Laserfiche WebLink
A B <br />C D E <br />F <br />X <br />I. - <br />H I I <br />J <br />I I - <br />�i <br />Fz-: <br />LU <br />LU <br />LU <br />F- LLJ <br />LU <br />C15 EL <br />X CL <br />LU W <br />LU <br />0 <br />Z <br />6D <br />0 <br />LU <br />CL <br />9 <br />LU <br />W 0 <br />� =0) <br />0 <br />�-u LU <br />C0 <br />< <br />M <br />F- <br />LZ. <br />LU F- <br />0 <br />0 <br />LU <br />Z <br />0 <br />00, <br />F- <br />0 <br />LW Lu <br />LU 0 <br />U) F- <br />LU <br />Cr (33 <br />0 <br />LIJ <br />F- <br />U) Cf) <br />LLI <br />LU (40 <br />Ck') <br />LU <br />Z <br />T6 <br />Ll. LU <br />LU <br />CO <br />L1J <br />co <br />U) <br />0 <br />Z <br />LU <br />LU <br />LW <br />0 <br />Er = <br />Is <br />F- <br />0 <br />Z <br />cr <br />Er <br />LU <br />0) 0 <br />Z <br />0 <br />CL Z <br />0 <br />C� <br />Z <br />0 <br />id 9 <br />ILL <br />25 <br />0 <br />Ld <br />Z (Al <br />< L:L] <br />3.0 <br />a- <br />WW <br />0 <br />1 <br />2 <br />3 <br />4 <br />5 <br />A <br />7 <br />REFERENCED DATA <br />1. TOPOGRAPHIC SURVEY WAS PERFORMED BY AND OBTAINED FROM SURVTECH SOLUTIONS, TAMPA FLORIDA <br />(813) 621-4929, DATED OCTOBER 23,2023. <br />2. EXISTING UTILITY INFORMATION SHOWN ON THESE PLANS IS A COMBINATION OF SURFACE -ONLY SURVEY DATA, <br />FIELD OBSERVATION, AND LEGACY RECORD DRAWINGS. UTILITY LOCATES HAVE NOT BEEN PERFORMED (TO <br />DATE) FOR THIS PROJECT. <br />3. VERTICAL DATUM IS NAVD 19138, U.S. SURVEY FEET. BENCHMARK UTILIZED WAS NGS CONTROL STATION "C-663- <br />WITH ELEVATION OF 131.57 FEET. HORIZONTAL DATUM IS BASED ON STATE PLANE NAD 1983 FLORIDA WEST, 2011 <br />ADJUSTMENT U.S. SURVEY FEET. SAID DATUM WAS ESTABLISHED BY UTILIZING THE FLORIDA PERMANENT <br />REFERENCE NETWORK (FPRN). <br />4. THE SURVEY INFORMATION CONTAINED HEREIN WAS OBTAINED FOR DESIGN PURPOSES AND MAY NOT BE <br />ADEQUATE REPRESENTATION OF ACTUAL CONDITIONS FOR PROJECT CONSTRUCTION. EXISTING CONTOURS <br />SHOWN REPRESENT INTERPOLATIONSIEXTRAPOLATIONS FROM THE BEST AVAILABLE SURVEY DATA ALL RISK <br />RESULTING FROM THE USE OR INTERPRETATION OF THE SURVEY DATA SHOWN SHALL BE BORNE BY THE <br />CONTRACTOR. <br />5. GEOTECHNICAL INVESTIGATION AND RECOMMENDATIONS PERFORMED BY ECS FLORIDA, LLC, REFER TO REPORT <br />DATED JUNE 15,2022. <br />6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH IN THE FIELD LIMITS OF CONSTRUCTION, <br />BENCHMARKS (ELEV.), COORDINATES, CENTER LINES, AND STATIONING AS REQUIRED TO CONSTRUCT THIS <br />PROJECT, <br />GENERAL <br />I . ALL DESIGN AND CONSTRUCTION SHALL CONFORM TO THE MINIMUM STANDARDS SET FORTH BY THE FDEP, <br />AWWA, NSF, AND CITY OF ZEPHYRHILLS. <br />2. THE CONTRACTOR IS ADVISED NOT TO SCALE FROM DRAWINGS BUT TO FIELD VERIFY ALL DIMENSIONS. THE <br />DIMENSIONS OF SPECIFIED AND FURNISHED PRODUCTS AND MATERIALS TAKE PRECEDENCE OVER DIMENSIONS <br />INDICATED ON THE DRAWINGS. IF SIGNIFICANT DEVIATIONS OCCUR, THE CONTRACTOR SHALL NOTIFY THE <br />ENGINEER AT LEAST 72 HOURS PRIOR TO CONSTRUCTION FOR A DETERMINATION AND RESOLUTION. <br />3. