GENERAL NOTES
<br />1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH SITE
<br />CONDITIONS AS THEY MAY AFFECT CARRYING OUT THE WORK AS DESCRIBED IN
<br />THESE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL INVESTIGATE, VERIFY,
<br />AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT, AND NOTIFY THE
<br />ARCHITECT OF ANY CONDITIONS THAT REQUIRE MODIFICATION BEFORE PROCEEDING
<br />WITH THE WORK.
<br />2. ARCHITECTURAL DRAWING NOTATION INCLUDES SPECIFICATION SECTION
<br />REFERENCE NUMBERS IN CONJUNCTION WITH MATERIAL DESCRIPTIONS. THIS
<br />INFORMATION IS PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR ONLY
<br />AND IS NOT INTENDED TO INDICATE SPECIFIC TRADES TO BE UTILIZED FOR THE
<br />WORK. IN CASE OF DISCREPANCIES BETWEEN THE REFERENCE NUMBER AND THE
<br />VERBAL DESCRIPTION, THE VERBAL DESCRIPTION SHALL TAKE PRECEDENCE,
<br />UNLESS OTHERWISE DIRECTED. DISCREPANCIES BETWEEN SPECIFICATION NUMBER
<br />REFERENCES AND WRITTEN DESCRIPTIONS OF MATERIALS OR SYSTEMS IN NO WAY
<br />RELIEVES THE CONTRACTOR OF RESPONSIBILITY FOR THE COMPLETING OF THE
<br />WORK AS SHOWN.
<br />3. DIMENSIONS INDICATED ARE TO FACES OF STRUCTURE AND GRID LINES (TYPICAL),
<br />UNLESS NOTED OTHERWISE.
<br />4. REFER TO ENLARGED PLANS FOR DIMENSIONS, DETAIL REFERENCES, AND INTERIOR
<br />ELEVATION REFERENCES WITHIN THOSE AREAS.
<br />5. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL FOR
<br />ADDITIONAL GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS. ALL NOTES ARE TO
<br />BE REVIEWED, AND APPLIED TO RELATED BUILDING COMPONENTS. DETAILS NOT
<br />SHOWN ARE SIMILAR IN CHARACTER TO THOSE THAT ARE SHOWN. WHERE
<br />SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED OR
<br />REASONABLY INFERRED, CONSULT THE ARCHITECT BEFORE PROCEEDING WITH THE
<br />WORK. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL COLUMN AND BEARING
<br />WALL LOCATIONS AND SIZES.
<br />6. REFER TO DETAIL SHEET FOR PARTITION TYPES, DETAILS, AND DESCRIPTIONS.
<br />7. REFER TO REFLECTED CEILING PLANS FOR SOFFIT LOCATIONS AND CEILING
<br />DETAIL REFERENCES.
<br />B. WHERE DOORS IN METAL STUO/GYPSUM BOARD PARTITIONS ARE NOT
<br />SPECIFICALLY LOCATED ON THE PLANS WITH DIMENSION STRINGS, PROVIDE A
<br />MINIMUM HINGE -SIDE JAMB DIMENSION OF 6' FROM DOOR OPENING TO ADJACENT
<br />PERPENDICULAR WALLS. WHERE DOORS APPEAR TO BE CENTERED WITHIN
<br />CORRIDORS, LOCATE THE DOORS IN THE CENTER OF THE CORRIDOR.
<br />9. TOP OF CONCRETE FINISH FLOOR (LEVEL ONE) IS ASSUMED AT EI. 100'-0.
<br />10. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT CONFIGURATIONS OR
<br />DETAILS OF SPECIFIC MANUFACTURERS (TYPICALLY THE FIRST MANUFACTURER
<br />LISTED UNDER 'ACCEPTABLE MANUFACTURERS' IN THE SPECIFICATIONS).
<br />DIMENSIONS AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY
<br />ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER
<br />MANUFACTURERS MAY ALSO BE ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION
<br />DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL
<br />VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED
<br />IN THE WORK (INCLUDING PARTITION THICKNESSES FOR RECESSED OR
<br />SEMI -RECESSED PRODUCTS), AND IS RESPONSIBLE FOR ACCOMMODATING AND
<br />COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE
<br />NECESSARY BECAUSE OF THESE DIFFERENCES.
<br />11. PARTITION TYPES CONTINUE AROUND CORNERS UNLESS INDICATED OTHERWISE.
<br />12. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR THE
<br />CONVENIENCE OF THE ARCHITECT AND THE CONTRACTOR. THE SEPARATIONS
<br />USED HEREIN ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND
<br />REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT
<br />OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS
<br />A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY
<br />SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE,
<br />INTEGRATED AND UNIFIED WHOLE.
<br />13. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY
<br />SPECIFIC ENGINEERING DISCIPLINES (SUCH AS CIVIL, STRUCTURAL, MECHANICAL,
<br />ELECTRICAL, ETC.) ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN
<br />THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT
<br />FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE
<br />DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR
<br />SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE ARCHITECT PRIOR TO
<br />BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND
<br />WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED,
<br />THE CONTRACTOR SHALL INCLUDE THE BETTER QUALITY OR GREATER QUANTITY
<br />OF WORK IN THE BID PROPOSAL.
