Laserfiche WebLink
r, <br />GENERAL NOTES <br />1 THESE PLANS ARE SOLELY TO ASSIST THE CONTRACTOR IN ASSESSING THE NATURE AND <br />EXTENT OF THE EXISTING CONDITIONS WHICH MAY BE ENCOUNTERED DURING THE COURSE OF <br />WORK. CONTRACTORS ARE DIRECTED, TO CONDUCT WHATEVER INVESTIGATION THEY DEEM <br />NECESSARY, PRIOR TO BIDDING, TO DETERMINE THE ACTUAL CONDITIONS THAT WILL BE <br />ENCOUNTERED. <br />2. LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER <br />FEATURES ARE SHOWN BASED ON THE BEST INFORMATION AVAILABLE AT THE TIME OF <br />PREPARATION OF THESE PLANS BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. THE <br />CONTRACTOR SHALL VERIFY, PRIOR TO CONSTRUCTION, THE LOCATIONS, ELEVATIONS, AND <br />DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (WHETHER OR NOT <br />SHOWN ON THE PLANS) AFFECTING HIS WORK. <br />3. THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS ON THE PLANS AND REVIEW ALL <br />FIELD CONDITIONS THAT MAY AFFECT CONSTRUCTION. SHOULD DISCREPANCIES OCCUR, THE <br />CONTRACTOR SHALL NOTIFY THE ENGINEER TO OBTAIN WRITTEN CLARIFICATION BEFORE <br />COMMENCING WITH CONSTRUCTION. <br />4. THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES, STORM DRAINS, SEWERS, <br />UTILITIES, AND OTHER FACILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR SHALL REPAIR <br />ANY DAMAGES DUE TO HIS CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST TO THE OWNER. <br />5. WHERE IT IS NECESSARY TO DEFLECT PIPE EITHER HORIZONTALLY OR VERTICALLY, PIPE JOINT <br />DEFLECTION SHALL NOT EXCEED 75% OF THE MANUFACTURERS' MAXIMUM RECOMMENDED <br />DEFLECTION. <br />6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF THE EXISTING DRAINAGE <br />SYSTEM WITHIN THE LIMITS OF THE PROJECT AREA FOR THE DURATION OF THE PROJECT. <br />7. THE CONTRACTOR SHALL PROVIDE CERTIFIED RECORD DRAWINGS AS OUTLINED IN THE <br />SPECIFICATIONS. RED —LINE DRAWINGS SHALL BE CURRENT WITH EACH PAY APPLICATION <br />SUBMITTED AND WILL BE CHECKED AS PART OF THE PAY APPLICATION REVIEW PROCESS. <br />PAYMENT WILL NOT BE MADE TO THE CONTRACTOR WITHOUT APPROVED RED —LINE DRAWINGS. <br />8. FIELD CONDITIONS MAY NECESSITATE ALIGNMENT AND GRADE DEVIATION OF THE PROPOSED <br />PIPELINES TO AVOID CONFLICTS. NO ADDITIONAL PAYMENT SHALL BE MADE WITHOUT PRIOR <br />APPROVAL OF THE OWNER AND THE OWNER'S ENGINEER. <br />9. THE CONTRACTOR SHALL FURNISH SHOP DRAWINGS TO THE ENGINEER FOR APPROVAL OF ALL <br />EQUIPMENT, MATERIALS, AND SPECIALS PRIOR TO FABRICATION OR DELIVERY TO THE JOB SITE. <br />10. CONNECTIONS TO EXISTING FACILITIES