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO PERFORMING ANY <br />WORK IN THE AFFECTED AREA <br />4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMIT AND INSPECTION <br />REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AGENCIES AND THE ENGINEER. THE CONTRACTOR <br />SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION AND SCHEDULE INSPECTION ACCORDING TO <br />AGENCY INSTRUCTIONS. <br />5. ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE VARIOUS <br />GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK. <br />CONSTRUCTION LAYOUPLIMITS OF CONSTRUCTION <br />1 THE CONTRACTOR SHALL OBTAIN THE SERVICES OF A PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE <br />OF FLORIDA FOR LAYOUT. PROOF OF LICENSE SHALL BE SUBMITTED TO THE ENGINEER BEFORE BEGINNING <br />LAYOUT. <br />2. NO DISTURBANCE SHALL BE ALLOWED OUTSIDE OF THE RIGHT OF WAYS AND/OR THE LIMITS OF CONSTRUCTION <br />SHOWN ON THE DRAWINGS UNLESS APPROVED BY THE OWNER OR SPECIFICALLY NOTED ON THE DRAWINGS. <br />EXISTING CONDITIONS <br />1 LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE <br />SHOWN BASED ON THE BEST INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. <br />CONTRACTOR SHALL VERIFY THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL EXISTING UTILITIES, <br />STRUCTURES, AND OTHER FEATURES AFFECTING THIS WORK PRIOR TO CONSTRUCTION. <br />2. PRIOR TO SHOP DRAWING PREPARATION AND SUBMITTAL AND PURCHASE OF RELATED MATERIALS, THE <br />CONTRACTOR SHALL FIELD VERIFY EXISTING UTILITIES (LOCATION, SIZE, MATERIALS OF CONSTRUCTION, <br />OUTSIDE DIAMETER, WALL THICKNESS, ROUNDNESS, ELEVATIONS, ETC.) TO WHICH CONNECTION(S) WILL BE <br />MADE. CONTRACTOR SHALL INCLUDE FIELD MEASUREMENTS ON SHOP DRAWINGS. <br />3. THE CONTRACTOR SHALL NOTIFY THE OWNER AND ENGINEER IN WRITING IMMEDIATELY IF CONFLICTS BETWEEN <br />THE DRAWINGS AND ACTUAL CONDITIONS ARE DISCOVERED. THE CONTRACTOR SHALL ACCURATELY RECORD <br />ANY SUCH CONFLICTS ON THE RECORD DRAWINGS. <br />4. ANY PROPERTY CORNERS, MONUMENTS, OR BENCH MARKS WITHIN THE PROJECT AREA SHALL BE PROTECTED <br />UNLESS OTHERWISE INDICATED FOR DEMOLITION. IF ANY SUCH ITEMS ARE IN DANGER OF DAMAGE OR HAVE <br />BEEN DAMAGED, THE CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER IMMEDIATELY AND <br />REPLACEIRESTORE THESE ITEMS AT NO ADDITIONAL COST TO THE OWNER. IF OWNER CHOOSES TO SELF <br />PERFORM THE WORK OR INCURS RELATED EXPENSES, THE CONTRACTOR SHALL REIMBURSE THE OWNER FOR <br />ALL COSTS ASSOCIATED WITH THE EFFORT. <br />5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR BELOW <br />GROUND THAT MAY OCCUR AS A RESULT OF THE WORK PERFORMED BY THE CONTRACTOR CALLED FOR IN THIS <br />CONTRACT. <br />UTILITY COORDINATION <br />1 . THE CONTRACTOR SHALL NOTIFY ALL UTILITIES