PLUMBING 5PECIFICATIONS
<br />0
<br />.0
<br />�L--
<br />C-)
<br />U)
<br />E
<br />C14
<br />cn
<br />a)
<br />CD
<br />U)
<br />C-)
<br />cn
<br />0_
<br />a)
<br />cn
<br />U)
<br />04
<br />U-)
<br />cn
<br />A)
<br />2
<br />Q-
<br />E
<br />C=)
<br />r--:
<br />'r7
<br />00
<br />co
<br />'117
<br />C%4
<br />PART I GENERAL
<br />1.01 DE5GRIPTION
<br />A. TIE NOW INGLUDE5 THE PROVIDING OF ALL LABOR. MATERIAL5, AND 5ERVIGE5 NEGE55ARY TO IN5TALL
<br />THE INDICATED 5Y5TEM5, GOMPLETE WITH HAN6ER5,5UPPORT5, EQUIPMENT AND GONNECTION5 REQUIRED
<br />TO ANY FIXTURE OR EQUIPMENT INDICATED OR 5PECIFIED.
<br />B. THE WORK INGLUVE5, BUT 15 NOT LIMITED TO THE FOLLOWING:
<br />1. 5ANITARY WA5TE AND VENT PIPING 5Y5TEM5.
<br />2. DOME5TIG HATER PIPING 5Y5TEM5.
<br />I D2 ALL V40RK
<br />A. 5HALL BE PERFORMED BY MECHANIG5 5KILLED IN THE PARTICULAR CLA55 OF WORK AND ALL EQUIPMENT
<br />5HALL BE IN5TALLED IN 5TRIGT ACAC,,ORDANGE WITH T14E MANUFACTURERS REGOMMENDATION5. THE WORK
<br />5HALL BE COORDINATED WITH OTHER TRADE5 AND RE5PON51BILITIE5 E5TABL15HED 50 THAT THE WORK
<br />5HALL 13E COMPLETED HITHOUT DELAY5 OR INTERFERENCE WITH 56HEDULE5.
<br />1.03 CUTTING AND PATCHING
<br />A. WHERE REQUIRED, THE CONTRACTOR 94ALL DO THE GUTTING AND PATGHI% U51% HORKER5 WHO ARE
<br />5KILLED IN THE TRADE INVOLVED. THE GOMPLETED V40RK 5HALL PRE5ENT A FIN15HED WORKMANLIKE
<br />APPEARANGE.
<br />1.04 PIPING AND DRAHING-5
<br />A. THE DRMIN6,5 ARE DIAGRAMMATIC AND NOT INTENDED TO 5WW IN DETAIL All FEATURE5 OF THE WORK. THE
<br />LOCATION OF ALL PIPING 5HALL BE COORDINATED TO DETERMINE THAT IT GLEAR5 ALL OPENIN65 AND
<br />5TRUGTURAL MEMBER5, THAT PIPING INDICATED A5 GONGEALED GAN 13E PROPERLY GONCEALED IN WALL5
<br />OR PARTITION5 OF FIN15HED ROOM5, AND THAT IT DOE5 NOT INTERFERE HITH LIGHT5 OR EQUIPMENT HAVING
<br />FIXED LOGATION5. GONGEAL ALL PIPING EXCEPT WHERE OTHERW15E INDIGATED.
<br />1.05 OPENIN65 IN EXI5TI% GONGRETE GON5TRUGTlON
<br />A. 5HALL BE GORE DRILLED OR GUT WITH MA50NRY 5AW. PNEUMATIC TOOL5 WILL NOT BE PERMITTED. THE
<br />INTEGRITY OF THE FIRE RATING OF HALL5, CEILING5, AND FLOOR5 5HALL BE MAINTAINED AND 5HALL MEET
<br />LIFE 5AFETY AND LOGAL GODE5.
<br />I.Ob EXGAVATION AND BAGKFILL
<br />A. IN AGGORDANGE WITH THE CIVIL REQUIREMENT5
<br />1.0`7 TRAP5
<br />A. EAGH FIXTURE, EQUIPMENT DRAIN OR FLOOR M%IN 5HALL BE 5EPARATELY TRAPPED, UNLE55
<br />OTHERH15E INDICATED OR 5PEGIFIED.