SHALL BE ACCOMPLISHED IN A NEAT WORKMANLIKE <br />MANNER. WHEN FIELD CONDITIONS INDICATE ANY VARIANCE FROM DETAILED METHODS, THE <br />CONTRACTOR SHALL PROVIDE COMPREHENSIVE AND DETAILED DRAWINGS FOR OWNER REVIEW AND <br />APPROVAL PRIOR TO MAKING THE CONNECTIONS. <br />11. UNLESS OTHERWISE INDICATED OR APPROVED, ALL BELOW GROUND DUCTILE IRON PIPE SHALL <br />HAVE PUSH —ON OR MECHANICAL JOINTS, AND ALL ABOVE GROUND DUCTILE IRON PIPE SHALL <br />HAVE FLANGED JOINTS. <br />12. ALL PIPELINES SHALL HAVE A MINIMUM COVER OF 36" BELOW EXISTING GRADE UNLESS <br />OTHERWISE NOTED OR DIRECTED. <br />13. ALL VALVE BOX COVERS AND EXPOSED PIPING SHALL BE PAINTED WITH DESIGNATED COLORS <br />ASSOCIATED WITH THEIR USAGE AS PROVIDED IN THE SPECIFICATIONS. <br />14. WATER SHALL NOT BE PERMITTED IN EXCAVATIONS AND TRENCHES DURING CONSTRUCTION. <br />DEWATERING IS REQUIRED TO A MINIMUM OF 18" BELOW BOTTOM OF EXCAVATION. <br />15. ALL NEW PIPELINES SHALL BE FLUSHED, PRESSURE TESTED, AND APPROVED PRIOR TO TIE—INS <br />TO EXISTING FACILITIES. THE CONTRACTOR WILL BE ALLOWED TO USE TEMPORARY PLUGS FOR <br />PRESSURE TESTING. <br />16. ALL TEST POINT TAPPING SHALL BE CUT LOOSE FROM THE CORPORATION STOP AND <br />COMPLETELY REMOVED AND DISPOSED OF BY THE CONTRACTOR PRIOR TO FINAL ACCEPTANCE. <br />THE CORPORATION STOP SHALL BE CAPPED AND REMAIN IN PLACE. <br />17. ALL CONCRETE THRUST BLOCKS INSTALLED FOR TESTING PURPOSES AND NOT REQUIRED FOR <br />THE PIPELINE SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR PRIOR TO FINAL <br />ACCEPTANCE, <br />18. CONTRACTOR SHALL MAINTAIN A CLEAR PATH FOR ALL SURFACE WATER DRAINAGE STRUCTURES <br />AND DITCHES DURING ALL PHASES OF CONSTRUCTION.THE CONTRACTOR SHALL BE REQUIRED TO <br />INSTALL ALL EROSION, SEDIMENT AND TURBIDITY CONTROL MEASURES PRIOR TO CONSTRUCTION <br />OF ANY COMPONENTS ASSOCIATED WITH THE PROJECT. SEDIMENT CONTROL INCLUDES SILT DAMS, <br />TRAPS, EROSION PROTECTION, AND ANY OTHER APPURTENANCES NEEDED BUT NOT NECESSARILY <br />SHOWN ON THESE DRAWINGS. <br />19. CONTRACTOR SHALL PROVIDE PROTECTIVE MATTING, FUEL CONTAINMENT AND ALL OTHER <br />MATERIALS, EQUIPMENT AND LABOR TO PROTECT THE STAGING AREA DURING CONSTRUCTION. <br />20. CONTRACTOR SHALL SUBMIT A DEWATERING PLAN FOR APPROVAL PRIOR TO BEGINNING <br />CONSTRUCTION. DEWATERING SHALL BE CONDUCTED IN ACCORDANCE WITH THE BMPS IDENTIFIED <br />IN CHAPTER 4, 4.40 "DEWATERING" OF "THE FLORIDA STORMWATER EROSION AND SEDIMENTATION <br />CONTROL INSPECTOR'S MANUAL". <br />21. CONTRACTOR SHALL EMPLOY A PROFESSIONAL SURVEYOR, LICENSED IN