Laserfiche WebLink
i <br />Ile <br />GENERAL NOTES <br />1.1 Fabrication shall be in accordance with G.S.C. standard practices in <br />compliance with the applicable sections, relating to design requirements <br />and allowable stresses of the latest edition of the "AWS Structural <br />Welding Code D1.1 and D1.3". R.B.S. manufacturing procedures are <br />certified by. <br />Reference Certification numbers <br />Houston GSC. <br />#456 <br />1.2 MATERIALS ASTM DESIGNATION <br />MIN. YIELD STRENGTH <br />Hot Rolled Steel Shapes (W. S. C & L) A572 <br />Fy = 50 KSI <br />Steel Pipes A500 <br />Fy = 42 KSI <br />Structural Tubing A500 <br />Fy = 46 KSI <br />Structural Steel Web Plate A572/A1011 <br />Fy = 50 KSI <br />Structural Steel Flange Plotes/Bors A529/A572 <br />Fy = 55 KSI <br />Cold Formed Light Gage A653/Al Oil <br />Fy = 50, 55 KSI <br />Roof and Wall Sheets A792/A653 <br />Fy = 50. 80 KSI <br />Cable Brace A475 - TYPE 1 <br />Extra High Strength <br />Rod Brace A36 <br />Fy = 36 KSI <br />Machine Bolts & Nuts A307 <br />MIN. TENSILE STRENGTH <br />Fu = 60 KSI <br />High Strength Bolts (1"0 and less) A325-TYPE 1 <br />Fu = 120 KSI <br />High Strength Bolts (>1'0 to 1 1/2'0) A325-TYPE 1 <br />Fu = 105 KSI <br />Anchor Bolts (if supplied) A36/A307/F1554 <br />Fu = 60 KSI <br />1.3 PRIMER <br />Shop primer paint is a rust inhibitive primer which meets the end <br />performance of Federal Specification TT-P-636 and is G.S.C. Red <br />Oxide color. This paint is not intended for long term exposure <br />to the elements. G.S.C. is not responsible for any deterioration <br />of the shop primer paint as a result of Improper handling and/or <br />jobsite <br />storage. G.S.C. shall not be responsible for any field applied <br />paint and/or coatings. (Section 6.5 AISC Code of Standard Practice, <br />9th Edition). Nominal thickness of primer will be 1 mil unless otherwise <br />specified In contract documents. <br />1.4 GALVANIZED OR SPECIAL COATINGS: <br />See Contract Documents <br />1.5 ALL ROLTS ARE 1f2"d x 0'-1' A307 EXCEPT : <br />a Eave strut connection - 1/2'0 x 0'-1 1/4" A307 <br />b Endwall rafter splice - 5/8"0 x 0'-1 3/4' A325-N <br />c) Endwall column to rafter connection - 1/2"0 x 0'-1 1/4" A325-N <br />d Main frame connections - SEE CROSS SECTION <br />NOTE: Washers are not supplied unless noted otherwise on drawing <br />1.6 A325 BOLT TIGHTENING REQUIREMENTS <br />All high strength bolts are A325-N unless specifically noted otherwise. <br />Structural bolts shall be tightened by the tum-of-the-nut method in <br />accordance with the 9th Edition AISC 'Specification For Structural Joints ' using ASTM <br />A325 or A490 Bolts, when specifically required. A325-N bolts are supplied without <br />washer unless otherwise noted on the drawings. <br />All bolted connections unless noted ore designed as bearing type connections <br />with bolt threads not excluded from the shear plane. <br />1.7 CLOSURE STRIPS ARE FURNISHED FOR APPLICATION: <br />INSIDE- Under roof panels at eave <br />OUTSIDE - Between endwall panels and rake trim <br />Under continuous ridge vent skirts <br />1.8 ERECTION NOTE: <br />All bracing, strapping, & bridging shown and provided by G.S.C. for this building is <br />required and shall be installed by the erector as a permanent part of the structure. <br />If additional bracing is required for stability during erection, it shall be the <br />erectors responsibility to determine the amount of such bracing and to <br />procure and install as needed. <br />1.9 ERECTION AND UNLOADING NOT BY G.S.C. <br />1.10 SHORTAGES <br />Any claims or shortages by buyer must be made to G.S.C. within five (5) <br />working days after delivery, or such claims will