<br />I.Ob UNION5
<br />A. IN5TALL ON ONE 51DE OF EAGH VALVE OR GONNEGTION5 TO EQUIPMENT
<br />I.Oq 5HOP DRAHINC-6
<br />A. A5 NEEDED
<br />PART 2 - PRODUCT5
<br />2.01 GENERAL
<br />A. ALL MATERIAL5 5HALL BE NEW AND FREE FROM ALL DEFECT5. THE5E 5PEGIFIGATION5 L15T ALL OF THE
<br />AGGEPTA13LE MATERIAL5 FOR A 61VEN 5ERVIGE, ONE OF WHICH 5HALL 13E U5ED UNLE55 OTHEI;?,HI5E
<br />5PEGIFIGALLY NOTED.
<br />B. THE QUALITY AND WEI 6HT OF MATERIAL5 FURN15HED AND IN5TALLED 5HALL COMPLY V41TH THE REOUIREMENT5
<br />OF THE APPROPRIATE 5TANDARD5 OF THE AMERIGAN 50CIETY FOR TE5TIN6 AND MATERIAL5 (A5TM), LIFE
<br />5AFETY GODE AND THE LOGAL PLUMBINC-7 GODE.
<br />2.02 PIPE AND FITTIN65
<br />A. GENERAL: ALL PIPING 5HALL BE RUN 5TRAIG-HT, PLUMB AND PROPERLY GRADED IN DIRECTION INDICATED
<br />ON THE PRAHING-5. CUT PIPE 5HALL BE 5QUARELY CUT AND PROPERLY REAMED TO REMOVE ALL GUTTING-5
<br />AND E3URR5 BEFORE MAKINC7UP THE JOINT5. FITTIN66 AND NIPPLE5 5HALL BE OF THE 5AME MATERIAL5 A5
<br />THE PIPE.
<br />B. GPVG 5GHEDULE &0 PIPE 94ALL 13E 50ITABLE FOR U5E AT MAXIMUM WORKING PRE55URE OF 150 P51. ALL
<br />PIPE MU5T MEET THE REQ1JIREMENT5 OF A5TM D-11M, A5TM F-441, AND N5F 5TANDARD 14. 5OCKET TYPE
<br />FITTINC-6 5HALL MEET A5TM F-4341. THREADED FITTIN65 5HALL MEET A5TM f-431 WITH THREADED BRA55
<br />IN5ERT BY IPT/HARRIN6TON OR AGGEPTABLE ALTERNATIVE. 50LVENT WELD MATERIAL 5HALL BE 5OLVENT
<br />GEMENT MEETING THE REQUIREMENT5 OF A5TM F-4q3.
<br />G. PLA5TIG PIPE AND FITTIN65: PIPE 5HALL BE 5GHEPULE 40 PVG GONFORMIN6 TO A5TM 005. FITTIN65
<br />5HALL BE PVG GONFORMIN6 TO A5TM D24bb. 5OLVENT GEMENT 5HALL CONFORM TO A5TM D25b4.
<br />GELLULAR GORE PIPIN 6 15 NOT AGGEPTABLE.
<br />2.03 VALVE5
<br />A. GENERAL: VALVE NUMBER5 ARE 5PECIFIED TO E5TABLI5H TYPE AND QUALITY. EQUIVALENT VALVE5 WILL BE
<br />GON510ERED FOR APPROVAL.
<br />B. DOME5TIG WATER PIPING:
<br />1. GATE VALVE5: 2" AND 94ALLER - GRANE NO. 42b OR NO. 43& A5 APPLICABLE 2-1/2'
<br />IP5 OR LARGER - CRANE #465-1/2 OR #461 A5 APPLIGABLE.
<br />2. CHEGK VALVE5: 2" IP5 OR 5MALLER - CRANE #31. 2-1/2" IP5 OR LARGER - CRANE 313.
<br />3. H05E BIBB: CHIGA60 FAUGET5 #3&1 WITH KATT5 NO. bA BAGKFLOH PREVENTER. KEY
<br />OPERATED HANDLE5.
<br />4. QUARTER TURN 5TOP VALVE: BRA55GRAFT - 1/4 TURN BALL 5TOP (KT 5ERIE5). MG6UIRE
<br />MFO. - CONVERTIBLE 1/4 TURN BRA55 BALL VALVE (LFI3V 5ERIE5). KEENEY MFD. QUARTER
<br />TURN VALVE (PGLF 5ERIE5). LEAD FREE, 13RA55 BALL, 5TEM AND 1300Y GON5TRuGTION,
<br />CHROME PLATED FOR GORRO51ON PROTEGTION.
