Laserfiche WebLink
1 2 3 4 5 6 <br />E <br />A <br />CONSTRUCTION ACTIVITY TYPES INFECTION CONTROL RISK GR " <br />TYPE A inspection and Non-invasive Activities. Includes but is not limited to removal of ceiling tiles for visual <br />inspection (limited to 1 the per 50 square feet), painting (but not sanding) wall covering, electrical trim <br />work, minor plumbing and activities that do not generate dust or require cutting of walls or access to <br />ceilings other than for visual inspection. <br />TYPE B Small-scale, short duration activities that create minimal dust. Includes but is not limited to installation of <br />telephone and computer cables, access to chase spaces, cutting of walls or ceiling where dust migration <br />can be controlled. <br />TYPE C Any work that generates a moderate to high level of dust or requires demolition or removal of any fixed <br />building components or assemblies. Includes but is not limited to sanding walls for painting or wall <br />APLQQVRnM <br />minor ductwork or <br />TYPE D Major demolition and construction projects. Includes but is not limited to activities that require <br />consecutive work shifts, heavy demolition or removal of a complete ceiling system and new construction. <br />Any work that requires disruption of water supply for more than 1 hour. <br />RE El G <br />D K <br />PARTIAL PROJECT LIMIT LINE <br />D <br />I; SUPPLY SUPPLY <br />IM 111 112 I IRLPOOL <br />1 1 <br />113 <br />M ■sas ' <br />SUB -PROJECT i i iDY 1 <br />AREA I LINEN I OLODING I POOL/ <br />0 I I STORAGE <br />1 IRLPOOL <br />2 <br />0 1 114 <br />1! <br />I! EXAM 7 , <br />110 I 1 <br />1� 1 <br />TL <br />U)~ ' 115 , <br />� <br />1 EXAM 6 I `iii 120 <br />1; 109 <br />OFFICE � I i i i s i <br />a W 1i 1 r <br />1� i I W 1 --�--� <br />0 1 W. I I M. STAFF <br />I EXAM 5 1 N o LOCKM MCKER LOUNGE <br />W co10$ I Q T I 117 li 118 119 <br />C 1 1M a <br />OPEN 1 1 CA k <br />SUPPLY o II <br />0 ! r <br />I 'EXAM 4 1 <br />Cr 1 107 1 I IIWORKI 1 <br />1 1W 1FEt <br />l 1 <br />02 I I M 3 I I <br />SUB -PROJECT 0 11 1os 1 1 <br />AREA H j I ` <br />1 I 1 <br />� - - - <br />Ii" <br />BED 1 � 1 ►F - I OPEN <br />REPAIR I I �XAM 2 , 1 WORGYM <br />K <br />-1 I ' 105 - 122 <br />1 i <br />I� <br />Z1� I OIL <br />l-- EXAM 1 1 STORAG LIN <br />nmmi JI 104 103 12 <br />0j <br />SUB -PROJECT Cl) <br />QI�i <br />AREA G Cn `� <br />1 Q PTIO IN <br />BIOMED I P, I 101 OFFICE <br />0 0 Q 102 <br />B �� ��s T LT <br />cS ' 127 6 <br />s-s sms®sms s®s s S ' <br />� S / <br />/ / PEDS <br />PARTIAL PROJECT LIMIT LINE c� GYM L 1 <br />i i i i i i i 127 <br />s�S M S�S�S�S�S s•�s ®s <br />I PED. sl 1 1 <br />WAITING RECCE -PATIO li I I m OBSERV <br />1; 201 A 202 129 rn S S <br />I� ! 1 1 _ �, S S <br />I II ! 