be considered to have <br />been waived by the customer and disallowed. <br />1.11 CORRECTIONS OF ERRORS AND REPAIRS (MBMA 610) <br />aaims for correction of alleged misfits will be disallowed unless G.S.C. <br />shall have received prior notice thereof and allowed reasonable inspection <br />of such misfits. The correction of minor misfits by the use of drift <br />spins to draw the components into line, moderate amounts of reaming, <br />chipping and cutting, and the replacement of minor shortages of material <br />are a normal part of erection and are not subject to claim. No part of <br />the Building may be returned for alleged misfits without the prior <br />approval of G.S.C. <br />BUYER/END USE CUSTOMER RESPONSIBILITIES <br />2.1 It is the responsibility of the BUYER/END USE CUSTOMER to obtain appropriate <br />approvals and secure necessary permits from City, County, State, or <br />.Federal Agencies as required, and to advise/release G.S.C. to fabricate <br />upon receiving such. - <br />2.2 General Steel Corporation (hereafter referred to as G.S.C.) <br />standard specifications apply unless stipulated otherwise in the Contract <br />Documents. G.S.C. design, fabrication, quality criteria, standards, <br />practice, methods and tolerances shall govern the work with any other <br />interpretations to the contrary notwithstanding. It Is understood by both <br />Parties that the BUYER/END USE CUSTOMER is it for clarification of <br />inclusions or exclusions from the architectural plans and/or specifications. <br />2.3 In case of discrepancies between G.S.C. structural steel plans and plans <br />for other trades, G.S.C. plans shall govern. <br />2.4 Approval of G.S.C. drawings and calculations indicates that G.S.C. has <br />correctly interpreted and applied the Contract Documents. This approval <br />constitutes the contractor/owners acceptance of the G.S.C. design <br />concepts, assumptions, and loading. <br />FOR <br />EIELcoRpoFERMI <br />DRAWING PACKAGE <br />SALES NO. 40859 1JOB NO.1 96295 1BLDG.1 A (Main) <br />CUSTOMER Sunrise Properties <br />END USER Sunrise Properties <br />END USE Commercial <br />STREET 6520 Fort King Road <br />CITY,ST,ZIP 1 Zephyrhills, FL 33542 <br />COUNTY I Pasco <br />THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH THE FOLLOWING AS INDICATED: <br />DESIGN LOADS: <br />Design Code <br />: FBC 10 <br />Enclosure <br />: Closed <br />Dead Load (psf) <br />: Metal building structure only by GSC <br />Collateral Load (psf) <br />:3 <br />Wind Load <br />Ultimate Design <br />Wind speed, 3 sec gust :146 mph <br />Risk Category <br />:III <br />Wind Exposure <br />:C <br />Internal Pressure Coefficient, GCPi <br />:+0.18/-0.18 CLOSED <br />Wall Panel <br />Wind Pressure (psf) <br />:49.2 <br />Wind Suction (psf) <br />:65.8 <br />Girt/Header <br />Wind Pressure (psf) <br />:41.9 <br />Girt/Header <br />Wind Suction (psf) <br />:46.0 <br />Live Load <br />Primary Framing (psf) <br />Trib. Area Reduction <br />Secondary Framing (psf) <br />Other Loads/Requirements <br />Wall Panel Used <br />Roof Panel Used <br />FLORIDA APPROVAL NUMBERS <br />FL 15137 <br />FL 15282 <br />Other Loads/Requirements <br />Wall Condition <br />Deflection Limits <br />20.00 <br />Yes <br />20.00 <br />"PBR" 26 Ga. <br />"PBR" 26 Go. <br />"PBR" Wall Panel <br />"PBR" Roof Panel <br />1. Back Sidewall is fully open/ <br />common to existing building. <br />2. Front Sidewall is partially <br />open at 184'-3" long and <br />9'-0" high for future glazing. <br />3. 