Laserfiche WebLink
THIS DETAIL ONLY P,EFERS TO THE DIAMOND -MESH <br />EXPANDED METAL LATH A-TACHMENT. <br />METAL LATH OJAI _ SHiEATH rJG <br />J' <br />II I II <br />4.-f --- <br />Il�r �f III <br />s-4 1 1 1 1 <br />I X i I <br />I ITT_ 1 I ! 11 <br />16GAx1-1''2" LONG (3 4"-"" CRO'NN) <br />STAPLES fa 6" O.C. VERT BETWEEN I j k ! 1 I f 1EG+'*x.1-1�2" LONG (3,4"-1" <br />CR0,A1114) STAPLES �421 6" <br />STUDS (NC-TED THUS--) - OF=SET I i I I 0 C, VERT INTO STUDS <br />STAPLES BETWEEN STUDS .AS SHOWN <br />(NOTED THUS:_; <br />V <br />METAL LATH ATTACHMENT DETAIL <br />REV. 09.24.21 SCALE: 34" = T-0' <br />`DETAIL EXCEEDS THE REQU=REMENTS FOR FBCP 7+03.7.1 LATH* <br />"ONLY APPLIES TO LENNAR TPA:,JAX" <br />LATHING ACCESSORIES: <br />ATTACHMENTS SHALL BE OF CORROSION -RESISTANT MATERIALS. <br />WOOD APPLICATION: 16 GA. x 1-1/2" LONG (3/4"-1" CROWN) STAPLES @ 6" O.C. <br />VERTICALLY/HORIZONTALLY INTO FRAMING MEMBERS. <br />MASONRY APPLICATION: CONCRETE STUB NAIL, 3/8" (10 MM) HEAD DIA. MIN. @ <br />6" O.C. VERTICALLY/HORIZONTALLY OR COMPATIBLE ADHESIVES, EXTERIOR <br />GUN -GRADE, CONSTRUCTION ADHESIVE WITH 1" DABS @ 6" O.C. OR IN A <br />SEMI -CONTINUOUS BEAD BETWEEN THE SOLID PLASTER BASE AND THE SOLID <br />PORTION OF THE KEY ATTACHMENT FLANGE. <br />CONTROL JOINTS: INSTALL CONTROL JOINT LATHING ACCESSORIES IN <br />CONFORMANCE WITH C1063. LATH SHALL NOT BE CONTINUOUS THROUGH <br />CONTROL JOINTS, BUT SHALL BE STOPPED AND TIED AT EACH SIDE. <br />ALL ACCESSORIES SHALL BE IN ACCORDANCE WITH THE LATEST ASTM C1063 & <br />ASTM C1861. <br />CORNER OF <br />HOME <br />GARAGE SIDE <br />10'-0" <br />TANK -LESS W/H <br />5'-0" _ <br />STUB -OUT FOR -' <br />GAS METER O — <br />0 <br />N <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />"ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY" <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />7-5" <br />(2)16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2) 16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3) 16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16'-5" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) SIMPSON HTS20 OR (4) 16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6-1" <br />(2) 16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'-6" <br />(2) 16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2) 16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13'-0" <br />(3) 16d TOENAILS <br />2" X 12" @ 24" O.C. <br />15'-4" <br />(1) SIMPSON HTS20 OR (3) 16d TOENAILS <br />_J <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />15/32" CDX <br />Q <br />PLYWOOD OR <br />a <br />7/16" OSB <br />RIDGE LINE <br />140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE 140 MPH (ult) 3 SECOND GUST EXPOSURE "C" WIND ZONE <br />8d RING SHANK NAILS @ 6" O.C. & 8d RING SHANK NAILS @ 6" O.C. EDGES & <br />+ + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS 8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />+ + 0.113 INCH NOMINAL SHANK DIAMETER 0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH 16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER 0.280 INCH FULL ROUND HEAD DIAMETER <br />2-3/8 INCH NAIL LENGTH 2-3/8 INCH NAIL LENGTH <br />NOTE: * FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ + <br />+ <br />+ + <br />+ + <br />+ + + + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ + <br />+ <br />+ + <br />+ + <br />+ + + + + <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />4'-0" <br />+ <br />4'-0" <br />+ + <br />+ + <br />+++ <br />+++ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ + <br />+ + + + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ <br />/++ <br />++ <br />+ <br />+++++++++ <br />+ <br />Backer and Filler Block Dimensions <br />BCI Joist <br />Backer Block <br />Thickness <br />Filler Block Thickness <br />Series <br />5000s 1.8/1.7 <br />3/4" or panels <br />wood panels <br />Two 3/4" wood panels or 2 x — <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />902.0 <br />2 x — lumber <br />Double 2 x — lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking ° <br />1/8" gap r <br />FILL CELL STD. 90° HOOK BOND BEAM <br />w <br />STD. 90° <br />CONT. #5 <br />CONT. #5 HOOK <br />BAR <br />BAR <br />#5 CONT. <br />FROM <br />ON <br />TOUHIG HIGHEST <br />BOND BEAM <br />BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />PLYWOOD FLOOR <br />SEE PLAN FOR REQ'D <br />SHEATHING PER PLAN <br />COLUMN AND <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION <br />@ INT. BRG. WALL <br />N.T.S. <br />1/8" min. } Small gap 2" min. <br />2" <br />max. � 4 max. <br />Clinch nails <br />when <br />possible <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. 