1 1W QUIET <br />u, <br />1 �, O 1 F ROOM I STD <br />1 iI s® S S S S I <br />I S S S S S Sn � �i � � I <br />1� WAITING U I s =s- s <br />Cn <br />co 201 I I� I <br />P. `� I MECH. ® OFFICE <br />1 ;1 � � a o a <br />1 <br />W If <br />1 <br />®S S®SESL.. <br />SAS SAS S S ' S S Sm S®S ' ®S®S®S s S,_S\_ S <br />iii I\ <br />PARTIAL PROJECT LIMIT LINE ���\ <br />W <br />1 <br />A <br />I <br />SAS S®S!sCn <br />�S S®S®S®S®ST msSsS s�S®SAS®s <br />W <br />OFFICE STORAGE OFFICE <br />0 0 <br />OVERALL PROJECT <br />AREA B <br />w <br />IJ <br />tZ <br />J <br />�a <br />~ r1 <br />I <br />1 <br />1 <br />SUB -PROJECT <br />AREA C <br />SUB -PROJECT <br />AREA D <br />OVERALL PROJECT <br />GROUP 1 <br />ROUP 3 <br />GROUP 4 <br />GROUP 2 <br />LOWEST RiSK <br />F <br />MEDIUM RISK <br />EDIUM-HIGH RISK <br />HIGH RISK <br />1,0 Office Areas <br />1.0 All other patient care areas <br />1.0 Emergency Departments <br />1.0 All ICUs <br />(e.g. cardiac rehab, <br />ambulatory care clinics unles <br />2.0 Unoccupied wards <br />2.0 Outpatient clinics (except for <br />2.0 Radiology / MRI <br />2.0 All ORs <br />' <br />oncologv and surgery) <br />3.0 Admissions/Discharge units <br />3.0 Post Anesthesia Care Unit <br />3.0 Oncology units and outpatient <br />clinics for cancer patients <br />! " <br />4.0 Labor and Delivery <br />4.0 Transplant units and outpatient <br />I <br />clinics <br />5.0 Normal Newborn Nurseries <br />5A Wards and outpatient clinics <br />for patients with AIDS or other <br />C <br />immunodeficiencv <br />+ <br />6.0 Same Day Surgery <br />6.0 Dialysis <br />7.0 Nuclear Medicine <br />8.0 Physiotherapy tank areas <br />7.0 Tertiary care nurseries <br />8.0 Labor & Delivery Operating <br />Rooms <br />[ <br />9.0 Echocardiology <br />9.0 All Cardiac Catherizatlon & <br />C°. <br />0.0 Laboratories <br />Anqioqraphy areas <br />10.0 Cardiovascular/Cardiology <br />patients <br />1.0 Gen Med/surg units other than <br />11.0 Anesthesia areas <br />y V'. <br />those listed in Grp 4 <br />2.0 Pediatrics <br />12.0 All Endoscopy areas <br />- <br />13.0 Pharmacy admixture areas <br />14.0 Sterile processing rooms <br />SUB -PROJECT SOILE[ <br />AREA I LINEN <br />OFFICE <br />OPEN <br />SUPPLY <br />AREA A SUB -PROJECT <br />AREA H <br />BED <br />SUB -PROJECT REPAIR <br />AREA E 0 <br />RECEIVING <br />DOCK <br />0 <br />PARTIAL PROJECT LIMIT LINE <br />11 SUPPLY SUPPLY i- -1 ' <br />ISLS 111 112 1 <br />EXAMi3 8 <br />I <br />1 � � 1 <br />■sas I LT i i i , <br />BODY <br />OLDING I I I POOL/ <br />U 0 F_ 7 ,STORAGE <br />116 <br />�EX <br />0IM9 1 <br />1 14 <br />1!�---� I , i_J 1 <br />1 L EXAM , ® 1 <br />L 110 J <br />1 <br />1 TL ® 1 <br />,W � , 115 <br />� i iii l <br />1W EXAM I Liii� <br />� 09 6__1 ' <br />Is 1 i <br />IW <br />1 m EXAM 1 Q o 1-LA1{tG E <br />1° L i o8 I N <br />I1 EX M 1 <br />1 $ <br />/ ICL 1 <br />cc II <br />11,EXAM 4� 1 <br />o I r L io7 J I I WORK,1 <br />V 1 cn (nj I I 121 I <br />W 1 <br />II �3 1 <br />I��'6 J I <br />I 1 <br />1 U)I <br />In EXAM 2� , I WORK <br />L J I 122 <br />1 <br />1�i , s�s�s s s sus OPEN <br />��it <br />Cn