Framina. Layout Ngles: <br />1 Framing layout drawn by Daniel M. Ossman Drag Service, Inc. is a schematic <br />representation only. It is the responsibility of the General Contractor to make a field <br />inspection to verify "ALL" existing field conditions including accuracy in dimensions with <br />proposed plans. General Contractor "MUST" certify in writing (the time and date) that <br />this field inspection was conducted on and submitted to truss manufacture. If this field <br />inspection was "NOT" done prior to giving said plans to the truss manufacture, then the <br />"GENERAL CONTRACTOR WILL BE HELD LIABLE FOR ALL COST OF ANY / ALL <br />MISTAKES" on pre-engineered truss that are constructed for said project. Daniel M. <br />Ossman Drafting Service, Inc. "WALL NOT BE HELD LIABLE" for errors made on any <br />framing (floor or roof) truss layouts. <br />2 Upon receiving said plans from the General Contractor the truss manufacture <br />"MUST" make a their "OWN" field inspection to "DOUBLE CHECK" all existing field <br />conditions, roof sk>pes, overhangs, and dimensions prior to the manufacturing of any / all <br />trusses. Truss manufacture "MUST" certify (the time and date) that this field inspection <br />was conducted on by their company. This certification must be given to the General <br />Contractor in writing prior to the manufacturing of any / all trusses on said project. <br />3 All thickened slabs / footing on foundation plan are located according to the schematic <br />truss layout drawn by Daniel M. Ossman Drafting Service, Inc. Only truss manufacture <br />can change these locations due to truss bearing points and "MUST" notify General <br />Contractor of these changes as soon as possible. <br />4 All hurricane truss straps specified on said project are to be used unless otherwise <br />specified by truss manufacture. All hurricane straps specified are "Simpson Strong Tie" <br />( or equal ), unless noted otherwise. Only truss manufacture can change any / or all <br />truss straps that are specified on truss layout drawn by Daniel M. Ossman Drafting <br />Service, Inc. Truss manufacture must first notify General Contractor in writing of these <br />changes as soon as possible. <br />5 Truss design drawings shall be prepared in accordance to and conformance with section <br />R802.1.6.1. These documents shall be provided by the truss manufacture at time of truss <br />delivery and approved by the building official prior to the installation of the roof truss. <br />(See code section items 1-13). <br />6 This plan as indicated is diagrammatical in nature for permit and contract purposes only. <br />Any revisions as required by the truss company's engineer as indicated on truss company's <br />sealed drawings shall superseded this drawing. This also includes truss company's <br />specified hurricane and other anchors supersede one shown on this drawing. <br />7 If shingles are being used, shingles MUST comply with section 905.2.2, 905.2.4.1 and <br />table R - 905.2.6.1 for wind resistance, FBC residential code 5th edition (2014) residential. <br />8 CONTRACTOR, MUST COORDINATE WITH TRUSS MANUFACTURE FOR ALL VAULTED, TRAY, <br />FLAT AND OR OTHER CEILING TYPES. CONTRACTOR IS 100% RESPONSIBLE FOR THE <br />EXTERIOR WALL CONSTRUCTION METHOD WHERE A GABLE END IS CONSTRUCTED. <br />ALL EXTERIOR WALLS MUST COMPLY WITH THE FBC RESIDENTIAL CODE 5TH EDITION <br />(2014) RESIDENTIAL, SECTION R - 609 FOR CONSTRUCTION