---I - 1 - II ns,•q .
<br />(i
<br />i
<br />G7 C0 a) U
<br />MIAMMLIADE ra l`uDA�ECtotTl�FIY
<br />PGT Industries,1w.
<br />PGT Industries,11W.
<br />L-
<br />PRODUCTCOii MOL SECTION
<br />PGT Industries. attar.
<br />N ca. Q �
<br />11905 F s� lxoom474
<br />NOTICE OF ACCEPTANCE: E%�ENCE SUBMITTED
<br />NOTICE OF ACCEPTANNCE: EXTIDENCE SUBA11TTED
<br />�
<br />M
<br />Bt]i.4RD A1MD CtWE ADMII�iiSTJ;A.Ti€tI4 DTEISgDPi DEPARTNOff OF REGUIATORY A" C RESOURCES �y T t7$e0 3 i� st#a �333 15-2349
<br />NOTICE OF ACCEPTANCE: EVIDENCE SUBbffrTED
<br />D. AL1TT ASS[TR.4��TCE
<br />Q1
<br />� t� � � Qi
<br />U '` D � '*''
<br />.Cn
<br />NOTICE OF ACCEPTA:'"�CE (-NOA) WWWM"Mdnde.1t*y eo�c
<br />)
<br />1. Evidence submitted under previous NOA
<br />A. DRAS'1'L'qGS
<br />1- Matntfactunes. die drawings and wetiims.
<br />B. TESTS (continued)
<br />5. Test report on 1) Air Infiltration, Test, per FBC, TAS 202-94
<br />1 _ Miami Dade Department of Regulatory and Economic Resources (RER)_
<br />Ca
<br />N -0 UO -0 _0
<br />0 O - • O (DNorth
<br />�- = �
<br />PGT iadasairs, Inc.
<br />1070 Techafty Drive,
<br />Venice, FL 34275
<br />(Sribmiffed under YOA N & 11.-0107 04)
<br />2) Uniform Static Air Pressure Test, per FBC, TAS 202-94
<br />E. i'� ATERLAL CERTMCATIONS
<br />0 -
<br />SCOPE:
<br />2- Drawing No. s3►iD-5570.0, titled '-Vinyl Sliding Glass Door NOA ', sheets 1
<br />3) Water Resistance Test, per FBC, TAS 202-94.
<br />1. Notice of Acceptance No.1"528.1d issued to Vision Extrusion Limited for their
<br />co �_ co
<br />0
<br />11mNOAisbeing i�sstedunkrthe applicable rules and reguUh msgoverningtheuseofconstructionmatetials.Mw
<br />through 21 of21, prepared by manufacturer, dated 10,1}5/15. with revision A dated
<br />4)Large Missile Impact Test per FBC, TAS 201-9
<br />'%
<br />-A a Rigid PVC Exterior Extrusions for Alindews and Doors". dated09-13!15.
<br />CU O O
<br />,W
<br />�
<br />docuramts ionsubmitted has beenrei�iewed and accepted byM art -.Dade County RER-Product Control Sectionto
<br />04i05f17, signed and sealed by A- Lynn Miller, P-E.
<br />5) Cyclic and P� Loadingper FBC, TAS 203-94
<br />expiring on 09/3W19.
<br />� U � L-
<br />beused in MtamiDade Courrey and vt3rerareas where allowed by the Authority Having 7uxis&ction (AHJ).
