMENT TESTING <br />1. THE CONTRACTOR SHALL RETAIN THE SERVICES OF AN OWNER APPROVED INDEPENDENT TESTING LABORATORY TO CONDUCT ALL <br />REQUIRED TESTS ON SUBGRADE, BASE AND SURFACE COURSE MATERIALS. TEST RESULTS MUST BE SUBMITTED PRIOR TO ANY REQUEST <br />FOR PAYMENT ON THE ABOVE ITEMS. <br />THE SCHEDULE FOR TESTING THE PAVEMENT SHALL BE AS FOLLOWS: <br />SUBGRADE: <br />1. FLORIDA BEARING VALUE, OR UMEROCK BEARING RATIO (LBR) TESTS SHALL BE TAKEN AT INTERVALS OF NOT MORE THAN 200 <br />FEET. OR CLOSER AS MAY BE REQUIRED IN THE EVENT OF VARIATIONS IN SUBSOIL CONDITIONS. <br />2. DENSITY TESTS SHALL BE TAKEN AT INTERVALS OF NOT MORE THAN 200 FEET OR CLOSER AS MAY BE REQUIRED. <br />BASEe <br />1. DENSITY TESTS SHALL BE TAKEN AT INTERVALS OF NOT MORE THAN 500 FEET OR CLOSER AS MAY BE REQUIRED. <br />2. ALL TESTING SHALL BE TAKEN IN A STAGGERED SAMPLING PATTERN FROM A POINT 12 INCHES INSIDE THE LEFT EDGE. TO THE <br />CENTER, TO A POINT 12 INCHES INSIDE THE RIGHT EDGE OF THE ITEM TESTED. <br />3. IF ANY TEST INDICATES THAT THE WORK DOES NOT MEET THE SPECIFICATIONS, THE SUBSTANDARD ITEM SHALL BE REWORKED OR <br />CORRECTED AND RETESTED, AT THE CONTRACTOR'S EXPENSE, UNTIL THE PROVISIONS OF THESE SPECIFICATIONS ARE MET. <br />4. ALL TESTS SHALL BE PAID FOR BY 'ME CONTRACTOR. <br />SHOP DRAWING SUBMITTALS. <br />THE FOLLOWING INFORMATION AND/OR DRAWINGS SHALL BE SUBMITTED TO THE PROJECT ENGINEER AND JURISDICTIONAL AGENCY PRIOR <br />TO BEGINNING WORK: <br />1. INFORMATION ON THE PIPE AND CULVERTS, INDICATING THE TYPE, CLASS, SIZE AND OTHER RELEVANT INFORMATION. <br />2. ASPHALT AND CONCRETE MIX DESIGN. <br />3. DOCUMENTATION ON ALL OTHER MATERIALS BEING USED INCLUDING, BUT NOT LIMITED To. FILTER FABRIC. GUARDRAILS, <br />CONCRETE, STEEL POSTS, CURING COMPOUND AND JOINT MATERIAL. INLETS, MANHOLES, PRESSURE PIPE, FITTINGS, LIFT <br />STATION. HYDRANTS, ETC. <br />4. MAINTENANCE OF TRANSPORTATION, *MOr, IF REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING A <br />MAINTENANCE OF TRAFFIC PLAN IN ACCORDANCE WITH THE LOCAL, COUNTY AND STATE GUIDELINES AND SECURING THE <br />APPROPRIATE APPROVALS FROM THE JURISDICTIONAL AGENCIES TO IMPLEMENT THE PLAN. <br />DRAINAGE SPECIFICATIONS_ <br />1. STORM INLETS AND MANHOLES SHALL BE CONSTRUCTED IN GENERAL ACCORDANCE NTH SEC11ON 425 OF THE STANDARD <br />SPECIFICATIONS. <br />2. ALL REINFORCING STEEL TO BE ASTM A 615 (LATEST REVISION) GRADE 40 FYP=40,000 PSI, AND SHALL BE HANDLED AND PLACED <br />IN ACCORDANCE NTH THE AMERICAN CONCRETE INSTITUTE (ACI) 318 (LATEST REVISION). <br />3. PRECAST CONCRETE MANHOLES AND STORM INLETS ARE TO BE USED (ONLY AFTER THE ENGINEER'S REVIEW OF THE <br />MANUFACTURER'S SHOP DRAWINGS). <br />4. STORM SEWER CONSTRUCTION SHALL BE IN ACCORDANCE NTH SEC11ON 430 AND RELATED SECTIONS OF THE STANDARD <br />SPECIFICATIONS. <br />5. THE LOCATIONS OF STORM SEWER STRUCTURES SHOWN ON THESE PLANS (AND PROVIDED IN ASSOCIATED AUTOCAD FILES) ARE <br />APPROXIMATE. THE CONTRACTOR SHALL STAKE ALL CURB INLET STRUCTURES SUCH THAT INLET TOPS ALIGN HORIZONTAL! Y WITH <br />PROPOSED CURB LOCATIONS. <br />CONCRETE- <br />1. UNLESS OTHERWISE SPECIFIED OR INDICATED, ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 3000 <br />PSI. ALL WORK SHALL COMPLY NTH THE CURRENT EDITION OF THE AMERICAN CONCRETE INSTITUTE (ACI) BUILDING CODE AND THE <br />APPLICABLE BUILDING CODES HAVING JURISDICTION IN THE AREA. <br />PRECAST INLETS. <br />1. ALL STORM INLETS SHALL BE PRECAST REINFORCED CONCRETE IN ACCORDANCE WITH THE DETAILS SHOWN HEREIN. TYPE 11 <br />PORTLAND CEMENT SHALL BE USED IN THE CONCRETE MIX. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS <br />OF 4000 PSI. <br />CULVERT PIPES_ <br />1. REINFORCED CONCRETE PIPE (RCP) SHALL BE IN ACCORDANCE WITH SECTION 941 OF THE STANDARD SPECIFICATIONS. <br />2. CORRUGATED ALUMINUM PIPE (CAP) SHALL BE IN ACCORDANCE NTH SECTION 945 OF THE STANDARD SPECIFICATIONS. <br />3. HIGH DENSITY POLYETHYLENE PIPE (HDPE) SHALL BE IN ACCORDANCE WITH SECTION 948 OF THE STANDARD SPECIFICATIONS. <br />r <br />CONSTRUCTION OBSERVATION <br />THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER, AN INDEPENDENT TESTING LABORATORY AND THE APPLICABLE JURISDICTIONS <br />AT LEAST 48 HOURS PRIOR TO PERIODS OF THE FOLLOWING CONSTRUCTION ACTIVITIES: <br />DRAINAGE <br />1. LAYING OF PIPE (BEFORE BACKFILL). <br />2. ALL DRAINAGE STRUCTURES AND PIPE LAYING COMPLETED. <br />3. CONSTRUCTION AND STABILIZATION OF RETENT10N AREAS AND SWALES. <br />4. SEEDING, MULCH, AND SODDING IN AREAS WERE EROSION IS EVIDENT OR WHERE PLANS SO IDENTIFY. <br />UllLITIES <br />1. LAYING OF PIPE (BEFORE BACKFILL). <br />2. JACK AND BORING OR DIRECT10NAL BORING. <br />CONCRETE <br />1. COMPLETION OF FORMING FOR CURBING, SIDEWALK, AND RETAINING WALLS BEFORE PLACEMENT OF CONCRETE. <br />PAVEMENT <br />1. LINE AND GRADE (CERTIFICATION). <br />2. SUB -BASE (PRIOR TO ADDING BASE MATERIAL). <br />3. BASE (PRIOR TO PRIMING AND SAND SEAL). <br />4. BASE (AFTER PRIMING, SAND SEAL, AND BEFORE PLACING ASPHALT). <br />5. ASPHALT OR CONCRETE PAVING. <br />6. TURN OUT CONSTRUCTION ON TO CITY. COUNTY OR STATE ROAD (ABOVE INSPEC11ONS APPLY). <br />CLEAN-UP. <br />1. THE CONTRACTOR MUST PROVIDE CLEAN-UP OF EXCESS CONSTRUCTION MATERIAL UPON COMPLETION OF THE PROJECT. THE SITE <br />MUST BE LEFT IN A NEAT, CLEAN, GRADED CONDITION. <br />1. THE STORMWATER POLLUTION PREVENTION PLAN (-SWPPP-) IS COMPRISED OF THIS EROSION CONTROL PLAN, THE STANDARD <br />DETAILS, THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND ALL <br />SUBSEQUENT REPORTS AND RELATED DOCUMENTS. <br />2. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED NTH STORMWATER POLLUTION PREVENT10N SHALL OBTAIN A COPY OF <br />THE STORM WATER POLLUTION PREVENTION PLAN AND THE STATE OF FLORIDA NATIONAL POLLUTANT DISCHARGE ELIMINATION <br />SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS. <br />3. THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THE SWPPP. ADDITIONAL BEST <br />MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO THE OWNER <br />THROUGHOUT ALL PHASES OF CONSTRUCTION. <br />4. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR <br />MANUAL OF PRACTICE, AS APPLICABLE. THE CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY THE <br />PERMITTING AGENCY OR OWNER. <br />5. EROSION CONTROL PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY <br />IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES. <br />6. THE CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL <br />PERMIT. <br />7. CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA MICH SHALL ALSO BE USED AS THE <br />EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, <br />OFFICE TRAILERS, AND TOILET FACILITIES. <br />8. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE DETAINED AND PROPERLY <br />TREATED OR DISPOSED. <br />9. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY <br />AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. <br />10 THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON SITE. THE USE OF MOTOR OILS AND OTHER PETROLEUM <br />BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. <br />11. RUBBISH, TRASH, GARBAGE, UTTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS. <br />MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORM WATER DISCHARGE <br />INTO DRAINAGE DITCHES OR WATERS OF THE STATE. <br />12. ALL STORM WATER POLLU11ON PREVENTION MEASURES PRESENTED ON THE PLAN, SHALL BE INITIATED AS SOON AS <br />PRACTICABLE. <br />13. STABILIZATION PRACTICES SHOULD BE IN111ATED AS SOON AS PRACTICAL, BUT IN NO CASE MORE THAN 7 DAYS WHERE <br />CONSTRUC71ON HAS TEMPORARILY CEASED. <br />14. DISTURBED PORTIONS OF THE SITE WERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY <br />SEEDED. THESE AREAS SHALL BE SEEDED NO LATER THAN 7 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRED IN <br />THESE AREAS. REFER TO SECT10N 981 OF THE STANDARD SPECIFICATIONS FOR SEEDING AND MAINTENANCE REQUIREMENTS. <br />15. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION ENTRANCES IS NOT SUFFICIENT TO REMOVE THE <br />MAJORITY OF DIRT OR MUD, THEN THE 11RES MUST BE WASHED BEFORE THE VEHICLES ENTER A PUBLIC ROAD. IF WASHING IS <br />USED, PROVISIONS MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF THE <br />SITE. <br />16. ALL MATERIALS SPILLED. DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST <br />BE REMOVED AS SOON AS POSSIBLE. <br />17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING SEDIMENT IN THE DETENTION POND AND ANY SEDIMENT THAT <br />MAY HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE STABILIZATION OF THE SITE. <br />18. ON -SITE & OFFSITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION <br />THROUGH IMPLEMENTATION OF BEST MANAGEMENT PRACTICES. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE NOTED ON <br />THE EROSION CONTROL PLAN AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. <br />19. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND <br />EROSION. <br />20. DUE TO GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES, ETC.) TO PREVENT EROSION. <br />21. ALL CONSTRUCT10N SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES <br />FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION. <br />MAINTENANCE <br />ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORMWATER POLLUTION <br />PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A <br />COMPLETED PHASE OF WORK OR FINAL STABIUZA11ON OF THE SITE. ALL EROSION AND SEDIMENTATION CONTROL <br />MEASURES SHALL BE CHECKED BY A QUALIFIED PERSON AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND <br />WITHIN 24 HOURS OF THE END OF A 0.5w RAINFALL EVENT, AND CLEANED AND REPAIRED IN ACCORDANCE NTH THE <br />FOLLOWING: <br />1. INLET PROTECT10N DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF <br />UNDERMINING, OR DETERIORATION. <br />2 . ALL SEEDED AREAS SHALL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD <br />BE FERTILIZED, WATERED AND RESEEDED AS NEEDED. FOR MAINTENANCE REQUIREMENTS REFER TO SECTION 981 OF THE <br />STANDARD SPECIFICATIONS. <br />3. SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF DAMAGED. SEDIMENT SHALL BE REMOVED FROM <br />THE SILT FENCES MEN IT REACHES ONE-HALF THE HEIGHT OF THE SILT FENCE. <br />4. THE CONSTRUCTION ENTRANCES SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF <br />MUD ONTO PUBLIC RIGHTS -OF -WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE CONSTRUCTION ENTRANCES AS <br />CONDITIONS DEMAND. <br />5. THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION (SUITABLE FOR PARKING AND <br />STORAGE). THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AS CONDITIONS DEMAND. <br />6. OUTLET STRUCTURES IN THE SEDIMENTATION BASINS SHALL BE MAINTAINED IN OPERATIONAL CONDITIONS AT ALL <br />TIMES. SEDIMENT SHALL BE REMOVED FROM SEDIMENT BASINS OR TRAPS MEN THE DESIGN CAPACITY HAS BEEN <br />REDUCED BY 55 CY/ACRE. <br />7. ALL MAINTENANCE OPERATIONS SHALL BE DONE IN A 11MELY MANNER BUT IN NO CASE LATER THAN 2 CALENDAR <br />DAYS FOLLOWING THE INSPECTION. <br />RECORD DRAWINGS. <br />1. THE CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS ON THE PROJECT SITE AT ALL TIMES MICH SHALL BE ANNOTATED BY THE <br />CONTRACTOR DEPICTING ANY CHANGES MADE IN THE FIELD MICH DIFFER FROM THE CONTRACT DRAWINGS. <br />2. RECORD DRAWINGS SHALL INCLUDE, BUT NOT BE LIMITED TO, CULVERT LENGTHS, INVERT AND TOP ELEVATIONS OF STORM SEWER <br />INLETS, STORM AND SANITARY SEWER MANHOLES, LIFT STATIONS, WEIRS AND CONTROL STRUCTURES. A RECORD DRAWING, IF REQUIRED, <br />OF THE TOP ELEVATION OF THE BASE MATERIAL GRADING AT ALL LOCATIONS OF THE PROPOSED FINAL GRADES SHALL BE PREPARED AND <br />SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO THE INSTALLATION OF ASPHALT OR FINAL SURFACE. THE CONTRACTOR SHALL <br />PREPARE A RECORD DRAWING VERIFYING ALL PROPOSED GRADES OF EACH STORM WATER BODY AND CONTAIN A MINIMUM OF (2) CROSS <br />SECTIONS IN EACH STORM WATER BODY. <br />3. THE CONTRACTOR SHALL SUBMIT COMPLETE AND FINAL RECORD DRAWINGS TO THE ENGINEER UPON COMPLE11ON OF THE PROJECT AND <br />PRIOR TO FINAL INSPECT10N AND FINAL PAYMENT. RECORD DRAWINGS SHALL BE CERTIFIED BY A SURVEYOR REGISTERED IN THE STATE <br />OF FLORIDA. <br />CALL 48 HOURS <br />BEFORE YOU DIG <br />IT'S THE LAW! <br />DIAL 811 <br />SUNSHINE STATE ONE CALL OF FLORIDA, INC. <br />U 04 <br />z't C4 <br />Zi. i;i 43 <br />�Pn OD <br />a 1 C4 <br />'2 <br />c3m-L) F= <br />00,3 0 <br />F3'N- <br />:3 1 s <br />22 IS g <br />V4 iz3 � . V) <br />.44i5a P'� <br />CK to W <br />sa <2-IN <br />:2 Mlllrl, <br />a i3 C000 i < <br />zCoN 0 <br />r <br />P <br />ix <br />04 <br />C4 r- <br />+ U) <br />U) W <br />LL <br />-i <br />w <br />m Q <br />00 <br />w >- <br />w 0 <br />z w <br />< <br />L <br />04 <br />4t <br />z <br />0 <br />U) z <br />w 0 <br />w <br />ILL <br />Cl) z <br />0 <br />< <br />M LLJ <br />CL Z <br />ui ui <br />N <br />0 <br />Lu <br />0 <br />z <br />Cn <br />L I < <br />0 <br />N, <br />0 <br />w <br />o- <br />w <br />V) <br />uj <br />CM0 <br />0 <br />b <br />Lu <br />Z <br />Ir <br />0 < <br />0 n <br />-i Fr <br />C.) 0 <br />j <br />�-t LL <br />Ir <br />0 <br />OWTV <br />8/13/2012 <br />120501 <br />CO2 <br />