<br />2.04 GLEANOUT5
<br />A. WHERE INDICATED AND AT THE BA5E OF ALL R15ER5. ADDITIONAL GLEANOUT5 AT THE GONTRAGTORV
<br />OPTION FOR THE GGNVENIENCE OF TE5TI% AND ERECTION. GLEANOUIT5 1145TALLED IN FLOOR5 HITH
<br />WATERPROOF MEMBRANE 5HALL BE PROVIDED HIT14 CLAMPING RIN65. IN5TALL GLEANOUT FRAME5 AND
<br />GOVER5 TO BE FLL15H WITH THE ADJOINING ARGHITEGTURAL FIN15HIN& MATERIAL. GLEAN-OUT5 LOGATED
<br />OUT51DE THE BUILDING 5HALL 13E THO-HAY TYPE. J05AM MODEL NUMBER5 ARE INDIGATED BELOW.
<br />GOMPARABLE MODEL NUMBER513Y HADE OR J. R. 5MITH HILL BE GON51DERED FOR APPROVAL.
<br />B. GLEANOUT PLIk�6: J05AM 5&540- 20.
<br />G. GLEANOUT5 IN WALL: J05AM 5blqO- 22.
<br />D. GLEANOUT5 IN CONCRETE AND TERRAZZO FLOOR FIN15HE5: J05AM 5&4(OOA- 2.
<br />2.05 PIPE HAN67ER5
<br />A. HAN6ER5 5HALL BE OF THE GLEV15 TYPE, M55 5P-5b, TYPE 1.
<br />2.0(b WATER HAMMER ARRE5TOR5
<br />A. IN GONFORMANGE WITH PLUMBINC7 AND DRAINAGE IN5TITUTE NO. PDI-M-201 AND A55E 1010.
<br />2.01 PLUMBING FIXTURE5
<br />A. GENERAL: ALL PLUMBING FIXTURE5 5HALL 13E "FIR5T QUALITY". ALL ENAMELED IRON FIXTURE-5 5HALL HAVE
<br />A( ID RE515TINC-7 MITE ENAMEL. ALL FIXTURE5 AND FITTIN65 PROP05ED 5HALL BE FROM ONE
<br />MANUFAGTURER AND OF 51MILAR GHARAGTER. E5GUTGHEON5, HANDLE5, ETC., ON THE DIFFERENT FIXTURE5
<br />5HALL BE OF THE 5AME DE516N. ALL FIXTUIRE5 AND FITTIN&5 PROP05ED 5HALL BE 5"ITTED FOR
<br />APPROVAL WITH CATALOG GUT5 AND FULL DE5GRIPTION. ALL EXP05ED METAL AND PIPING NOT OTHERA15E
<br />5PEGIFIEO 5HALL 13E POL15HED GHROMIUM ON BRA55 OR BRONZE. ALL GOLD HATER �,UPPLY TO FIXTURE5
<br />5HALL BE PROVIDED WITH 5TOP5 OF THE L005E KEY TYPE.
<br />B. 5EE DE516N BA515 FOR FIXTURE 5PEGIFIGATION5. WHERE FIXTURE TYPE5 REFER TO TH05E MANUFACTURED
<br />BY AMERIGAN 5TANDARD, UNLE55 OTHERN15E NOTED, THE5E NUMBER5 ARE U5ED TO INDIGATE TYPE AND
<br />QUALITY Of FIXTURE5 DBIRED. FIXTURE5 OF EQUAL QUALITY MANUFAGTURED BY AMERICAN 5TANDARD,
<br />GRANE, ELJER OR KOHLER WILL BE GON51DERED FOR APPROVAL. HANGER 5UPPORT5 AND GARRIER5 5HALL
<br />BE IN5TALLED IN ACCORDANCE WITH MANUFACTURER5'RECOMMENE)ATION5.
<br />2.Oq THERMAL IN5ULATION
<br />A. GENERAL: NO IN50LATION 5HALL BE 1145TALLED UNTIL THE PIPING 5Y5TEM5 HAVE BEEN CHECKED AND FOUND
<br />FREE OF ALL I FAK5.5URFAGE5 5HALL BE GLEAN AND DRY BEFORE ATTEMPTING TO APPLY IN5ULATION.
<br />IN51JLATION 5HALL BE IN5TALLE0 BY A PROFE55IONAL IN50LATION GONTRAGTOR WITH ADEQUATE
<br />EXPERIENCE AND AL31LITY TO PERFORM THE WORK. THE GONTRAGTOr� 5HALL VERIFY THAT ALL MATERIAL5
<br />GOMPLY WITH THE 5PEGIFIGATION5.
<br />B. DOME5TIG WATER PIPING:
<br />1. MATERIAL: 5HALL 13E IN5ULATEI) WITH I' THICK JOHN5-MA% I,' I E FLAME 5AFE AF-T
<br />FIBER61LA55 PIPE Iff)ULATION.