<br />6) Forced Entry "Test, per FBC, TAS 202-94
<br />2. Notice of Acceptance No.16-0920.08 issued to Vision Extrusion Limmited for their -17E
<br />Cn "O CU Q
<br />'ibis NOA shalt not be valid after the eapir on date sta�edbelow_The Miami -Dade County Ccamtrt Seeaom
<br />B. TESTS
<br />along Frith marled -up drawings and installation diagram of vinyl sliding glass door, prepared
<br />1001� Tan 202 and fighter Shades (lion-3;'idte) Rigid PVC Exterior Extrusions for
<br />I- � .� Cn Q
<br />(In Matm Dade County) andlorthe AHJ (ffi areas other than Miami. DadeConnty) reserve the right to have this
<br />1: Test report on 1) Uniform Static Air Pressure Test, per FBC_ TAS 202-94
<br />by Fenestration Testing Tab_ Inc., Test Report No- FTL W549, dated 11106fl.5, signed and
<br />Windows and Doorx,', dated 1210.8,16. expiring on 1212 2 L
<br />product or material tented for quality assurawepurposes_ If this product or material fails to perform m the a ccepted
<br />2) Lange Missile Impact Test per FBC, TAS 201-94
<br />sealed by Idalmis thtega, P. E_ (Pest tupc►rt revised on 12/04/15 and 02,`11/16)
<br />3- Notice of Acceptance No.11,4528.15 issued to Vision ExtrusionLimited for their
<br />"Brown
<br />manner, themainfacturerwill iti=theexpense ofsucht%stingandtheAlUmayiminediaaelyrevoke, modify- or
<br />3) Cyclic Wind Pressure Loading per FBC. TAS 203-44
<br />6- Test report on 1) Air Infiltration Test, per FBC, TAS 202-94
<br />Coated (Painted or Laminated) Alike Rigid PVC Exterior Extrusions for
<br />swpend the use of such product or material within their jurisdiction. RER reserves the right to revoke this
<br />along with -up drawings and installation diagram ofvinyl sliding glass door, prepared
<br />2) Uniform Static Air Presses Test, per FBC, TAS 202-94
<br />Windows and Doom", dated 08113115. expiring on 09/3019.
<br />acceptance, if it is detensaaned byMiami-Dade County Product Cool Section that this product or material fails to
<br />by Fenestration Testing Lab. Inc., Test Report No. FTL 8717, dated 111V7,11 5, signed and
<br />3 Water ResisTest, FBC, TAS 202-94.
<br />) mace �
<br />4_ Notice of Acceptance No-16-0712.02 issued to ENERGI Fenestration Solutions USA,
<br />meet the requntments of the applicable budding code.
<br />This product is approved as described herein and has been designed to comply wilt the Florida Budding Code,
<br />sealed by Idahuis Ortega, P- E. (Test report revised on 02/15/16 and 0224116)
<br />4) Large Missile Impact Test per FBC, TAS 201-94
<br />Inc. for their ` T.VN 3040 and Lighter Shades (Non-Mli t+e) Rigid PVC Exterior
<br />including the High Velocity Hurricane Zoe_
<br />2. Test on 1) Air Infiltration Test, per FBC, TAS 202-94
<br />5) Cyclic Wind Pressure Loading per FBC, TAS 20394
<br />Extrusions for Windows and Doors" dated 09115r 16_ expiring on t1?�'04121.
<br />DESCRTPTI©lti: Series -�70J277�D"'4"��-1 Sliding Glass Dour (Reinforced) �rhso lei° & 13�'t'°' corner-L.3i3.
<br />2) Uniform Static Air Pressure Test_ per FBC, TAS 202-94
<br />with marked and installation d of 1 s door,
<br />P � ��1 '�Y shy prepared
<br />5. Notice of Acceptance No-16-0712.04 issued to ENERGI Fenestration Solutes USA,
<br />"Bronze
<br />APPROVAL DOCII- A0EXE Drawing No. MD-S{ {{I.D Rev B, titled "Vinyl Sliding Glass DoorNOA (LK-. sheels
<br />3) Water Rye Test, per FBC. TAS 20294_
<br />4) Imp Miss& Impact Test per FBC_ TAS 20194
<br />by Fenestration Testing Lab, Inc.., Test Report No. FTL 8552, dated 12104115, signed and
<br />sealed by idahnis Ortega,P. E_(rest report revised on 02115201
<br />Inc_ for their and Lighter Shades of Cap Coated Rigid PAC Exterior
<br />Extrusions for A -endows and Doors" dated 091546- expiring on 04,1&70.