<br />14. WALL, CEILING, BASE, AND FLOOR FINISHES ARE TO BE PROVIDED IN EVERY
<br />ROOM UNLESS THE DRAWINGS SPECIFICALLY INDICATE THAT A ROOM OR PORTION
<br />THEREOF IS TO REMAIN 'UNFINISHED.' IF ROOM FINISHES ARE NOT
<br />SPECIFICALLY INDICATED, PROVIDE THE SAME FINISHES AS ARE PROVIDED IN
<br />THE ROOM ADJACENT TO THE ROOM IN QUESTIONS, OR OBTAIN CLARIFICATION
<br />FROM THE ARCHITECT PRIOR TO BIDDING.
<br />15. FIRE-RATEO CORRIDOR PARTITIONS INDICATED ON FLOOR PLANS ARE COMPONENTS
<br />OF CONTINUOUS RATED CORRIDOR ASSEMBLIES CONSISTING OF WALLS, FLOOR,
<br />AND CEILING. SEE REFLECTED CEILING PLANS AND PARTITION TYPES FOR
<br />SPECIFIC METHODS OF ACHIEVING THE NECESSARY RATINGS. WHERE THE
<br />SPECIFIC METHOD OF ACHIEVING THE RATING IS NOT INDICATED, OBTAIN
<br />CLARIFICATION FROM THE ARCHITECT PRIOR TO BIDDING. THE RATING OF THE
<br />ENTIRE CORRIDOR MUST BE MAINTAINED. PROVIDE RATED PARTITIONS, FLOORS
<br />CEILINGS, AND DOOR OR OTHER OPENING ASSEMBLIES TO MAINTAIN THE
<br />CONTINUITY OF THE FIRE RATING. PROVIDE FIRE SAFING AND FIRE -RATED
<br />SEALANTS TO MAINTAIN THE CONTINUITY OF THE FIRE -RATED SYSTEM. IF A
<br />CEILING RATING IS NOT SPECIFICALLY INDICATED, OBTAIN CLARIFICATION FROM
<br />THE ARCHITECT PRIOR TO BIDDING; OTHERWISE, ASSUME A RATING TO MATCH THE
<br />RATING OF THE CORRIDOR WALLS. WHERE MECHANICAL WORK PENETRATES ANY
<br />COMPONENT OF THE FIRE -RATED ASSEMBLY, PROVIDE THE APPROPRIATE FIRE
<br />ANO/OR SMOKE DAMPERS. IF IT IS NOT CLEAR WHETHER OUCTWORK PENETRATES
<br />A PORTION OF THE RATED ASSEMBLY, OBTAIN CLARIFICATION FROM THE
<br />ARCHITECT PRIOR TO BIDDING.
<br />16. DOOR ASSEMBLIES IN I -HOUR RATED PARTITIONS ARE TO BE 20-MINUTE RATED
<br />UNLESS A HIGHER RATING IS INDICATED IN THE DOOR SCHEDULE.
<br />17. DOOR ASSEMBLIES IN 2-HOUR RATED PARTITIONS ARE TO BE 90-MINUTE RATED
<br />UNLESS A HIGHER RATING IS INDICATED IN THE DOOR SCHEDULE.
<br />le. USE TEMPERED GLASS IN ALL OPENINGS WITHIN 18' OF THE FLOOR OR A DOOR,
<br />UNLESS ANOTHER FORM OF SAFETY GLAZING IS SPECIFICALLY INDICATED ON THE
<br />DRAWINGS.
<br />19. USE WIRE -GLASS IN ALL GLAZED OPENINGS WITHIN FIRE -RATED CORRIDORS.
<br />20. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR MATERIALS
<br />INTERSECT PERPENDICULAR TO EACH OTHER, AND THE INTERSECTION IS EXPOSED
<br />TO VIEW, UNLESS INDICATED OTHERWISE ON THE DRAWINGS.
<br />21. PROVIDE SLIP JOINT CONNECTIONS AT THE TOPS OF ALL PARTITIONS WHICH
<br />INTERSECT THE STRUCTURE ABOVE; PROVIDE FIRE-SAFING AT ALL SLIP -JOINT
<br />CONNECTIONS IN FIRE-RATEO PARTITIONS. SEE PARTITION TYPES FOR TYPICAL
<br />SLIP -JOINT CONNECTION DESIGN. IF AMOUNT OF DEFLECTION TO BE
<br />ACCOMMODATED IS NOT INDICATED, OBTAIN CLARIFICATION FROM THE ARCHITECT
<br />PRIOR TO INSTALLATIONS.
<br />22. PAINT ALL EXPOSED STEEL OR WOOD (UNLESS NOTED OTHERWISE).
<br />23. ALL MATERIAL COLORS TO BE SELECTED BY ARCHITECT, UNLESS NOTED
<br />OTHERWISE.
<br />24. M.O. (MASONRY OPENING) REFERS TO NOMINAL MASONRY OPENING DIMENSIONS IN
<br />MASONRY CONSTRUCTION. 6"n-ax 36" min
<br />1* J* J*
<br />54"min .00 10
<br />.4 0* �04# 0* 18
<br />- -,-\ 09� 42"Min 70e .0
<br />GENERAL
<br />NOTES
<br />MEP MOUNTING HEIGHTS
<br />ABBREVIATIONS
<br />1.
<br />INFORMATION CONTAINED ON THESE DRAWINGS WITH REGARD TO EXISTING
<br />ELECTRICAL GENERAL:
<br />A.B.
<br />ANCHORBOLT
<br />K.O.
<br />KNOCK OUT
<br />CONDITIONS OF CONSTRUCTION IS PROVIDED FOR THE CONVENIENCE OF THE
<br />MOUNTING HEIGHTS INDICATED APPLY FOR GENERAL CONDITIONS UNLESS NOTED OTHERWISE
<br />A.C.T.
<br />ACOUSTICAL CEILING TILE
<br />LAB.
