Laserfiche WebLink
---I - 1 - II ns,•q . <br />(i <br />i <br />G7 C0 a) U <br />MIAMMLIADE ra l`uDA�ECtotTl�FIY <br />PGT Industries,1w. <br />PGT Industries,11W. <br />L- <br />PRODUCTCOii MOL SECTION <br />PGT Industries. attar. <br />N ca. Q � <br />11905 F s� lxoom474 <br />NOTICE OF ACCEPTANCE: E%�ENCE SUBMITTED <br />NOTICE OF ACCEPTANNCE: EXTIDENCE SUBA11TTED <br />� <br />M <br />Bt]i.4RD A1MD CtWE ADMII�iiSTJ;A.Ti€tI4 DTEISgDPi DEPARTNOff OF REGUIATORY A" C RESOURCES �y T t7$e0 3 i� st#a �333 15-2349 <br />NOTICE OF ACCEPTANCE: EVIDENCE SUBbffrTED <br />D. AL1TT ASS[TR.4��TCE <br />Q1 <br />� t� � � Qi <br />U '` D � '*'' <br />.Cn <br />NOTICE OF ACCEPTA:'"�CE (-NOA) WWWM"Mdnde.1t*y eo�c <br />) <br />1. Evidence submitted under previous NOA <br />A. DRAS'1'L'qGS <br />1- Matntfactunes. die drawings and wetiims. <br />B. TESTS (continued) <br />5. Test report on 1) Air Infiltration, Test, per FBC, TAS 202-94 <br />1 _ Miami Dade Department of Regulatory and Economic Resources (RER)_ <br />Ca <br />N -0 UO -0 _0 <br />0 O - • O (DNorth <br />�- = � <br />PGT iadasairs, Inc. <br />1070 Techafty Drive, <br />Venice, FL 34275 <br />(Sribmiffed under YOA N & 11.-0107 04) <br />2) Uniform Static Air Pressure Test, per FBC, TAS 202-94 <br />E. i'� ATERLAL CERTMCATIONS <br />0 - <br />SCOPE: <br />2- Drawing No. s3►iD-5570.0, titled '-Vinyl Sliding Glass Door NOA ', sheets 1 <br />3) Water Resistance Test, per FBC, TAS 202-94. <br />1. Notice of Acceptance No.1"528.1d issued to Vision Extrusion Limited for their <br />co �_ co <br />0 <br />11mNOAisbeing i�sstedunkrthe applicable rules and reguUh msgoverningtheuseofconstructionmatetials.Mw <br />through 21 of21, prepared by manufacturer, dated 10,1}5/15. with revision A dated <br />4)Large Missile Impact Test per FBC, TAS 201-9 <br />'% <br />-A a Rigid PVC Exterior Extrusions for Alindews and Doors". dated09-13!15. <br />CU O O <br />,W <br />� <br />docuramts ionsubmitted has beenrei�iewed and accepted byM art -.Dade County RER-Product Control Sectionto <br />04i05f17, signed and sealed by A- Lynn Miller, P-E. <br />5) Cyclic and P� Loadingper FBC, TAS 203-94 <br />expiring on 09/3W19. <br />� U � L- <br />beused in MtamiDade Courrey and vt3rerareas where allowed by the Authority Having 7uxis&ction (AHJ). <br />6) Forced Entry "Test, per FBC, TAS 202-94 <br />2. Notice of Acceptance No.16-0920.08 issued to Vision Extrusion Limmited for their -17E <br />Cn "O CU Q <br />'ibis NOA shalt not be valid after the eapir on date sta�edbelow_The Miami -Dade County Ccamtrt Seeaom <br />B. TESTS <br />along Frith marled -up drawings and installation diagram of vinyl sliding glass door, prepared <br />1001� Tan 202 and fighter Shades (lion-3;'idte) Rigid PVC Exterior Extrusions for <br />I- � .