NEAR THE PROJECT AREA AT LEAST 48 HOURS PRIOR TO <br />CONSTRUCTION. THIS SHALL INCLUDE NOTIFYING "SUNSHINE STATE ONE CALL OF FLORIDN'AT LEAST 48 HOURS <br />PRIOR TO ANY EXCAVATION WORK TO HAVE ALL EXISTING UTILITIES LOCATED. THE PHONE NUMBER IS <br />1-800432-4770 AND THE WEB SITE IS WWW.CALLSUNSHINE.COM. IN INSTANCES WHERE DIGGING OCCURS IN <br />WETLANDS, THE NOTIFICATION PERIOD SHALL BE INCREASED FROM AT LEAST 48 HOURS TO AT LEAST 10 DAYS. <br />2. FLORIDA LAW (FS 553.851) REQUIRES THAT PERSONS MAKING EXCAVATIONS IN PUBLIC STREETS, ALLEYS, <br />RIGH-r-OF-WAYS OR UTILITY EASEMENTS MUST FIRST OBTAIN INFORMATION ON LOCATIONS OF UNDERGROUND <br />GAS PIPELINES. <br />3. THE CONTRACTOR IS RESPONSIBLE FOR BRACING, SHORING, OR PROVIDING OTHER MEANS NECESSARY TO <br />PROTECT AND SUPPORT EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (EXPOSED OR UNEXPOSED) <br />THAT MAY BE IMPACTED BY HIS WORK. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING POWERrrELEPHONE COMPANIES AND ARRANGING <br />TO HAVE UTILITIES POLES HELD ANDIOR GUY WIRES REMOVED AND REPLACED, IF NECESSARY FOR <br />CONSTRUCTION, AT NO ADDITIONAL COST TO THE OWNER. <br />5. THE CONTRACTOR SHALL NOTIFY THE APPROPRIATE PUBLIC AGENCY(IES) PRIOR TO COMMENCING WORK <br />WITHIN THEIR JURISDICTION. <br />6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BE FAMILIAR WITH THE OSHA EXCAVATION SAFETY <br />STANDARDS AND TO ABIDE BY THEM AS COVERED UNDER THE FLORIDA TRENCH SAFETY ACT. <br />7. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION SAFETY. <br />RESTORATION <br />1. ALL PAVING, STABILIZED EARTH, DRIVEWAYS, CURBS, SIDEWALKS, FENCES, SOD, LANDSCAPING, CULVERTS, ETC. <br />DISTURBED BY CONSTRUCT10N ACTIVITIES SHALL BE RESTORED BY AND AT THE EXPENSE OF THE CONTRACTOR <br />TO THE SATISFACTION OF THE OWNER. <br />2. ALL EXISTING SIGNS AND MAILBOXES LOCATED WITHIN THE PROJECT SHALL BE REMOVED AND REINSTALLED OR <br />REPLACED AS REQUIRED DURING CONSTRUCTION AND SHALL BE RESTORED BY AND AT THE EXPENSE OF THE <br />CONTRACTOR TO THE SATISFACTION OF THE OWNER. <br />3. ALL SIDEWALKS DAMAGED DURING CONSTRUCTION ARE TO BE A MINIMUM WIDTH OF 4% A MINIMUM OF 4" THICK, <br />3,000 PSI CONCRETE, AND SHALL BE REINFORCED WITH 1AX1 4 W.W.M. <br />ACCESSMAI NTE NANCE OF FACILITIES <br />1. THE CONTRACTOR SHALL PROVIDE ACCESS TO ALL EXISTING UTILITIES/FACILITIES AND MAINTAIN <br />UNINTERRUPTED SERVICES THROUGHOUT THE CONTRACT PERIOD. <br />MAINTENANCE OF TRAFFIC <br />1 THE CONTRACTOR SHALL REFER TO THE "2014 FLORIDA DEPARTMENT OF TRANSPORTATION ROADWAY AND <br />TRAFFIC DESIGN STANDARDS" FOR FDOT DESIGN INDEXES AND 2014 "FLORIDA DEPARTMENT OF <br />TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" AS SUPPLEMENTS TO <br />THE INFORMATION AND DETAILS PROVIDED IN THESE CONSTRUCTION DRAWINGS. <br />2. ALL REFERENCED FDOT STANDARD INDEX DRAWINGS CAN BE FOUND AT <br />WWW.DOT.STATE.FL.USIRDDESIGN/DS114/S`TDS.SHTM. <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFE MAINTENANCE OF PEDESTRIAN AND VEHICULAR TRAFFIC <br />AT ALL TIMES DURING THE DURATION OF THE PROJECT. <br />4. THE CONTRACTOR SHALL MAINTAIN TRAFFIC IN ACCORDANCE WITH FDOT STANDARD INDEX 600 SERIES AND THE <br />TECHNICAL SPECIFICATIONS. THE CONTRACTOR SHALL FURNISH, ERECT, AND MAINTAIN ALL NECESSARY <br />TRAFFIC CONTROL AND SAFETY DEVICES THROUGHOUT THE PROJECT. ONE TRAFFIC LANE MUST BE MAINTAINED <br />AT ALL TIMES WITH USE OF FLAGGER. ALL TRAFFIC LANES MUST BE WIDE OPEN FOR TRAFFIC AT THE CLOSE OF <br />WORKDAYS. ALL SIGNING, BARRICADES, LIGHTING, AND FLAGGERS SHALL BE INCLUDED IN THE LUMP SUM COST. <br />5. ALL PAVEMENT MARKINGS SHALL MEET CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, <br />STANDARDS, AND SHALL BE PAINTED IN ACCORDANCE WITH FDOT STANDARD SPECIFICATION SECTION 710. <br />6. SIGNS AND BARRICADES TO BE ACCORDING TO FDOT MANUAL OF SAFE PRACTICES; REFERENCE FDOT INDEXES <br />600 THROUGH 650 AND 17349 PER ROADWAY AND TRAFFIC DESIGN STANDARDS LATEST EDITION. <br />PROJECT SPECIFIC <br />1. REFER TO PROJECT SPECIFICATIONS. <br />0 <br />ISSUED FOR PERMIT <br />09/19/24 <br />TJS <br />NHL <br />JPRH <br />ACS <br />AJE <br />REV <br />REVISION DESCRIPTION <br />DATE <br />I DRWN <br />DSGNICHKDI <br />QC <br />JAPPD <br />REF. DWG. NO <br />REFERENCE DRAWING TITLE <br />SURVEYOR'S NOTES <br />1.) Paper copies of this survey are not valid without the original signature and raised <br />seal of a Florida Licensed Surveyor and Mapper. Digital copies are not valid without <br />the digital signature of a Florida Licensed Surveyor and Mapper. <br />2.) The horizontal datum utilized for this project is NAD 1983 Florida West Zone, 2011 <br />Adjustment, U.S. Survey Feet. Said datum was established by utilizing the Florida <br />Permanent Reference Network (FPRN). <br />3.) The vertical datum utilized for this project is INAVID 1988, U.S. Survey Feet. The <br />benchmark utilized was National Geodetic Survey (NGS) Benchmark "C 663" with an <br />elevation of 81.57 feet. <br />4.) All utilities depicted hereon are from visible evidence only. Surveyor did not contact <br />subsurface utility locator service. <br />5.) No underground foundations or footers were excavated or located for this survey. <br />6.) Surveyor makes no guarantees as to the species of trees or to the health of each <br />tree depicted hereon, if this information is necessary a certified arborist should be <br />contacted. <br />7.) The trees shown hereon were located utilizing methods adequate for their accurate <br />location and identification. However, this company and the signing surveyor reserves <br />the right to verify the location of all trees critical to the design of buildings, <br />parking and other permanent features. It is the responsibility of the design <br />professional to inform this company and/or