THE STATE OF FLORIDA <br />TO PERFORM CONSTRUCTION STAKING IN ACCORDANCE WITH RULE 61G17-6.004(3) OF THE <br />FLORIDA ADMINISTRATIVE CODE. <br />22. THE CONTRACTOR IS ADVISED THAT PAYMENT FOR SEDIMENT CONTROL IS TO BE INCLUDED <br />UNDER BID PRICES FOR ALL OF THE ITEMS LISTED ON THE BID SHEET. SEDIMENT CONTROL <br />INCLUDES SILT DAMS, TRAPS, EROSION PROTECTION, AND ANY OTHER APPURTENANCES NEEDED <br />BUT NOT NECESSARILY SHOWN ON THESE DRAWINGS. <br />23. THE GENERAL CONTRACTOR SHALL PROVIDE SECURITY FENCING FOR ALL OF HIS MATERIALS AND <br />EQUIPMENT STORED OVER NIGHT ON THE SITES. THE STORAGE AREA SHALL BE COORDINATED <br />WITH PINELLAS COUNTY UTILITIES. <br />I REMO. <br />UTILITY NOTES <br />1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE FOLLOWING <br />JURISDICTIONAL BODIES AND UTILITY COMPANIES: <br />BRIGHTHOUSE NETWORKS <br />EAST PASCO <br />MIKE KIKER <br />30432 SIR 54 <br />WESLEY CHAPEL, FIL 33543 <br />(813)862-0522 EXT. 84263 <br />DIGITAL COMMUNITY NETWORKS <br />PAUL DANA CLARK <br />3555 PORTER LAKE DRIVE, UNIT 110 <br />SARASOTE, FIL 34240 <br />(941)378-5200 <br />VERIZON FLORIDA INC <br />MR. DAVID WYNNS <br />1909 US HWY 301 NORTH <br />TAMPA FLORIDA 33619 <br />(813) 627-8343 <br />WITHILACCOCHEE RIVER ELECTRIC <br />MR. COREY LITTLEFIELD <br />COOPERATIVE <br />PO BOX 278 <br />DADE CITY FLORIDA 33526 <br />(352)588-5115 EXT. 1131 <br />CENTURYLINK <br />MR. JEFF GRIFFIN <br />33 NORTH MAIN STREET <br />WINTER GARDEN FLORIDA 34787 <br />(407)814-5344 <br />PASCO COUNTY UTILITIES <br />MS. GEORGEANN BENNETT <br />7530 LITTLE ROAD ROOM 205 <br />NEW PORT RICHEY FLORIDA 34654 <br />(727)847-8145 EXT. 8064 <br />INVESTIGATE <br />BEFORE YOU <br />EXCAVATE <br />CALL LOCAL PUBLIC <br />UTILITY NOTIFICATION <br />CENTER <br />TOLL FREE <br />1-800-432-4770 <br />MIN. 48 HOURS BEFORE <br />YOU EXCAVATE <br />RESTORATION AND MISCELLANEOUS NOTES. <br />1. THE CONTRACTOR SHALL REPLACE ALL EXISTING PAVING, STABILIZED EARTH, CURBS, SIDEWALKS, <br />FENCES, LANDSCAPING AND OTHER IMPROVEMENTS WITH THE SAME OR BETTER TYPE OF <br />MATERIAL THAT WAS REMOVED DURING CONSTRUCTION OR AS DIRECTED BY THE ENGINEER. <br />2. ALL RESTORATION WORK PERFORMED THROUGHOUT THE PROJECT SHALL CONFORM TO EXISTING <br />LINES AND GRADES UNLESS OTHERWISE NOTED. <br />3. ALL EXISTING FENCES DISTURBED DURING CONSTRUCTION SHALL BE REPLACED AND REINSTALLED <br />BY THE CONTRACTOR IN LIKE KIND AT NO ADDITIONAL COST TO THE OWNER UNLESS SHOWN TO <br />BE REMOVED ON CONSTRUCTION PLANS. <br />4. CONTRACTOR SHALL RESTORE ALL IRRIGATION