<br />1 through 21 of 21, pseparedby mam%&ctmw. elated 10;0M 5 and Last revised on On 1121. signed and sealed by
<br />5) Cyclic Wind Presmr Loading per FBC, TAS 203-94
<br />7. Test report an 1) Uniform Static Air Pressure Test. per FBC, TAS 20294
<br />6- Notice of Acceptance No-16-0712.03 issued to ENERGI Fenestration, Solutions USA,
<br />A. Lynn M lUer, P.E_, bearing the Miami -Dade CotnntyProducdCoutrd Revision stamp with the Notice of
<br />6) Forced Entry Test, per FBC, TAS 202-94
<br />2) Large Missile Impact Test per FBC, TAS 201-94
<br />Inc. for their "White Rigid PVC Exterior Extrusions for Windows and Doors" dated
<br />Acceptance number and expiration crate by the Miami Dade C- aray Product Control Section.
<br />°d
<br />al withnnIed- draw and instWlatica d of� 1 slidingdoor
<br />Wind
<br />3) Cyclic Vtrmd Pressure Loadingper FBC_ TAS . 03-94
<br />08�1C}1i7, expiring on 02128/18.
<br />IATLtiG: La and StaaUl�rsstle aetReiistatit
<br />byF�ion Testing Lab, Inc., Test Report No -I n 8546. dated 11fWIS. Signed and
<br />along with maid -up drawer and installation diagram of vinyl sliding glass door, prepared
<br />7. Test reports No(s). 10-002-70(A), 10-MM0527. 535753-09. per A.STME-84,
<br />Limitations:
<br />i Setable 1 sheet 7 and table 2 sheet S for able SGD unit sizes. des" r cemen�
<br />( ( appdic � p�� types,
<br />sealed by Idahrns Ortega, P. E. (%et report revised on 01104116 and 02'1112016)
<br />�
<br />by Fenestration Testing Lab. Inc., Test Report No. FTL 5638 (samples A-1 thou A-22), dated
<br />ASTND 1929 and ASTUD-635. issued by EXOV'A to Vision Extnision for cellulosic
<br />.
<br />glass types, sill rises (see tables B-1 & B-2, sheets 7-9) and anchor layout sheets requirements in i I thru 16_
<br />3. Test on 1 Air Infiltration Test, FBC, TAS 202 94
<br />) - P'or
<br />r
<br />1 L �'f 9110, and scaledJorge A Canso. P. E. (Srtbtrr�d tender N0.4 N a.11-
<br />signed by
<br />composite material
<br />Z. Rigid White PVC, Tan (Non -while) Rigid PVC and Brown coated ((Fainted or laminated) white Rigid PVC to be
<br />2) Utuform Pressure Air Test, per FBC, TAS :102-94
<br />t11 p? 0-4)
<br />(Submitted render NrD.4 A-o,11-67dT.1i4)
<br />labeled pier referenoedNOA's requirements.
<br />3) Water Resistance~ Test, per FBC, TAS 202-94
<br />8 Test report an 1) Air Infiltration Test, per FBC_ TAS ?02-94
<br />8. Notice ofA ceptance No. 14-0916.1I issued to Buraray America., Inc_ for their
<br />3. Egress operable doors must comply with min clear width or height perFBC requitement. as applicable-
<br />4) Large Missile Imp2d Test per FBC, TAS 201-94
<br />2) Uniform Static Air Pressure Test, per FBC. TAS 202-94
<br />"Sentn-Gbsg- (Clear and Wake) Interh,. ei . expiring on 07/04i 18.
<br />4. Pocket walls under separate approval, to be re Aeuedby Building official
<br />5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
<br />3) Water Resistastee Test, per FBC, TAS 202-94.
<br />9. Notice of Acceptance No.16-1117.01 issued to Kuraray America, Inc. for their
<br />L aiBELLNG: Each unit snail bear a permanent label with the mardactureesname or logo, city. state and series and
<br />6) Forced Entry Test, per FBC, TAS 202-94
<br />4) Large Missile Impact Test per FBC, TAS 201-94
<br />" T`rosif olt Ulu alclear. Clear and Color PVB Interlayers7. expiring on 07/08,n9.
<br />following statement "Miami -Dade County Product Cool Approved'.noted herein.
<br />Tong with -up draw roes and installation diagram of vinyl sliding glass door; Prepay
<br />Cyclic %rmd Pressure Load FBC, TAS 203-94
<br />5) Loadingper
<br />PLY -NEW -AL of bins NOA shall be considered after a rewwal application has been filed amdthere has been
<br />by Fenestration Testing Lab, Inc.. Test Report No. FTL 8_r, dated 12 4115, signed and
<br />6) Forced Entry Test, per FBC, TAS 202-94
<br />F. STATE N-TS
<br />change in the appiicablebusldingcodenegati-veiyaffectingthe perforounceofthis product.