� Cn Q <br />(In Matm Dade County) andlorthe AHJ (ffi areas other than Miami. DadeConnty) reserve the right to have this <br />1: Test report on 1) Uniform Static Air Pressure Test, per FBC_ TAS 202-94 <br />by Fenestration Testing Tab_ Inc., Test Report No- FTL W549, dated 11106fl.5, signed and <br />Windows and Doorx,', dated 1210.8,16. expiring on 1212 2 L <br />product or material tented for quality assurawepurposes_ If this product or material fails to perform m the a ccepted <br />2) Lange Missile Impact Test per FBC, TAS 201-94 <br />sealed by Idalmis thtega, P. E_ (Pest tupc►rt revised on 12/04/15 and 02,`11/16) <br />3- Notice of Acceptance No.11,4528.15 issued to Vision ExtrusionLimited for their <br />"Brown <br />manner, themainfacturerwill iti=theexpense ofsucht%stingandtheAlUmayiminediaaelyrevoke, modify- or <br />3) Cyclic Wind Pressure Loading per FBC. TAS 203-44 <br />6- Test report on 1) Air Infiltration Test, per FBC, TAS 202-94 <br />Coated (Painted or Laminated) Alike Rigid PVC Exterior Extrusions for <br />swpend the use of such product or material within their jurisdiction. RER reserves the right to revoke this <br />along with -up drawings and installation diagram ofvinyl sliding glass door, prepared <br />2) Uniform Static Air Presses Test, per FBC, TAS 202-94 <br />Windows and Doom", dated 08113115. expiring on 09/3019. <br />acceptance, if it is detensaaned byMiami-Dade County Product Cool Section that this product or material fails to <br />by Fenestration Testing Lab. Inc., Test Report No. FTL 8717, dated 111V7,11 5, signed and <br />3 Water ResisTest, FBC, TAS 202-94. <br />) mace � <br />4_ Notice of Acceptance No-16-0712.02 issued to ENERGI Fenestration Solutions USA, <br />meet the requntments of the applicable budding code. <br />This product is approved as described herein and has been designed to comply wilt the Florida Budding Code, <br />sealed by Idahuis Ortega, P- E. (Test report revised on 02/15/16 and 0224116) <br />4) Large Missile Impact Test per FBC, TAS 201-94 <br />Inc. for their ` T.VN 3040 and Lighter Shades (Non-Mli t+e) Rigid PVC Exterior <br />including the High Velocity Hurricane Zoe_ <br />2. Test on 1) Air Infiltration Test, per FBC, TAS 202-94 <br />5) Cyclic Wind Pressure Loading per FBC, TAS 20394 <br />Extrusions for Windows and Doors" dated 09115r 16_ expiring on t1?�'04121. <br />DESCRTPTI©lti: Series -�70J277�D"'4"��-1 Sliding Glass Dour (Reinforced) �rhso lei° & 13�'t'°' corner-L.3i3. <br />2) Uniform Static Air Pressure Test_ per FBC, TAS 202-94 <br />with marked and installation d of 1 s door, <br />P � ��1 '�Y shy prepared <br />5. Notice of Acceptance No-16-0712.04 issued to ENERGI Fenestration Solutes USA, <br />"Bronze <br />APPROVAL DOCII- A0EXE Drawing No. MD-S{ {{I.D Rev B, titled "Vinyl Sliding Glass DoorNOA (LK-. sheels <br />3) Water Rye Test, per FBC. TAS 20294_ <br />4) Imp Miss& Impact Test per FBC_ TAS 20194 <br />by Fenestration Testing Lab, Inc.., Test Report No. FTL 8552, dated 12104115, signed and <br />sealed by idahnis Ortega,P. E_(rest report revised on 02115201 <br />Inc_ for their and Lighter Shades of Cap Coated Rigid PAC Exterior <br />Extrusions for A -endows and Doors" dated 091546- expiring on 04,1&70. <br />1 through 21 of 21, pseparedby mam%&ctmw. elated 10;0M 5 and Last revised on On 1121. signed and sealed by <br />5) Cyclic Wind Presmr Loading per FBC, TAS 203-94 <br />7. Test report an 1) Uniform Static Air Pressure Test. per FBC, TAS 20294 <br />6- Notice of Acceptance No-16-0712.03 issued to ENERGI Fenestration, Solutions USA, <br />A. Lynn M lUer, P.E_, bearing the Miami -Dade CotnntyProducdCoutrd Revision stamp with the Notice of <br />6) Forced Entry Test, per FBC, TAS 202-94 <br />2) Large Missile Impact Test per FBC, TAS 201-94 <br />Inc. for their "White Rigid PVC Exterior Extrusions for Windows and Doors" dated <br />Acceptance number and expiration crate by the Miami Dade C- aray Product Control Section. <br />°d <br />al withnnIed- draw and instWlatica d of� 1 slidingdoor <br />Wind <br />3) Cyclic Vtrmd Pressure Loadingper FBC_ TAS . 