2x4/Plywood/OSB web stiffener 2" min. <br />4) Place joists together and nail from each side with 2 rows of 10d nails required when indicated or 4" max. <br />2x_: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVING)/8" GAP @ TOP sides by 6". - Hangers with sides not containing WEB STIFFENER <br />top flange of joist. <br />DOUBLE JOIST CONNECTION - Birdsmouthcuts. N.T.S. <br />- Under 2nd floor cnh imn w/ Inadc <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 plf max along load bearing wall. <br />Load bearing wall must stack <br />'Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />wall or beam below.* <br />consideration. Check <br />local building <br />code for appropriate <br />1/16 <br />Zor--20 <br />details in <br />One 10d box <br />areas=20 of high <br />sinker <br />lateral load. <br />nail each side <br />at bearing. <br />Squash block / <br />(2x4 minimum) <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam O <br />NO HOLES (EXCEPT <br />KNOCKOUTS) ALLOWED <br />IN BEARING ZONES --- <br />DO NOT cut, notch <br />or drill flanges <br />Boise Joist Blocking <br />Use 3" 110d1 nails at 6" o.r.. <br />Provide adequate bearing <br />for each lapped joist. <br />10d nails SECTION @ INT. BRG. WALL <br />N.T.S. <br />MINIMUM SPACING = 2x GREATEST <br />D DIMENSION OF LARGEST HOLE <br />(see table below) (KNOCKOUT EXEMPTS) D <br />(see table below) <br />higher than 15001b <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : - for vertical load transfer <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Use 10&3" nails at 6"o.c. for all joist <br />blocking panel *Non -stacking walls <br />require additional consideration. <br />(D ❑ (O <br />6" A %" ROUND HOLE MAY 6" 6" DO NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN 1Y" <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1)/2-- <br />Round Hole Diameter (in) <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />8.875 <br />10 <br />1 1 <br />12 <br />13 <br />Rectangular Hole Side (in) <br />2 <br />3 <br />5 <br />6 <br />8 <br />9 <br />10 <br />Any 16" joist <br />Span (ft) <br />8 <br />1'-0" <br />1'-1" <br />V-2" <br />V-2" <br />V-3" <br />V-3" <br />1'-7" <br />V-11" <br />2'-4" <br />2'-9" <br />3' 2" <br />3' 7., <br />12 <br />1'-0" <br />V-1" <br />1' 2" <br />V-2" <br />1' 3" <br />1'-9" <br />2'-4" <br />2'-11" <br />3'-7" <br />41'-2" <br />4'-9" <br />5'-4" <br />16 <br />V-0" <br />V-1" <br />V-2" <br />V-2" <br />V-7" <br />2'-5" <br />3'-2" <br />3%10" <br />4' 9" <br />5'-7" <br />64" <br />7'-2" <br />20 <br />1 '-0" <br />1 ' 1 " <br />1 '-2" <br />1'-2" <br />2`-0" <br />3'-0" <br />4'-0" <br />4'.10" <br />5'-1 1 " <br />6'-1 1 " <br />7'-1 1" <br />24 <br />1 1'-0" <br />1'-1" <br />V-3" 1 <br />2'-5" <br />3'-7" <br />14'-9" <br />5'-10" <br />T-2" <br />8'-4•' <br />1 9'-6" <br />10'-9" <br />kKel9�I <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. 1Yz" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE 1Yz" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />Web Stiffener Fastener Schedule <br />Joist Bearin Location <br />Series De th End Intermediate <br />® <br />BC15000s <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />- <br />BCI 6000so <br />BCI6500s® <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI 60s® <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI90S <br />" <br />3-16 <br />3-16d <br />14" <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />SIMPSC <br />wl (22), <br />NAILS 1 <br />5/8"0 <br />THRU <br />BOLT <br />SIMPSC <br />w/ (22) <br />NAILS 1 <br />R TRUSS <br />'OP PLATE <br />I.0 <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />AIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON HETA20 / <br />Plumbing HETAL20 INSTALLATION <br />Joist <br />�When joists meet over wall, provide <br />1 3/4" minimum bearing for each. I -Joist can be offset <br />up to 3 to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />Backer block (12" wide min.) <br />Nail with 10-10d nails. <br />',-,,Install tight to"top flange. <br />Joist hanger <br />\ 'N Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />1/4%2" gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4"-2" gap at top of bottom 1/4%2" gap at bottom of top <br />flange. flange. <br />Web stiffner as <br />Web stiffeners are not re uired when to <br />p /doesn't <br />q 9re uired if han er <br />qflange is laterally supported by joist hanger. meet <br />height <br />requirements <br />0.6 X Joist <br />(D <br />p depth <br />SIMPSON HETA20 / HETAL20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />® <br />LOCATION OF <br />° <br />SECOND H10A <br />SIMPSON H10A <br />° �° <br />(WHEN <br />w/ (18) 10d x 1 1/2" <br />° <br />REQUIRED) <br />NAILS <br />UPLIFT = 1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />PLUMBING LINE <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE PVC OR SCH40 SLEEVE <br />A/C CHASE 4" PVC PENETRATION <br />SLEEVE THRU STEM <br />WALL .4a d <br />a I Ia a <br />1�4I III-rI I—III—� °. °. I IL4.:°I—III— • FINI GRADE II —I I I- <br />I I —I 11=1 I 1=1 I FEI I I-WI <br />-1 I I— — — — — — <br />�III_II�IIIII�IIIII�IIII-IIIIIIiII IIIIII�IIIII1IIIIlIIIITII_II�II' r� <br />SLEEVE THRU STEM—/ ° <br />a <br />SEE PLAN FOR--'°• a • • <br />FOUNDATION INFO ^ d <br />STEM FOUNDATION <br />GRADE <br />REINF. SEE PLAN <br />(2) #5 REBAR <br />A/C CHASE 4" PVC <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />I -JOISTS BUCKETS <br />N.T.S. -, /\ <br />AUG 2 4 2022-,, <br />� <br />V� <br />wi;TUAL <br />.-rI r.. .. - 'vd <br />r r ' <br />:h <br />.00 <br />I <br />SEE FND. PLN. <br />ol SIZE & REINF. <br />12" BELOW PIPE VERTICAL THRU FND. <br />GRADE <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION rPLUMBING LINE <br />1I� SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENTERED @ PIPE <br />PENETRATION PLUMBING LINE <br />FF <br />a a d d <br />-----� . d --.— -- v. °, dv G <br />° TT =1 ff—T <br />i <br />T_ <br />0 <br />SEE FND. PLN. <br />SIZE & REINF. <br />011 <br />CV <br />N <br />t <br />141 <br />N <br />LO <br />CID <br />LO <br />Z <br />Lu <br />0 <br />Z <br />Q <br />E <br />> CDM o <br />_W &Z c 10u <br />D 0 M N d <br />N VA <br />W r o <br />0 2 o <br />`l 8 Q <br />'(v'1i V w cap N <br />co 2) <br />C co <br />7W� L <br />0 rz,a -0 <br />LLI W <br />0 W <br />LLI uj w O r- <br />�� o Lu � X�~zo <br />< QQ <br />ui0 �LLUOw�O <br />Q Q U <br />1— <br />��O�Z�u-2Zmp� aQ <br />Oww�OZOWOOXmZ? U <br />U 0 0 Z <br />CL <br />��o->ZwoZZ"Ow�"a <br />, on. <br />-¢<005d -Zo�U <br />~pwgw <br />LILQ <br />w 2I-� Q <br />OX o D 0Q <br />�Q 0 �Qu <br />O <br />Z <br />LU <br />0� <br />U) 5 ti <br />1- cM O <br />Q M � <br />LL <br />2 (n <br />111� <br />0�IZCM <br />Cr00 <br />Z (� <br />W <br />LU <br />JC:) <br />O <br />I <br />I <br />I <br />I <br />I <br />, <br />N <br />000Cq <br />QNQQ <br />N <br />r-- <br />M <br />M <br />Co <br />O <br />M <br />C)— <br />O <br />N <br />O <br />! <br />I <br />I <br />I <br />Z <br />0 <br />LoW <br />Cn <br />o <br />0 <br />N <br />0 <br />M <br />o <br />I <br />i <br />i <br />I <br />CO <br />Z Z <br />U) <br />Q w <br />C)Z <br />M O <br />LJ.I <br />U <br />w0Z0 <br />UVV5 <br />=)Zj <br />0 <br />Z <br />w�2 <br />LU <br />Ln <br />= <br />w <br />Ln <br />(D <br />m l~- 2 <br />N <br />zO <br />oo <br />w <br />IZ <br />2~� <br />■ ■ <br />N <br />0 <br />Z=0 <br />Q <br />V <br />gwu_ <br />z <br />-Z� <br />Z <br />z <br />�� <br />U <br />< <br />0. <br />W <br />z <br />SN1 <br />Q <br />Z <br />J <br />W <br />N <br />N <br />LAST PLOT DATE <br />. . <br />z 0 <br />STRUCTURAL <br />DETAILS <br />