<br />seated by Ids Ortega, P. E. (Test repat revised on 01 15,16)
<br />along with marked -up drawings and installation diagraut of vinyl sliding glass door, prepared
<br />i- Statement letter ofcanmfornrance with FBC-StbEdition (2014) and FBC4*Edition
<br />TERAH ATTON of this NOAwdl oc cur after the expiration date or if there has been a revision or change in the
<br />4. Test t[epettt can 1) Air Infiltration Tend. per FBC, TAS 202-94
<br />by Fenestration Testing Lab, Inca Test Report No_ FTL 6337 (sanVles A-1 thru A-5j dated
<br />(2017), issued by manufacturer, dated 0&14117, signed & sealed by Lynn Miller, P.E-
<br />use, andfor matnsfactweofthe product or process- Misuse of this NOA as an endorsement of arty product,
<br />rR Static Air Pressure Test, per FBC- TAS 20294
<br />2) Uniform
<br />2)
<br />1210 40, signed and sealed by Jorge A_ Canso. P. E_ (Submitted under .N0 4 X6. ll-
<br />2- Statement letter ofao financial interest, dated 0411 &17, issued by mmwfacturer, signed
<br />for sales, ach-ertising or any olherpugx*es shall automalicallyt�tinate this NOA Failure too- comply with any
<br />3) Water Resistance Tent, per FBC, TAS 202-94
<br />are 02-
<br />0107 09)
<br />& sealed by Lynn Miller: P.E_
<br />section of this NOA shall be cause for terriiination. and removal ofNOA.
<br />4) Lxge Mmile In4W Test per FBC- TAS 201-94
<br />3_ Letter of lab compliance, part of the above test reports.
<br />AMT.RTISFMLN'T: Me NOA number by the words NLimi-Dade C Florida, and followed b the
<br />P� ��y: Y
<br />5) Cyclic Wind Prey= Loading per FBC, TAS �20394
<br />C. C�i1.C1'LAITO;�S
<br />4. RER Test No.17-0387. dated 05tn5 r17, b I Chanda, F.E.
<br />� � Y 4
<br />_
<br />expiration be in advwtisin literature. If ostionoftheNOAis displayed, their it shall be
<br />xp PAS g ffiYF F 7t
<br />6) Forced Entry Test, per FBC, TAS 202-94
<br />1 _ Anchor verifwation calcutlatians and structural analysis, complying with FBC-2014,
<br />dame is its entirety-
<br />along with nuked -up drawings and installation diagram of vinyl sliding glass donut, prepared
<br />prepared by PGT_ dated 111093 Sand last revised oil 02'15116, signed and sealed by
<br />G. OTHER
<br />L�+SPECTION: A co b
<br />PJ`of this eutireNOA shall be Provided to the user Ythe manufacturer or As disiribatars and
<br />, nil xd and
<br />by Fenestration Testing Lab, Inc., Test Report No. FTL 8_5418_ dated 12/04il5eptance
<br />L Miller, P.E. (Submitted under JYOANo.15-1114.01).
<br />1. Notice of AccAnthony No.15-1210.01, issued to PGT Industries. for their Series
<br />shall be available £or inspection at the jab site at the request oftheBuildiag Official.
<br />sealed by Idaln is Ortega, P. E_ (Test report revised on 01104/1+6 and 02111116).
<br />s, Glazing a with ASTME-13Of3-09.
<br />"357012770" Vinyl Sliding Glass Door (Reinforced) - L.3,:f.L". egg on O4/14xr21-
<br />o
<br />This NOA rev ices & re news NO A #20-0429.05 and canists of this page 1 and evidence pages E-1, E-2, E-3, E-a,
<br />1 iw l ; ` rm rfl.
<br />j y . w (,
<br />E-S & E-6 as well as appro-ual docIImeat mentioned abo%v.