<br />2. APPLICATION: PRIOR TO IN5TALLIN6 THE IW?ULATION, THE PRE5WRE RELEA5E PAPER
<br />5HALL BE REMOVED FROM THE JACKET LAP5. PIPE IN5ULATION 5HALL BE 5EGURED IN
<br />PLACE BY APPLYING PRE55URE TO THE PRE55URE 5EN51TIVE GL05URE 5Y5TEM. ELE3011115
<br />5HALL BE MULATED WITH JOHN5-MANVILLE UNIFIT PVG FITTING GOVER5. VALVE5 AND
<br />OTHER IRREGULAR 5HAPED FITTINC-6 5HALL BE IWA)LATED WITH PIPE MULATION
<br />5E6MENT5 AND FIN15HED HITH A 5KIM GOAT Of AIR DRYING JOHN5-MANVILLE 3-75
<br />GEMENT AND WHITE 6LA55 FABRIC, DIPPED IN F05TER5 30-60 COMING OR EQUAL.
<br />PART 3 EXEGUTION
<br />3.01 501L, HA5TE, AND VENT PIPING
<br />A. BURIED PIPING: 501L AND WA5TE PIPE AND FITTIN65 BELOW T14E FLOOR 5LAE3 AND THE BUILDING FIVE FOOT LINE 5HALL BE OF 5GHEDULE
<br />40 PVG PLA5TIG AND 5HALL BE PROVIDED P41TH A LOGATOR HIRE NO. 12 GAGE 1145TALLED PER MANUFAGTURE5'RECOMMENDATION5.
<br />B. ABOVE GRADE 501L, WA5TE, AND VENT PIPING AND FITTIN65 5HALL BE 5GHEDUl IF 40 PVG PLA5TIG.
<br />3.02 DOME5TIG WATER PIPING
<br />A. ALL PIPE AND FITTIN65 5HALL 13E 5GHEDULE 9>0 GPVG.
<br />3.03 CLEANING AND PROTEGTION OF PIPE
<br />A. BEFORE BEING PLACED IN P05ITION, PIPE AND FITTIN65 5HALL 13E GLEANED CAREFULLY. ALL PIPE 5HALL BE MAINTAINED IN A GLEAN
<br />GONDITION.
<br />3.04 PIPE IN TRENGHE5
<br />A. 5EHER AND HATER PIPING 5HALL BE PLACED IN 5EPARATE TRENGHE5.
<br />B. HATER PIPING 5HALL BE BURIED AT A DEPTH OF 51X INGHE5 13ELOH THE FR05T LINE OR A MINIMUM OF 12 INGHE5, MIGHEVER 15 GREATER.
<br />3.05 IN5TALLATION Of 5GREN-JOINTEDPIPIN65 (If U5ED)
<br />A. ALL PIPING 5HALL BE GUT AGGURATELY TO MEA5UREMENT5 E5TA1311-15HED BY THE GONTRAGTOR AND 5HALL BE WORKED INTO PLACE
<br />HITHOUT 5PRIN6IN6 OR FORGING. PROPER PROV15ION 5HALL BE MADE FOR THE EXPAN51ON AND CONTRACTION OF ALL PIPE LINE5. PIPE
<br />AND FITTIN65 5HALL BE FREE FROM FIN5 AND BURR5. 5GREW JOINT5 IN WATER PIPING 5HALL BE MADE WITH A LUBRICANT APPLIED ON
<br />THE MALE THREAD5 ONLY. THREAD5 5HALL BE FULL GUT AND NOT MORE THAN THREE THREAD5 ON THE PIPE 5HALL REMAIN EXPO5ED. ALL
<br />FERROU15 PIPE THREAD, AFTER BEING IN5TALLED AND TE5TED, 5HALL 13E GIVEN ONE GOAT OF RED LEAL) AND OIL PAINT. UNION5 AND
<br />UNION TYPE GONNEGTION5 AND 5HUT-OFF VALVE5 5HALL 13E PROVIDED FOR ALL FIXTURB AND EQUIPMENT READY FOR 015GONNEGTION.
<br />ON FERROU15 PIPE 3 INCHE5 IN DIAMETER AND 5MALLER, UNION5 5HALL 13E 150 POUND 5TEAM-HORKINC-PRE55LRE MALLEA13LE IRON
<br />GROUND JOINT TYPE. PIPE HUNG FROM GEILIN65 5HALL BE 5UPPORTED BY HEAVY, AD16TABLE HAN67ER5 GONFORMIN6 TO M55 5P-5q.
