My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38833 10th Ave
Zephyrhills
>
Building Department
>
Building Plans
>
38833 10th Ave
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 7:34:36 PM
Creation date
2/18/2025 4:20:17 PM
Metadata
Fields
Template:
Building Plans
Street #
38833
Location
10th Ave
Contractor
Kerns Family Construction
Building Plans - Permit #
17806
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISIONS <br />I NO I DATE I DESCRIPTION I <br />All elevations drawn are for "illustration" purposes <br />only. For "actual" elevation construction, consult <br />construction drawings and structural details for <br />additional information. <br />/ MOP F-X I S)-r ., <br />N &WO t),=V 7 <br />RIGHT SIDE ELEVATION <br />f-7 i if % Ir— a 1--r- <br />EY151- FIZO P <br />5 rv, bopKi ) <br />LEFT SIDE ELEVATION <br />Fiberglass shingles over 30 lbs felt over 1/2" plywood <br />sheathing or "opf'7/16" OSB sheathing with roof <br />structure spaced no more than @ 24" o.c.. See roof <br />framing layout and connection schedule for additional <br />information.. <br />FRONT ELEVATION <br />SCALE: 1/4" = 1'- 0" <br />NOTE: <br />Approx. proposed roof pitch: 4 / 12 "MUST" be field verified by truss manufacture <br />before production of roof trusses. <br />Proposed finish ceiling height: 8'- 0" (rnin.) Contraclor0MUST"fieW verity and <br />match existing ceiling height on SFR. <br />All door and window header heights to start at: 6'- 8" Contractor "MUST" verify <br />"ALL" lintel height locations with owner before construction begins. <br />Truss company "MUST" field verify all existing roof conditions, roof sk)pe, overhang <br />bearing points, tiein, etc. before engineering and manufacturing of roof trusses. <br />Daniel M. Ossman Drafting Service and Architect who signed / sealed the plans <br />assurnes no responsibility for errors in production of roof trusses due to negligence <br />to conduct proper and accurate field inspection by truss manufacture and <br />dimensioning. <br />EXTERIOR FINAH: <br />Match existing vinyl siding, over a water resistive <br />"Tyvek" vapor barrier, over 1/2" cd-x plywood <br />sheathing that is nailed with 1 Od x 1 1/2" nails @ 6" <br />o.c. edges and 12" field, over 2 x 4 exterior wood <br />studs @ 16" o.c. with R - 13 insulation between and <br />finished with 1/2" drywall on the inside. Water <br />resistive barrier in accordance with Section R703.6.3, <br />of the FBC 5th Edition 2014 Residential. <br />LM <br />Im- <br />REAR ELEVATION <br />11 <br />E-X <br />�b Piz <br />Contractor MUST field verify and match all existing <br />conditions including roofing material, exterior finish <br />paint colors, and soffit / fascia board. Truss company <br />is responsible for verifying and matching existing roof <br />pitch and overhang. <br />,/ Ex I $T N PZO P <br />N S F: Q� 00� <br />r, a 'or . I -r <br />SCALE: 114" = 1'- 0" <br />014- 4A -S <br />j9p-0.4 <br />3600 33 <br />19cr N.I.S1 6y\ <br />K <br />cq <br />JOB NO. <br />38833 1 OTH AVE <br />DATE <br />AUGUST 28, 2016 <br />DRAWN BY <br />Daniel M. Ossman <br />SCALE: 1/4" = 1' - 0" <br />SCALE: 1/4"= 1'- 0" <br />SHEET NO. <br />A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.