03-94 <br />08�1C}1i7, expiring on 02128/18. <br />IATLtiG: La and StaaUl�rsstle aetReiistatit <br />byF�ion Testing Lab, Inc., Test Report No -I n 8546. dated 11fWIS. Signed and <br />along with maid -up drawer and installation diagram of vinyl sliding glass door, prepared <br />7. Test reports No(s). 10-002-70(A), 10-MM0527. 535753-09. per A.STME-84, <br />Limitations: <br />i Setable 1 sheet 7 and table 2 sheet S for able SGD unit sizes. des" r cemen� <br />( ( appdic � p�� types, <br />sealed by Idahrns Ortega, P. E. (%et report revised on 01104116 and 02'1112016) <br />� <br />by Fenestration Testing Lab. Inc., Test Report No. FTL 5638 (samples A-1 thou A-22), dated <br />ASTND 1929 and ASTUD-635. issued by EXOV'A to Vision Extnision for cellulosic <br />. <br />glass types, sill rises (see tables B-1 & B-2, sheets 7-9) and anchor layout sheets requirements in i I thru 16_ <br />3. Test on 1 Air Infiltration Test, FBC, TAS 202 94 <br />) - P'or <br />r <br />1 L �'f 9110, and scaledJorge A Canso. P. E. (Srtbtrr�d tender N0.4 N a.11- <br />signed by <br />composite material <br />Z. Rigid White PVC, Tan (Non -while) Rigid PVC and Brown coated ((Fainted or laminated) white Rigid PVC to be <br />2) Utuform Pressure Air Test, per FBC, TAS :102-94 <br />t11 p? 0-4) <br />(Submitted render NrD.4 A-o,11-67dT.1i4) <br />labeled pier referenoedNOA's requirements. <br />3) Water Resistance~ Test, per FBC, TAS 202-94 <br />8 Test report an 1) Air Infiltration Test, per FBC_ TAS ?02-94 <br />8. Notice ofA ceptance No. 14-0916.1I issued to Buraray America., Inc_ for their <br />3. Egress operable doors must comply with min clear width or height perFBC requitement. as applicable- <br />4) Large Missile Imp2d Test per FBC, TAS 201-94 <br />2) Uniform Static Air Pressure Test, per FBC. TAS 202-94 <br />"Sentn-Gbsg- (Clear and Wake) Interh,. ei . expiring on 07/04i 18. <br />4. Pocket walls under separate approval, to be re Aeuedby Building official <br />5) Cyclic Wind Pressure Loading per FBC, TAS 203-94 <br />3) Water Resistastee Test, per FBC, TAS 202-94. <br />9. Notice of Acceptance No.16-1117.01 issued to Kuraray America, Inc. for their <br />L aiBELLNG: Each unit snail bear a permanent label with the mardactureesname or logo, city. state and series and <br />6) Forced Entry Test, per FBC, TAS 202-94 <br />4) Large Missile Impact Test per FBC, TAS 201-94 <br />" T`rosif olt Ulu alclear. Clear and Color PVB Interlayers7. expiring on 07/08,n9. <br />following statement "Miami -Dade County Product Cool Approved'.noted herein. <br />Tong with -up draw roes and installation diagram of vinyl sliding glass door; Prepay <br />Cyclic %rmd Pressure Load FBC, TAS 203-94 <br />5) Loadingper <br />PLY -NEW -AL of bins NOA shall be considered after a rewwal application has been filed amdthere has been <br />by Fenestration Testing Lab, Inc.. Test Report No. FTL 8_r, dated 12 4115, signed and <br />6) Forced Entry Test, per FBC, TAS 202-94 <br />F. STATE N-TS <br />change in the appiicablebusldingcodenegati-veiyaffectingthe perforounceofthis product. <br />seated by Ids Ortega, P. E. (Test repat revised on 01 15,16) <br />along with marked -up drawings and installation diagraut of vinyl sliding glass door, prepared <br />i- Statement letter ofcanmfornrance with FBC-StbEdition (2014) and FBC4*Edition <br />TERAH ATTON of this NOAwdl oc cur after the expiration date or if there has been a revision or change in the <br />4. Test t[epettt can 1) Air Infiltration Tend. per FBC, TAS 202-94 <br />by Fenestration Testing Lab, Inca Test Report No_ FTL 6337 (sanVles A-1 thru A-5j dated <br />(2017), issued by manufacturer, dated 0&14117, signed & sealed by Lynn Miller, P.E- <br />use, andfor matnsfactweofthe product or process- Misuse of this NOA as an endorsement of arty product, <br />rR Static Air Pressure Test, per FBC- TAS 20294 <br />2) Uniform <br />2) <br />1210 40, signed and sealed by Jorge A_ Canso. P. E_ (Submitted under .N0 4 X6. ll- <br />2- Statement letter ofao financial interest, dated 0411 &17, issued by mmwfacturer, signed <br />for sales, ach-ertising or any olherpugx*es shall automalicallyt�tinate this NOA Failure too- comply with any <br />3) Water Resistance Tent, per FBC, TAS 202-94 <br />are 02- <br />0107 09) <br />& sealed by Lynn Miller: P.E_ <br />section of this NOA shall be cause for terriiination. and removal ofNOA. <br />4) Lxge Mmile In4W Test per FBC- TAS 201-94 <br />3_ Letter of lab compliance, part of the above test reports. <br />AMT.RTISFMLN'T: Me NOA number by the words NLimi-Dade C Florida, and followed b the <br />P� ��y: Y <br />5) Cyclic Wind Prey= Loading per FBC, TAS �20394 <br />C. C�i1.C1'LAITO;�S <br />4. RER Test No.17-0387. dated 05tn5 r17, b I Chanda, F.E. <br />� � Y 4 <br />_ <br />expiration be in advwtisin literature. If ostionoftheNOAis displayed, their it shall be <br />xp PAS g ffiYF F 7t <br />6) Forced Entry Test, per FBC, TAS 202-94 <br />1 _ Anchor verifwation calcutlatians and structural analysis, complying with FBC-2014, <br />dame is its entirety- <br />along with nuked -up drawings and installation diagram of vinyl sliding glass donut, prepared <br />prepared by PGT_ dated 111093 Sand last revised oil 02'15116, signed and sealed by <br />G. OTHER <br />L�+SPECTION: A co b <br />PJ`of this eutireNOA shall be Provided to the user Ythe manufacturer or As disiribatars and <br />, nil xd and <br />by Fenestration Testing Lab, Inc., Test Report No. FTL 8_5418_ dated 12/04il5eptance <br />L Miller, P.E. (Submitted under JYOANo.15-1114.01). <br />1. Notice of AccAnthony No.15-1210.01, issued to PGT Industries. for their Series <br />shall be available £or inspection at the jab site at the request oftheBuildiag Official. <br />sealed by Idaln is Ortega, P. E_ (Test report revised on 01104/1+6 and 02111116). <br />s, Glazing a with ASTME-13Of3-09. <br />"357012770" Vinyl Sliding Glass Door (Reinforced) - L.3,:f.L". egg