Laserfiche WebLink
DATE : <br />SCALE: <br />/ 11 <br />1/4 <br />FDAGE <br />OUTSIDE EDGE OF SLA15 OUTSIDE EDGE OF SLAB <br />IN <br />IN <br />DESIGN SERVICES INC, <br />MOIBILE/ OFFICE 352-20ro-552-1 <br />OFFICE FAX 352-5e&-2342 <br />F-5 <br />IRR H A4 N L E= Y P 0 eOX 1325 SAN ANTONIO <br />FLA, 3351ro <br />u- <br />in <br />EMAIL: hanlegoro-sembarqmail.com <br />Lu <br />0 <br />u- <br />Lu <br />Lu <br />�3 <br />Lu <br />�3 <br />CHAFTER 4 SECTION 412 <br />4'2,2,3 FLOOR SURFACE. FLOORS SHALL BE GRADED AND DRAINED <br />TO PREVENT WATER OR FUEL FROM REMAINING ON THE FLOOR <br />FLOOR DRAINS SHALL DISCHARGE THROUGH AN OIL 6EPERATOR <br />TO THE SEWER OR TO AN OUTSIDE VENTED SUMP. <br />THE SLAB WILL,5LOPE FROM THIS LINE <br />OIL BEFERATOR <br />AT A MIN OF 5% 0:200) TO THE CENTER <br />OF THE AREA AS DETERMINED BY THE DRAIN. <br />IDENTIFY THE WORK AREA AND ONLY SLOPE THOSE <br />AREAS OF THE BUILDING TO THE 4" DRAIN. <br />OIL BEPERATORS SHALL HAVE A DEPTH OF NOT LESS <br />THAN 24" BELOW THE INVERT OF THE DISCHARGE DRAIN, <br />THE OUTLET OPENING OF THE SEPARATOR SHALL HAVE <br />NOT LESS THAN AN 18" WATER SEAL. IT SHALL HAV�E A <br />u- <br />MINIMUM CAPACITY OF ro CU FT FOR THE FIRST 100 SF OF <br />AREA TO eE DRAINED, PLUS I CU FT FOR EACH ADDITIONAL <br />ui <br />SEPERATOR <br />u- <br />100 SF Or- AREA TO BE DRAINED INTO THE SEPERATOR. <br />ci <br />ui <br />4" DIR AIN <br />A TOTAL OF 5ro5O SF OF AREA 15 TO BE DRAINED IN THIS <br />ui <br />BUILDING. THE 5EPERATOR TANK WILL BE REQUIRED TO <br />cl, <br />Lu <br />HAVE A CAPACITY OF AT LEAST 4roO GAL, (U,S,), <br />lu <br />1,40 GAL, = 1 CU FT <br />UNDERGROUND PIPING AND COMPONTENTS USED IN <br />:3 <br />DRAINAGE SYSTEMS SHALL BE NON-COMBUSTIBLE AND <br />INERT TO FUEL. (E,G. STEEL, DUCTILE, IRON OR CONCRETE) <br />SUCH 5YSTEM5 SHALL BE DE51GNED WITH SUITABLE TRAPS <br />OR BE PROVIDED WITH ADEQUATE VENTILATION TO PREVENT <br />VAPOR MIXTURES FROM FORMING WITHIN THE UNDERGROUND <br />SYSTEM. <br />SEFERATOR FLAN <br />CONTRACTOR: <br />SEE THE 51TE PLAN FOR THE <br />SEPERATOR TANK LOCATION <br />G, L. STEVE CONSTRUCTION <br />ZEFHYf;RHILLS, FLORIDA <br />JOB NAME AND ADDRESS- <br />4" NON-COMeUSTIBLE DRAIN <br />TO THE -SEPERATOR TANK <br />ROMA VENTURES 11, INC, <br />PRIME STEEL BUILDINGS <br />24'-8" <br />uj <br />PARCEL "D" ZEFHYRHILS <br />W <br />CITY AIRPORT <br />lu <br />ZEPHYRHILL5, FLORIDA <br />ui <br />AIRPLANE HANGAR -1500 SF <br />T, L. HANSON <br />�:3 <br />4 ASSOCIATES INC. <br />CONSULTING ENGINNEERS <br />ENGINEERING BUSSINESS NO, Ee583O <br />Po5t OfFice Box 1128 <br />Dade Cltq, Florida 3352ro <br />Thomar. L� Hanson, PE 3&&54 <br />I HEREIBY CERTIFY THAT I HAVE REVIEWED THE ATTACHED <br />DESIGNS AND FOUND IT TO BE IN COMPLIANCE WITH CHAPTER <br />OUTSIDE EDGE OF SLAB OUTSIDE EDGE OF SLAB <br />Iro, SECTION IroOS OF THE FLORIDA iBUILDING CODE FOR THE <br />120 MPH ( 3 SECOND GUST) WIND ZONE - 100 MPH FASTEST <br />SPEED AND THE ENTIRE 2001 FLORIDA BUILDING CODE, <br />100'-0" <br />RESIDENTIAL AND ALL 200S SUPPLEMENTS. <br />THE CLIENT UNDERSTANDS THAT THE DESIGNER CARRIES NO I-IAE51LITY INSURANCE AND THEREFORE AGREES TO HOLD HARML-Ee�s <br />T.L. HANSON P.E. LICENSE NO. 35654 <br />IDEMNIFY, AND DEFEND DESIGNER FROM CLAIMS, LOSSES AND EXPENSES (INCLUDING ATTORNEYS FEES) ARISING OUT OF OR <br />RESULTING FROM THE PROJECT, THE DESIGNER WILL IN GOOD FAITH ATTEMPT TO PROVIDE ERROR FREE CONSTRUCTION DRAWINGS <br />OUT IN THE EVENT ERRORS OCCUR THE DESIGNER WILL NOT BE LIABLE FOR COST OF REPAIRS OR DELAY TO THE CONSTRUCTION. <br />P.0, E!�OX 1'72a, DADE CITY, FLA. 33526 <br />