<br />LABORATORY
<br />GENERAL CONTRACTOR IN EXECUTING THE WORK. EVERY ATTEMPT HAS BEEN
<br />(DIMENSIONS REPRESENT DISTANCE ABOVE FINISH FLOOR TYPICAL). IF CONFLICTS ARISE,
<br />A/C
<br />AIR CONDITIONER
<br />LAM.
<br />LAMINATE(0)
<br />MADE TO PROVIDE COMPLETE AND ACCURATE REPRESENTATIONS OF SUCH
<br />REVIEW WITH ARCHITECT PRIOR TO INSTALLATION OF BACK BOXES OR FRAMING; MODIFY
<br />ADJ.
<br />ADJUSTABLE
<br />LAV.
<br />LAVATORY
<br />EXISTING CONDITIONS. THIS INTERPRETATION HAS BEEN TAKEN FROM RECORD
<br />THESE HEIGHTS AS NECESSARY TO CONFORM TO ADA REQUIREMENTS, LOCAL CODE.
<br />A.F.F.
<br />ABOVE FINISH FLOOR
<br />LB.(s)
<br />POUNO(S)
<br />SETS OF 'AS -BUILT' DRAWINGS ON FILE FROM THE OWNER AND HAS BEEN
<br />ALT.
<br />ALTERNATE
<br />L.F.
<br />LINEAR FOOT
<br />FURTHER SUPPLEMENTED BY FIELD -MEASUREMENT AND OBSERVATIONS. THE
<br />ELECTRICAL ITEM MOUNTING HEIGHT:
<br />ALUM.
<br />ALUMINUM
<br />LGT.
<br />LENGTH
<br />ARCHITECT CANNOT AND DOES NOT GUARANTEE THE ACCURACY OF ANY SUCH
<br />A.P.
<br />ACCESS PANEL
<br />L.H.
<br />LEFT HAND
<br />INFORMATION AND ASSUMES NO LIABILITY THEREFORE.
<br />ACCESS PANEL @ WATER WALLS: 2'-0 AFF TO CENTER OF UNIT
<br />APPROX.
<br />APPROXIMATE
<br />LIN.
<br />LINEN
<br />DRINK FOUNTAIN OR ELECTRIC WATER COOLER:
<br />ARCH.
<br />ARCHITECTURAL
<br />LKR.
<br />LOCKER
<br />2.
<br />THE INFORMATION CONTAINED ON THESE DRAWINGS WITH REGARD TO EXISTING
<br />@ ACCESSIBLE: 3'-0' TO SPOUT
<br />A.S.
<br />ABOVE SLAB
<br />LT.
<br />LIGHT
<br />CONDITIONS OF CONSTRUCTION IN NO WAY RELEASES THE GENERAL CONTRACTOR
<br />@ STANDARD: 3'-6' TO SPOUT
<br />AUTO.
<br />AUTOMATIC
<br />MAINT.
<br />MAINTENANCE
<br />FROM THE RESPONSIBILITY FOR VERIFYING COMPLETELY ALL FIELD CONDITIONS
<br />MARKERBOARDS/TACKBOAROS: 3'-0 TO BOTTOM RAIL
<br />B/
<br />BOTTOM OF
<br />MAS.
<br />MASONRY
<br />RELATING TO AND AFFECTING THE EXECUTION OF THE WORK, AS DESCRIBED IN
<br />THERMOSTATS: 5'-0' AFF TO CENTER
<br />BO.
<br />BOARD
<br />MATL.
<br />MATERIAL
<br />THESE CONTRACT DOCUMENTS.
<br />ELECTRICAL RECEPTACLE: 1'-6', OR 4' ABOVE COUNTER AND
<br />BLDG.
<br />BUILDING
<br />MAX.
<br />MAXIMUM
<br />BACKSPLASH, OR CENTER IN SPACE
<br />BKL.
<br />BLOCK
<br />MECH.
<br />MECHANICAL
<br />3.
<br />IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO FIELD VERIFY AND
<br />PROVIDED WHEN USED WITH
<br />BKLG.
<br />BLOCKING
<br />MEZZ.
<br />MEZZANINE
<br />DOCUMENT ALL EXISTING DIMENSIONS, ELEVATIONS AND BENCHMARKS, MATERIALS
<br />COUNTERTOP & CABINETS ABOVE.
<br />BM.
<br />BEAM
<br />MFR.
<br />MANUFACTURER
<br />AND METHODS OF CONSTRUCTION THAT MAY AFFECT OR BE AFFECTED BY NEW
<br />B.M.
<br />BENCH MARK
<br />MGMT.
<br />MANAGEMENT
<br />WORK, AND TO COORDINATE SUCH FIELD VERIFICATION WITH THE CONTRACT
<br />ELECTRICAL AND COMMUNICATIONS RECEPTACLES:
<br />BOT.
<br />BOTTOM
<br />MIN.
<br />MINIMUM
<br />DOCUMENTS AND THE EXECUTION OF THE WORK. DISCREPANCIES AND/OR
<br />@ WALL MOUNTED TV: 7'-B' TO CENTER
<br />B.S.
<br />BOTH SIDES
<br />misc.
<br />MISCELLANEOUS
<br />CONFLICTS INVOLVING ANTICIPATED EXISTING CONDITIONS SHALL BE 13ROUGHT
<br />@ COMMUNICATIONS RECEPTACLE: l'-6', OR 4' ABOVE TOP OF COUNTER OR
<br />B.T.B.
<br />BACK TO BACK
<br />M.O.
