<br />CONSTRUCTION ACTIVITY TYPES INFECTION CONTROL RISK GR "
<br />TYPE A inspection and Non-invasive Activities. Includes but is not limited to removal of ceiling tiles for visual
<br />inspection (limited to 1 the per 50 square feet), painting (but not sanding) wall covering, electrical trim
<br />work, minor plumbing and activities that do not generate dust or require cutting of walls or access to
<br />ceilings other than for visual inspection.
<br />TYPE B Small-scale, short duration activities that create minimal dust. Includes but is not limited to installation of
<br />telephone and computer cables, access to chase spaces, cutting of walls or ceiling where dust migration
<br />can be controlled.
<br />TYPE C Any work that generates a moderate to high level of dust or requires demolition or removal of any fixed
<br />building components or assemblies. Includes but is not limited to sanding walls for painting or wall
<br />APLQQVRnM
<br />minor ductwork or
<br />TYPE D Major demolition and construction projects. Includes but is not limited to activities that require
<br />consecutive work shifts, heavy demolition or removal of a complete ceiling system and new construction.
<br />Any work that requires disruption of water supply for more than 1 hour.
<br />RE El G
<br />D K
<br />PARTIAL PROJECT LIMIT LINE
<br />D
<br />I; SUPPLY SUPPLY
<br />IM 111 112 I IRLPOOL
<br />1 1
<br />113
<br />M ■sas '
<br />SUB -PROJECT i i iDY 1
<br />AREA I LINEN I OLODING I POOL/
<br />0 I I STORAGE
<br />1 IRLPOOL
<br />2
<br />0 1 114
<br />1!
<br />I! EXAM 7 ,
<br />110 I 1
<br />1� 1
<br />TL
<br />U)~ ' 115 ,
<br />�
<br />1 EXAM 6 I `iii 120
<br />1; 109
<br />OFFICE � I i i i s i
<br />a W 1i 1 r
<br />1� i I W 1 --�--�
<br />0 1 W. I I M. STAFF
<br />I EXAM 5 1 N o LOCKM MCKER LOUNGE
<br />W co10$ I Q T I 117 li 118 119
<br />C 1 1M a
<br />OPEN 1 1 CA k
<br />SUPPLY o II
<br />0 ! r
<br />I 'EXAM 4 1
<br />Cr 1 107 1 I IIWORKI 1
<br />1 1W 1FEt
<br />l 1
<br />02 I I M 3 I I
<br />SUB -PROJECT 0 11 1os 1 1
<br />AREA H j I `
<br />1 I 1
<br />� - - -
<br />Ii"
<br />BED 1 � 1 ►F - I OPEN
<br />REPAIR I I �XAM 2 , 1 WORGYM
<br />K
<br />-1 I ' 105 - 122
<br />1 i
<br />I�
<br />Z1� I OIL
<br />l-- EXAM 1 1 STORAG LIN
<br />nmmi JI 104 103 12
<br />0j
<br />SUB -PROJECT Cl)
<br />QI�i
<br />AREA G Cn `�
<br />1 Q PTIO IN
<br />BIOMED I P, I 101 OFFICE
<br />0 0 Q 102
<br />B �� ��s T LT
<br />cS ' 127 6
<br />s-s sms®sms s®s s S '
<br />� S /
<br />/ / PEDS
<br />PARTIAL PROJECT LIMIT LINE c� GYM L 1
<br />i i i i i i i 127
<br />s�S M S�S�S�S�S s•�s ®s
<br />I PED. sl 1 1
<br />WAITING RECCE -PATIO li I I m OBSERV
<br />1; 201 A 202 129 rn S S
<br />I� ! 1 1 _ �, S S
<br />I II ! 1 1W QUIET
<br />u,
<br />1 �, O 1 F ROOM I STD
<br />1 iI s® S S S S I
<br />I S S S S S Sn � �i � � I
<br />1� WAITING U I s =s- s
<br />Cn
<br />co 201 I I� I
<br />P. `� I MECH. ® OFFICE
<br />1 ;1 � � a o a
<br />1
<br />W If
<br />1
<br />®S S®SESL..