<br />the submitted documentation was rerriewred b Isha L C7ia�, P.E.lslraq
<br />Ir q
<br />L Cl*onda, P E.
<br />Product Control Uiit Supervisor
<br />Islaaq L Chanda. P.E.
<br />Product Control grit Supervisor
<br />Isha L CLaada PF.
<br />q
<br />Product Control Unit Supervisor
<br />P-
<br />ti Op
<br />M
<br />NOA No.:1-0:06.03
<br />N04 tin. 21-0205.03
<br />NOA No. 2I-0205.03
<br />NOA No. 21-0205.03
<br />=
<br />m N
<br />X
<br />F�INtFCrtioi �� r // Expiration Date April 14, 2026
<br />..,. •,a
<br />Expiration Dam: April 14, 2026
<br />Approval Date: I4fareL 2{, 2021
<br />Expiration Date; April 14, 2026
<br />Approval Date: March 26, 2021
<br />Expiration Date. April 14, 2026
<br />"�
<br />I - �
<br />Y'� `� L !'1 r1. Approval Dat*.-March 25, :G21
<br />�ipprova I Date: March 15, 2021
<br />O L-
<br />} Page 1
<br />E -1
<br />E -2
<br />E -3
<br />N .0
<br />V
<br />c
<br />O en
<br />N Y
<br />a�
<br />c
<br />m
<br />Q
<br />Q
<br />5s ro
<br />'
<br />C: t]
<br />3 N
<br />m T
<br />PGTLulmtries, Inc.
<br />CGI Wmdows and Doors, Inc.
<br />PGT Industries, Lne.
<br />U c:
<br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
<br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
<br />NOTICE OF ACC'EPTAITCT: EVIDENCE SUB
<br />p
<br />o di
<br />2. Evidence Submitted under pm-ious submittal
<br />p
<br />E. MATERLAL CERTIFICATION'S (continu*)
<br />3. New Evidence Submitted
<br />S. Quane x Part Surwei• Spacer Standard complying with ASTM C518 Thermal Conductivity
<br />A. DRAWINGS
<br />0-881 BTU -in/ hr.- tl-°F, ASIM F 1249 iA7 ITR Pass, ASTM D3985 Oxygen -Pass. ASTM E
<br />A. DRAWINGS
<br />1. Drawing No. MD-5570.0 Rev B. titled --Vinyl Sliding Glass Door NOA (LM), . sheets
<br />2190 I.G- Durability No Fag Pass. (Subtrtf red render pret"s N0.4 Nro I M409 05)
<br />1. Drawing No_ NE D-S570.0 Rev B, ftleed "Vinyl Sliding Glass Door NOA a , sheets 1
<br />1 through. 21 of 21, prepared by manufacturer. dated 10,05/15 and last revised on
<br />through 21 of 21, prepared by manufacturer. dated. I0/(15115 and last ru-��21_ ed on 02�01r
<br />OV2220, signed and sealed by A_ Lynn Miller. P-E.
<br />6. Quamm Part Durase complying with ASTM C518 Th mual Conductivity 2-22 BTU -in/
<br />signed and d by A Lynn Miller, P.E_
<br />hr. fF-c`, ASTM F 1249 AWTI- Pass. ASTM D 1434 Argon Pace -Pass, AS1M E
<br />Note: This nnimn consists replant of same existing installation screw with flat head-
<br />B. TESTS
<br />2199 I_G_ Durability -No Fog, ASTM E 546 Dew Point Development 201F in 48 hirs.
<br />1. Test reports tan: 1) Air Infiltration Test, per FBC, TAS 202-94
<br />(Submi ted under N'O.4 Nro.1 S-0400.d5).
<br />2) Unifoan Static Air Pressure Test, Loadingper FBC. TAS 202-94
<br />7_ Vision E Lcions. Ltd. Parts compbymg with PVC-AAMA 303-13, Vohintary Specification
<br />B. TESTS
<br />3) Water Resistance Test, per FBC, TAS 202-94
<br />for Rigid Polyvinyl Chloride (PVC) Exterior Profiles for Vision ExWwons, Ltd--VEX-1 by
<br />1. None.
