Laserfiche WebLink
GENERAL NOTES <br />1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH SITE <br />CONDITIONS AS THEY MAY AFFECT CARRYING OUT THE WORK AS DESCRIBED IN <br />THESE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL INVESTIGATE, VERIFY, <br />AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT, AND NOTIFY THE <br />ARCHITECT OF ANY CONDITIONS THAT REQUIRE MODIFICATION BEFORE PROCEEDING <br />WITH THE WORK. <br />2. ARCHITECTURAL DRAWING NOTATION INCLUDES SPECIFICATION SECTION <br />REFERENCE NUMBERS IN CONJUNCTION WITH MATERIAL DESCRIPTIONS. THIS <br />INFORMATION IS PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR ONLY <br />AND IS NOT INTENDED TO INDICATE SPECIFIC TRADES TO BE UTILIZED FOR THE <br />WORK. IN CASE OF DISCREPANCIES BETWEEN THE REFERENCE NUMBER AND THE <br />VERBAL DESCRIPTION, THE VERBAL DESCRIPTION SHALL TAKE PRECEDENCE, <br />UNLESS OTHERWISE DIRECTED. DISCREPANCIES BETWEEN SPECIFICATION NUMBER <br />REFERENCES AND WRITTEN DESCRIPTIONS OF MATERIALS OR SYSTEMS IN NO WAY <br />RELIEVES THE CONTRACTOR OF RESPONSIBILITY FOR THE COMPLETING OF THE <br />WORK AS SHOWN. <br />3. DIMENSIONS INDICATED ARE TO FACES OF STRUCTURE AND GRID LINES (TYPICAL), <br />UNLESS NOTED OTHERWISE. <br />4. REFER TO ENLARGED PLANS FOR DIMENSIONS, DETAIL REFERENCES, AND INTERIOR <br />ELEVATION REFERENCES WITHIN THOSE AREAS. <br />5. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL FOR <br />ADDITIONAL GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS. ALL NOTES ARE TO <br />BE REVIEWED, AND APPLIED TO RELATED BUILDING COMPONENTS. DETAILS NOT <br />SHOWN ARE SIMILAR IN CHARACTER TO THOSE THAT ARE SHOWN. WHERE <br />SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED OR <br />REASONABLY INFERRED, CONSULT THE ARCHITECT BEFORE PROCEEDING WITH THE <br />WORK. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL COLUMN AND BEARING <br />WALL LOCATIONS AND SIZES. <br />6. REFER TO DETAIL SHEET FOR PARTITION TYPES, DETAILS, AND DESCRIPTIONS. <br />7. REFER TO REFLECTED CEILING PLANS FOR SOFFIT LOCATIONS AND CEILING <br />DETAIL REFERENCES. <br />B. WHERE DOORS IN METAL STUO/GYPSUM BOARD PARTITIONS ARE NOT <br />SPECIFICALLY LOCATED ON THE PLANS WITH DIMENSION STRINGS, PROVIDE A <br />MINIMUM HINGE -SIDE JAMB DIMENSION OF 6' FROM DOOR OPENING TO ADJACENT <br />PERPENDICULAR WALLS. WHERE DOORS APPEAR TO BE CENTERED WITHIN <br />CORRIDORS, LOCATE THE DOORS IN THE CENTER OF THE CORRIDOR. <br />9. TOP OF CONCRETE FINISH FLOOR (LEVEL ONE) IS ASSUMED AT EI. 100'-0. <br />10. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT CONFIGURATIONS OR <br />DETAILS OF SPECIFIC MANUFACTURERS (TYPICALLY THE FIRST MANUFACTURER <br />LISTED UNDER 'ACCEPTABLE MANUFACTURERS' IN THE SPECIFICATIONS). <br />DIMENSIONS AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY <br />ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER <br />MANUFACTURERS MAY ALSO BE ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION <br />DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL <br />VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED <br />IN THE WORK (INCLUDING PARTITION THICKNESSES FOR RECESSED OR <br />SEMI -RECESSED PRODUCTS), AND IS RESPONSIBLE FOR ACCOMMODATING AND <br />COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE <br />NECESSARY BECAUSE OF THESE DIFFERENCES. <br />11. PARTITION TYPES CONTINUE AROUND CORNERS UNLESS INDICATED OTHERWISE. <br />12. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR THE <br />CONVENIENCE OF THE ARCHITECT AND THE CONTRACTOR. THE SEPARATIONS <br />USED HEREIN ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND <br />REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT <br />OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS <br />A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY <br />SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, <br />INTEGRATED AND UNIFIED WHOLE. <br />13. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY <br />SPECIFIC ENGINEERING DISCIPLINES (SUCH AS CIVIL, STRUCTURAL, MECHANICAL, <br />ELECTRICAL, ETC.) ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN <br />THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT <br />FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE <br />DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR <br />SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE ARCHITECT PRIOR TO <br />BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND <br />WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, <br />THE CONTRACTOR SHALL INCLUDE THE BETTER QUALITY OR GREATER QUANTITY <br />OF WORK IN THE BID PROPOSAL. <br />14. WALL, CEILING, BASE, AND FLOOR FINISHES ARE TO BE PROVIDED IN EVERY <br />ROOM UNLESS THE DRAWINGS SPECIFICALLY INDICATE THAT A ROOM OR PORTION <br />THEREOF IS TO REMAIN 'UNFINISHED.' IF ROOM FINISHES ARE NOT <br />SPECIFICALLY INDICATED, PROVIDE THE SAME FINISHES AS ARE PROVIDED IN <br />THE ROOM ADJACENT TO THE ROOM IN QUESTIONS, OR OBTAIN CLARIFICATION <br />FROM THE ARCHITECT PRIOR TO BIDDING. <br />15. FIRE-RATEO CORRIDOR PARTITIONS INDICATED ON FLOOR PLANS ARE COMPONENTS <br />OF CONTINUOUS RATED CORRIDOR ASSEMBLIES CONSISTING OF WALLS, FLOOR, <br />AND CEILING. SEE REFLECTED CEILING PLANS AND PARTITION TYPES FOR <br />SPECIFIC METHODS OF ACHIEVING THE NECESSARY RATINGS. WHERE THE <br />SPECIFIC METHOD OF ACHIEVING THE RATING IS NOT INDICATED, OBTAIN <br />CLARIFICATION FROM THE ARCHITECT PRIOR TO BIDDING. THE RATING OF THE <br />ENTIRE CORRIDOR MUST BE MAINTAINED. PROVIDE RATED PARTITIONS, FLOORS <br />CEILINGS, AND DOOR OR OTHER OPENING ASSEMBLIES TO MAINTAIN THE <br />CONTINUITY OF THE FIRE RATING. PROVIDE FIRE SAFING AND FIRE -RATED <br />SEALANTS TO MAINTAIN THE CONTINUITY OF THE FIRE -RATED SYSTEM. IF A <br />CEILING RATING IS NOT SPECIFICALLY INDICATED, OBTAIN CLARIFICATION FROM <br />THE ARCHITECT PRIOR TO BIDDING; OTHERWISE, ASSUME A RATING TO MATCH THE <br />RATING OF THE CORRIDOR WALLS. WHERE MECHANICAL WORK PENETRATES ANY <br />COMPONENT OF THE FIRE -RATED ASSEMBLY, PROVIDE THE APPROPRIATE FIRE <br />ANO/OR SMOKE DAMPERS. IF IT IS NOT CLEAR WHETHER OUCTWORK PENETRATES <br />A PORTION OF THE RATED ASSEMBLY, OBTAIN CLARIFICATION FROM THE <br />ARCHITECT PRIOR TO BIDDING. <br />16. DOOR ASSEMBLIES IN I -HOUR RATED PARTITIONS ARE TO BE 20-MINUTE RATED <br />UNLESS A HIGHER RATING IS INDICATED IN THE DOOR SCHEDULE. <br />17. DOOR ASSEMBLIES IN 2-HOUR RATED PARTITIONS ARE TO BE 90-MINUTE RATED <br />UNLESS A HIGHER RATING IS INDICATED IN THE DOOR SCHEDULE. <br />le. USE TEMPERED GLASS IN ALL OPENINGS WITHIN 18' OF THE FLOOR OR A DOOR, <br />UNLESS ANOTHER FORM OF SAFETY GLAZING IS SPECIFICALLY INDICATED ON THE <br />DRAWINGS. <br />19. USE WIRE -GLASS IN ALL GLAZED OPENINGS WITHIN FIRE -RATED CORRIDORS. <br />20. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR MATERIALS <br />INTERSECT PERPENDICULAR TO EACH OTHER, AND THE INTERSECTION IS EXPOSED <br />TO VIEW, UNLESS INDICATED OTHERWISE ON THE DRAWINGS. <br />21. PROVIDE SLIP JOINT CONNECTIONS AT THE TOPS OF ALL PARTITIONS WHICH <br />INTERSECT THE STRUCTURE ABOVE; PROVIDE FIRE-SAFING AT ALL SLIP -JOINT <br />CONNECTIONS IN FIRE-RATEO PARTITIONS. SEE PARTITION TYPES FOR TYPICAL <br />SLIP -JOINT CONNECTION DESIGN. IF AMOUNT OF DEFLECTION TO BE <br />ACCOMMODATED IS NOT INDICATED, OBTAIN CLARIFICATION FROM THE ARCHITECT <br />PRIOR TO INSTALLATIONS. <br />22. PAINT ALL EXPOSED STEEL OR WOOD (UNLESS NOTED OTHERWISE). <br />23. ALL MATERIAL COLORS TO BE SELECTED BY ARCHITECT, UNLESS NOTED <br />OTHERWISE. <br />24. M.O. (MASONRY OPENING) REFERS TO NOMINAL MASONRY OPENING DIMENSIONS IN <br />MASONRY CONSTRUCTION. 6"n-ax 36" min <br />1* J* J* <br />54"min .00 10 <br />.4 0* �04# 0* 18 <br />- -,-\ 09� 42"Min 70e .0 <br />GENERAL <br />NOTES <br />MEP MOUNTING HEIGHTS <br />ABBREVIATIONS <br />1. <br />INFORMATION CONTAINED ON THESE DRAWINGS WITH REGARD TO EXISTING <br />ELECTRICAL GENERAL: <br />A.B. <br />ANCHORBOLT <br />K.O. <br />KNOCK OUT <br />CONDITIONS OF CONSTRUCTION IS PROVIDED FOR THE CONVENIENCE OF THE <br />MOUNTING HEIGHTS INDICATED APPLY FOR GENERAL CONDITIONS UNLESS NOTED OTHERWISE <br />A.C.T. <br />ACOUSTICAL CEILING TILE <br />LAB. <br />LABORATORY <br />GENERAL CONTRACTOR IN EXECUTING THE WORK. EVERY ATTEMPT HAS BEEN <br />(DIMENSIONS REPRESENT DISTANCE ABOVE FINISH FLOOR TYPICAL). IF CONFLICTS ARISE, <br />A/C <br />AIR CONDITIONER <br />LAM. <br />LAMINATE(0) <br />MADE TO PROVIDE COMPLETE AND ACCURATE REPRESENTATIONS OF SUCH <br />REVIEW WITH ARCHITECT PRIOR TO INSTALLATION OF BACK BOXES OR FRAMING; MODIFY <br />ADJ. <br />ADJUSTABLE <br />LAV. <br />LAVATORY <br />EXISTING CONDITIONS. THIS INTERPRETATION HAS BEEN TAKEN FROM RECORD <br />THESE HEIGHTS AS NECESSARY TO CONFORM TO ADA REQUIREMENTS, LOCAL CODE. <br />A.F.F. <br />ABOVE FINISH FLOOR <br />LB.(s) <br />POUNO(S) <br />SETS OF 'AS -BUILT' DRAWINGS ON FILE FROM THE OWNER AND HAS BEEN <br />ALT. <br />ALTERNATE <br />L.F. <br />LINEAR FOOT <br />FURTHER SUPPLEMENTED BY FIELD -MEASUREMENT AND OBSERVATIONS. THE <br />ELECTRICAL ITEM MOUNTING HEIGHT: <br />ALUM. <br />ALUMINUM <br />LGT. <br />LENGTH <br />ARCHITECT CANNOT AND DOES NOT GUARANTEE THE ACCURACY OF ANY SUCH <br />A.P. <br />ACCESS PANEL <br />L.H. <br />LEFT HAND <br />INFORMATION AND ASSUMES NO LIABILITY THEREFORE. <br />ACCESS PANEL @ WATER WALLS: 2'-0 AFF TO CENTER OF UNIT <br />APPROX. <br />APPROXIMATE <br />LIN. <br />LINEN <br />DRINK FOUNTAIN OR ELECTRIC WATER COOLER: <br />ARCH. <br />ARCHITECTURAL <br />LKR. <br />LOCKER <br />2. <br />THE INFORMATION CONTAINED ON THESE DRAWINGS WITH REGARD TO EXISTING <br />@ ACCESSIBLE: 3'-0' TO SPOUT <br />A.S. <br />ABOVE SLAB <br />LT. <br />LIGHT <br />CONDITIONS OF CONSTRUCTION IN NO WAY RELEASES THE GENERAL CONTRACTOR <br />@ STANDARD: 3'-6' TO SPOUT <br />AUTO. <br />AUTOMATIC <br />MAINT. <br />MAINTENANCE <br />FROM THE RESPONSIBILITY FOR VERIFYING COMPLETELY ALL FIELD CONDITIONS <br />MARKERBOARDS/TACKBOAROS: 3'-0 TO BOTTOM RAIL <br />B/ <br />BOTTOM OF <br />MAS. <br />MASONRY <br />RELATING TO AND AFFECTING THE EXECUTION OF THE WORK, AS DESCRIBED IN <br />THERMOSTATS: 5'-0' AFF TO CENTER <br />BO. <br />BOARD <br />MATL. <br />MATERIAL <br />THESE CONTRACT DOCUMENTS. <br />ELECTRICAL RECEPTACLE: 1'-6', OR 4' ABOVE COUNTER AND <br />BLDG. <br />BUILDING <br />MAX. <br />MAXIMUM <br />BACKSPLASH, OR CENTER IN SPACE <br />BKL. <br />BLOCK <br />MECH. <br />MECHANICAL <br />3. <br />IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO FIELD VERIFY AND <br />PROVIDED WHEN USED WITH <br />BKLG. <br />BLOCKING <br />MEZZ. <br />MEZZANINE <br />DOCUMENT ALL EXISTING DIMENSIONS, ELEVATIONS AND BENCHMARKS, MATERIALS <br />COUNTERTOP & CABINETS ABOVE. <br />BM. <br />BEAM <br />MFR. <br />MANUFACTURER <br />AND METHODS OF CONSTRUCTION THAT MAY AFFECT OR BE AFFECTED BY NEW <br />B.M. <br />BENCH MARK <br />MGMT. <br />MANAGEMENT <br />WORK, AND TO COORDINATE SUCH FIELD VERIFICATION WITH THE CONTRACT <br />ELECTRICAL AND COMMUNICATIONS RECEPTACLES: <br />BOT. <br />BOTTOM <br />MIN. <br />MINIMUM <br />DOCUMENTS AND THE EXECUTION OF THE WORK. DISCREPANCIES AND/OR <br />@ WALL MOUNTED TV: 7'-B' TO CENTER <br />B.S. <br />BOTH SIDES <br />misc. <br />MISCELLANEOUS <br />CONFLICTS INVOLVING ANTICIPATED EXISTING CONDITIONS SHALL BE 13ROUGHT <br />@ COMMUNICATIONS RECEPTACLE: l'-6', OR 4' ABOVE TOP OF COUNTER OR <br />B.T.B. <br />BACK TO BACK <br />M.O. <br />MASONRY OPENING <br />TO THE ARCHITECT'S ATTENTION IMMEDIATELY. <br />BACKSPLASH, TO CENTER <br />B.U.R. <br />BUILT UP ROOFING <br />M.R. <br />MOISTURE RESISTANCE <br />CAB. <br />CABINET <br />MTO. <br />MOUNTED <br />4. <br />FIELD- VERIF IC ATI ON OF EXISTING CONDITIONS RELATED TO SPECIFIC PORTIONS <br />C.B. <br />CATCH BASIN <br />MTG. <br />MOUNTING <br />OF THE WORK SHALL BE UNDERTAKEN IN ADVANCE TO ALLOW FOR THE TIMELY <br />ELECTRICAL SWITCH: 3'-B' TO CENTER <br />CCTV. <br />CLOSED CIRCUIT TELEVISION <br />MTL. <br />METAL <br />IDENTIFICATION OF EXISTING CONDITIONS THAT MAY AFFECT THE SCHEDULED <br />FIRE ALARM PULL STATION: 3'-B' TO CENTER <br />C.G. <br />CORNER GUARD <br />MUL. <br />MULLION <br />INSTALLATION OF NEW WORK AS DESIGNED AND DETAILED, AND TO AVOID UNDUE <br />FIRE EXTINGUISHER CABINET: 3'-4' TO BOTTOM <br />C.J. <br />CONTROL JOINT <br />N.I.C. <br />NOT IN CONTRACT <br />AND UNREASONABLE DELAYS TO THE PROJECT SHOULD SUCH CONDITIONS BE <br />FIRE HORN DEVICE: 7'-B' TO CENTER <br />C.L. <br />CENTER LINE <br />NO. <br />NUMBER <br />DISCOVERED. TIMELY IDENTIFICATIONS OF SUCH CONDITIONS SHALL PROVIDE <br />CLOCK & WALL MOUNTED SPEAKER: 7'-0' AFF TO CENTERLINE OF UNITS <br />CLG. <br />CEILING <br />NOM. <br />NOMINAL <br />FOR A MINIMUM PERIOD OF TEN (10) WORKING DAYS DURING WHICH TIME THE <br />AUTOMATIC DOOR OPERATOR: 3'-0' TO CENTER <br />CLO. <br />CLOSET <br />N.T.S. <br />NOT TO SCALE <br />ARCHITECT WILL EVALUATE THE CONDITIONS AND MAKE RECOMMENDATIONS FOR <br />MAGNETIC DOOR HOLDER: 6'-4' TO CENTER <br />CLR. <br />CLEAR <br />O.A. <br />OVERALL <br />ACCOMMODATING NEW WORK. <br />PANIC HARDWARE: 3'-0' TO CENTER <br />CLS. <br />CLOSURE <br />D.C. <br />ON CENTER <br />ROOM SIGNAGE: 60' TO CENTER, 2' AWAY FROM LATCH SIDE <br />C.M. <br />CONSTRUCTION MANAGER <br />0.0. <br />OUTSIDE DIAMETER <br />5. <br />IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ASSIST THE <br />JAMB <br />C.M.U. <br />CONCRETE MASONRY UNIT <br />OFF. <br />OFFICE <br />ARCHITECT IN MAKING THEIR EVALUATIONS AND RECOMMENDATIONS BY PROVIDING <br />PLUMBING GENERAL: <br />COL. <br />COLUMN <br />OH. <br />OVERHEAD <br />IN A TIMELY MANNER, AT NO ADDITIONAL COST TO THE OWNER, ACCURATE AND <br />CONC. <br />CONCRETE <br />OPP. <br />OPPOSITE <br />COMPLETE DRAWINGS, SKETCHES, AND PHOTOGRAPHS SUFFICIENT TO CLEARLY <br />MOUNTING HEIGHTS INDICATED APPLY FOR TYPICAL CONDITIONS UNLESS NOTED OTHERWISE <br />CONF. <br />CONFERENCE <br />OPP.H. <br />OPPOSITE HANG <br />DESCRIBE DISCREPANCIES, CONFLICTS, AND CONCEALED OR OTHERWISE <br />(DIMENSIONS ARE ABOVE FINISH FLOOR (AFF) TYPICAL). IF CONFLICTS ARE DISCOVERED <br />CONT. <br />CONTINUOUS <br />O.T.O. <br />OUT TO OUT <br />UNANTICIPATED EXISTING CONDITIONS AFFECTING NEW CONSTRUCTION. THE <br />REVIEW WITH ARCHITECT PRIOR TO INSTALLATION OF BACK BOXES OR FRAMING. CONFIRM' <br />C , P , <br />CONTROL PANEL <br />P.A. <br />PUBLIC ADDRESS <br />GENERAL CONTRACTOR SHALL FURTHER ASSIST THE ARCHITECT BY PROVIDING IN <br />AND MODIFY THESE HEIGHTS AS NECESSARY TO CONFORM TO ADA REQUIREMENTS OR, LOCAL <br />CPT. <br />CARPET <br />PART. <br />PARTITION <br />A TIMELY MANNER PREPARED SOLUTIONS TO UNANTICIPATED EXISTING <br />CODES. <br />CORR. <br />CORRIDOR <br />PAV. <br />PAVEMENT <br />CONDITIONS. <br />C.T. <br />CERAMIC TILE <br />P.C. <br />PRECAST <br />cu. <br />CUBIC <br />PFB. <br />PREFABRICATE(D) <br />6. <br />THE ARCHITECT HAS ENDEAVORED TO IDENTIFY AS COMPLETELY AS POSSIBLE IN <br />PLUMBING ITEM MOUNTING HEIGHT <br />C.W. <br />COLD WATER <br />PFN. <br />PREFINISHED <br />THE DRAWINGS AND SPECIFICATIONS EXISTING ITEMS OF EQUIPMENT AND <br />LAVATORY: 34' TO RIM OR COUNTER <br />DBL. <br />DOUBLE <br />PL. <br />PLATE <br />CONSTRUCTION THAT ARE REQUIRED TO BE REMOVED OR OTHERWISE DEMOLISHED <br />WATER CLOSET: <br />DEMO. <br />DEMOLISH <br />PLWO. <br />PLYWOOD <br />SO AS TO ALLOW THE EXECUTION OF NEW WORK. THIS INFORMATION IS <br />@ ACCESSIBLE: 17' TO 19' TO TOP OF SEAT <br />DEPT. <br />DEPARTMENT <br />PR. <br />PAIR <br />PROVIDED FOR THE CONVENIENCE OF THE GENERAL CONTRACTOR, AND IS IN NO <br />@ STANDARD: 14' - 15' TO RIM <br />OET. <br />DETAIL <br />PROP. <br />PROPERTY <br />WAY INTENDED TO MEAN THAT DEMOLITION IS LIMITED ONLY TO THOSE ITEMS <br />URINAL: <br />O.F. <br />DRINKING FOUNTAIN <br />P.S. <br />PULL STATION <br />SPECIFICALLY IDENTIFIED. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY <br />@ ACCESSIBLE: 17' TO RIM <br />OIA. <br />DIAMETER <br />P.S.F. <br />POUNDS PER SQUARE FOOT <br />TO EXECUTE DEMOLITION WORK AS REQUIRED TO ALLOW THE EXECUTION OF NEW <br />@ STANDARD: 24' TO RIM <br />OIAG. <br />DIAGONAL <br />P.S.I. <br />POUNDS PER SQUARE <br />WORK. <br />MIRROR: 40' TO BOTTOM <br />DIM. <br />DIMENSION <br />INCHES <br />SOAP DISPENSERS AT LAVATORIES: 40' TO BOTTOM <br />OISP. <br />DISPENSER <br />P.T. <br />PRESSURE TREATED <br />7. <br />ALL AREAS ABOVE OR ON THE EXISTING CEILING THAT ARE AFFECTED BY <br />PAPER TOWEL DISPENSER: 40' TO BOTTOM <br />Div. <br />DIVISION <br />PTO. <br />PAINTED <br />INSTALLATION OF NEW WORK SHALL BE REPAIRED COMPLETELY WITH MATERIALS <br />HAND DRYER: 40' TO OPERATIONAL CONTROLS <br />ON. <br />DOWN <br />Q.T. <br />QUARRY TILE <br />AND PRODUCTS TO MATCH EXISTING INSTALLATION AND FIRE -RATED ASSEMBLIES. <br />NAPKIN DISPENSER: 40' TO OPERATIONAL CONTROLS <br />0.0. <br />DOOR OPENING <br />OTY. <br />QUANTITY <br />NAPKIN DISPOSAL: 24' TO CENTER <br />OP. <br />DAMPPROOFING <br />R. <br />RISER <br />B. <br />ALL ITEMS INDICATING CONTRACT LIMITS AND LINES OF DEMARCATION ARE <br />HAND HELD SHOWER HEAD: 6'-6' TO CENTER, ON 60' HOSE <br />DR. <br />DOOR <br />RAO. <br />RADIUS <br />SHOWN FOR THE CONVENIENCE OF THE GENERAL CONTRACTOR, AND ARE NOT TO <br />SHOWER SEAT: 17' <br />OTL. <br />DETAIL <br />R.C.P. <br />REFLECTED CEILING PLAN <br />BE TAKEN LITERALLY. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY <br />SHOWER CONTROL: 42' TO CENTER <br />OW. <br />DISH WASHER <br />R.O. <br />ROOF DRAIN <br />THE GENERAL CONTRACTOR PRIOR TO BID OPENINGS BY FIELD VERIFICATION. <br />SHOWER ROD: 6'-G' TO CENTER <br />OWG. <br />DRAWING <br />REC. <br />RECESSED <br />THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER INTERFACE <br />GRAB BAR: 36' TO CENTER <br />EA. <br />EACH <br />RECEP. <br />RECEPTION <br />BETWEEN EXISTING AND NEW WORK. <br />MOP HOLDER: 72' TO TOP <br />E.F.S. <br />EXTERIOR FINISH SYSTEM <br />REF. <br />REFERENCE <br />E.I.F.S. <br />EXTERIOR INSULATION FINISH <br />REFR. <br />REFRIGERATOR <br />9. <br />THE GENERAL CONTRACTOR MUST BE AWARE THAT CONSTRUCTION IN SOME AREAS <br />SYSTEM <br />REINF. <br />REINFORCED <br />SURROUNDING THE LIMITS OF THIS CONTRACT IS CURRENTLY IN PROGRESS. FOR <br />MATERIAL & FINISH NOTES <br />E.J. <br />EXPANSION JOINT <br />REO'O. <br />REQUIRE <br />THIS REASON, ACTUAL EXISTING CONDITIONS MAY VARY FROM CONDITIONS <br />ELEV. <br />ELEVATION <br />REV. <br />REVISION <br />INDICATED ON THESE DRAWINGS. ALL SUCH DISCREPANCIES SHALL BE <br />1. REFER TO CIVIL DRAWINGS FOR SITE GRADING; REFER TO ARCHITECTURAL SITE <br />ELEV. <br />ELEVATOR <br />R.H. <br />RIGHT HAND <br />ACCURATELY AND THOROUGHLY RECORDED BY THE GENERAL CONTRACTOR AND <br />PLAN AND ENLARGED SITE PLANS FOR CONCRETE PAVING PATTERNS AND SPOT <br />ELEC. <br />ELECTRICAL <br />RM. <br />ROOM <br />PROMPTLY REPORTED TO THE ARCHITECT. <br />ELEVATIONS. <br />EMER. <br />EMERGENCY <br />R.O. <br />ROUGH OPENING <br />ENCL. <br />ENCLOSURE <br />S.C. <br />SOLID CORE <br />10. <br />THE GENERAL CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ALL SIGNAGE AND <br />2. STRUCTURAL STEEL OR PRECAST CONCRETE SHAPES ARE SHOWN FOR DETAILING <br />ENT. <br />ENTRANCE <br />SCHED. <br />SCHEDULE <br />OTHER ASSEMBLIES THAT MAY BE AFFECTED BY DEMOLITION OR INSTALLATION OF <br />OF ARCHITECTURAL FINISHES ONLY; REFER TO STRUCTURAL DRAWINGS FOR <br />E.P. <br />ELECTRICAL PANEL <br />S.D. <br />SOAP DISPENSER <br />NEW WORK. SUCH PROJECT ELEMENTS SHALL BE REMOVED AND STORED PRIOR <br />STRUCTURAL DIMENSIONS, SIZES, SHAPES, AND DETAILS OF CONSTRUCTION FOR <br />EQ. <br />EQUAL <br />SECT. <br />SECTION <br />TO THE PERFORMANCE OF ANY WORK. THE CONTRACTOR IS RESPONSIBLE FOR <br />SPECIFIC CONDITIONS. <br />EQUIP. <br />EQUIPMENT <br />S.F. <br />SQUARE FOOT(FEET) <br />CATALOGING EACH ELEMENT AND ITS LOCATION IN THE BUILDING, AND IS <br />EXH. <br />EXHAUST <br />SHR. <br />SHOWER <br />RESPONSIBLE FOR REINSTALLING EACH ELEMENT IN ITS ORIGINAL LOCATION <br />3. REFER TO FINISH SCHEDULE AND INTERIOR ELEVATIONS FOR ALL WALL, <br />EXIST. <br />EXISTING <br />SHT. <br />SHEET <br />AFTER ALL WORK IN THE AREAS HAS BEEN COMPLETED. <br />CEILING, FLOOR, AND BASE MATERIALS AND FINISH DESIGNATIONS. <br />EXP. <br />EXPANSION <br />Sim. <br />SIMILAR <br />EXT. <br />EXTERIOR <br />SPEC. <br />SPECIFICATION <br />11. <br />THE GENERAL CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ANY UNFINISHED <br />4. REFER TO REFLECTED CEILING PLANS AND CEILING DETAILS FOR CEILING <br />F/ <br />FACE OF <br />S.S. <br />STAINLESS STEEL <br />WALL AREAS THAT MAY BE EXPOSED AS A RESUL- OF ADJUSTING FINISHED <br />HEIGHTS, SOFFIT HEIGHTS, AND MATERIALS OF CONSTRUCTION. <br />F.A. <br />FIRE ALARM <br />STO. <br />STANDARD <br />CEILING HEIGHTS. THE CONTRACTOR IS RESPONSIBLE FOR FINISHING THESE <br />F.D. <br />FLOOR DRAIN <br />STL. <br />STEEL <br />AREAS TO MATCH EXISTING ADJACENT FINISHED AREAS AND FIRE -RATED <br />5. FLASHING, DAMPPROOFING, AND INSULATIONS SHOWN ON WALL SECTIONS <br />F.E. <br />FIRE EXTINGUISHER <br />STOR. <br />STORAGE <br />ASSEMBLIES. <br />INDICATE VERTICAL LOCATIONS ONLY; PROVIDE CONTINUOUS SYSTEMS. <br />F.F. <br />FINISH FLOOR <br />STRUC. <br />STRUCTURAL <br />F.H. <br />FULL HEIGHT <br />SUSP. <br />SUSPENDED <br />12. <br />THE GENERAL CONTRACTOR AND AFFECTED SUBCONTRACTORS SHALL VISIT THE <br />6. PROVIDE SEALANT AND BACKER ROOS (TYPICAL) AT ALL EXTERIOR DOOR AND <br />F.H.C. <br />FIRE HOSE CABINET <br />SYM. <br />SYMMETRICAL <br />PROJECT SITE PRIOR TO SUBMITTING A PROPOSAL. THE CONTRACTOR SHALL <br />WINDOW FRAMES AND LOUVERS. <br />FIN. <br />FINISH <br />T/ <br />TOP OF <br />BECOME GENERALLY FAMILIAR WITH THE PROJECT, AND WITH THE IMPACT OF THE <br />FL. <br />FLOOR <br />T. & B. <br />TOP & BOTTOM <br />NEW WORK ON THE EXISTING CONDITIONS. ANY AREAS OF CONCERN SHALL BE <br />7. REFER TO WINDOW SCHEDULE AND ELEVATIONS FOR WINDOW AND GLAZING <br />FLASH. <br />FLASHING <br />T. & G. <br />TONGUE & GROOVE <br />BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO SUBMITTING A <br />TYPES. <br />FLUOR. <br />FLUORESCENT <br />T.B.D. <br />TO BE DETERMINED <br />PROPOSAL. NO ADDITIONAL CHARGE TO THE OWNER WILL BE APPROVED WHICH <br />FP <br />FIRE PROOF <br />TEL. <br />TELEPHONE <br />IS ATTRIBUTABLE TO THE CONTRACTOR'S FAILURE TO 00 THIS. <br />B. PROVIDE FIRE -RETARDANT WOOD WHEREVER WOOD BLOCKING IS SHOWN ON THE <br />FT. <br />FOOT (FEET) <br />TEMP. <br />TEMPERED <br />DRAWINGS. <br />F.T.F. <br />FACE TO FACE <br />TER. <br />TERRAZZO <br />13. <br />THE PROJECT IS CURRENTLY OCCUPIED, AND MUST REMAIN COMPLETELY <br />FTG. <br />FOOTING <br />T.O.B. <br />TOP OF BEARING <br />OPERATIONAL DURING NORMAL BUSINESS HOURS (7.00 A.M. TO 6:00 P.M. WEEKDAYS). <br />9. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR INTERFACES WITH THESE <br />GA. <br />GAUGE <br />T.O.P. <br />TOP OF PLATE <br />COORDINATE WITH THE OWNER ANY CONSTRUCTION ACTIVITIES WHICH MAY <br />SYSTEMS NOT SHOWN ON WALL SECTIONS. <br />GALV. <br />GALVANIZED <br />TOPO. <br />TOPOGRAPHY <br />IMPEDE NORMAL OPERATIONS, INCLUDING ANY ACTIVITY WHICH OPERATES <br />G.C. <br />GENERAL CONTRACTOR <br />T.O.S. <br />TOP OF SLAB <br />EXCESSIVE NOISE, AIRBORNE DIRT, OR WHICH DISRUPTS THE NORMAL FUNCTION <br />10. CONTRACTOR OR WINDOW MANUFACTURER TO DESIGN, PROVIDE AND INSTALL <br />GEN. <br />GENERAL <br />T.O.STL. <br />TOP OF STEEL <br />OF THE SPACE. PROTECT ANY ADJACENT SPACE WITH DUST PARTITIONS OR <br />COMPLETE ATTACHMENT OF WINDOW TO STRUCTURAL STEEL OR STRUCTURAL <br />GNO. <br />GROUND <br />T.V. <br />TELEVISION <br />CURTAINS FROM ACTIVITIES WHICH WILL CREATE OUST. NOTIFY ANY OCCUPANTS <br />CONCRETE, OR STRUCTURAL CONCRETE MASONRY PER SPECIFICATIONS AND <br />GVL. <br />GRAVEL <br />TYP <br />TYPICAL <br />OF THE BUILDING OF ANY CONSTRUCTION ACTIVITIES WHICH MAY AFFECT THEIR <br />WINDOW MANUFACTURER'S REQUIREMENTS AND IN ACCORDANCE WITH APPLICABLE <br />GYP. <br />GYPSUM <br />UNF. <br />UNFINISHED <br />ABILITY TO OPERATE NORMALLY. <br />CODES. <br />GYP. 80. <br />GYPSUM BOARD <br />U.N.O. <br />UNLESS NOTED OTHERWISE <br />H. <br />HIGH <br />U.O.N. <br />UNLESS OTHERWISE NOTED <br />H.C. <br />HOLLOW CORE <br />UR. <br />URINAL <br />HDCP. <br />HANDICAPPED <br />V. <br />VINYL <br />HOW. <br />HARDWARE <br />VAC. <br />VACUUM <br />HDWO. <br />HARDWOOD <br />V.B. <br />VINYL BASE <br />H.M. <br />HOLLOW METAL <br />V.C.T. <br />VINYL COMPOSITION TILE <br />H.O. <br />HOLD OPEN <br />VENT. <br />VENTILATION <br />HORIZ. <br />HORIZONTAL <br />VERT. <br />VERTICAL <br />HR. <br />HOUR <br />VEST. <br />VESTIBULE <br />HT. <br />HEIGHT <br />V.I.F. <br />VERIFY IN FIELD <br />HTG. <br />HEATING <br />V.T. <br />VINYL TILE <br />H.V.A.C. <br />HEATING, VENTILATING, AIR <br />V.W.C. <br />VINYL WALL COVERING <br />CONDITIONER <br />W/ <br />WITH <br />H.W. <br />HOT WATER <br />W/o <br />WITHOUT <br />H.W.H <br />HOT WATER HEATER <br />W.C. <br />WATERCLOSET <br />IN. <br />INCH(ES) <br />WD. <br />WOOD <br />INCAND. <br />INCANDESCENT <br />WDT. <br />WIDTH <br />INCL. <br />INCLUDE(D) <br />W.F. <br />WIDE FLANGE <br />INFO. <br />INFORMATION <br />W.H. <br />WATERHEATER <br />MOUNTING HEIGHTS <br />INSUL. <br />INSULATION <br />WIN. <br />WINDOW <br />INT. <br />INTERIOR <br />W.M. <br />WIRE MESH <br />NOTES <br />INV. <br />INVERT <br />WPFG. <br />WATERPROOFING <br />1. ALL MOUNTING HEIGHTS INDICATED ABOVE ARE BASED ON 'FLORIDA BUILDING <br />J.B. <br />JOIST BEARING <br />WSCT. <br />WAINSCOT <br />CODE, ACCESSIBILITY 2010' <br />J.C. <br />JANITOR'S CLOSET <br />2. MOUNTING HEIGHTS FOR WATER CLOSETS ARE SAME REGARDLESS IF WALL <br />JT. <br />JOINT <br />MOUNTED OR FLOOR MOUNTED <br />K.O. <br />KNOCK DOWN <br />KIT. <br />KITCHEN <br />x <br />0 <br />_E <br />bottom of <br />ref Lective <br />surface <br />:z <br />WATER GRAB WATER GRAB LAVATORY MIRROR LAVATORY <br />CLOSET BAR CLOSET BAR <br />x <br />0 <br />E <br />0 <br />E <br />:z <br />URINAL <br />36" min <br />C <br />TOILET TISSUE <br />DISPENSER at <br />GRAB BAR <br />x <br />0 <br />E <br />00 <br />TOILET TISSUE DIAPER <br />DISPENSER CHANGING <br />STATION <br />x <br />0 <br />E <br />DRINKING <br />FOUNTAIN <br />x <br />C) <br />E <br />0 <br />E <br />L <br />PLAN SYMBOLS <br />E_ WALL TYPE <br />CED MILLWORK LABEL <br />F00110 ROOM NUMBER LABEL <br />DOOR NUMBER LABEL <br />WINDOW TYPE LABEL <br />(REVISION NUMBER AND CLOUD <br />COLUMN BUBBLE <br />PROPERTY LINE <br />eLevation number <br />2 4 INTERIOR ELEVATION <br />3 drawing number <br />eLevation number <br />EXTERIOR ELEVATION <br />drawing number <br />DETAIL LOCATED ON SAME SHEET AS REFERENCE <br />detal number <br />DETAIL, ENLARGED PLAN, ETC. REFERENCE <br />drawing number <br />- section number <br />WALL SECTION REFERENCE <br />A-310 <br /><5- drawing number <br />section number <br />BUILDING SECTION REFERENCE <br />A-301 <br />i - drawing number <br />MOUNTING HEIGHTS <br />TO BE INSTALLED AT EACH <br />UNISEX TOILET ROOM <br />(1 REQUIRED EACH TOILET ROOM) <br />TYPICAL AOA COMPLIANT TOILET ROOM SIGN <br />VENDOR SUPPLIED ITEMS - FOR REFERENCE ONL-'l` <br />x <br />0 <br />E <br />El 00 <br />;:d- <br />SOAP SANITARY <br />DISPENSER NAPKIN <br />DISPOSAL <br />SANITARY <br />NAPKIN/ <br />TAMPON <br />VENDORS <br />ME <br />0 <br />LO <br />cn <br />-0 <br />cu <br />L_ <br />CL <br />C:) <br />00 <br />1`0 <br />Ca <br />Uj <br />-2 <br />Lo <br />to <br />C-Z <br />00 <br />U-) <br />M <br />Uj <br />Cr) <br />1`0 <br />to <br />L0 <br />Lj <br />>- <br />M <br />< <br />V) <br />C:) <br />C:) <br />ry <br />V) <br />Z:) <br />C:) <br />C) <br />0 <br />co <br />C14 <br />Lrl <br />C) <br />L0 <br />V) <br />_. <br />Elf <br />4� <br />1`10 <br />1`0 <br />co <br />C) <br />I <br />00 <br />LL_ <br />0 <br />Q) <br />0 <br />Q.) <br />co <br />-4- <br />Cn <br />04 <br />.4- <br />U-) <br />rl") <br />c- <br />LL_ <br />f- <br />E <br />0- <br />U) <br />Cl) <br />Q) <br />C- <br />C) <br />U-) <br />!E <br />L) <br />CY) <br />0 <br />Pr) 04 <br />0- �j <br />0 <br />Q <br />Ld <br />L) Zn <br />CD5 Ld <br />_j ir <br />19CO29 <br />review <br />approva <br />permit 07-29-2019 <br />revision <br />revision <br />PAPER TOWEL TOILET SEAT HAND DRYER <br />DISPENSER COVER DISPENSER G-100 <br />