METHODS. SEE ADDITIONAL <br />ATTACHED STRUCTURAL SHEETS FOR GABLE END BRACING DETAILS. DANIEL M. OSSMAN <br />DRAFTING SERVICE AND ARCHITECT WHO SIGNED / SEALED THE PLANS, ASSUMES NO <br />RESPONSIBILITY DUE TO NEGLIGENCE OF THE CONTRACTORS FAILURE TO FOLLOW <br />THE BUILDING CODE FOR GABLE END CONSTRUCTION. <br />Connection Schedule <br />Manufacturer <br />Model No. <br />Uplift <br />FI Product Approval <br />Location / Use <br />Name <br />Number <br />Simpson <br />Strong Tie <br />SP1 <br />#585 . <br />FI 10456.11 R3 <br />Bottom plate to wood stud connection. <br />Simpson <br />Strong Tie <br />SP2 <br />#1065 <br />FI 10456.11 R3 <br />Top plate to wood stud connection. <br />Simpson <br />Strong Tie <br />ABU44 <br />#2200 <br />FI 10860.4 R3 <br />4 x 4 bottom post connection to wood post. <br />Simpson <br />Strong Tie <br />BC4 <br />#980 <br />FI 10860 R3 <br />4 x 4 top post connection to wood post. <br />Simpson <br />HUSC210- <br />#3295 <br />FI 10655.25 R3 <br />2 - 2 x 10 wood beam hanger to exterior frame wall <br />Strop Tie <br />2 <br />of house. <br />Simpson <br />H10 <br />#995 <br />FI 10456.3 R3 <br />Roof structure connection to exterior frame wall or <br />Strong Tie <br />wood beam. <br />Simpson <br />MTS20 <br />#1000 <br />FI 10456.8 R3 <br />Alternate - Roof structure connection to exterior <br />Strong Tie <br />frame wall or wood beam. <br />Note: <br />I. Any products that are substituted, must "MUST" or "EXCEED" products specified. Contractor "MUST" provide <br />data to building inspector at time of inspection. Only truss company can modify hurricane clips and connections <br />specified and must coordinate with General Contractor with any changes to plans. <br />2. It's the responsibility of the truss manufacture to coordinate all cathedral ceiling locations with General <br />Contractor before the manufacturing of any floor and / or roof trusses. All ceiling heights are to be a minimum <br />of 10' - 0" unless otherwise specified by General Contractor. <br />Main house roof pitch: 6.5 / 12 <br />Front porch roof pitch: 5 / 12 <br />Main house finish ceiling height: 10'-0" <br />Front porch finish ceiling height: 8' - 0" <br />All door and window header height to <br />start at: 8' - 0" <br />I <br />ROOFERAMING LAYOUT <br />& - lie -1 �.a..i.. r rya✓ L- 0 ..s <br />(224'' 0- G " (iYP, ) <br />PRE. - UJ _� I J E ERED <br />Z00 P TI LJ 55 E5 <br />(E 2.4if 0.C. <br />SEE STIZUCTUML <br />�E <br />ICI .E_T FO R <br />EApE.12 SIZE <br />(TY P. ) <br />- Z. X 10 WCO p <br />FX4 P, T, woop <br />�5T (7YF) <br />REVISIONS <br />NO <br />DATE <br />DESCRIPTION <br />w a � <br />a� <br />� <br />v � <br />T <br />ae <br />O i. <br />-0 UPI <br />W) E a� <br />o � <br />� a <br />QD <br />a <br />A <br />.0 ►- o <br />a)cr-aci <br />o co <br />IT C1 <br />(D 0 o Cr M <br />a) +-� N d M <br />c <br />N c as <br />> do v <br />M --a <br />N � UJ i <br />QC. <br />0! OmR n 0 <br />Ecr0:?E <br />M -0 — ca <br />o TAU S �Cn <br />CM< > <br />0 > s L r <br />+,-O S2� O�O <br />ai E SO-L. rn <br />.- 0 0 rn 0 W to <br />+• � <br />ca rn <br />CO o 0-0_ a)� <br />rn u- r Uj c <br />W c (D H O <br />E--� OF-=Na- <br />N <br />U) <br />0 <br />LL <br />CY) <br />CO <br />fR <br />z <br />N <br />L0N <br />D <br />m <br />CID <br />t. <br />JOB NO. <br />5617 13TH STREET <br />DATE <br />APRIL 3, 2017 <br />DRAWN BY <br />Daniel M. Ossman <br />( SHEET NO. <br />SCALE: 1/4" = 1' 0" <br />A-4 <br />