SYSTEM COMPONENTS TO PRE —CONSTRUCTION <br />CONDITIONS. <br />VIE, SEAL <br />ot.. A <br />r <br />*6 <br />Wow <br />Z <br />04 <br />MATTWeV4jjjJVI1W,"P.E. <br />No. 66118 <br />SEAL <br />A <br />4QIk <br />44 �N4qKW&O�XED <br />3802 Ehrlich Road, Suite 306 <br />Tampa, FL 33624 <br />Phone: (813)549-3740, Fax: (813)549-3744 <br />EB0006691 <br />www.mckimcreed.com <br />INDEX OF DRAWINGS <br />GENERAL <br />COVER <br />G-1 GENERAL NOTES AND SHEET INDEX <br />G-2 ABBREVIATIONS, SYMBOLS AND LEGENDS <br />G-3 KEY SHEET <br />CIVIL <br />6 i PLAN AND PROFILE STA 188+28 TO STA 106+8a <br />6 2 PLAN AND PROFILE STA 186+88 TO STA 112+6& <br />6 3 PLAN AND PROFILE STA 112+60 TO STA 119+2& <br />6 4 PLAN ANB PROFILE STA 119+20 TO STA 125+ Ba <br />6 5 PLAN ANB PROFILE STA 125+80 TO STA 132+ 4-& <br />6 6 PLAN AND PROFILE STA 132+40 TO STA 135+1 & <br />6 7. PLAN AND PROFILE STA 199+82 TE) STA 206+ <br />6 8 PLAN AND PROFILE STA 286+48 TO STA 2 13 + - E8 11 "Br- <br />6 9 PLAN AND PROFILE STA 213+00 TO STA 21 S+E)+ <br />C-10 WELL No. 11 SITE PLAN <br />C-11 WELL No. 12 SITE PLAN <br />C-12 DETAILS 1 <br />C_ 13 DETAILS 2 <br />C-14 EROSION CONTROL DETAILS <br />ARCHITECTURAL <br />A-1 FLOOR AND ROOF PLANS, BUILDING DATA <br />A-2 EXTERIOR ELEVATION <br />A-3 BUILDING AND WALL SECTIONS <br />A-4 BUILDING DATA AND NOTES <br />STRUCTURAL <br />S-1 STRUCTURAL NOTES, DESIGN LOADS, DESIGN CRITERIA AND LEGEND <br />S-2 WELL HOUSE FOUNDATION PLAN, SECTIONS AND DETAILS <br />S-3 WELL HOUSE ROOF FRAMING PLAN, SECTIONS AND DETAILS <br />MECHANICAL <br />M-1 WELL HOUSE PLAN <br />M-2 WELL HOUSE SECTION <br />M-3 WELL DETAILS 1 <br />M-4 WELL DETAILS 2 <br />INSTRUMENTATION <br />1-1 P&ID LEGEND <br />1-2 PRODUCTION WELL 11 P&ID <br />1-3 PRODUCTION WELL 12 P&ID <br />ELECTRICAL <br />E-1 GENERAL NOTES, SYMBOLS AND LEGENDS <br />E-2 WELL NO. 11 ELECTRICAL SITE PLAN <br />E-3 WELL NO. 12 ELECTRICAL SITE PLAN <br />E-4 TYPICAL WELL PUMP BUILDING SINGLE LINE DIAGRAM AND ELECTRICAL POWER PLAN <br />E-5 ELECTRICAL DETAILS <br />CITY OF ZEPHYRHILLS <br />5335 8th Street <br />Zephyrhills, FL 33542 <br />Phone: (813)780-0000 <br />PRODUCTION WELLS <br />No. 11 AND No. 12 <br />WELL SITE IMPROVEMENTS <br />GENERAL NOTES AND <br />SHEET INDEX <br />F, <br />DATE: <br />- I <br />FEBRUARY 2012 <br />MCE PROJ. <br /># 4584-0003 <br />DRAWN <br />QES <br />DESIGNED <br />MSL <br />CHECKED <br />JSL <br />PROJ. MGR. <br />MSL <br />SCALE <br />HORIZONTAL: <br />AS SHOWN <br />VERTICAL: <br />NA <br />G-1 <br />STATUS: REVISION <br />ISSUE FOR BID <br />