My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
39863 Harvest Creek Ln
Zephyrhills
>
Building Department
>
Building Plans
>
39863 Harvest Creek Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 7:53:42 PM
Creation date
2/18/2025 4:22:00 PM
Metadata
Fields
Template:
Building Plans
Street #
39863
Location
Harvest Creek Ln
Contractor
Lennar Home
Building Plans - Permit #
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSS BRACING DETAIL (TYP.)- <br />SCALE:NTS <br />TRUSS NOTES: <br />CONV. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TPl-2014 MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE 1 <br />T LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION, FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 201-0 <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED Wit (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. <br />DB_<� <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT <br />SEE TYP <br />TRUSS BLOCKING DETAILS <br />VVI Q- f vu iw I I I v V"� <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED wl (2) <br />S I M PSON HTS20 w/ (24) 1 Od x <br />1 1/2" NAILS EACH <br />TB <br />-ENG.TRUSS <br />PRE <br />2X4 BLOCKING <br />2X4 DIAGONAL AT 8'-0" O.C. BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP <br />MAX & EACH END ALTERNATE CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />14 A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE:NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEARTRANSFER <br />EXTERIOR. WALL <br />SCALE:NTS <br />DIAGONAL <br />AT 8'-0" <br />MAX <br />2X4 CONT. AT <br />T & B CHORD <br />TRUSS <br />ROOF <br />SEE 'lu <br />SHI <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�;7A TRUSS <br />HIP <br />G.T <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />VERTICAL SCAB 2 x 6 <br />0. C. W/ (4) <br />#2 SPF 48" <br />1 Od TOP & BOTTOM <br />OR SIMPSON H2.5A w/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A W/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-O"O.C. MAX. W/ (3) 1 Od <br />COMMON TOENAILS TO TIE BEAM <br />CONC.MASONRY <br />STEEL OR WOOD <br />BEARING SUPPORT <br />A —A ALTERNATE BLOCKING <br />DETAIL @ INTERIOR BEARING el� <br />3 <br />SCALE:NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />OIL VARIES <br />2X4 #2 SPF BRACING @ <br />16" O.C. W/ (4) 12d <br />TOENAILS TO TOP <br />PLATE & (2) 12d END <br />NAILS TO TRUSS <br />BOTTOM CHORD <br />ROOF SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />COMMON TRUSSES. <br />SEE TRUSS PLAN <br />FOR CONNECTION <br />INFORMATION. <br />VARIES SEE PLAN <br />FOR WALL LOCATION <br />MIN. 2X4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />OL SEE PLAN FOR <br />PLATE BELOW <br />TOP OF WALL <br />MIN, 2X4 #2 SYP P.T. PLATE <br />W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />PLAN FOR MORE <br />16" O.C. MAX. <br />INFO. <br />ul" <br />SECTION <br />@ ENTRY <br />r8N� <br />SCALE:NTS <br />SIMPSON LSTA18 <br />w/ (12) 1 Od NAILS <br />CENTERED AT <br />SPLIT TO TIE <br />BEAMS TOGETHER <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />SCALE:NTS <br />)IMPSON HUC410 w/ <br />6d INTO HEADER & ( <br />Od INTO BEAM - SEE <br />�OOF PLAN FOR MOI <br />qFO <br />(2) 2x8 #2 SYP w) <br />O.S.B. FLITCH P1 <br />TOP @TRUSSB <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN wl (2) SIMPSON <br />HTS20 w/ (24) 1 Od x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 1 Od <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 wl (8) 1 Od <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 1 Od <br />& (4) 1/4"x2 1/4" TITENS EACH <br />BEAM @ RAISED ENTRY <br />MASONRY WALL ir4 <br />SCALE:NTS <br />SEE FLOOR PLAN FOR ....... <br />COLUMN SIZE& BASE <br />CONNECTION INFO <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />REQ'D ONLY WHEN COLUMN SIZE& BASE <br />INDICATED ON BM. CONNECTION INFO <br />OPTION A <br />SCHEDLILE/PLAN OPTION B <br />. <br />. <br />COMMON BM. TO POST ATTACHMENT <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON MTS1 8 W/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />--- A <br />A F <br />SEE PLAN FOR <br />SEE PLAN FOR <br />CANTILEVER IF <br />INDICATED <br />CORNER SEE FOUNDATION <br />51 PLAN FOR MORE INFO <br />COMMON BM. ATTACHMENT <br />SCALE:NTS <br />2X4 STUDS W/ SIMPSON <br />SP1 W/ (10) 1 Od NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 W/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 W/ <br />(14) 1 Od x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION r2 2'� <br />SCALE:NTS <br />SCALE: 3/4"=V-0" <br />SEE 1/S5 FOR <br />ADDITIONAL <br />INFO. <br />OUTLOOKER <br />GABL <br />TRUS <br />iWAtawliffiffielierx <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />�SEE