<br />4) Large Missile Impact Test per FBC. TAS 201-94
<br />AAMA Fenestration Exterior Profile Certification Program (Submh ed under N O 4 J1'o.15-
<br />5) Cyclic Wind Pressure Loadingper FBC, TAS 20394
<br />0409.05)
<br />C. CALCULATIONS
<br />along withnarlmd-up drawings and inffitAatian diagram of all PGT Industries. Inc.
<br />8_ Vision Extrusicons, Ltd. Parts complying with PVC AAM.k 303-13.
<br />1_ None'
<br />-+-.�
<br />representative units listed below and tested to qualify Dowsil 791 and Dowsil 983 silicones.
<br />(StthmiWed under NO-4 No.15--6409 05)
<br />prepared by Fenestration Testing Laboratory Inc., Test Reports No.:
<br />9. PVC-AAMA 303-13, Voluntary Specification four Rigid Polyvinyl Chloride (PVC) Exterior
<br />D, QLT4LITV ASSLrR.4,'�iCE
<br />FTL-7897, PGT PWS520 PVC Fixed Window (roan 6 in proposal), dated 09103114
<br />Profiles for Vision Extrusions, Ltd--VEX-1 by AAMA Fenestration Exterior Profi a
<br />1. Miami -Dade Department of Regulatory and Economic Resources (RER)-
<br />FTL-20-2107.1, PGT SGD780 Ahrminunm Sliding Glass Door (unit 7 in proposal) FTL-20-
<br />Certffication Program-
<br />2107.2, PGT CA740 Ahun Outswing Casement Window (unit 8 in proposal) FTL 20-
<br />10. Notice of Acceptance No. 18-1217.14 issued to Energi Fenestration Solution, USA, Inc. for
<br />'Tan
<br />E. M4,TERL4,L. CERTIFICATIONS
<br />co
<br />2107.3, PGT PW7620A Aluminum Fixed Window (unit 9 in proposal) and FTL-20-2107.4.
<br />their 3040 & light shade (non -white) WI&e Rigid PVC Exterior Extrusions for
<br />L Notice of Acceptance No_ 19-0305.02 isstned toKuraray America, Inc. fortheir
<br />>
<br />PGT PW7620A Aluminum Fixed Window (unit 10 in proposal) dated 07/13/20, all signed
<br />Windows and Doors", expiring on MY04,21.
<br />"TrosifoiS, Ultraclear, Clear, and Color PN B Glass lnterlaayers', expiring on 07'08r.14_
<br />Co
<br />O
<br />and sealed by Idahnis Ortega, P-E.
<br />11_ Notice of Acceptance No. 18-01�.02 issued to Energi Fenestration Sohitivn, USA, Inc, for
<br />2. Notice of Acceptance �To.17-0808.02 issued toKuraray America, Inc. for their
<br />their series "'Ci'hhe Rigid PVC Exterior Extrusions for Windows and Doors", expiring an
<br />"Sentr Gl ast (Clear and X%Ue) Glass Interlay-ers", e q icing on 07/04f13_
<br />0-
<br />C. CALCULATIONS
<br />1. Anchor lion calculations and structural analysis, couplymg with FBC T*
<br />02i28/21
<br />3- Notice- of Acceptance No.19-1106.10 issued to �' isionn Extrusivns Limited for their `Brottn
<br />O
<br />C-
<br />Q
<br />12. Notice of Acceptance No_ 20-0203.03 issued to Energi Fenestration Solution, USA Inc. for
<br />Coated (Painted or Laminated) Waite Rigid PVC Exterior ExtrlWons for Windows
<br />Edition (2020)- dated 04/1-120, prepared by manufacturer_ signed and sealed by
<br />their "Bronze & fight shade cap coated Urite Rigid PVC Exterior Extrusions for
<br />and Doors", expiring on 09130Q4.
<br />��
<br />+-j
<br />Anthony Lynn hfihler: P.E.
<br />Wmdow s and Doors", expiring on {04,1625.
<br />4_ Aiotire afAceeptance Ara_ 18-1106.1i issued to Vislan Fn>c+s Limited for their seines
<br />U
<br />o
<br />2. Glazing complies with AST iE1300.04, -09. -12 and -16.