GYM <br />ZIP 1 , OIL�g <br />123 <br />1� EXAM 17 m STORAG � <br />:3LINENI <br />104 I m 103 124 <br />0Ir`L�J 1 I i <br />�1� S <br />Cr iiii <br />a PTIO IN <br />P1 I 101 VITALS <br />°�s I T LT <br />10 6 <br />�S-SAS®S S®SS S®S S 0 ' L J <br />S 0 <br />0 1 <br />PARTIAL PROJECT LIMIT LINE <br />SUB -PROJECT - -5 SM S S® SSA ��� 1W OFFI <br />�s <br />AREA F 1! EP I "� 1 129 1 <br />Im REC20To III )' <br />I <br />1 I /) I <br />11 ! 1 `� <br />0 1 ut <br />I! F$cE'I <br />I ! s s••�S s S <br />1 <br />I � 1 <br />si4Si"s S <br />PS S S S S O I v7 <br />I; WAITING v <br />201 I III I <br />I; �' P. `� I MECH. ® OFFICE <br />I0 ' a a <br />! n � <br />W Cn <br />®sis s S Sys s S®s S-:s S s S®S "' ws SMS s SW S=s S <br />i i i i n 71 <br />N <br />PARTIAL PROJECT LIMIT LINE <br />1 <br />i <br />I <br />rS s®S S®S S s S®S®S®S s s®s®s s-s-s®S <br />`® OFFICE STORAGE �' OFFICE <br />0 0 <br />OVERALL PROJECT <br />AREA B <br />A <br />3 SUB -PROJECT <br />AREA G <br />BIB <br />02 <br />1 120 1 <br />LARGE <br />EXAM 1 <br />f 119 � <br />uJ iJ <br />12 <br />ICRA NOTES: <br />CLASS PRECAUTIONS <br />DURING CONSTRUCTION <br />UPON COMPLETION OF WORK <br />1. Execute work by methods to minimize raising dust <br />Clean work area upon completion of task. <br />from construction operations. <br />u <br />U) <br />2. Immediately replace a ceiling tile displaced for visual <br />g <br />inspection <br />U <br />1. Provide active means to prevent airborne dust from <br />1. Wipe work surfaces with disinfectant. <br />- <br />dispersing into atmosphere. <br />2. Contain construction waste before transport in tightly <br />07 <br />co <br />2. Water mist work surfaces to control dust while cutting. <br />covered containers. <br />U3. <br />Seal unused doors with duct tape. <br />3. Wet mop and/or vacuum with HEPA filtered vacuum <br />4. Block off and seal air vents. <br />before leaving work area. <br />5. Place dust mat at entrance and exit of work area <br />4. Remove isolation of HVAC system in areas where <br />6. Remove or isolate HVAC system in areas where work <br />work is being performed. <br />is being performed. <br />1. Remove or Isolate HVAC system in area where work <br />1. Do not remove barriers from work area until <br />is being done to prevent contamination of duct system. <br />completed project is inspected by the owner's Safety <br />2. Complete all critical barriers i.e. sheetrock, plywood, <br />Department and Infection Control Department and <br />plastic, to seal area from non work area or implement <br />thoroughly cleaned by the owner's Environmental <br />Cn <br />control cube method (cart with plastic covering and sealed <br />Services Department. <br />vconnection <br />to work site with HEPA vacuum for vacuuming <br />2. Remove barrier materials carefully to minimize <br />prior to exit) before construction begins. <br />spreading of dirt and debris associated with construction. <br />3. Maintain negative air pressure within work site <br />3. Vacuum work area with HEPA filtered vacuums. <br />utilizing HEPA equipped air filtration units. <br />4. Wet mop area with disinfectant. <br />4. Contain construction waste before transport in tightly <br />5. Remove isolation of HVAC system in areas where <br />covered containers. <br />work is being performed. <br />5. Cover transport receptacles or carts. Tape covering <br />unless solid lid <br />1. Isolate HVAC system in area where work is being <br />1. Remove barrier material carefully to minimize <br />done to prevent contamination of duct system. <br />spreading of dirt and debris associated with construction. <br />2. Complete all critical barriers i.e. sheetrock, plywood, <br />2. Contain construction waste before transport in tightly <br />plastic, to seal area from non work area or implement <br />covered containers. <br />control cube method (cart with plastic covering and sealed <br />3. Cover transport receptacles or carts. Tape covering <br />connection to work site with HEPA vacuum for vacuuming <br />unless solid lid <br />prior to exit) before construction begins. <br />4. Vacuum work area with HEPA filtered vacuums. <br />3. Maintain negative air pressure within work site <br />5. Wet mop area with disinfectant. <br />> <br />utilizing HEPA equipped air filtration units. <br />6. Remove isolation of HVAC system in areas where <br />cO <br />co <br />4. Seal holes, pipes, conduits, and punctures <br />work is being performed, <br />v <br />appropriately. <br />5. Construct anteroom and require all personnel to pass <br />through this room so they can be vacuumed using a <br />HEPA vacuum cleaner before leaving work site or they <br />can wear cloth or paper coveralls that are removed each <br />time they leave the work site. <br />6. All personnel entering work site are required to wear <br />shoe covers. Shoe covers must be changed each time <br />the worker exits the work area. <br />7. Do not remove barriers from work area until <br />completed project is inspected by the owner's Safety <br />Department and Infection Control Department and <br />thoroughly cleaned by the owner's Environmental <br />Services Department. <br />SUB -PROJECT <br />AREA C <br />SUB -PROJECT <br />AREA D <br />OVERALL PROJECT <br />AREA A <br />SUB -PROJECT <br />AREA E <br />SUB -PROJECT <br />AREA F <br />WALL RATINGS: <br />1 HOUR FIRE <br />-*S-♦S-♦S- 1 HOUR FIRE/ SMOKE BARRIER <br />2 HOUR FIRE <br />-44-S-- *S-**S- 2 HOUR FIRE/ SMOKE BARRIER <br />-�-T ------ *T TEMPORARY 1 HOUR FIRE <br />S S SMOKE BARRIER <br />PARTITIONS: <br />EXISTING/REMAINING <br />NEW WORK <br />F_ _ _ DEMOLISHED <br />PROJECT AREA WORK <br />DESCRIPTION <br />PROJECT <br />GENERAL: SKIM COAT EXISTING WALL <br />AREA A <br />PAPER W/ DRYWALL MUD & APPLY NEW <br />PAINT. <br />SEE BELOW FOR SUB -PROJECT AREA <br />WORK. <br />PROJECT <br />DEMOLISH EXISTING