PLAN <br />- <br />FOR CANTf <br />7/16" OSB FLITCH PLATE <br />REQ'D ONLY WHEN <br />INDICATED ON BM. <br />SCHEDULEIPLAN <br />OPTION C. <br />BM. SPLICE OVER <br />CENTER OF POST <br />-MIDDLE <br />SEE PLAN FOR <br />8d NAILS AT VALLEY TRUSS <br />4" O.C. INFO. <br />MASONRY WALL BELOW: SIMPSON <br />HETA1 6 w/ (9) 1 Od x 1 1/2" NAILS @ <br />MASONRY WALL 4'-0" O.C. TO GABLE TRUSS <br />A <br />OR BEAM BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN <br />(24) 1 Od x 1 1/2" NAILS @ 4'-0" 0. C. <br />TO GABLE TRUSS <br />4 <br />COMMON TRUSS <br />SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE rj_2_'� <br />SCALE:NTS <br />EXTERIOR <br />ATTACHED <br />SCHEDULE <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL @ ENTRY FRONT WALL <br />2X4 #2 SYP NAILER. NAIL <br />TO STUDS W/ (3) 16d AT <br />EACH STUD - TOENAIL <br />EACH TRUSS TO NAILER <br />W/ (3) 1 Od <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />W/ (4) 16d NA I LS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />W/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />SCALE:NTS <br />ROOF AND EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />SIMPSON LUS26 W/ (8) 1 Od NAILS B B <br />H H <br />OR IF 2 PLY TRUSS SIMPSON <br />LUS26-2 W/ (8) 16d NAILS TO ZSEE FLOOR FRAMING PLAN <br />LEDGER AND J/S6 FOR MORE INFO. <br />VERIFY WITH PLAN FOR <br />2X1 0 #2 SYP CONT. LEDGER W1 (3) <br />1/2" X 4 1/2" LAG SCREWS ATTACH LOCATION AND DIRECTION <br />(IF PARALLEL SEE 2/D2 FOR <br />LAG SCREWS INTO END OF EACH BLOCKING INFO) <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />EACH SIDE OF G.T. INSTALL (4) LAG 1_�_MASONRYWALL <br />(TYPICAL) <br />SCREWS EACH SIDE) <br />SECTION AT LOW ROOF � �q <br />SCALE: NTS <br />LOW ROOFIWALL---\ <br />SHEATHING ATTACHED\ <br />PER NAILING SCHEDULE <br />2x STUDS @ 16" O.C. <br />W/ SIMPSON SP1 W/ (10) 1 Od <br />NAILS AT BASE & SIMPSON <br />SP2 W1 (12) 1 Od NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END (BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />2x BASE PLATE Wit (2) 12d <br />NAILS @ 16" O.C. ALONG Wit <br />SIMPSON MTS1 2 W/ (14) 1 Od x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />PLYWOOD <br />FLOORING <br />LOW ROOF TRUSS W/----/ <br />Z- (2) 2X6 BLOCKING UNDER� FLOOR G.T. <br />RAISED BOTTOM CHORD 2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS SIMPSON LUS24-2 W/ (16) <br />MANUF. SPEC'S FOR 16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION @ BUMP OUT( '39'� <br />SCALE:NTS 11.1_� <br />DETAILS & SECTIONS <br />C14 <br />C11,> <br />CZ) <br />It, <br />A�- <br />it <br />0q, <br />* 1-� <br />- <br />v"I 0 <br />Uj <br />T <br />E F <br />0 <br />OR <br />....... <br />0 N P- 0% <br />"111111till, <br />To the best of the Engineers knowledge, information,and belief, <br />the structural plans and spedificaltions contained with n these <br />drawings comply with the 2020 <br />Florida Building Code - <br />Residential 7th Edition. Engineer's signature and sea[ is only for <br />the structural engineering portions <br />of the drawing pages bearing <br />Engineers signature and seal. <br />c� <br />W <br />4 <br />'cz ', E <br />5 <br />C-, <br />-L-L, <br />0 <br />p co 5 <br />-g co 65 Lu <br />a <br />0 <br />a <br />P�- :R U� - <br />c1j C) <br />LL W <br />w <br />JU--;, 0: 0 <br />z <br />x I0 <br />'0�' 2 <br />0: <br />M 0 <br />4§ — _j <br />vj <br />W <br />IL <br />- <br />(n <br />Z <br />a <br />co Z� <br />Lo z of Ln 0 <br />< < <br />do <br />z <br />W <br />z izz- <br />< <br />Om <br />o <br />4--J <br />2 <br />G) <br />0 <br />V) <br />V) <br />V <br />Lu <br />Lu <br />E <br />c13 <br />co <br />z <br />E <br />63 <br />m. <br />z< a <br />E 6 <br />'T <br />oL <br />oo <br />zE <br />< <br />mg� <br />=1 M <br />C/) <br />v <br />I <br />mo <br />I , <br />ol <br />z <br />z <br />_j <br />o <br />1 <br />�z <br />w <br />2w <br /><m <br />z <br />'o <br />E z <br />ow <br />m <br />o <br />j <br />—CD <br />< <br />i <br />'I <br />Uj 'W <br />I <br />E, <br />o <br />z <br />C <br />2 C) <br />0 <br />(D <br />00 <br />C: <br />> <br />ca <br />_j <br />_�e <br />C) <br />Cco <br />(0 <br />+iii` <br />r1_1- <br />Lf) <br />(a Irl, <br />01) <br />r N <br />Ir- <br />L0 <br />co CD <br />04 <br />Lf.) <br />00 <br />— <br />00 <br />C14 <br />E <br />-E <br />0 <br />ca <br />z <br />:3 N <br />E <br />cv) <br />z <br />C <br />ca <br />CL <br />E <br />0 0 <br />C) <br />-0 m <br />a) <br />JOB <br />NO: <br />21-4276 <br />SCALE <br />AS NOTED <br />SHEET NO. <br />D1 <br />-.7 "YA�0"_VJ_ VIVT�i� v.1z# ft-,�!; <br />
The URL can be used to link to this page
Your browser does not support the video tag.