<br />"YE 1000 Tan 2.02 and lighter shades (Noce -Aline) Rigid Cellular PVC Exterior
<br />D. �UALITI ASStBAi`iCE
<br />F. STATEXEENI'S
<br />Examsions for Windows and Doors-- an 12 -921.
<br />�
<br />�
<br />0
<br />O
<br />Miami -Dade Department of Regulatory. and Economic Resources (RER).
<br />1. Statement letter of conformance to FBC 76 Edition (2020), dated 04e220?'0, issued by
<br />L
<br />manufacturer, signed and sealed by Anthony Lynn Miller, P.E.
<br />F. STATEh ENTS
<br />E. I ATERIAL CERTIFICATIONS
<br />2. Statement letter of no financial interest and of independent. issued by manufacturer. dated
<br />1_ Statement letter of conformance to FBC 76 Edition (2020), dated 02Ati1/21, issued by
<br />O
<br />1. Notice of Acceptance No. I9-0305.02 issued to Kurarar America, Inc. for their
<br />04/1820. signed and sealed by Anthony Lynn Mitkr_ P-E.
<br />manufacturer, signed and sealed by Anthony Lynn Miller, P-E_
<br />U)
<br />"Trasafoff, Ultraclear, Clear, and Color PTB Glass Interlayers, expiring on
<br />3. Private Labeling Agreement docummt between PGT, dated 0330115 and signed by all
<br />2_ Private Labeling Agreement dated 0360 21 between PGT Industries, Inc. and CGI
<br />C6
<br />07/0&24_
<br />involved parties
<br />Windrows and. Doors Inc.. signed by Dean M. Ruadi, P.E., V.P. Engineering. on behalf of
<br />m
<br />2. Notice of Acceptance No.17-0803.02 issued toll Ural ay America, Inc. for their
<br />"S+enttTGInvt
<br />bath ecimpanies_
<br />Q
<br />(Clear and White) Glass Int"ym. e7q* tg on 07104/23.
<br />G. OTHERS
<br />�
<br />3. Notice of Acceptance No. 18-110610 issued to Vision Extrusions Limited for their
<br />"Biotin Coated Laminated) Alke Rigid PVC Ease for E=uvsious
<br />1. This NOA revises NOA# 17-04:!0.06(PVTw)CGI) and updates to1FBC2020 (TIEdition),
<br />G. OTHERS
<br />(Painted or .
<br />expiring 0402V.21 _
<br />I_ 119s NOA revises & renews Nfl4.# 20-0429.05 (PLA w/CGI), expiring 04114/26.
<br />for Windows and Doors", expiring on 09I3024.
<br />2. RER Test proposals #14-I155 dated 01i 10,20 approved by Ishagi_ Chanda, P.E. expiring
<br />2. the cxwmt associated PLA CGI file. #21-0203.0L a 04/14,26.
<br />L--
<br />4. Notice of Acceptance No.18-1106.11 issued to Vision Extrusions Limited for then
<br />0411421 _
<br />O
<br />CU
<br />series "VE 1000 Tan 202 and lighter shades (Non -Alike) Rid Cellular PVC
<br />c e . = �',ry`
<br />i Z� (, �n
<br />w
<br />2
<br />Exterior Extrusions for 'i endows and Doors , expiring on 1229/21_ / �
<br />r
<br />� � n-�.
<br />�
<br />Q n '
<br />l:shaq L C'hax&, P.E.
<br />Ishaq L Chanda. P.E.
<br />Z
<br />13"q I, Chsnda, P.E.
<br />Product Control Unk Supervisor
<br />Product Counroi Usk Saperrisor
<br />Product Cantral Unit Supervisor
<br />-NOA No. 21-020-.03
<br />W. A No. 21-0205.03
<br />Z
<br />IkOA No. 21-020a.03
<br />Expiration Date: April 14, 2026
<br />Expiration Date: April 14,2026
<br />Q
<br />J
<br />Expiration Date: April 14, 2026
<br />Approval Date March 2v,1021
<br />Approval Darr: March 25. 2021
<br />d
<br />Approval Date. March 25, 2021
<br />E -a
<br />E -6
<br />E 4
<br />SHEET
<br />NO.
<br />PA 1.
<br />3
<br />
|