WALL BETWEEN <br />AREA B <br />ADULT & PEDIATRIC WAITING. <br />UPGRADE FINISHES. <br />SUB -PROJECT <br />CONSTRUCT NEW FLOORING <br />AREA C <br />PLATFORM OVER POOL AREA. ADD <br />DOUBLE DOOR AT EXTERIOR WALL TO <br />DOCK/ RECEIVING AREA. INFILL DOORS <br />TO OTHER ROOMS. <br />SUB -PROJECT <br />CONVERT EXISTING RESTROOMS <br />AREA D <br />STAFF LOUNGE INTO NEW LARGE <br />EXAM ROOMS. <br />SUB -PROJECT <br />CONSTRUCT NEW WALLS & DOORS TO <br />AREA E <br />SEPARATE STAFF WORK AREAS FROM <br />OPEN GYM SPACE. <br />SUB -PROJECT <br />REMOVE STAGE. CONSTRUCT NEW <br />AREA F <br />WALLS TO CREATE FOUR SEPARATE <br />OFFICES. REARRANGING LIGHTING FOR <br />INDIVIDUAI R OMS. <br />SUB- R JE T <br />C N R OFFICE IN O EW V AL <br />AREA G <br />STATISTICS ROOM. RELOCATE <br />RESTROOM DOOR TO OPEN INTO NEW <br />VITALS ROOM. <br />SUB -PROJECT <br />SKIM COAT EXISTING WALL PAPER <br />AREA H <br />WITHIN EXAM ROOMS W/ DRYWALL <br />MUD & APPLY NEW PAINT. CONSTRUCT <br />WALLS TO ENCLOSE OPEN EXAM <br />ROOMS. INFILL EXISTING DOOR TO <br />CORRIDOR. <br />SUB -PROJECT <br />CONVERT THERAPY ROOMS INTO NEW <br />AREA I <br />EXAM ROOMS. UPGRADE FINISHES <br />WITHIN EXISTING RESTROOM. <br />cha uis design <br />group <br />architecture.pa <br />510 VONDERBURG DR. SUITE 216 <br />BRANDON, FL 33511 <br />Tel. 813-667-2340 <br />CGDPA - FL # AA-26003049 <br />exp U.S. Services Inc. <br />t: +1.407.660.0088 f: +1.407.660.1655 <br />2601 Westhall Lane <br />Maitland, FL 32751 <br />USA 04 <br />A&Z 0 <br />www.exp.com <br />Project #: 21000928 <br />Cert of Ruth: 29701 <br />ex P <br />PROJECT FOR <br />ADVENT HEALTH <br />ZEPHYRHILLS <br />UROLOGY SUITE <br />RENOVATION <br />7050 Gall Blvd. <br />Zephyrhills, FL 33541 <br />c In <br />vent Health <br />AHCA CLIENT CODE / FILE NUMBER: 23/100046-126 <br />B <br />3 <br />APRIL 14, 2021 <br />ASI No. 1- AHCA & OWNER REVISIONS <br />2 <br />MARCH 17, 2021 <br />AHCA STAGE 3 DOCUMENT SET <br />1 <br />FEB.19, 2021 <br />ADDENDUM 1 - <br />MARK <br />I DATE <br />DESCRIPTION <br />PROJECT NUMBER <br />042-20.164.01 <br />ORIGINAL ISSUE <br />MAR. 17, 2021- <br />PROJECT MANAGER <br />TEC <br />PROJECT DESIGNER <br />TEC <br />PROJECT ARCHITECT <br />THOMAS E. CHAPUIS - AR97109 <br />LANDSCAPE ARCHITECT <br />NiA <br />CIVIL ENGINEER <br />N/A <br />STRUCTURAL ENGINEER <br />N/A <br />MECHANICAL ENGINEER <br />N/A <br />ELECTRICAL ENGINEER <br />N/A <br />INTERIOR DESIGNER <br />TEC <br />EQUIPMENT PLANNER <br />N/A <br />DRAWN BY <br />SDL <br />OVERALL PLAN - <br />DEMOLITION &NEW <br />A WORK <br />As indicated <br />d <br />- - - PLAN - 1 ST FLOOR - OVERALL PLAN - NEW WORK PROJECT Awl <br />�, PLAN 1ST FLOOR OVERALL PLAN DEMOLITION NORTH OO <br />A 1 1 /8" = 1'-0" <br />9 N <br />O <br />d' <br />1 2 3 4 5 6 1 Project Status <br />---T--- -r7 r-rrtr-- -T-- - <br />I I ili-�T �i ��� of �I. �.:I iLillf--Tiii k l-,ll uidL i Ill Al i I Ill1 1 11 11 I i <br />