<br />SAS SAS S S ' S S Sm S®S ' ®S®S®S s S,_S\_ S
<br />iii I\
<br />PARTIAL PROJECT LIMIT LINE ���\
<br />W
<br />1
<br />A
<br />I
<br />SAS S®S!sCn
<br />�S S®S®S®S®ST msSsS s�S®SAS®s
<br />W
<br />OFFICE STORAGE OFFICE
<br />0 0
<br />OVERALL PROJECT
<br />AREA B
<br />w
<br />IJ
<br />tZ
<br />J
<br />�a
<br />~ r1
<br />I
<br />1
<br />1
<br />SUB -PROJECT
<br />AREA C
<br />SUB -PROJECT
<br />AREA D
<br />OVERALL PROJECT
<br />GROUP 1
<br />ROUP 3
<br />GROUP 4
<br />GROUP 2
<br />LOWEST RiSK
<br />F
<br />MEDIUM RISK
<br />EDIUM-HIGH RISK
<br />HIGH RISK
<br />1,0 Office Areas
<br />1.0 All other patient care areas
<br />1.0 Emergency Departments
<br />1.0 All ICUs
<br />(e.g. cardiac rehab,
<br />ambulatory care clinics unles
<br />2.0 Unoccupied wards
<br />2.0 Outpatient clinics (except for
<br />2.0 Radiology / MRI
<br />2.0 All ORs
<br />'
<br />oncologv and surgery)
<br />3.0 Admissions/Discharge units
<br />3.0 Post Anesthesia Care Unit
<br />3.0 Oncology units and outpatient
<br />clinics for cancer patients
<br />! "
<br />4.0 Labor and Delivery
<br />4.0 Transplant units and outpatient
<br />I
<br />clinics
<br />5.0 Normal Newborn Nurseries
<br />5A Wards and outpatient clinics
<br />for patients with AIDS or other
<br />C
<br />immunodeficiencv
<br />+
<br />6.0 Same Day Surgery
<br />6.0 Dialysis
<br />7.0 Nuclear Medicine
<br />8.0 Physiotherapy tank areas
<br />7.0 Tertiary care nurseries
<br />8.0 Labor & Delivery Operating
<br />Rooms
<br />[
<br />9.0 Echocardiology
<br />9.0 All Cardiac Catherizatlon &
<br />C°.
<br />0.0 Laboratories
<br />Anqioqraphy areas
<br />10.0 Cardiovascular/Cardiology
<br />patients
<br />1.0 Gen Med/surg units other than
<br />11.0 Anesthesia areas
<br />y V'.
<br />those listed in Grp 4
<br />2.0 Pediatrics
<br />12.0 All Endoscopy areas
<br />-
<br />13.0 Pharmacy admixture areas
<br />14.0 Sterile processing rooms
<br />SUB -PROJECT SOILE[
<br />AREA I LINEN
<br />OFFICE
<br />OPEN
<br />SUPPLY
<br />AREA A SUB -PROJECT
<br />AREA H
<br />BED
<br />SUB -PROJECT REPAIR
<br />AREA E 0
<br />RECEIVING
<br />DOCK
<br />0
<br />PARTIAL PROJECT LIMIT LINE
<br />11 SUPPLY SUPPLY i- -1 '
<br />ISLS 111 112 1
<br />EXAMi3 8
<br />I
<br />1 � � 1
<br />■sas I LT i i i ,
<br />BODY
<br />OLDING I I I POOL/
<br />U 0 F_ 7 ,STORAGE
<br />116
<br />�EX
<br />0IM9 1
<br />1 14
<br />1!�---� I , i_J 1
<br />1 L EXAM , ® 1
<br />L 110 J
<br />1
<br />1 TL ® 1
<br />,W � , 115
<br />� i iii l
<br />1W EXAM I Liii�
<br />� 09 6__1 '
<br />Is 1 i
<br />IW
<br />1 m EXAM 1 Q o 1-LA1{tG E
<br />1° L i o8 I N
<br />I1 EX M 1
<br />1 $
<br />/ ICL 1
<br />cc II
<br />11,EXAM 4� 1
<br />o I r L io7 J I I WORK,1
<br />V 1 cn (nj I I 121 I
<br />W 1
<br />II �3 1
<br />I��'6 J I
<br />I 1
<br />1 U)I
<br />In EXAM 2� , I WORK
<br />L J I 122
<br />1
<br />1�i , s�s�s s s sus OPEN
<br />��it
<br />Cn GYM