<br />ALL HANG-ER5 AND GOLLAR5 5HALL 13E OF 51ZE5 WITA13LE FOR THE HEI 6HT OF THE PIPE. ALL GHAW-7E5 IN 51ZE5 OF PIPE 5HALL BE
<br />MADE WITH REDUCING FITTINC-5.
<br />3.06 WATER HAMMER ARRE5TOR5
<br />A. WATER HAMMER ARRE5TOR5 5HALL 13E PROVIDED IN5TEAD OF 51TE-FABRIGATED AIR GHAMBER5, AND 5HALL 13E 5VE1? A5 REQUIRED
<br />AND IN5TALLED IN AGGORDANGE WITH MANUFACTURERS REGOMMENDATION5.
<br />3.01 5ANITARY 5Y5TEM5
<br />I 5ANITARY 5Y5TEM5 5HALL BE PROVIDED WHERE APPLICABLE, HITW FITTING-5 AND 1/13 OR Illb BEND5 OR COMBINATION Y AND I/B BENDS. ALL
<br />FIXTUIRE5 NOT 5PEGIFIED TO 13E PROVIDED WITH TRAP5 A5 INTEGRAL PART5 OF T�ER OUTFIT5 AND ALL DRAIN5 5HALL HAVE 5EPARATE
<br />TRAP5 WITH GLEANOUT5. HA5TE LINE5 5HALL NOT BE LE55 THAN 2 INGHE5 IN DIAMETER- ALL FIXTURE5 5HALL 13E INDIVIDUALLY VENTED, OR
<br />5HALL BE GONNECTED TO A VENTED 501L OR WA5TE LINE. UNLE55 INDIGATED OTHERH15E, 5ANITARY PIPING 5HALL FORM GIRGUIT OR LOOP
<br />VENT5 HITH NO DEAL) EN05 OR INVERTED 51PHON5. GIRGUIT OR LOOP VENT LINE5 5HALL 13E CONNECTED AT A HEIGHT OF NOT LE55 THAN 12
<br />INGHE5 ABOVE THE FIXTURE5 5ERVEL). HORIZONTAL VENT5 5HALL 5LOPE DOWN TO HA5TE OR 501L BRANCH OR5TAGK. HORIZONTAL 501L AND
<br />KA5TE PIPINGGENERALLY, 5HALL BE GRADED I/& INCH PER FOOT. VERTICAL 5TAGK5 5HALL BE EXTENDED FULL 51ZE A5 VENT5 TO NOT LE55
<br />THAN 12 INGHE5 ABOVE THE ROOF AND 5HALL BE PLACED IN P051TION BEFORE THE ROOFING 15 APPLIED. MERE PRAGTIGABLE, TWO OR MORE
<br />VENT LINE5 MAY BE GONNECTED AND EXTENDED A5 ONE PIPE THROUGH THE ROOF. GLEANOUT5 5HALL BE IN5TALLED AT THE FOOT OF EACH
<br />501L OR WA5TE LINE, AT GHAN6E5 IN DIREGTION IN THE LINE5, AND 44ERE INDIGATED; HOWEVER, WITHIN THE BUILDIN65, THE D15TANGE BETWEEN
<br />GLEANOUIT5 IN HORIZONTAL RUN5 5HALL IN NO GA5E EXCEED 50 FEET. GLEANOUT5 IN FLOOR5 5HALL BE EXTENDED FULL 51ZE TO THE FLOOR
<br />LEVEL HITH OUTLET5 FITTED WITH TRAP 5GREH5 WITH GOUNTER-5)NK GAP5. GLEANOUT5 5HALL BE PIPE 51ZE EXGEPT NO GLEAN OUT 5HALL
<br />EXCEED b INGHE5 IN DIAMETER. VENT FLA5141% AT THE ROOF 5HALL EXTEND NOT LE55 THAN b INCHE5 FROM THE VENT PIPE IN ALL
<br />DIREGTION5. LEAD FLA5HIN6 5HALL 13E TURNED DOWN INTO THE PIPE5 OR HUB5.
<br />3.0& WATER 5Y5TEM5
<br />A. WATER 5Y5TEM5 5HALL 13E IN5TALLE0 HITH A FALL TOHAR05 T14E 5HUT OFF VALVE OR THE LOHE5T FIXTURE. BRAN6HE5 FROM GOLD
<br />WATER LINE5 5HALL BE PROVIDED TO FIXTURE5 AND OUTLET5 A5 INDIGATED.