3'-O" high drop -fascia is present <br />along front sidewall to box the <br />canopy. <br />H/360 (spandrel/header beams) <br />SUBMITTED PLAN(S) HAVE BEEN REVIEWab <br />ICY ZEPH I.T.S >~IR� S OFFICE <br />Date: <br />BUILDING DESCRIPTION: <br />Width (ft) <br />; 21 <br />Length (ft) <br />:236.9896 <br />Eave Ht. at BSW (ft) <br />: 22.5 <br />Eave Ht. at FSW (ft) <br />:17.33 <br />Roof Slope at BSW <br />:2.0:12 <br />Roof Slope at FSW <br />:3.42:12 <br />Bay Spacing (ft) <br />1 at 32.0729 <br />1 at 33.9792 <br />1 at 34.4583 <br />1 at 31.7292 <br />1 at 32.0208 <br />1 at 24.0833 <br />1 at 23,9583 <br />1 at 24.6875 <br />COVERING AND TRIMS: <br />Roof Panels & Trims <br />Panel Type <br />: 26 Go. PBR <br />Panel Color <br />: Saddle Tan <br />Trim Colors <br />Eave Trim <br />Koko Brown <br />Eave Gutter <br />: None <br />Gable Trim <br />Koko Brown <br />Wall Panel & Trims <br />Panel Type <br />: 26 Go. PBR <br />Panel Color <br />: Saddle Tan <br />Trim Colors <br />Corner Trims <br />: Koko Brown <br />Opening Trims <br />: Koko Brown <br />Downspouts <br />:None <br />Base Trim <br />:None <br />Mos. Flash <br />: None <br />Special Requirements: <br />NONE <br />+NJuN 2 9 2D32 <br />2.5 Once the BUYER/END USE CUSTOMER has signed G.S.C. Approval Package and the <br />project is released for fabrication, changes shall be billed to the BUYER/ <br />END USE CUSTOMER including material, engineering and other costs. An additional <br />fee may be charged if the project must be moved from the fabrication and <br />shipping schedule. <br />2.6 The BUYER/END USE CUSTOMER is responsible for overall project coordination. All <br />interface, compatibility, and design considerations concerning any materials <br />not furnished by G.S.C. and G.S.C. steel system are to be considered and <br />coordinated by the BUYER/END USE CUSTOMER. Specific design criteria concerning <br />this interface between materials must be furnished before release for <br />fabrication or G.S.C. assumptions will govern <br />2.7 It is the responsibility of the BUYER/END USE CUSTOMER to Insure that G.S.C. <br />plans comply with the applicable requirements of any governing building <br />authorities. The supplying of sealed engineering data and drawings for <br />the metal building system does not imply or constitute an agreement <br />that G.S.C. or its design engineers arc acting as the engineer of record <br />or design professional for a construction project. These drawings are <br />sealed only to certify the design of the structural components furnished <br />by G.S.C. <br />2.8 The BUYER/END USE CUSTOMER is responsible for setting of anchor bolts and <br />erection of steel in accordance with G.S.C. "For Construction" drawings <br />only. Temporary supports such as guys, braces, falsework, cribbing or <br />other elements required for the erection operation shall be determined <br />furnished and installed by the erector. No items should be purchased from <br />a preliminary set of drawings, including anchor bolts. Use only final <br />"FOR CONSTRUCTION DRAWINGS" for this use. <br />2.9 General Steel Corporation is responsible for the design of the anchor bolt to <br />permit the transfer of forces between the base plate and the anchor bolt in <br />shear, bearing and tension, but is not responsible for the transfer of anchor bolt <br />forces to the concrete or the adequacy of the anchor bolt in relation to the <br />concrete. <br />Unless otherwise provided in the Order Documents, G.S.C. <br />does not design and is not responsible for the design, material <br />and construction of the foundation or foundation embedments. The <br />END USE CUSTOMER should assure himself that adequate provisions are made <br />In the foundation design for loads imposed by column reactions of the building, <br />other imposed loads, and bearing capacity of the soil and other conditions of the <br />building site. <br />It is recommended that the anchorage and foundation of the building be <br />designed by a Registered Professional Engineer experienced in the design <br />of such structures. <br />2.10 Normal erection operations include the corrections of minor misfits by <br />moderate amounts of reaming, chipping, welding or cutting, and the <br />drawing of elements into line through the use of drift pins. Errors <br />which cannot be corrected by the foregoing means or which require <br />major changes in member configuration are to be reported immediately <br />to GSC. by the BUYER/END USE CUSTOMER, to enable whoever is responsible <br />either to correct the error or to approve the most efficient and economic <br />method of correction to be used by others. <br />2.11 Neither the fabricator nor the BUYER/END USE CUSTOMER will cut, drill or otherwise <br />alter his work, or the work of other trades, to accommodate other trades, <br />unless such work is clearly specified in the contract documents. Whenever <br />such work is specified, the BUYER/END USE CUSTOMER is responsible for furnishing <br />complete information as to materials, size, location and number of <br />alterations prior to preparation of shop drawings. <br />2.12 WARNING In no case should Galvalume steel panels be used <br />in conjunction with lead or copper. Both lead and copper have harmful <br />corrosive effects on the Galvalume alloy coating when they are <br />in contact with Galwlume steel panels. Even run-off from copper <br />flashing, wiring, or tubing onto Galvolume should be avoided. <br />2.13 SAFETY COMMITMENT General Steel Corporation has a commitment <br />to manufacture quality building components that can be safely erected. <br />However, the safety commitment and job site practices of the erector <br />are beyond the control of G.S.C. <br />It is strongly recommended that safe working conditions and accident <br />prevention practices be the top priority of any job site. Local. State, <br />and Federal safety and health standards should always be followed to help <br />insure workers safety. Make certain all employees know the safest and <br />most productive way of erecting a building. Emergency procedures <br />should be known to all employees. <br />Daly meetings highlighting safety procedures are also recommended. The <br />use of hard hats, rubber sole shoes for roof work, proper equipment for <br />handling material, and safety nets where applicable, are recommended. <br />2.14 Roof drainage systems (gutter, downspouts, etc.) must be free of any obstruction <br />to ensure smooth operation at any given time. <br />2.15 It is recommended by Factory Mutual (Reference: B2.44) that roofs be cleared <br />of snow when half of the maximum snow depth is reached. The maximum snow depth <br />can be estimated based on the design snow load and the density of snow and/or ice <br />buildup. See Chart below. <br />ROOF SNOW LOAD I EOUIVALENT SNOW HEIGHT AT ROOF I RECOMMENDED SNOW HEIGHT <br />(IN PSF) (IN INCHES) WHEN SNOW REMOVAL SHOULD START <br />NOTE: <br />For SnowAce Removal Procedure, Refer to Metal <br />Section A8.4, Page XI-A8-2, <br />SEALING OF THIS DRAWING DOES NOT IMPLY <br />R CONSTITUTE THAT GSC BUILDINGS ENGINEER <br />i THE ENGINEER OF RECORD OR THE DESIGN <br />ROFESSIONAL FOR THIS PROJECT. ONLY THE <br />ESIGN OF THE METAL BUILDING SYSTEM AS <br />URNISHED BY GSC IS INCLUDED. FOUNDATION <br />NALYSIS, ELECTRICAL, AND MECHANICAL <br />YSTEMS, AND/OR OTHER PARTS SUPPLIED BY <br />NYONE OTHER THAN GSC ARE SPECIFICALLY <br />XCLUDED. NO INSPECTION OR SUPERVISION IS <br />* <br />' V i <br />fl • STAT OF .: Cc <br />41, <br />• <br />�'i. -ONAI eel <br />nrise rro <br />