Laserfiche WebLink
CROSS BRACING DETAIL (TYP.) <br />SCALE:NTS <br />TRUSS NOTES: <br />CONV. FRAMED RIDGE <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 <br />MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER <br />W/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES PRE-ENG. TRUSS <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED W/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB­�_ <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. <br />DB_+1 <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />VVI I mm ­1 1 1 1 1� v v <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />EACH S I DE W/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 wl (24) 10d x <br />1 1/2" NAILS EACH <br />-TB <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP <br />MAX & EACH END ALTERNATE CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />WOOD TRUSS <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE:NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />01b VARIES W/ <br />"F ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL <br />I <br />SCALE:NTS <br />DIAGONAL <br />AT 8'-0" <br />MAX <br />2X4 CONT. AT <br />T & B CHORD <br />TRUSS <br />ROOF <br />SEE "'U <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />Ty <br />P, <br />TRUSS <br />HIP <br />G.T <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE:NTS <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />1 Od TOP & BOTTOM <br />OR SIMPSON H2.5A W/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A W/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />iclf 2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-O"O.C. MAX. W/ (3) 1 Od <br />COMMON TOENAILS TO TIE BEAM <br />CONC.MASONRY <br />STEEL OR WOOD <br />BEARING SUPPORT <br />A —A ALTERNATE BLOCKING <br />DETAIL @ INTERIOR BEARING K-3 <br />SCALE:NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />VARIES <br />ROOF SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 #2 SPF BRACING @ <br />16" O.C. W/ (4) 12d COMMON TRUSSES. <br />TOENAILS TO TOP SEE TRUSS PLAN <br />PLATE & (2) 12d END —MIN. (2) 2X4 FOR CONNECTION <br />NAILS TO TRUSS SPFTOP INFORMATION. <br />i <br />I <br />BOTTOM CHORD PLATE <br />gkVAR <br />IES SEE PLAN <br />FOR WALL LOCATION <br />SEE PLAN FOP <br />\IF TOP OF WALL <br />MIN. 2x4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />PLATE BELOW <br />---MIN. 2X4 #2 SYP P.T. PLATE <br />4 W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE @ 3" FROM EACH END & <br />PLAN FOR MORE 16" O.C. MAX. <br />_A: <br />� 11 <br />INFO. <br />. <br />SECTION @ ENTRY <br />SCALE:NTS <br />SIMPSON LSTA18 <br />w/ (12) 1 Od NAILS <br />CENTERED AT <br />SPLIT TO TIE <br />BEAMS TOGETHER <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />'IMPSON HUC410 w/ <br />5 <br />6d INTO HEADER & <br />Od INTO BEAM - SEE <br />=F PLAN FOR MOI <br />NFO <br />SEE FLOOR PLAN F <br />COLUMN SIZE& BA <br />CONNECTION INFO <br />(2) 2x8 #2 SYP w) <br />O.S.B. FLITCH Pi <br />TOP @TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 1 Od x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 W/ (8) <br />16d NAILS TO POST & (4) 1 Od <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 1 Od <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 1 Od <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />BEAM @ RAISED ENTRY <br />MASONRY WALL r4 <br />SCALE:NTS <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />REQ'D ONLY WHEN COLUMN SIZE& BASE <br />INDICATED ON BM. CONNECTION INFO <br />OPTION A SCHEDULE/PLAN OPTION B <br />COMMON BM. TO POST ATTACHMENT ( <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />2X4 STU <br />Spi W/ ( <br />AT BASI <br />MORE11' <br />A A <br />SEE PLAN FOR <br />SIMPSON MTS1 8 W/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />0. jC, <br />CORNER <br />SEE PLAN FOR <br />CANTILEVER IF <br />INDICATED <br />SEE FOUNDATION <br />PLAN FOR MORE INFO <br />COMMON BM. ATTACHMENT <br />SCALE:NTS <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 W/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 W/ <br />(14) 1 Od x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION <br />SCALE:NTS <br />SCALE: 3/4"=V-0" <br />SEE 1/S5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />TRU <br />1/2" PLYWOOD <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />SEE PLAN <br />FOR CANT <br />7/16" OSB FLITCH PLATE <br />REQ'D ONLY WHEN <br />INDICATED ON BM. <br />SCHEDULE/PLAN <br />OPTION C <br />BM. SPLICE OVER <br />CENTER OF POST <br />�z <br />MIDDLE <br />8d NAILS AT <br />4" O.C. <br />SEE PLAN FOR <br />VALLEY TRUSS <br />INFO. <br />9 MASONRY WALL BELOW: SIMPSON <br />HETA1 6 w/ (9) 1 Od x 1 1/2" NAILS @ <br />MASONRY WALL . A 4'-0" O.C. TO GABLE TRUSS <br />OR BEAM BEAM BELOW: SIMPSON HTS20 wl <br />SEE TRUSS PLAN <br />(24) 1 Od x 1 1/2" NAILS @ 4'-0" 0. C. <br />TO GABLE TRUSS <br />COMMON TRUSS <br />TSEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE rj_2_s� <br />SCALE:NTS <br />EXTERIOR <br />ATTACHED <br />SCHEDULE <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL ENTRY FRONT WALL <br />SCALE:NTS <br />2X4 #2 SYP NAILER. NAIL <br />TO STUDS W/ (3) 16d AT <br />EACH STUD - TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />W/ (3) 1 Od 7-PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />W/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />W/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />SIMPSON LUS26 W/ (8) 10d NAILS <br />OR IF 2 PLY TRUSS SIMPSON <br />ZSEE <br />LUS26-2 W/ (8) 16d NAILS TO <br />FLOOR FRAMING PLAN <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />2X1 0 #2 SYP CONT. LEDGER W/ (3) <br />VERIFY WITH PLAN FOR <br />LOCATION AND DIRECTION <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />(IF PARALLEL SEE 2/D2 FOR <br />LAG SCREWS INTO END OF EACH <br />BLOCKING INFO) <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />SECTION AT LOW <br />ROOF <br />SCALE: NTS <br />2x STUDS @ 16" O.C. <br />W/ SIMPSON SP1 W/ (10) 1 Od <br />NAILS AT BASE & SIMPSON <br />SP2 W/ (12) 1 Od NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END (BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />LOW ROOF/WAL STUD <br />SHEATHING ATTACHE <br />PER NAILING SCHEDULE 2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS1 2 W/ (14) 1 Od x <br />.;e-, 1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />.. . ....... ... PLYWOOD <br />FLOORING <br />LOW ROOF TRUSS W <br />___/(2) 2x6 BLOCKING UN`D�ER�'FLOOR G.T. <br />RAISED BOTTOM CHORD 2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS SIMPSON LUS24-2 W/ (16) <br />MANUF. SPEC'S FOR 16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION P 0 <br />_@ BUM UTr3q <br />SCALE:NTS ��j <br />DETAILS & SECTIONS, <br />C=o <br />.%� N%% �, - L E Vvko 4., <br />"% ....... <br />%4- 0 <br />Z! . (0: . NO E78750 <br />OF 14/ Z <br />4, <br />0 i" k <br />0-116 <br />10 <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 <br />Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal is only for <br />the structural engineering portion$ of the drawing pages bearing <br />Engineers signature and seal. <br />14 <br />5 <br />- 6 <br />0 <br />0 <br />1 .0 S 7. <br />.1M ID <br />r- P4.12 Uj a- <br />0) <br />4 <br />0 <br />0 <br />L-L <br />CN 0 a. . le , <br />-, 7� - g <br />-9 - u- at <br />z <br />= -6;; 0 <br />20'4 0 1.- <br />W <br />04 �2 M t� <br />r- Go <br />0) Cn <br />2 <br />W <br />Z <br />L <br />. . '-i <br />C, z <br />M ' i� S2 0 <br />3 <br />z <br />C14 .. < 0 <br />00 0 <br />(D <br />< <br />;:7 <br />(D <br />Q) <br />4­1 <br />(0 <br />C-n u-- <br />Uj 2 <br />in M <br />U <br />0 <br />LU <br />ILA <br />Ln <br />M <br />8 <br />.2 <br />Cl> <br />Cl> <br />0i <br />z <br />U_ <br />E <br />E 0 <br />WD <br />0 <br />z <br />ro <br />E <br />0 �i <br />U <br />0, <br />0, <br />ul <br />M <br />= I <br />f <br />.0 <br />I , <br />01 <br />Z , <br />z <br />�z <br />0 <br />'0 <br />D z <br />ff <br />x <br />mi <br />9 <br />FX <br />0 <br />.2 0 <br />(0 <br />C) <br />(a <br />t: <br />C) <br />> <br />N <br />< <br />a) <br />> <br />2 <br />C) <br />c <br />0 <br />E <br />L0 <br />M <br />C14 <br />Ir- <br />Uj <br />CN <br />CD <br />0 <br />00 <br />00 <br />V) <br />E <br />C) <br />C*4 <br />M <br />04 <br />0 <br />z <br />z <br />C <br />E C) <br />E <br />0) <br />2 <br />M <br />a <br />a. <br />0 78 <br />0 _j <br />_j <br />JOB <br />NO: <br />21-2023 <br />SCALE <br />AS NOTED <br />SHEET NO. <br />D 1 <br />