<br />3.04 HATER VALVE5
<br />A. WATER VALVE5 5HALL 13E IN5TALLEI? IN AGGE551BLE PLAGE5 AND 5HALL BE LOGATED A5 FALLOH5:
<br />1. VALVE WITH H05E CONNECTION ON THE BUILDING 51DE OF THE MAIN 5HUT OFF VALVE.
<br />2. 5HUT OFF VALVE ON EACH 5UPPLY TO EAGH FIXTURE NOT PROVIDED WITH GOMPRE55ION 5TOP.
<br />3. VALVE5 5HALL BE PROVIDED ON ALL BRANGHE5 5ERVIN6 MORE THAN ON FIXTURE.
<br />3.10 IN5TALLATION Of FIXTURE5
<br />A. GONNEGTION5 13ETHEEN HATER CL05ET5 AND THE FLAN67E5 ON 501L PIPE 5HALL BE MADE 6A5 AND WATER T16HT V41TH ONE PIEGE
<br />5PEGIAL MOLDED 6A5KET. All BULK MATERIAL INCLUDING PUTTY AND PLA5TIG55HALL NOT BE U5ED. FLOOR PRAIN5 5HALL BE 5EGURED
<br />TO THE WATERPROOFING OR FLA5HIN6 IN A WATER TIGHT MANNER. EXACT ROU6H-IN LOGATION5 FOR FIXTURE5 AND FLOOR DRAIN5
<br />5HALL BE DETERMINED FROM THE ARGHITECTURAL PRANINC75.
<br />3.11 5UPPORT!5 AND FA5TENIN65
<br />A. PLUMBING FIXTURE-5, TRIMMIN65, AGGE55ORIE5 AND APPURTENANGE5 5HALL BE5ECURED TO GONCRETE BY 1/4 INGH BRA55 EXPAN51ON
<br />BOLT5 NOT LE55 THAN 4 INGHE5 LONG, AND TO 6YP5UM HITH 5TEEL PLATE5 Ilb INCH THIGK, b INGHE5 WIDE AND NOT LE55 THAN 24
<br />INGHE5 LONG AT THE BAGK OF THE THROUGH BOLT5. EXPAN51ON BOLT5 5HALL BE OF A LENGTH 5UFFIGIENT TO EXTEND AT LEA5T 3
<br />INGHE5 INTO 50LID GONGRETE. THROUGH Ek..'LF5 5HALL 13E PROVIDED HITH PLATE5 OR HA5HER5 AT THE 5AGK AND 5ET 50 THAT HEAD5,
<br />NU15, AND HA5HER5 WILL BE CONCEALED BY THE HALL MATERIAL. EXP05ED HEA05 OF BOLT5, AND NUT5 5HAILL BE NIGKEL-GHROMIUM
<br />PLATED HEXA6ON5 WITH ROUNDED TOP5. WHERE NEGE55ARY, NIGKEL-GHROMIUM PLATED HA5HER5 5HALL BE PROVIDED.
<br />3.12 PIPE 5LEEVE5
<br />A. PIPE 5LEEVE5 5HALL BE PROVIDED WHERE PIPE5 PA55 THROUGH MA50NRY OR CONCRETE HALL5, FLOOR5, ROOF5 AND PARTITION5.
<br />5LEEVE!5 5HALL BE PLACED DURING GON5TRUGTION OF THE BUILDING ANO AT NO TIME 5HALL JACK HAMMER5 BE U5E0. 5LEEVE5 IN
<br />OUT51DE HALL5 BELOW AND AE30VE GRADE, OR IN FLOOR 5LAB5, 5HALL BE ZING-GOATED 5HEET 5TEEL. 5PAGE BETWEEN PIPE, TUBING
<br />OR MULATION AND THE 5LEEVE 5HALL NOT LE55 THAN 1/4 INCH. 5LEEVE5 5HALL BE HELD 5EGURELY IN PROPER P051TION AND LOCATION
<br />BEFORE AND DURING CON5TRUGTION. ALL 5LEEVE5 5HALL BE OF 5UFFIGIENT LENGTH TO PA55 THROUGH ENTIRE THIGKNE55 OF WALL5,
<br />PARTITION5 OR 5LAB5. 5LEEVE5 IN FLOOR 5LAE35 5HALL EXTEND 2 INGHE5 ABOVE THE FIN15HED FLOOR. 5PAGE BETWEEN THE PIPE AND
<br />THE 5LEEVE 5HALL BE FIRMLY PACKED WITH OAKUM AND CAULKED ON E30TH END5 OF THE 5LEEVE WITH IN5ULATI% CEMENT. 5LEEVE5
<br />LOGATFD IN HATERPROOFED GON5TRUGTION 5HALL BE PROVIDED WITH FLANGE AND GLAMPIN65 RIN65. 5LEEVE5 ARE NOT REQUIRED IN
<br />FLOOR 5LAB5 LOGATED ON GRADE EXCEPT THAT C49PPER PIPE 94ALL NOT COME INTO GONCRETE.
