Laserfiche WebLink
PLUMBING FIXTURE SCHEDULE <br />MARK <br />QTY <br />FIXTURE <br />SOIU <br />VENT <br />COLD <br />HOT <br />ELEC <br />MANUFACTURER <br />DESCRIPTION <br />WASTE <br />WATER <br />WATER <br />CONN. <br />MS-1 <br />1 <br />MOP SINK <br />2" <br />2" <br />1/2" <br />1/2" <br />- <br />MUSTEE <br />MOLDED MOP BASIN WITH 3" OUTLET. <br />MODEL 63M <br />• PROVIDE FAUCET WITH WALL BRACE, PAIL HOOK AND APPROVED VACUUM BREAKER. <br />• PROVIDE HOSE & HOSE BRACKET, MOP HANGER, BUMPER GUARDS AND STAINLESS STEEL <br />WALL GUARD <br />S-1 <br />2 <br />HAND SINK <br />1-1/2" <br />1-1/2" <br />1/2" <br />1/2" <br />- <br />REGENCY TABLES AN <br />• 20-GAUGE TYPE 304 STAINLESS STEEL, SINGLE BOWL WITH 1-1/2" IPS DRAIN BASKET, EASY TO <br />SINKS #600HS12SP <br />INSTALL 8" GOOSNECK FAUCET INCLUDED, HOLES PUNCHED FOR 4" CENTERS. <br />S-2 <br />1 <br />3 COMP SINK <br />1-112" <br />1-1/2" <br />1/2" <br />1/2" <br />- <br />REGENCY TABLES AND <br />' MADE OF HIGH QUALITY 16-GAUGE, TYPE 304 STAINLESS STEEL, GALVANIZED 1-5/8" STEEL <br />SINKS #60OS318242X <br />LEGS WITH SOCKETS, FAUCET HOLES PRE -PUNCHED ON 8" CENTERS (FAUCET SOLD <br />SEPARATELY). <br />S-3 <br />1 <br />1 COMP PREP SINK <br />1-1/2" <br />1-1/2" <br />1/2" <br />1/2" <br />- <br />REGENCY TABLES AND <br />MADE OF HIGH QUALITY 16-GAUGE, TYPE 304 STAINLESS STEEL, GALVANIZED 1-5/8" STEEL <br />SINKS #60OS12323G <br />LEGS WITH SOCKETS, FAUCET HOLES PRE -PUNCHED ON 8" CENTERS (FAUCET SOLD <br />SEPARATELY). <br />FD-1 <br />- <br />FLOOR DRAIN <br />3" <br />- <br />- <br />- <br />- <br />ZURN MODEL Z400H <br />ZURN FLOOR DRAIN "TYPE H" ROUND STRAINER WITH CLAMP DEVICE. <br />• ALL FLOOR DRAINS SHALL BE INSTALLED WITH TRAP PRIMERS. COORDINATE EXACT <br />LOCATIONS AND QUANTITY OF FLOOR DRAINS WITH ARCHITECTURAL DRAWINGS PRIOR TO <br />ROUGH -IN. <br />• PROVIDE TRAP PRIMER CONNECTION TO FLOOR DRAINS IN TOILET ROOMS EQUAL TO J.R. <br />SMITH MODEL 2698, SEE DETAIL ON SHEET 9.1 ALL OTHER FLOOR DRAINS TO BE PROVIDED <br />WITH TRAP PRIMERS EQUAL TO PRECISION PRODUCTS INC., SEE DETAIL ON SHEET P9.1 <br />HD-1 <br />- <br />HUB DRAIN <br />3" <br />- <br />- <br />- <br />- <br />ZURN MODEL Z1870 <br />• ZURN FLOOR DRAIN "TYPE 304 STAINLESS STEEL" ROUND STRAINER WITH CLAMP DEVICE. <br />TYPE 304 <br />• ALL FLOOR DRAINS/HUB DRAIN SHALL BE INSTALLED WITH TRAP PRIMERS. COORDINATE <br />EXACT LOCATIONS AND QUANTITY OF FLOOR DRAINS WITH ARCHITECTURAL DRAWINGS PRIOR <br />TO ROUGH -IN. <br />• PROVIDE TRAP PRIMER WITH AUTOMATIC TRAP PRIMER VALVE ZURN Z1022-XL. COORDINATE <br />FINAL LOCATION WITH G.C. <br />PLUMBING LEGEND <br />DESCRIPTION <br />SYMBOL <br />NEW SANITARY