on O4/14xr21- <br />o <br />This NOA rev ices & re news NO A #20-0429.05 and canists of this page 1 and evidence pages E-1, E-2, E-3, E-a, <br />1 iw l ; ` rm rfl. <br />j y . w (, <br />E-S & E-6 as well as appro-ual docIImeat mentioned abo%v. <br />the submitted documentation was rerriewred b Isha L C7ia�, P.E.lslraq <br />Ir q <br />L Cl*onda, P E. <br />Product Control Uiit Supervisor <br />Islaaq L Chanda. P.E. <br />Product Control grit Supervisor <br />Isha L CLaada PF. <br />q <br />Product Control Unit Supervisor <br />P- <br />ti Op <br />M <br />NOA No.:1-0:06.03 <br />N04 tin. 21-0205.03 <br />NOA No. 2I-0205.03 <br />NOA No. 21-0205.03 <br />= <br />m N <br />X <br />F�INtFCrtioi �� r // Expiration Date April 14, 2026 <br />..,. •,a <br />Expiration Dam: April 14, 2026 <br />Approval Date: I4fareL 2{, 2021 <br />Expiration Date; April 14, 2026 <br />Approval Date: March 26, 2021 <br />Expiration Date. April 14, 2026 <br />"� <br />I - � <br />Y'� `� L !'1 r1. Approval Dat*.-March 25, :G21 <br />�ipprova I Date: March 15, 2021 <br />O L- <br />} Page 1 <br />E -1 <br />E -2 <br />E -3 <br />N .0 <br />V <br />c <br />O en <br />N Y <br />a� <br />c <br />m <br />Q <br />Q <br />5s ro <br />' <br />C: t] <br />3 N <br />m T <br />PGTLulmtries, Inc. <br />CGI Wmdows and Doors, Inc. <br />PGT Industries, Lne. <br />U c: <br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED <br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED <br />NOTICE OF ACC'EPTAITCT: EVIDENCE SUB <br />p <br />o di <br />2. Evidence Submitted under pm-ious submittal <br />p <br />E. MATERLAL CERTIFICATION'S (continu*) <br />3. New Evidence Submitted <br />S. Quane x Part Surwei• Spacer Standard complying with ASTM C518 Thermal Conductivity <br />A. DRAWINGS <br />0-881 BTU -in/ hr.- tl-°F, ASIM F 1249 iA7 ITR Pass, ASTM D3985 Oxygen -Pass. ASTM E <br />A. DRAWINGS <br />1. Drawing No. MD-5570.0 Rev B. titled --Vinyl Sliding Glass Door NOA (LM), . sheets <br />2190 I.G- Durability No Fag Pass. (Subtrtf red render pret"s N0.4 Nro I M409 05) <br />1. Drawing No_ NE D-S570.0 Rev B, ftleed "Vinyl Sliding Glass Door NOA a , sheets 1 <br />1 through. 21 of 21, prepared by manufacturer. dated 10,05/15 and last revised on <br />through 21 of 21, prepared by manufacturer. dated. I0/(15115 and last ru-��21_ ed on 02�01r <br />OV2220, signed and sealed by A_ Lynn Miller. P-E. <br />6. Quamm Part Durase complying with ASTM C518 Th mual Conductivity 2-22 BTU -in/ <br />signed and d by A Lynn Miller, P.E_ <br />hr. fF-c`, ASTM F 1249 AWTI- Pass. ASTM D 1434 Argon Pace -Pass, AS1M E <br />Note: This nnimn consists replant of same existing installation screw with flat head- <br />B. TESTS <br />2199 I_G_ Durability -No Fog, ASTM E 546 Dew Point Development 201F in 48 hirs. <br />1. Test reports tan: 1) Air Infiltration Test, per FBC, TAS 202-94 <br />(Submi ted under N'O.4 Nro.1 S-0400.d5). <br />2) Unifoan Static Air Pressure Test, Loadingper FBC. TAS 202-94 <br />7_ Vision E Lcions. Ltd. Parts compbymg with PVC-AAMA 303-13, Vohintary Specification <br />B. TESTS <br />3) Water Resistance Test, per FBC, TAS 202-94 <br />for Rigid Polyvinyl Chloride (PVC) Exterior Profiles for Vision ExWwons, Ltd--VEX-1 by <br />1. None. <br />4) Large Missile Impact Test per FBC. TAS 201-94 <br />AAMA Fenestration Exterior Profile Certification Program (Submh ed under N O 4 J1'o.15- <br />5) Cyclic Wind Pressure Loadingper FBC, TAS 20394 <br />0409.05) <br />C. CALCULATIONS <br />along withnarlmd-up drawings and inffitAatian diagram of all PGT Industries. Inc. <br />8_ Vision Extrusicons, Ltd. Parts complying with PVC AAM.k 303-13. <br />1_ None' <br />-+-.