<br />MASONRY OPENING
<br />TO THE ARCHITECT'S ATTENTION IMMEDIATELY.
<br />BACKSPLASH, TO CENTER
<br />B.U.R.
<br />BUILT UP ROOFING
<br />M.R.
<br />MOISTURE RESISTANCE
<br />CAB.
<br />CABINET
<br />MTO.
<br />MOUNTED
<br />4.
<br />FIELD- VERIF IC ATI ON OF EXISTING CONDITIONS RELATED TO SPECIFIC PORTIONS
<br />C.B.
<br />CATCH BASIN
<br />MTG.
<br />MOUNTING
<br />OF THE WORK SHALL BE UNDERTAKEN IN ADVANCE TO ALLOW FOR THE TIMELY
<br />ELECTRICAL SWITCH: 3'-B' TO CENTER
<br />CCTV.
<br />CLOSED CIRCUIT TELEVISION
<br />MTL.
<br />METAL
<br />IDENTIFICATION OF EXISTING CONDITIONS THAT MAY AFFECT THE SCHEDULED
<br />FIRE ALARM PULL STATION: 3'-B' TO CENTER
<br />C.G.
<br />CORNER GUARD
<br />MUL.
<br />MULLION
<br />INSTALLATION OF NEW WORK AS DESIGNED AND DETAILED, AND TO AVOID UNDUE
<br />FIRE EXTINGUISHER CABINET: 3'-4' TO BOTTOM
<br />C.J.
<br />CONTROL JOINT
<br />N.I.C.
<br />NOT IN CONTRACT
<br />AND UNREASONABLE DELAYS TO THE PROJECT SHOULD SUCH CONDITIONS BE
<br />FIRE HORN DEVICE: 7'-B' TO CENTER
<br />C.L.
<br />CENTER LINE
<br />NO.
<br />NUMBER
<br />DISCOVERED. TIMELY IDENTIFICATIONS OF SUCH CONDITIONS SHALL PROVIDE
<br />CLOCK & WALL MOUNTED SPEAKER: 7'-0' AFF TO CENTERLINE OF UNITS
<br />CLG.
<br />CEILING
<br />NOM.
<br />NOMINAL
<br />FOR A MINIMUM PERIOD OF TEN (10) WORKING DAYS DURING WHICH TIME THE
<br />AUTOMATIC DOOR OPERATOR: 3'-0' TO CENTER
<br />CLO.
<br />CLOSET
<br />N.T.S.
<br />NOT TO SCALE
<br />ARCHITECT WILL EVALUATE THE CONDITIONS AND MAKE RECOMMENDATIONS FOR
<br />MAGNETIC DOOR HOLDER: 6'-4' TO CENTER
<br />CLR.
<br />CLEAR
<br />O.A.
<br />OVERALL
<br />ACCOMMODATING NEW WORK.
<br />PANIC HARDWARE: 3'-0' TO CENTER
<br />CLS.
<br />CLOSURE
<br />D.C.
<br />ON CENTER
<br />ROOM SIGNAGE: 60' TO CENTER, 2' AWAY FROM LATCH SIDE
<br />C.M.
<br />CONSTRUCTION MANAGER
<br />0.0.
<br />OUTSIDE DIAMETER
<br />5.
<br />IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ASSIST THE
<br />JAMB
<br />C.M.U.
<br />CONCRETE MASONRY UNIT
<br />OFF.
<br />OFFICE
<br />ARCHITECT IN MAKING THEIR EVALUATIONS AND RECOMMENDATIONS BY PROVIDING
<br />PLUMBING GENERAL:
<br />COL.
<br />COLUMN
<br />OH.
<br />OVERHEAD
<br />IN A TIMELY MANNER, AT NO ADDITIONAL COST TO THE OWNER, ACCURATE AND
<br />CONC.
<br />CONCRETE
<br />OPP.
<br />OPPOSITE
<br />COMPLETE DRAWINGS, SKETCHES, AND PHOTOGRAPHS SUFFICIENT TO CLEARLY
<br />MOUNTING HEIGHTS INDICATED APPLY FOR TYPICAL CONDITIONS UNLESS NOTED OTHERWISE
<br />CONF.
<br />CONFERENCE
<br />OPP.H.
<br />OPPOSITE HANG
<br />DESCRIBE DISCREPANCIES, CONFLICTS, AND CONCEALED OR OTHERWISE
<br />(DIMENSIONS ARE ABOVE FINISH FLOOR (AFF) TYPICAL). IF CONFLICTS ARE DISCOVERED
<br />CONT.
<br />CONTINUOUS
<br />O.T.O.
<br />OUT TO OUT
<br />UNANTICIPATED EXISTING CONDITIONS AFFECTING NEW CONSTRUCTION. THE
<br />REVIEW WITH ARCHITECT PRIOR TO INSTALLATION OF BACK BOXES OR FRAMING. CONFIRM'
<br />C , P ,
<br />CONTROL PANEL
<br />P.A.
<br />PUBLIC ADDRESS
<br />GENERAL CONTRACTOR SHALL FURTHER ASSIST THE ARCHITECT BY PROVIDING IN
<br />AND MODIFY THESE HEIGHTS AS NECESSARY TO CONFORM TO ADA REQUIREMENTS OR, LOCAL
<br />CPT.
<br />CARPET
<br />PART.
<br />PARTITION
<br />A TIMELY MANNER PREPARED SOLUTIONS TO UNANTICIPATED EXISTING
<br />CODES.
<br />CORR.
<br />CORRIDOR
<br />PAV.
<br />PAVEMENT
<br />CONDITIONS.
<br />C.T.