WASTE BELOW SLAB <br />— — <br />NEW SANITARY WASTE ABOVE SLAB <br />EXISTING SANITARY WASTE ABOVE SLAB TO REMAIN <br />EXISTING SANITARY WASTE TO BE REMOVED <br />X_ X—X—X—X—X _E <br />EXISTING SANITARY WASTE TO BE REMOVED <br />X-X-)(-X-X-X-X <br />GAS, PROPANE LINE <br />GAS <br />EXISTING GAS, PROPANE LINE <br />— — — — — — — <br />NEWVENT <br />------- <br />EXISTING VENT TO REMAIN <br />— — — — — — — <br />EXISTING VENT TO BE REMOVED <br />X _E -X X iF X- X <br />NEW COLD WATER PIPING <br />— <br />EXISTING COLD WATER PIPING TO REMAIN <br />— <br />EXISTING COLD WATER PIPING TO BE REMOVED <br />x x x X x x <br />NEW HOT WATER PIPING <br />— — <br />EXISTING HOT WATER PIPING TO REMAIN <br />— — <br />EXISTING HOT WATER PIPING TO BE REMOVED <br />Xx—X—X—X X—iE <br />NEW HOT WATER RECIRCULATION PIPING <br />— — <br />EXISTING HOT WATER RECIRCULATION PIPING TO REMAIN <br />— — — <br />EXISTING HOT RECIRCULATION WATER PIPING TO BE REMOVED <br />x X-1X_ X x x <br />STORM WATER DRAIN PIPING <br />ST <br />EXISTING STORM WATER DRAIN PIPING <br />— — — — <br />NEW GREASE/WASTE PIPING <br />GW <br />EXISTING GREASE/WASTE PIPING <br />GW <br />EXISTING GREASE/WASTE PIPING TO BE REMOVED <br />*x_X GWX X <br />TRAP PRIMER PIPING <br />TP <br />TRAP PRIMER <br />TP <br />BACK WATER VALVE <br />SHUT-OFF VALVE <br />SHUT-OFF VALVE WITH VALVE BOX <br />FLOOR DRAIN <br />FLOOR SINK <br />SMOKE DECK <br />POINT OF CONNECTION TO EXISTING SYSTEM <br />PIPE PENETRATION THROUGH FINISHED FLOOR <br />ABBREVIATIONS <br />BALL VALVE <br />BV <br />AIR ADMITTANCE VALVE <br />AAV <br />DOUBLE CHECK BACKFLOW <br />DCBF <br />COLD WATER SYSTEM <br />CW <br />EXISTING <br />EX. <br />FLOOR DRAIN, FLOOR SINK, FLOOR HUB <br />FS, FD, FH <br />GENERAL CONTRACTOR <br />G.C. <br />GRADE/FLOORANALL CLEAN OUT <br />GCO/FCO/WCO <br />HOSE-BIBB <br />HB <br />HOT WATER SYSTEM (110°F) <br />HW <br />HOT WATER RETURN SYSTEM (110°F) <br />HWR <br />INDIRECT DRAIN PIPING <br />ID <br />INVERT ELEVATION BELOW FINISHED FLOOR OR GRADE. I <br />IE <br />PLUMBING CONTRACTOR <br />P.C. <br />TEMPERATURE & PRESSURE RELIEF VALVE <br />T&P <br />UNLESS OTHERWISE NOTED <br />U.O.N. <br />BASIC PLUMBING MATERIAL <br />REQUIREMENTS <br />SOIL WASTE, VENT, ROOF DRAIN PIPING ABOVE GRADE: <br />CAST IRON, NO HUB, WITH STAINLESS STEEL CLAMPS <br />X❑ PVC-DWV, SCHEDULE 40 <br />SOIL WASTE, VENT, ROOF DRAIN PIPING BELOW GRADE: <br />CAST IRON, NO HUB, WITH STAINLESS STEEL CLAMPS <br />XD PVC-DWV, SCHEDULE 40 <br />WATER PIPING ABOVE GRADE: <br />COPPER, TYPE L <br />X CPVC, SCHEDULE 40, RETURN AIR PLENUM RATED <br />WATER PIPING BELOW GRADE: <br />X❑ COPPER, TYPE K, NO JOINTS BELOW GRADE <br />CPVC <br />FUEL GAS PIPING: <br />X❑ SEAMLESS BLACK STEEL PIPE <br />PVC <br />NOTES: <br />X❑ UTILIZE MATERIALS ABOVE UNLESS NOTED OTHERWISE ON PLANS <br />PLUMBING SHEET INDEX <br />P0.1 <br />— PLUMBING GENERAL <br />P4.1 <br />— PLUMBING PROPOSED SANITARY PLAN <br />P5•1 <br />— PLUMBING PROPOSED WATER PLAN <br />P8• i <br />— PLUMBING RISER DIAGRAMS <br />P&I <br />— PLUMBING DETAILS <br />PLUMBING SPECIFICATIONS <br />PART 1 -GENERAL <br />0.01 GENERAL SCOPE <br />A. THIS PROJECT WILL REQUIRE INSTALLATION OF PLUMBING SYSTEMS AS <br />INDICATED. <br />B. GENERAL CONTRACTOR SHALL FURNISH OWNER WITH COPIES OF <br />AS-BUILTS, WARRANTIES AND OWNER'S MANUALS PRIOR TO REQUESTING <br />FINAL PAYMENT. <br />1.01 GENERAL DOCUMENTS <br />A. INSTALLATION SHALL BE IN ACCORDANCE WITH THE FLORIDA BUILDING <br />CODE 7TH EDITION 2020 (EFFECTIVE 12/31/2020), WHICH INCLUDES THE <br />FLORIDA BUILDING CODE, PLUMBING AND FUEL GAS CODES. ALL <br />EQUIPMENT SHALL BE UL LISTED. <br />B. THE PLUMBING WORK SHALL INCLUDE FURNISHING ALL LABOR, <br />EQUIPMENT, MATERIALS AND SERVICE NECESSARY FOR THE PROPER <br />COMPLETION OF ALL PLUMBING WORK SHOWN ON THE DRAWINGS AND <br />AS SPECIFIED. ALL MATERIAL SHALL BE NEW. <br />C. THIS ENGINEER IS NOT RESPONSIBLE FOR MATERIALS, METHODS, <br />INSTALLATION, AND CONSTRUCTION WHICH DEVIATE FROM THESE <br />CONSTRUCTION DOCUMENTS AND SPECIFICATIONS. <br />1.02 SUBMITTALS <br />A. MATERIALS OR PRODUCTS SPECIFIED HEREIN AND/OR INDICATED ON <br />DRAWINGS BY TRADE NAME, MANUFACTURER'S NAME OR CATALOG <br />NUMBERS SHALL BE INTERPRETED AS ESTABLISHING A STANDARD OF <br />QUALITY AND DESIGN. SUBSTITUTIONS MAY BE ALLOWED IF THEY MEET <br />THE QUALITY STANDARDS AND DESIGN INTENT, UNLESS OTHERWISE <br />NOTED. <br />B. PRIOR TO STARTING THE PROJECT, THE PLUMBING CONTRACTOR SHALL <br />STUDY THE COMPLETE SET OF CONSTRUCTION DOCUMENTS AND <br />COORDINATE WITH THE MANUFACTURER(S) AS REQUIRED TO PROVIDE <br />EQUIPMENT SUBMITTALS TO SUBMIT TO PLUMBING ENGINEER OF <br />RECORD FOR REVIEW AND APPROVAL. THE EQUIPMENT SUBMITTALS <br />SHALL INCLUDE DIMENSIONS, WEIGHTS, SPECIFIED ACCESSORIES AND <br />REQUIRED CLEARANCES, AS WELL AS FAN CURVES, SOUND LEVELS, <br />CONSTRUCTION DETAILS, WARRANTY INFORMATION, AND ALL OTHER <br />RELEVANT DATA. <br />C. IF SUBSTITUTIONS TO THE BASIS OF DESIGN ARE SUBMITTED, THE <br />PLUMBING CONTRACTOR SHALL PROVIDE A CLEAR, DETAILED SUMMARY <br />IN THE SUBMITTALS OF THE DIFFERENCES BETWEEN THE SUBMITTED <br />EQUIPMENT AND THE BASIS OF DESIGN. ADDITIONALLY, PLUMBING <br />CONTRACTOR SHALL PROVIDE AN AFFIDAVIT STATING THAT PROPOSED <br />SUBSTITUTION IS AN EQUAL TO THAT WHICH IS SPECIFIED. PLUMBING <br />ENGINEER OF RECORD MAY ACCEPT OR REJECT THE SUBSTITUTIONS. <br />1.03 SHOP DRAWINGS <br />A. FURNISH SIX (6) COPIES OF SHOP DRAWINGS OF EQUIPMENT, FIXTURES <br />AND SYSTEM LAYOUT TO GENERAL CONTRACTOR PRIOR TO PURCHASING <br />ANY EQUIPMENT AND BEGINNING WORK. <br />1.04 RECORD DRAWINGS <br />A. AFTER COMPLETION OF ALL WORK, THE PLUMBING CONTRACTOR SHALL <br />PROVIDE THE GENERAL CONTRACTOR WITH AS BUILT RECORD <br />DRAWINGS. PLUMBING CONTRACTOR SHALL KEEP A RECORD OF THE <br />LOCATIONS OF ALL CONCEALED WORK AND UPON COMPLETION OF THE <br />JOB, SHALL SUPPLY AS -BUILT DRAWINGS SHOWING ANY DEVIATION FROM <br />THE ORIGINAL DRAWINGS. THESE DRAWINGS SHALL INDICATE DIMENSION <br />OF BURIED UTILITY LINES FROM BUILDING WALLS. <br />PART 2 - INSTALLATION <br />2.01 MATERIAL <br />A. SOIL, WASTE, VENT, & ROOF DRAIN PIPING DRAINAGE PIPING: <br />A.A. CAST IRON - SERVICE WEIGHT CAST IRON, NO HUB, WITH STAINLESS <br />STEEL CLAMPS AND SHIELDS WITH NEOPRENE SEALING SLEEVES <br />A.B. PVC - PVC-DWV SCHEDULE 40 PIPE AND BELOW SLAB SHALL BE <br />PVC-DWV SCHEDULE 40 PIPE AND FITTINGS WITH SOLVENT WELD <br />JOINTS AND DRAINAGE PATTERN FITTINGS. <br />A.C. REFER TO BASIC PLUMBING MATERIAL REQUIREMENTS CHART ON <br />THIS SHEET FOR MATERIAL SELECTION. <br />A.D. SAW CUT FLOOR AS NECESSARY FOR INSTALLATION OF NEW <br />SANITARY DRAINAGE PIPING. REPAIR/PATCH FLOOR TO MATCH <br />ADJACENT AREAS. <br />B. DOMESTIC WATER PIPING: <br />B.A. TYPE L COPPER - TUBING WITH LEAD FREE SOLDER JOINTS. <br />B.B. TYPE K COPPER - TUBING WITH LEAD FREE SOLDER JOINTS. <br />B.C. COPPER FITTINGS - PIPE FITTING SHALL BE WROUGHT COPPER, <br />B.D. SCHEDULE 40 CPVC WITH SOLVENT WELD JOINTS ASTM 02846, F441 & <br />F442 INSTALLED AS PER MANUFACTURERS RECOMMENDATIONS. <br />B.E. REFER TO BASIC PLUMBING MATERIAL REQUIREMENTS CHART ON <br />THIS SHEET FOR MATERIAL SELECTION. <br />C. PIPE INSULATION: HOT WATER SUPPLY AND RETURN PIPING SHALL BE <br />INSULATED WITH 1" THICK R-6 MINIMUM FIBERGLASS OR EQUAL, IN <br />COMPLIANCE WITH APPLICABLE ENERGY CODES, STORM WATER PIPING <br />INCLUDING ROOF DRAIN SUMPS, ALL HORIZONTAL RAINWATER LEADERS & <br />ANY PIPING ABOVE SLAB RECEIVING COLD WATER DISCHARGE FROM A/C <br />UNITS, ICE MACHINES ETC. SHALL BE INSULATED WITH 1" THICK R-6 <br />MINIMUM FIBERGLASS (OR EQUAL) INSULATION WITH VAPOR JACKET. <br />2.02 VALVES <br />A. EQUAL TO NIBCO, CRANE, OR WALWORTH. ALL BRONZE 150 LB. BALL <br />VALVES WITH RISING STEMS. <br />2.03 SPECIALTIES <br />H. PROVIDE UL LISTED FIRE STOPPING PIPE PENETRATION ASSEMBLIES AT <br />ALL PIPING THROUGH RATED WALLS AND ASSEMBLIES. <br />I. TRAP PRIMERS: RESEAL ALL FLOOR DRAIN TRAPS WITH 2' WATER