� <br />representative units listed below and tested to qualify Dowsil 791 and Dowsil 983 silicones. <br />(StthmiWed under NO-4 No.15--6409 05) <br />prepared by Fenestration Testing Laboratory Inc., Test Reports No.: <br />9. PVC-AAMA 303-13, Voluntary Specification four Rigid Polyvinyl Chloride (PVC) Exterior <br />D, QLT4LITV ASSLrR.4,'�iCE <br />FTL-7897, PGT PWS520 PVC Fixed Window (roan 6 in proposal), dated 09103114 <br />Profiles for Vision Extrusions, Ltd--VEX-1 by AAMA Fenestration Exterior Profi a <br />1. Miami -Dade Department of Regulatory and Economic Resources (RER)- <br />FTL-20-2107.1, PGT SGD780 Ahrminunm Sliding Glass Door (unit 7 in proposal) FTL-20- <br />Certffication Program- <br />2107.2, PGT CA740 Ahun Outswing Casement Window (unit 8 in proposal) FTL 20- <br />10. Notice of Acceptance No. 18-1217.14 issued to Energi Fenestration Solution, USA, Inc. for <br />'Tan <br />E. M4,TERL4,L. CERTIFICATIONS <br />co <br />2107.3, PGT PW7620A Aluminum Fixed Window (unit 9 in proposal) and FTL-20-2107.4. <br />their 3040 & light shade (non -white) WI&e Rigid PVC Exterior Extrusions for <br />L Notice of Acceptance No_ 19-0305.02 isstned toKuraray America, Inc. fortheir <br />> <br />PGT PW7620A Aluminum Fixed Window (unit 10 in proposal) dated 07/13/20, all signed <br />Windows and Doors", expiring on MY04,21. <br />"TrosifoiS, Ultraclear, Clear, and Color PN B Glass lnterlaayers', expiring on 07'08r.14_ <br />Co <br />O <br />and sealed by Idahnis Ortega, P-E. <br />11_ Notice of Acceptance No. 18-01�.02 issued to Energi Fenestration Sohitivn, USA, Inc, for <br />2. Notice of Acceptance �To.17-0808.02 issued toKuraray America, Inc. for their <br />their series "'Ci'hhe Rigid PVC Exterior Extrusions for Windows and Doors", expiring an <br />"Sentr Gl ast (Clear and X%Ue) Glass Interlay-ers", e q icing on 07/04f13_ <br />0- <br />C. CALCULATIONS <br />1. Anchor lion calculations and structural analysis, couplymg with FBC T* <br />02i28/21 <br />3- Notice- of Acceptance No.19-1106.10 issued to �' isionn Extrusivns Limited for their `Brottn <br />O <br />C- <br />Q <br />12. Notice of Acceptance No_ 20-0203.03 issued to Energi Fenestration Solution, USA Inc. for <br />Coated (Painted or Laminated) Waite Rigid PVC Exterior ExtrlWons for Windows <br />Edition (2020)- dated 04/1-120, prepared by manufacturer_ signed and sealed by <br />their "Bronze & fight shade cap coated Urite Rigid PVC Exterior Extrusions for <br />and Doors", expiring on 09130Q4. <br />�� <br />+-j <br />Anthony Lynn hfihler: P.E. <br />Wmdow s and Doors", expiring on {04,1625. <br />4_ Aiotire afAceeptance Ara_ 18-1106.1i issued to Vislan Fn>c+s Limited for their seines <br />U <br />o <br />2. Glazing complies