the signing surveyor of any trees <br />critical to their design so that those trees can be verified prior to the completion <br />of the design. <br />8.) THIS IS NOT A BOUNDARY SURVEY. <br />BENCHMARK INFORMATION: NAVD 1988 <br />TBM # 1 CP70 <br />Elevation = 82.01' <br />Set nail & disk labeled "SurvTech Tray. Pt" in concrete pavement; ±0.5 feet East of the <br />edge of pavement; ±13 feet Southwest of the edge of concrete; ±18 feet South of sign. <br />TBM #2 CP71 <br />Elevation = 80.48' <br />Set nail & disk labeled "SurvTech Trov. Pt" in asphalt pavement; ±7 feet East of the <br />back of curb; ±7 feet Northeast of a chain link fence. <br />SURVEYLEGEND <br />PSM <br />Professional Surveyor and Mapper <br />Utility Pole <br />Id. <br />Identification <br />le <br />C- <br />Guy Wire <br />LB <br />Licensed Business <br />[E] <br />Electric Pull Box <br />OR <br />Official Records <br />M <br />Telephone Pull Box <br />0 <br />Found Concrete Monument <br />Fire Hydrant <br />0 <br />Found Iron Pipe or Rod <br />Water Meter <br />40 <br />Found Nail & Disk <br />Water Valve <br />Temporary Benchmark <br />W <br />Water Line Marker <br />TBM <br />Temporary Benchmark <br />Palm <br />Back of Curb Elevation <br />0 <br />Oak <br />X92 <br />Edge of Pavement Elevation <br />0 <br />Unknown Tree <br />+* <br />Spot Elevation <br />0 <br />Round Post <br />x <br />,�# <br />Spot Elevation on Hard Surface <br />Sign <br />X <br />X- � x <br />Fence <br />0 <br />Miscellaneous Feature <br />Overhead Utility Lines <br />Gate <br />DEMOLITION LEGEND <br />DEMOLISH AND REMOVE CHAIN LINK FENCE <br />DEMOLISH AND REMOVE CURB <br />X REMOVE AND RELOCATE SIGN <br />Digitally signed by John PR <br />Holland ll <br />ON: C-US, <br />ri-John.thollandOnwick.com, <br />O-Mentick & Co., CN-John PR <br />John PR Holland 11 Holland 11 <br />Reason; I agree to the terms <br />defined by the placernertl of my <br />s"ture on this document <br />Date: 2024.09. 9 <br />14:44:59-06'00� <br />ss%�1111.1 <br />V <br />0'. <br />01' <br />67114 <br />STAT*E OF - 1 14 <br />09/24/2024 <br />10NAL <br />ABBREVIATIONS <br />ABC <br />AGGREGATE BASE COURSE <br />ACP <br />ASPHALTIC CONCRETE PAVEMENT <br />AD <br />ALGEBRAIC DIFFERENCE <br />& <br />AND <br />APPROX <br />APPROXIMATE <br />ARV <br />AIR RELIEF VALVE <br />@ <br />AT <br />ASCE <br />AMERICAN SOCIETY OF CIVIL ENGINEERS <br />AVB <br />ACTIVE VEHICLE BARRIER <br />BVCE <br />BEGIN VERTICAL CURVE ELEVATION <br />BVCS <br />BEGIN VERTICAL CURVE STATION <br />cc <br />CENTER OF CURVATURE <br />CL <br />CENTERLINE <br />CMP <br />CORRUGATED METAL PIPE <br />Comm <br />COMMUNICATIONS <br />CONC <br />CONCRETE <br />CONT <br />CONTINUED/CONTINUOUS <br />COR <br />CORNER <br />CP <br />CONTROL POINT <br />0 <br />DEGREES <br />DESC <br />DESCRIPTION <br />O/DIA <br />DIAMETER <br />DWG <br />DRAWING <br />DCM <br />DRAINAGE CRITERIA MANUAL <br />EA <br />EACH <br />E <br />EAST <br />E: <br />EASTING <br />ELEC <br />ELECTRIC <br />EUELEV <br />ELEVATION <br />EOC <br />EDGE OF CONCRETE <br />EOP <br />EDGE OF PAVEMENT <br />EQ <br />EQUAL <br />EVCE <br />END VERTICAL CURVE ELEVATION <br />EVCS <br />END VERTICAL CURVE STATION <br />EX/EXIST <br />EXISTING <br />FES <br />FLARED END SECTION <br />FH <br />FIRE HYDRANT <br />FO <br />FIBER OPTIC <br />FL <br />FLOW LINE <br />FDN <br />FOUNDATION <br />FT <br />FEET <br />GA <br />GAUGE <br />G.B. <br />GRADE BREAK <br />GI <br />GRATEINLET <br />GPP <br />GREEN PROCUREMENT PROGRAM <br />GRND <br />GROUND <br />H <br />HAND HOLE <br />HCL <br />HORIZONTAL CONTROL LINE <br />HORIZ <br />HORIZONTAL <br />H.P. <br />HIGH POINT <br />IBC <br />INTERNATIONAL BUILDING CODE <br />INV <br />INVERT <br />LF <br />LINEAR FEET <br />LP <br />LIGHT POLE/LOW POINT <br />M.E. <br />MATCH EXISTING <br />MH <br />MANHOLE <br />MAX <br />MAXIMUM <br />M.P.H. <br />MILES PER HOUR <br />MIN <br />MINIMUM <br />NEPA <br />NATIONAL ENVIRONMENTAL POLICY ACT <br />NPDES <br />NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM <br />N <br />NORTH <br />NE <br />NORTHEAST <br />N.I.C. <br />NOT IN CONTRACT <br />N: <br />NORTHING <br />NW <br />NORTHWEST <br />NO <br />NUMBER <br />OC <br />ON CENTER <br />Oz <br />OUNCE <br />OHE <br />OVERHEAD ELECTRIC LINE <br />PERF <br />PERFORATED <br />PC <br />POINT OF CURVE <br />PT <br />POINT OF TANGENCY <br />PSI <br />POUNDS PER SQUARE INCH <br />POT <br />POTABLE <br />PVB <br />PASSIVE VEHICLE BARRIER <br />PVI <br />POINT OF VERTICAL INTERSECTION <br />PRC <br />POINT OF REVERSE CURVATURE <br />RCP <br />REINFORCED CONCRETE PIPE <br />RPR <br />REPAIR <br />SAN <br />SANITARY <br />SS <br />SANITARY SEWER LINE <br />SHT <br />SHEET <br />Sim <br />SIMILAR <br />SF <br />SQUARE FEET <br />S <br />SOUTH <br />SE <br />SOUTHEAST <br />SW <br />SOUTHWEST <br />STD <br />STANDARD <br />STL <br />STEEL <br />SD <br />STORM DRAIN LINE <br />SUST <br />SUSTAIN <br />TEL <br />TELEPHONE <br />TRANS <br />TRANSFORMER <br />T.O.C. <br />TOP OF CONCRETE <br />TYP <br />TYPICAL <br />UGE <br />UNDERGROUND ELECTRIC LINE <br />VERT <br />VERTICAL <br />VCP <br />VITRIFIED CLAY PIPE <br />W <br />WEST <br />WM <br />WATER METER <br />XS <br />EXTRA STRENGTH <br />* THE LIST OF ABBREVIATIONS AND THE LEGENDS MAY <br />CONTAIN ITEMS THAT ARE NOT SHOWN WITHIN THE <br />DRAWINGS AND DO NOT OCCUR IN THE PROJECT. <br />000 <br />o90 MERRICK* <br />000 <br />B L U E T R I T 0 N <br />MERRICK PROJECT NO.: 3021600491 <br />CLIENT PROJECT NO.: <br />. SCALE: N/1AJ <br />TITLE: <br />BLUE TRITON ZEPHYRHILLS <br />CIVIL <br />GENERAL NOTES, LEGENDS, AND ABBREVIATIONS <br />REVISION: DRAWNG NO.: SHEET NO.: <br />0 6004-CN-02-001 1 OF 1 <br />1 <br />2 <br />3 <br />2 <br />5 <br />7 <br />9 <br />10 <br />A I B <br />C I D I E I F I G I H <br />I I J <br />