<br />CERAMIC TILE
<br />P.C.
<br />PRECAST
<br />cu.
<br />CUBIC
<br />PFB.
<br />PREFABRICATE(D)
<br />6.
<br />THE ARCHITECT HAS ENDEAVORED TO IDENTIFY AS COMPLETELY AS POSSIBLE IN
<br />PLUMBING ITEM MOUNTING HEIGHT
<br />C.W.
<br />COLD WATER
<br />PFN.
<br />PREFINISHED
<br />THE DRAWINGS AND SPECIFICATIONS EXISTING ITEMS OF EQUIPMENT AND
<br />LAVATORY: 34' TO RIM OR COUNTER
<br />DBL.
<br />DOUBLE
<br />PL.
<br />PLATE
<br />CONSTRUCTION THAT ARE REQUIRED TO BE REMOVED OR OTHERWISE DEMOLISHED
<br />WATER CLOSET:
<br />DEMO.
<br />DEMOLISH
<br />PLWO.
<br />PLYWOOD
<br />SO AS TO ALLOW THE EXECUTION OF NEW WORK. THIS INFORMATION IS
<br />@ ACCESSIBLE: 17' TO 19' TO TOP OF SEAT
<br />DEPT.
<br />DEPARTMENT
<br />PR.
<br />PAIR
<br />PROVIDED FOR THE CONVENIENCE OF THE GENERAL CONTRACTOR, AND IS IN NO
<br />@ STANDARD: 14' - 15' TO RIM
<br />OET.
<br />DETAIL
<br />PROP.
<br />PROPERTY
<br />WAY INTENDED TO MEAN THAT DEMOLITION IS LIMITED ONLY TO THOSE ITEMS
<br />URINAL:
<br />O.F.
<br />DRINKING FOUNTAIN
<br />P.S.
<br />PULL STATION
<br />SPECIFICALLY IDENTIFIED. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY
<br />@ ACCESSIBLE: 17' TO RIM
<br />OIA.
<br />DIAMETER
<br />P.S.F.
<br />POUNDS PER SQUARE FOOT
<br />TO EXECUTE DEMOLITION WORK AS REQUIRED TO ALLOW THE EXECUTION OF NEW
<br />@ STANDARD: 24' TO RIM
<br />OIAG.
<br />DIAGONAL
<br />P.S.I.
<br />POUNDS PER SQUARE
<br />WORK.
<br />MIRROR: 40' TO BOTTOM
<br />DIM.
<br />DIMENSION
<br />INCHES
<br />SOAP DISPENSERS AT LAVATORIES: 40' TO BOTTOM
<br />OISP.
<br />DISPENSER
<br />P.T.
<br />PRESSURE TREATED
<br />7.
<br />ALL AREAS ABOVE OR ON THE EXISTING CEILING THAT ARE AFFECTED BY
<br />PAPER TOWEL DISPENSER: 40' TO BOTTOM
<br />Div.
<br />DIVISION
<br />PTO.
<br />PAINTED
<br />INSTALLATION OF NEW WORK SHALL BE REPAIRED COMPLETELY WITH MATERIALS
<br />HAND DRYER: 40' TO OPERATIONAL CONTROLS
<br />ON.
<br />DOWN
<br />Q.T.
<br />QUARRY TILE
<br />AND PRODUCTS TO MATCH EXISTING INSTALLATION AND FIRE -RATED ASSEMBLIES.
<br />NAPKIN DISPENSER: 40' TO OPERATIONAL CONTROLS
<br />0.0.
<br />DOOR OPENING
<br />OTY.
<br />QUANTITY
<br />NAPKIN DISPOSAL: 24' TO CENTER
<br />OP.
<br />DAMPPROOFING
<br />R.
<br />RISER
<br />B.
<br />ALL ITEMS INDICATING CONTRACT LIMITS AND LINES OF DEMARCATION ARE
<br />HAND HELD SHOWER HEAD: 6'-6' TO CENTER, ON 60' HOSE
<br />DR.
<br />DOOR
<br />RAO.
<br />RADIUS
<br />SHOWN FOR THE CONVENIENCE OF THE GENERAL CONTRACTOR, AND ARE NOT TO
<br />SHOWER SEAT: 17'
<br />OTL.
<br />DETAIL
<br />R.C.P.
<br />REFLECTED CEILING PLAN
<br />BE TAKEN LITERALLY. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY
<br />SHOWER CONTROL: 42' TO CENTER
<br />OW.
<br />DISH WASHER
<br />R.O.
<br />ROOF DRAIN
<br />THE GENERAL CONTRACTOR PRIOR TO BID OPENINGS BY FIELD VERIFICATION.
<br />SHOWER ROD: 6'-G' TO CENTER
<br />OWG.
<br />DRAWING
<br />REC.
<br />RECESSED
<br />THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER INTERFACE
<br />GRAB BAR: 36' TO CENTER
<br />EA.
<br />EACH
<br />RECEP.
<br />RECEPTION
<br />BETWEEN EXISTING AND NEW WORK.
<br />MOP HOLDER: 72' TO TOP
<br />E.F.S.
<br />EXTERIOR FINISH SYSTEM
<br />REF.
<br />REFERENCE
<br />E.I.F.S.
<br />EXTERIOR INSULATION FINISH
<br />REFR.
<br />REFRIGERATOR
<br />9.
<br />THE GENERAL CONTRACTOR MUST BE AWARE THAT CONSTRUCTION IN SOME AREAS
<br />SYSTEM
<br />REINF.