with AST iE1300.04, -09. -12 and -16. <br />"YE 1000 Tan 2.02 and lighter shades (Noce -Aline) Rigid Cellular PVC Exterior <br />D. �UALITI ASStBAi`iCE <br />F. STATEXEENI'S <br />Examsions for Windows and Doors-- an 12 -921. <br />� <br />� <br />0 <br />O <br />Miami -Dade Department of Regulatory. and Economic Resources (RER). <br />1. Statement letter of conformance to FBC 76 Edition (2020), dated 04e220?'0, issued by <br />L <br />manufacturer, signed and sealed by Anthony Lynn Miller, P.E. <br />F. STATEh ENTS <br />E. I ATERIAL CERTIFICATIONS <br />2. Statement letter of no financial interest and of independent. issued by manufacturer. dated <br />1_ Statement letter of conformance to FBC 76 Edition (2020), dated 02Ati1/21, issued by <br />O <br />1. Notice of Acceptance No. I9-0305.02 issued to Kurarar America, Inc. for their <br />04/1820. signed and sealed by Anthony Lynn Mitkr_ P-E. <br />manufacturer, signed and sealed by Anthony Lynn Miller, P-E_ <br />U) <br />"Trasafoff, Ultraclear, Clear, and Color PTB Glass Interlayers, expiring on <br />3. Private Labeling Agreement docummt between PGT, dated 0330115 and signed by all <br />2_ Private Labeling Agreement dated 0360 21 between PGT Industries, Inc. and CGI <br />C6 <br />07/0&24_ <br />involved parties <br />Windrows and. Doors Inc.. signed by Dean M. Ruadi, P.E., V.P. Engineering. on behalf of <br />m <br />2. Notice of Acceptance No.17-0803.02 issued toll Ural ay America, Inc. for their <br />"S+enttTGInvt <br />bath ecimpanies_ <br />Q <br />(Clear and White) Glass Int"ym. e7q* tg on 07104/23. <br />G. OTHERS <br />� <br />3. Notice of Acceptance No. 18-110610 issued to Vision Extrusions Limited for their <br />"Biotin Coated Laminated) Alke Rigid PVC Ease for E=uvsious <br />1. This NOA revises NOA# 17-04:!0.06(PVTw)CGI) and updates to1FBC2020 (TIEdition), <br />G. OTHERS <br />(Painted or . <br />expiring 0402V.21 _ <br />I_ 119s NOA revises & renews Nfl4.# 20-0429.05 (PLA w/CGI), expiring 04114/26. <br />for Windows and Doors", expiring on 09I3024. <br />2. RER Test proposals #14-I155 dated 01i 10,20 approved by Ishagi_ Chanda, P.E. expiring <br />2. the cxwmt associated PLA CGI file. #21-0203.0L a 04/14,26. <br />L-- <br />4. Notice of Acceptance No.18-1106.11 issued to Vision Extrusions Limited for then <br />0411421 _ <br />O <br />CU <br />series "VE 1000 Tan 202 and lighter shades (Non -Alike) Rid Cellular PVC <br />c e . = �',ry` <br />i Z� (, �n <br />w <br />2 <br />Exterior Extrusions for 'i endows and Doors , expiring on 1229/21_ / � <br />r <br />� � n-�. <br />� <br />Q n ' <br />l:shaq L C'hax&, P.E. <br />Ishaq L Chanda. P.E. <br />Z <br />13"q I, Chsnda, P.E. <br />Product Control Unk Supervisor <br />Product Counroi Usk Saperrisor <br />Product Cantral Unit Supervisor <br />-NOA No. 21-020-.03 <br />W. A No. 21-0205.03 <br />Z <br />IkOA No. 21-020a.03 <br />Expiration Date: April 14, 2026 <br />Expiration Date: April 14,2026 <br />Q <br />J <br />Expiration Date: April 14, 2026 <br />Approval Date March 2v,1021 <br />Approval Darr: March 25. 2021 <br />d <br />Approval Date. March 25, 2021 <br />E -a <br />E -6 <br />E 4 <br />SHEET <br />NO. <br />PA 1. <br />3 <br />