LINE <br />CONNECTED TO A TRAP PRIMER FITTING IN THE COLD WATER SUPPLY <br />LINE SERVING A FREQUENTLY USED PLUMBING FIXTURE. <br />J. ADA WRAP: HANDICAPPED LAVATORIES SHALL HAVE ADA APPROVED <br />UNDER COUNTER WRAP FOR WASTE AND WATER PIPING. <br />PART 3 - EXECUTION <br />3.01 INSTALLATION <br />A. INSTALL PIPE ABOVE GROUND PLUMB AND SQUARE WITH BUILDING LINES, <br />ADEQUATELY SUPPORTED WITHOUT SAGS OR HIGH POINTS, CONCEAL <br />PIPING IN OCCUPIED AREAS AND MAINTAIN HEAD ROOM AND ACCESS <br />SPACE IN UNFINISHED AREAS. SLEEVE PIPING THROUGH ALL WALLS, <br />SLABS, OR PARTITIONS WITH ESCUTCHEONS AT ALL FINISHED SURFACE. <br />PROVIDE UNIONS AT ALL FINAL CONNECTIONS AND STOPS ON ALL <br />SUPPLIES. ALL PIPE OPENINGS SHALL BE PLUGGED DURING <br />INSTALLATION. <br />B. SANITARY DRAINAGE PIPING 3" & LARGER SHALL BE INSTALLED WITH A <br />MINIMUM 1/8" PER FOOT SLOPE UNLESS NOTED OTHERWISE. ALL <br />DRAINAGE PIPING 2-1/2" AND SMALLER SHALL BE INSTALLED WITH A <br />MINIMUM OF 1/4" PITCH PER FOOT. <br />C. ALL FIXTURES AND TRIM FOR HANDICAPPED SHALL BE INSTALLED IN <br />COMPLIANCE WITH ADA CODE, <br />D. INSTALL ALL PIPING TO ALLOW FOR EXPANSION. <br />E. SEE RISER DIAGRAMS FOR ALL DRAINAGE &VENT PIPE SIZING FOR THE <br />PLUMBING SYSTEMS. REFER TO PLUMBING FLOOR PLAN (WATER SYSTEM) <br />& SCHEDULES FOR ALL WATER PIPING SYSTEM SIZING. <br />F. ALL WORK ASSOCIATED WITH HANDICAPPED TOILETS SHALL COMPLY <br />WITH ADA REQUIREMENTS AND FLORIDA BUILDING CODE - CHAPTER 11 <br />FLORIDA ACCESSIBILITY CODE FOR BUILDING CONSTRUCTION. <br />G. FINAL CONNECTIONS TO DRAINAGE AND WATER SERVICE LINES TO <br />EXISTING OR NEW AS SHOWN ON THESE DOCUMENTS SHALL BE BY THE <br />PLUMBING CONTRACTOR. <br />3.02 DISINFECTING OF POTABLE WATER SYSTEM <br />A. THE SYSTEM SHALL BE FILLED WITH A SOLUTION CONTAINING 50 PARTS <br />PER MILLION OF AVAILABLE CHLORINE AND ALL ALLOWED TO STAND 24 <br />HOURS BEFORE FLUSHING AND RETURNING TO SERVICE. DISINFECTION <br />PROCEDURE AND RESULT SHALL BE SUBJECT TO THE APPROVAL OF THE <br />LOCAL PLUMBING INSPECTOR. <br />3.03 TEST <br />A. ALL PLUMBING SYSTEMS SHALL BE TESTED IN ACCORDANCE WITH THE <br />FLORIDA BUILDING CODE PLUMBING. ALL TESTS SHALL BE APPROVED BY <br />THE LOCAL PLUMBING INSPECTOR AND SHALL BE OBSERVED BY A <br />REPRESENTATIVE OF THE OWNER. <br />3.04 SYSTEM IDENTIFICATION <br />A. THE PLUMBING CONTRACTOR SHALL PROVIDE IDENTIFICATION TAGS FOR <br />ALL NEW PIPING AND VALVES IN THE BUILDING AS PER OWNER ACCEPTED <br />STANDARDS, THE PIPE MARKS SHALL INCLUDE PIPING SYSTEM <br />IDENTIFICATION AND DIRECTIONS OF FLOW. EVERY 10 FEET AND <br />CHANGES OF DIRECTION. <br />3.05 SPECIFICATIONS AND DRAWINGS <br />A. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE <br />SANITARY, STORM, AND DOMESTIC WATER PIPING SYSTEMS: INCLUDING <br />ALL ASSOCIATED DEVICES, EQUIPMENT, CONTROLS, AND CONNECTIONS <br />TO NEW SERVICES, SUPPORTS, AND HARDWARE REQUIRED FOR THE <br />SATISFACTORY OPERATIONS OF THE SYSTEMS, WHETHER SPECIFICALLY <br />SHOWN OR NOT ON THE DRAWINGS. <br />B. THE PLANS SHOW THE LOCATION OF ALL FIXTURES AND EQUIPMENT AND <br />ARE INTENDED TO DEPICT THE GENERAL INTENT OF THE WORK IN SCOPE, <br />LAYOUT, AND QUALITY OF WORKMANSHIP. THEY ARE NOT INTENDED TO <br />SHOW IN MINUTE DETAIL EVERY AND ALL ACCESSORIES INTENDED FOR <br />THE PURPOSE OF EXECUTION OF THE WORK, BUT IT SHALL BE <br />UNDERSTOOD THAT SUCH DETAILS SHALL BE PART OF THIS WORK. <br />C. THE DRAWINGS AND SPECIFICATIONS ARE MEANT TO BE <br />SUPPLEMENTARY, HOWEVER, WHERE DRAWINGS AND SPECIFICATIONS <br />CONFLICT, IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO <br />BRING SUCH CONFLICT TO THE ATTENTION OF PLUMBING ENGINEER OF <br />RECORD FOR CLARIFICATION. <br />D. REFER TO ARCHITECTURAL DRAWINGS AND VERIFY FIELD CONDITIONS <br />FOR EXACT LOCATION OF ALL PLUMBING FIXTURES. <br />E. ALL DOCUMENTS, TEST REPORTS, & AS -BUILT DRAWINGS SHALL BE <br />ATTACHED TO THE CLOSING DOCUMENTS OF THE PROJECT. <br />3.06 WARRANTY <br />A. THE PLUMBING CONTRACTOR SHALL WARRANT ITS WORK TO BE FREE <br />FROM DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE <br />YEAR FROM FINAL ACCEPTANCE OF ALL WORK. <br />B. THE PLUMBING CONTRACTOR SHALL PROVIDE FIVE (5) BOUND COPIES OF <br />ALL PLUMBING CONTRACTOR WARRANTIES, MANUFACTURER'S <br />WARRANTIES, PARTS LISTS, AND INSTALLATION AND MAINTENANCE <br />MANUALS FOR ALL PLUMBING EQUIPMENT, AS WELL AS INSTRUCTIONS <br />FOR OPERATING AND MAINTAINING ALL PLUMBING EQUIPMENT TO THE <br />OWNER UPON FINAL COMPLETION, <br />3.07 COORDINATION <br />A. PIPE PROTECTIVE COATING: FOR STEEL OR COPPER PIPE, PERMACEL OR <br />SCOTCHWRAP VINYL TAPE APPLIED OVER PIPE TO A TOTAL MINIMUM <br />THICKNESS OF 20 MLS. APPLY TO ALL WATER PIPE IN CONTACT WITH <br />MASONRY OR CONCRETE. <br />B. PIPE HANGERS: HANGERS FOR BARE COPPER PIPE THROUGH 4 INCH (4") <br />DIAMETER OR SMALLER SHALL BE ADJUSTABLE RING TYPE, PLASTIC <br />COATED EQUAL TO MICHIGAN 102a, FOR STEEL PIPE MICHIGAN 100. <br />C. DRAINS AND CLEANOUTS: SEE SCHEDULE ON DRAWINGS. <br />D. DIELECTRIC UNIONS: PROVIDE EBCO OR CAPITOL DIELECTRIC UNIONS AT <br />ALL POINTS OF CONNECTION BETWEEN DISSIMILAR PIPE METALS. <br />E. FLASHING AND VENT STACKS: ALL VENTS EXTENDING THROUGH THE <br />ROOF SHALL BE PROVIDED WITH FOUR POUND SHEET LEAD FLASHING <br />EXTENDING UPWARD AROUND THE PIPE AND