<br />REINFORCED
<br />SURROUNDING THE LIMITS OF THIS CONTRACT IS CURRENTLY IN PROGRESS. FOR
<br />MATERIAL & FINISH NOTES
<br />E.J.
<br />EXPANSION JOINT
<br />REO'O.
<br />REQUIRE
<br />THIS REASON, ACTUAL EXISTING CONDITIONS MAY VARY FROM CONDITIONS
<br />ELEV.
<br />ELEVATION
<br />REV.
<br />REVISION
<br />INDICATED ON THESE DRAWINGS. ALL SUCH DISCREPANCIES SHALL BE
<br />1. REFER TO CIVIL DRAWINGS FOR SITE GRADING; REFER TO ARCHITECTURAL SITE
<br />ELEV.
<br />ELEVATOR
<br />R.H.
<br />RIGHT HAND
<br />ACCURATELY AND THOROUGHLY RECORDED BY THE GENERAL CONTRACTOR AND
<br />PLAN AND ENLARGED SITE PLANS FOR CONCRETE PAVING PATTERNS AND SPOT
<br />ELEC.
<br />ELECTRICAL
<br />RM.
<br />ROOM
<br />PROMPTLY REPORTED TO THE ARCHITECT.
<br />ELEVATIONS.
<br />EMER.
<br />EMERGENCY
<br />R.O.
<br />ROUGH OPENING
<br />ENCL.
<br />ENCLOSURE
<br />S.C.
<br />SOLID CORE
<br />10.
<br />THE GENERAL CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ALL SIGNAGE AND
<br />2. STRUCTURAL STEEL OR PRECAST CONCRETE SHAPES ARE SHOWN FOR DETAILING
<br />ENT.
<br />ENTRANCE
<br />SCHED.
<br />SCHEDULE
<br />OTHER ASSEMBLIES THAT MAY BE AFFECTED BY DEMOLITION OR INSTALLATION OF
<br />OF ARCHITECTURAL FINISHES ONLY; REFER TO STRUCTURAL DRAWINGS FOR
<br />E.P.
<br />ELECTRICAL PANEL
<br />S.D.
<br />SOAP DISPENSER
<br />NEW WORK. SUCH PROJECT ELEMENTS SHALL BE REMOVED AND STORED PRIOR
<br />STRUCTURAL DIMENSIONS, SIZES, SHAPES, AND DETAILS OF CONSTRUCTION FOR
<br />EQ.
<br />EQUAL
<br />SECT.
<br />SECTION
<br />TO THE PERFORMANCE OF ANY WORK. THE CONTRACTOR IS RESPONSIBLE FOR
<br />SPECIFIC CONDITIONS.
<br />EQUIP.
<br />EQUIPMENT
<br />S.F.
<br />SQUARE FOOT(FEET)
<br />CATALOGING EACH ELEMENT AND ITS LOCATION IN THE BUILDING, AND IS
<br />EXH.
<br />EXHAUST
<br />SHR.
<br />SHOWER
<br />RESPONSIBLE FOR REINSTALLING EACH ELEMENT IN ITS ORIGINAL LOCATION
<br />3. REFER TO FINISH SCHEDULE AND INTERIOR ELEVATIONS FOR ALL WALL,
<br />EXIST.
<br />EXISTING
<br />SHT.
<br />SHEET
<br />AFTER ALL WORK IN THE AREAS HAS BEEN COMPLETED.
<br />CEILING, FLOOR, AND BASE MATERIALS AND FINISH DESIGNATIONS.
<br />EXP.
<br />EXPANSION
<br />Sim.
<br />SIMILAR
<br />EXT.
<br />EXTERIOR
<br />SPEC.
<br />SPECIFICATION
<br />11.
<br />THE GENERAL CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ANY UNFINISHED
<br />4. REFER TO REFLECTED CEILING PLANS AND CEILING DETAILS FOR CEILING
<br />F/
<br />FACE OF
<br />S.S.
<br />STAINLESS STEEL
<br />WALL AREAS THAT MAY BE EXPOSED AS A RESUL- OF ADJUSTING FINISHED
<br />HEIGHTS, SOFFIT HEIGHTS, AND MATERIALS OF CONSTRUCTION.
<br />F.A.
<br />FIRE ALARM
<br />STO.
<br />STANDARD
<br />CEILING HEIGHTS. THE CONTRACTOR IS RESPONSIBLE FOR FINISHING THESE
<br />F.D.
<br />FLOOR DRAIN
<br />STL.
<br />STEEL
<br />AREAS TO MATCH EXISTING ADJACENT FINISHED AREAS AND FIRE -RATED
<br />5. FLASHING, DAMPPROOFING, AND INSULATIONS SHOWN ON WALL SECTIONS
<br />F.E.
<br />FIRE EXTINGUISHER
<br />STOR.
<br />STORAGE
<br />ASSEMBLIES.
<br />INDICATE VERTICAL LOCATIONS ONLY; PROVIDE CONTINUOUS SYSTEMS.
<br />F.F.
<br />FINISH FLOOR
<br />STRUC.
<br />STRUCTURAL
<br />F.H.
<br />FULL HEIGHT
<br />SUSP.
<br />SUSPENDED
<br />12.
<br />THE GENERAL CONTRACTOR AND AFFECTED SUBCONTRACTORS SHALL VISIT THE
<br />6. PROVIDE SEALANT AND BACKER ROOS (TYPICAL) AT ALL EXTERIOR DOOR AND
<br />F.H.C.
<br />FIRE HOSE CABINET
<br />SYM.
<br />SYMMETRICAL
<br />PROJECT SITE PRIOR TO SUBMITTING A PROPOSAL. THE CONTRACTOR SHALL
<br />WINDOW FRAMES AND LOUVERS.