<br />3.13 5TERILIZATION
<br />A. PRIOR TO 5TARTINr-, WORK, VERIFY 5Y5TEM 15 COMPLETE, FLU5HED AND GLEAN.
<br />B. EN5URE PH OF WATER TO BE TREATED 15 BETWEEN 1.4 AND 1b BY ADDING ALKALI (GA16TIG 500A OR 500A A5H) OR ACID
<br />WDRO( HLORIG).
<br />G. INJEGT 015INFECTANT, FREE GHLORINE IN LIQUID, POWDER, TABLET OR GA5 FORM, THROUGHOUT 5Y5TEM TO OBTAIN 50 TO &0 M&L
<br />RE51DUAL.
<br />0. BLEED WATER FROM OUTLET5 TO EN5URE 015TRIBUTION AND TE5T FOR D15INFEGTANT RE51DUAL AT MINIMUM 15 PERCENT OF OUTLET5.
<br />E. MAINTAIN 015INFEGTANT IN 5Y5TEM FOR 24 HOUR5.
<br />F. IF FINAL 015INFEGTANT RE51MAL TE5T5 LE55 THAN 25 M6A-, REPEAT TREATMENT.
<br />6. FLU15H 015INFECTANT FROM 5Y5TEM UNTIL RE51L-A)AL EQUAL TO THAT OF INCOMING WATER OR ID M6A-.
<br />H. TAKE 5AMPLE5 NO 50ONER THAN 24 HOUR5 AFTER FLU5141%, FROM 10 PERGENT OF OUTLET5 AND FROM HATER ENTRY, AND ANALYZE IN
<br />AGCORDANGE WITH A" 6651.
<br />1. A TE5TIN6 FIRM COMPANY 5PEGIALIZI% IN TE5TING POTABLE WATER 5Y5TEM5 5HALL BE APPROVED BY THE 5TATE
<br />J. A GERTIFIGATE 5HALL BE 5UBMITTED TO OWNER THAT GLEANLINE55 OF WATER 015TRIBUTION 5Y5TEM MEET5 OR EXGEED5 5TATE HR5
<br />REOUIREMENT5.
<br />3.14 ANCHORING, GUIDING AND 5UPPORTIN67 OF PIPING
<br />A. ALL PIPING 5HALL BE ANCHORED AND 5UPPORTED IN A MANNER 5UGH THAT EXPAN51ON AND CONTRACTING WILL TAKE PLACE IN THE
<br />DIRECTION DE51RED AND VIBRATION AND UNDUE 5TRAIN5 ON EQUIPMENT WILL BE PREVENTED BY U5E Of VIBRATION DAMPENER5.
<br />HAN67ER5 U5ED FOR THE 5UPPORT OF PIPING, 2 INGH NOMINAL PIPE 51ZE AND LARGER, 5HALL 13E FABRIGATED TO PERMIT ADEQUATE
<br />ADJU15TMENT AFTER EREGTION WHILE 5TIH 5UPPORTI% THE LOAD. HALL BRAGKET5 5HALL BE L15ED WHERE PIPE5 ARE ADJAGENT TO
<br />HALL OR OTHER VERTIGAL 50RFAGE5 THAT MAY BE U5EI) FOR 5UPPORT5. 5UPPORT5 5HALL BE PROVIDED WITH A TYPE 40 PIPE
<br />COVERING PROTEGTION 5ADDLE AT EACH 5UPPORT IN AGGORDANGE WITH TA13LE 4 OF 5P-bq. PIPE 5UPPORT5 5HALL 13E 5PAGED TO
<br />B.