TURNED DOWN INSIDE THE <br />PIPE OR AS OTHERWISE SHOWN ON THE DRAWINGS. THE ROOF FLASHING <br />SHALL BE INSTALLED BY LICENSED ROOFING CONTRACTOR. <br />F. ESCUTCHEONS AND SLEEVES. WHERE PIPES PIERCE EXPOSED <br />PARTITIONS, FLOORS, WALL, OR CEILINGS, PROVIDE CHROME PLATED <br />ESCUTCHEONS TO THE COVER THE RAW EDGE. <br />G. SLEEVES SHALL BE PROVIDED A ALL PIPE PENETRATIONS OF MASONRY <br />AND CONCRETE WALLS AND FLOORS. <br />A. COORDINATE WORK WITH OTHER TRADES AND EXISTING CONDITIONS <br />PRIOR TO BEGINNING WORK. PLUMBING CONTRACTOR SHALL PROVIDE <br />ROUTING AND OFFSETS NECESSARY TO AVOID CONFLICT WITH <br />STRUCTURE, FINISHES, AND WORK OF OTHER TRADES. <br />B. VERIFY LOCATIONS, SIZES, AND INVERT ELEVATIONS OF SANITARY DRAIN, <br />AND DOMESTIC WATER PIPING CONNECTIONS WITH FIELD CONDITIONS <br />AND CIVIL ENGINEERING DRAWINGS (AS APPLICABLE) PRIOR TO <br />PROCEEDING WITH THE WORK. SHOULD ANY DISCREPANCIES BE <br />DISCOVERED, PLUMBING CONTRACTOR SHALL SUBMIT A REQUEST FOR <br />INFORMATION TO PLUMBING ENGINEER OF RECORD. <br />C. COORDINATE WITH ARCHITECTURAL DRAWINGS FOR WALL AND <br />PARTITION CONSTRUCTION AND THICKNESS WHERE PLUMBING PIPING, <br />FIXTURES CARRIERS OR EQUIPMENT IS INDICATED. BEFORE STARTING <br />CONSTRUCTION, IDENTIFY ANY CONFLICT PRIOR TO STARTING <br />CONSTRUCTION. <br />D. COORDINATE EXACT LOCATION, ELEVATIONS, AND SIZES OF ALL SLEEVES <br />IN NEW STRUCTURE WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS <br />AND FIELD CONDITIONS. <br />GS JOB #: S831 .21 .00 <br />GLOBAL <br />5,,�Cn�ZINC. <br />MEPF ENGINEERING <br />INFO@GLOBAL-SANCHEZ.COM <br />CA#: 6237 <br />B 1 6 MANATEE AVE. E, SUITE 18 <br />BRADENTON, FL 3420B <br />PHONE: 941-75B-2SS1 <br />3825 HENDERSON BLVD., <br />SUITE 103 <br />TAMPA, FL 33629 <br />PHONE: B 1 3-28 1 -❑❑❑ 1 <br />C&K ARCHITECTS I INTERIORS <br />architecture• interior design -client services <br />AAC0.01629 <br />4221 WEST BOY SCOUT BLVD., SUITE 150 <br />TAMPA, FL 33607-5743 <br />813.884.2000 <br />280 WEST CENTRAL AVE. <br />WINTER HAVEN, FL 33880-2957 <br />863.577.2054 <br />c <br />A SF� <br />N 1 4' <br />u <br />5/1 /2021: W <br />STATE OF <br />I '• FtOR��Pr°G� <br />SS/ONAL1�� <br />- <br />z <br />c <br />_ <br />t <br />2 <br />z <br />0 <br />- <br />' <br />s <br />i <br />mQ <br />0 <br />O <br />z <br />J <br />LL <br />� <br />J <br />x <br />0- <br />w <br />N <br />v r <br />i <br />O <br />I..L <br />Z <br />W <br />( <br />Z Lu <br />NO <br />m <br />I <br />J <br />J <br />Q <br />0 <br />M <br />LO <br />01 <br />ISSUED FOR: <br />PERMIT <br />PROJECT NUMBER <br />21020 <br />DATE <br />5.5.21 <br />DRAWING NUMBER <br />PO I I <br />