<br />FIN.
<br />FINISH
<br />T/
<br />TOP OF
<br />BECOME GENERALLY FAMILIAR WITH THE PROJECT, AND WITH THE IMPACT OF THE
<br />FL.
<br />FLOOR
<br />T. & B.
<br />TOP & BOTTOM
<br />NEW WORK ON THE EXISTING CONDITIONS. ANY AREAS OF CONCERN SHALL BE
<br />7. REFER TO WINDOW SCHEDULE AND ELEVATIONS FOR WINDOW AND GLAZING
<br />FLASH.
<br />FLASHING
<br />T. & G.
<br />TONGUE & GROOVE
<br />BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO SUBMITTING A
<br />TYPES.
<br />FLUOR.
<br />FLUORESCENT
<br />T.B.D.
<br />TO BE DETERMINED
<br />PROPOSAL. NO ADDITIONAL CHARGE TO THE OWNER WILL BE APPROVED WHICH
<br />FP
<br />FIRE PROOF
<br />TEL.
<br />TELEPHONE
<br />IS ATTRIBUTABLE TO THE CONTRACTOR'S FAILURE TO 00 THIS.
<br />B. PROVIDE FIRE -RETARDANT WOOD WHEREVER WOOD BLOCKING IS SHOWN ON THE
<br />FT.
<br />FOOT (FEET)
<br />TEMP.
<br />TEMPERED
<br />DRAWINGS.
<br />F.T.F.
<br />FACE TO FACE
<br />TER.
<br />TERRAZZO
<br />13.
<br />THE PROJECT IS CURRENTLY OCCUPIED, AND MUST REMAIN COMPLETELY
<br />FTG.
<br />FOOTING
<br />T.O.B.
<br />TOP OF BEARING
<br />OPERATIONAL DURING NORMAL BUSINESS HOURS (7.00 A.M. TO 6:00 P.M. WEEKDAYS).
<br />9. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR INTERFACES WITH THESE
<br />GA.
<br />GAUGE
<br />T.O.P.
<br />TOP OF PLATE
<br />COORDINATE WITH THE OWNER ANY CONSTRUCTION ACTIVITIES WHICH MAY
<br />SYSTEMS NOT SHOWN ON WALL SECTIONS.
<br />GALV.
<br />GALVANIZED
<br />TOPO.
<br />TOPOGRAPHY
<br />IMPEDE NORMAL OPERATIONS, INCLUDING ANY ACTIVITY WHICH OPERATES
<br />G.C.
<br />GENERAL CONTRACTOR
<br />T.O.S.
<br />TOP OF SLAB
<br />EXCESSIVE NOISE, AIRBORNE DIRT, OR WHICH DISRUPTS THE NORMAL FUNCTION
<br />10. CONTRACTOR OR WINDOW MANUFACTURER TO DESIGN, PROVIDE AND INSTALL
<br />GEN.
<br />GENERAL
<br />T.O.STL.
<br />TOP OF STEEL
<br />OF THE SPACE. PROTECT ANY ADJACENT SPACE WITH DUST PARTITIONS OR
<br />COMPLETE ATTACHMENT OF WINDOW TO STRUCTURAL STEEL OR STRUCTURAL
<br />GNO.
<br />GROUND
<br />T.V.
<br />TELEVISION
<br />CURTAINS FROM ACTIVITIES WHICH WILL CREATE OUST. NOTIFY ANY OCCUPANTS
<br />CONCRETE, OR STRUCTURAL CONCRETE MASONRY PER SPECIFICATIONS AND
<br />GVL.
<br />GRAVEL
<br />TYP
<br />TYPICAL
<br />OF THE BUILDING OF ANY CONSTRUCTION ACTIVITIES WHICH MAY AFFECT THEIR
<br />WINDOW MANUFACTURER'S REQUIREMENTS AND IN ACCORDANCE WITH APPLICABLE
<br />GYP.
<br />GYPSUM
<br />UNF.
<br />UNFINISHED
<br />ABILITY TO OPERATE NORMALLY.
<br />CODES.
<br />GYP. 80.
<br />GYPSUM BOARD
<br />U.N.O.
<br />UNLESS NOTED OTHERWISE
<br />H.
<br />HIGH
<br />U.O.N.
<br />UNLESS OTHERWISE NOTED
<br />H.C.
<br />HOLLOW CORE
<br />UR.
<br />URINAL
<br />HDCP.
<br />HANDICAPPED
<br />V.
<br />VINYL
<br />HOW.
<br />HARDWARE
<br />VAC.
<br />VACUUM
<br />HDWO.
<br />HARDWOOD
<br />V.B.
<br />VINYL BASE
<br />H.M.
<br />HOLLOW METAL
<br />V.C.T.
<br />VINYL COMPOSITION TILE
<br />H.O.
<br />HOLD OPEN
<br />VENT.
<br />VENTILATION
<br />HORIZ.
<br />HORIZONTAL
<br />VERT.
<br />VERTICAL
<br />HR.
<br />HOUR
<br />VEST.
<br />VESTIBULE
<br />HT.
<br />HEIGHT
<br />V.I.F.
<br />VERIFY IN FIELD
<br />HTG.
<br />HEATING
<br />V.T.
<br />VINYL TILE
<br />H.V.A.C.
<br />HEATING, VENTILATING, AIR
<br />V.W.C.
<br />VINYL WALL COVERING
<br />CONDITIONER
<br />W/
<br />WITH
<br />H.W.