<br />G. PROVIDE ADEQUATE 5UPPORT FOR THE PIPE5, THE MEDIUM IN THE PIPE, IN50LATION, VALVE5 AND FITTIN65; 5PAGIN6 OF 50PPORT5 5HALL
<br />BE 5UGH A5 TO PREVENT THE FORMING OF POGKET5. THE MAXIMUM HORIZONTAL 5PACIN6, FOR METAL PIPINC713ETHEEN PIPE 5UPPORT5
<br />5HALL CONFORM TO TABLE 3 OF M55 5P-bq, EXCEPT THAT GA5T IRON 501L PIPE 5HALL HAVE A MAXIMUM 5PAGIN6 13ETVEEN HANGER5
<br />OF 5 FEET. VERTIGAL PIPING 5HALL BE 5UPPORTED BY BOLTED 5TEEL GLAMP5 OR TYPE GONFORMIN6 TO M55 5P-bq. PIPE HAN67ER5
<br />5HALL 13E 15OLATED FROM UNIN50LATEI? METAL PIPE WITH NEOPRENE PAP5 5U( H THAT ORGAN HJ51G WIH NOT PERMIT OR GAU5E THE
<br />PIPE TO VIBRATE WITHIN THE 5UPPORT.
<br />3.15 IN5TRUGTION MANUAL5
<br />A. FURN15H FOUR GOMPLETE GOPIE5 OF IN5TRUGTION5 EXPLAINING OPERATION AND MAINTENANCE AND REPLACEMENT PART5 L15T5 FOR THE
<br />FAUCET TRIM, FLU514 VALVE5, AND FIXTUIRE-5.
<br />3.16 5AFETY CODE
<br />A. ALL PIPING IN AGGORDANGE HITH AN51
<br />3.11 A5-BUILT DRAHIN65
<br />A. PROVIDED A COMPLETE 5ET OF REPRODUCIBLE 'A5-BUILT' ORMINC-6 AT JOB COMPLETION.
<br />3.0 FIELD TE5T5
<br />A. WATER 5UPPLY PIPINC75HALL BE 5UBJEGTE[) TO A HYDR05TATIG PRE55URE TE5T OF 100 P51 MINIMUM. PRE55URE 5HALL 13E MAINTAINED
<br />ON THE LINE5 FOR A PERIOD OF TIME 5UFFIGIENT TO EXAMINE THE ENTIRE 5Y5TEM BUT NOT LE55 THAN ONE HOUR.
<br />B. 5ANITARY PIPING: 13EFORE THE IN5TALLATION OF ANY FIXTURE5, THE VENT5 OF THE 5Y5TEM 5HALL BE GAPPED AND ALL LINE5 FILLED
<br />WITH WATER TO THE ROOF AND ALLOWED TO 5TAND UNTIL A THOROUGH IN5PE( TION HA5 BEEN MAO. AFTER THE FIXTURE-5 ARE 5ET, A
<br />5MOKE OR EQUIVALENT TE5T 5HALL BE MADE U5INC7 A 501TA13LE APPARATU5.
<br />I HERE13Y GERTIFY THAT I HAVE REVIEWED
<br />TH15 PLAN AND FOUND IT TO 13E IN COMPLIANCE WITH A5G-E 1-16 AND
<br />THE 2020 BUILDING GODE ITH EDITION
<br />owl I I I I////,
<br />10A)(4-1,
<br />No86663
<br />-;3 STATE OF /44 - I
<br />ORID
<br />: 1-11roY
<br />E
<br />0
<br />0
<br />_g_-
<br />m
<br />Lij
<br />cu
<br />a)
<br />a
<br />C)
<br />E
<br />Lu
<br /><
<br />Lu 0 C,
<br />of .*-
<br />C) Lr)
<br />c)
<br />c)
<br />uj
<br />LL
<br />0
<br />w
<br />z = a- -1
<br />LL
<br />X LU >- 6
<br />cu V
<br />Lu
<br />ui
<br />z
<br />uj
<br />CL
<br />J co
<br />c:)
<br />z
<br />Lu
<br />co
<br />c:: co
<br />0 c)
<br />0
<br />i
<br />LL.
<br />U-)
<br />co
<br />c1c)
<br />C?
<br />�2
<br />z
<br />0
<br />N
<br />C14
<br />Z
<br />ix
<br />Z
<br />x
<br />z
<br />z
<br />Ix
<br />0.
<br /><
<br />0
<br />C3
<br />0
<br />C)
<br />0
<br />c)
<br />c)
<br /><
<br />cy')
<br />0
<br />0
<br />0 F-
<br />L0
<br />LL
<br />C6
<br />< CD
<br />C) co
<br />of
<br />m
<br />a- Lu
<br />rL
<br />Lu
<br />Lu
<br />U)
<br />N
<br />0
<br />Lu
<br />:z
<br />c/)
<br />c/)
<br />0
<br />C)
<br />u-
<br />C)
<br />Lu
<br />0-
<br />c/)
<br />(D
<br />2-7
<br />co
<br />2
<br />DRAWING
<br />12
<br />
|