<br />HOT WATER
<br />W/o
<br />WITHOUT
<br />H.W.H
<br />HOT WATER HEATER
<br />W.C.
<br />WATERCLOSET
<br />IN.
<br />INCH(ES)
<br />WD.
<br />WOOD
<br />INCAND.
<br />INCANDESCENT
<br />WDT.
<br />WIDTH
<br />INCL.
<br />INCLUDE(D)
<br />W.F.
<br />WIDE FLANGE
<br />INFO.
<br />INFORMATION
<br />W.H.
<br />WATERHEATER
<br />MOUNTING HEIGHTS
<br />INSUL.
<br />INSULATION
<br />WIN.
<br />WINDOW
<br />INT.
<br />INTERIOR
<br />W.M.
<br />WIRE MESH
<br />NOTES
<br />INV.
<br />INVERT
<br />WPFG.
<br />WATERPROOFING
<br />1. ALL MOUNTING HEIGHTS INDICATED ABOVE ARE BASED ON 'FLORIDA BUILDING
<br />J.B.
<br />JOIST BEARING
<br />WSCT.
<br />WAINSCOT
<br />CODE, ACCESSIBILITY 2010'
<br />J.C.
<br />JANITOR'S CLOSET
<br />2. MOUNTING HEIGHTS FOR WATER CLOSETS ARE SAME REGARDLESS IF WALL
<br />JT.
<br />JOINT
<br />MOUNTED OR FLOOR MOUNTED
<br />K.O.
<br />KNOCK DOWN
<br />KIT.
<br />KITCHEN
<br />x
<br />0
<br />_E
<br />bottom of
<br />ref Lective
<br />surface
<br />:z
<br />WATER GRAB WATER GRAB LAVATORY MIRROR LAVATORY
<br />CLOSET BAR CLOSET BAR
<br />x
<br />0
<br />E
<br />0
<br />E
<br />:z
<br />URINAL
<br />36" min
<br />C
<br />TOILET TISSUE
<br />DISPENSER at
<br />GRAB BAR
<br />x
<br />0
<br />E
<br />00
<br />TOILET TISSUE DIAPER
<br />DISPENSER CHANGING
<br />STATION
<br />x
<br />0
<br />E
<br />DRINKING
<br />FOUNTAIN
<br />x
<br />C)
<br />E
<br />0
<br />E
<br />L
<br />PLAN SYMBOLS
<br />E_ WALL TYPE
<br />CED MILLWORK LABEL
<br />F00110 ROOM NUMBER LABEL
<br />DOOR NUMBER LABEL
<br />WINDOW TYPE LABEL
<br />(REVISION NUMBER AND CLOUD
<br />COLUMN BUBBLE
<br />PROPERTY LINE
<br />eLevation number
<br />2 4 INTERIOR ELEVATION
<br />3 drawing number
<br />eLevation number
<br />EXTERIOR ELEVATION
<br />drawing number
<br />DETAIL LOCATED ON SAME SHEET AS REFERENCE
<br />detal number
<br />DETAIL, ENLARGED PLAN, ETC. REFERENCE
<br />drawing number
<br />- section number
<br />WALL SECTION REFERENCE
<br />A-310
<br /><5- drawing number
<br />section number
<br />BUILDING SECTION REFERENCE
<br />A-301
<br />i - drawing number
<br />MOUNTING HEIGHTS
<br />TO BE INSTALLED AT EACH
<br />UNISEX TOILET ROOM
<br />(1 REQUIRED EACH TOILET ROOM)
<br />TYPICAL AOA COMPLIANT TOILET ROOM SIGN
<br />VENDOR SUPPLIED ITEMS - FOR REFERENCE ONL-'l`
<br />x
<br />0
<br />E
<br />El 00
<br />;:d-
<br />SOAP SANITARY
<br />DISPENSER NAPKIN
<br />DISPOSAL
<br />SANITARY
<br />NAPKIN/
<br />TAMPON
<br />VENDORS
<br />ME
<br />0
<br />LO
<br />cn
<br />-0
<br />cu
<br />L_
<br />CL
<br />C:)
<br />00
<br />1`0
<br />Ca
<br />Uj
<br />-2
<br />Lo
<br />to
<br />C-Z
<br />00
<br />U-)
<br />M
<br />Uj
<br />Cr)
<br />1`0
<br />to
<br />L0
<br />Lj
<br />>-
<br />M
<br /><
<br />V)
<br />C:)
<br />C:)
<br />ry
<br />V)
<br />Z:)
<br />C:)
<br />C)
<br />0
<br />co
<br />C14
<br />Lrl
<br />C)
<br />L0
<br />V)
<br />_.
<br />Elf
<br />4�
<br />1`10
<br />1`0
<br />co
<br />C)
<br />I
<br />00
<br />LL_
<br />0
<br />Q)
<br />0
<br />Q.)
<br />co
<br />-4-
<br />Cn
<br />04
<br />.4-
<br />U-)
<br />rl")
<br />c-
<br />LL_
<br />f-
<br />E
<br />0-
<br />U)
<br />Cl)
<br />Q)
<br />C-
<br />C)
<br />U-)
<br />!E
<br />L)
<br />CY)
<br />0
<br />Pr) 04
<br />0- �j
<br />0
<br />Q
<br />Ld
<br />L) Zn
<br />CD5 Ld
<br />_j ir
<br />19CO29
<br />review
<br />approva
<br />permit 07-29-2019
<br />revision
<br />revision
<br />PAPER TOWEL TOILET SEAT HAND DRYER
<br />DISPENSER COVER DISPENSER G-100
<br />
|