<br />ZIP 1 , OIL�g
<br />123
<br />1� EXAM 17 m STORAG �
<br />:3LINENI
<br />104 I m 103 124
<br />0Ir`L�J 1 I i
<br />�1� S
<br />Cr iiii
<br />a PTIO IN
<br />P1 I 101 VITALS
<br />°�s I T LT
<br />10 6
<br />�S-SAS®S S®SS S®S S 0 ' L J
<br />S 0
<br />0 1
<br />PARTIAL PROJECT LIMIT LINE
<br />SUB -PROJECT - -5 SM S S® SSA ��� 1W OFFI
<br />�s
<br />AREA F 1! EP I "� 1 129 1
<br />Im REC20To III )'
<br />I
<br />1 I /) I
<br />11 ! 1 `�
<br />0 1 ut
<br />I! F$cE'I
<br />I ! s s••�S s S
<br />1
<br />I � 1
<br />si4Si"s S
<br />PS S S S S O I v7
<br />I; WAITING v
<br />201 I III I
<br />I; �' P. `� I MECH. ® OFFICE
<br />I0 ' a a
<br />! n �
<br />W Cn
<br />®sis s S Sys s S®s S-:s S s S®S "' ws SMS s SW S=s S
<br />i i i i n 71
<br />N
<br />PARTIAL PROJECT LIMIT LINE
<br />1
<br />i
<br />I
<br />rS s®S S®S S s S®S®S®S s s®s®s s-s-s®S
<br />`® OFFICE STORAGE �' OFFICE
<br />0 0
<br />OVERALL PROJECT
<br />AREA B
<br />A
<br />3 SUB -PROJECT
<br />AREA G
<br />BIB
<br />02
<br />1 120 1
<br />LARGE
<br />EXAM 1
<br />f 119 �
<br />uJ iJ
<br />12
<br />ICRA NOTES:
<br />CLASS PRECAUTIONS
<br />DURING CONSTRUCTION
<br />UPON COMPLETION OF WORK
<br />1. Execute work by methods to minimize raising dust
<br />Clean work area upon completion of task.
<br />from construction operations.
<br />u
<br />U)
<br />2. Immediately replace a ceiling tile displaced for visual
<br />g
<br />inspection
<br />U
<br />1. Provide active means to prevent airborne dust from
<br />1. Wipe work surfaces with disinfectant.
<br />-
<br />dispersing into atmosphere.
<br />2. Contain construction waste before transport in tightly
<br />07
<br />co
<br />2. Water mist work surfaces to control dust while cutting.
<br />covered containers.
<br />U3.
<br />Seal unused doors with duct tape.
<br />3. Wet mop and/or vacuum with HEPA filtered vacuum
<br />4. Block off and seal air vents.
<br />before leaving work area.
<br />5. Place dust mat at entrance and exit of work area
<br />4. Remove isolation of HVAC system in areas where
<br />6. Remove or isolate HVAC system in areas where work
<br />work is being performed.
<br />is being performed.
<br />1. Remove or Isolate HVAC system in area where work
<br />1. Do not remove barriers from work area until
<br />is being done to prevent contamination of duct system.
<br />completed project is inspected by the owner's Safety
<br />2. Complete all critical barriers i.e. sheetrock, plywood,
<br />Department and Infection Control Department and
<br />plastic, to seal area from non work area or implement
<br />thoroughly cleaned by the owner's Environmental
<br />Cn
<br />control cube method (cart with plastic covering and sealed
<br />Services Department.
<br />vconnection
<br />to work site with HEPA vacuum for vacuuming
<br />2. Remove barrier materials carefully to minimize
<br />prior to exit) before construction begins.
<br />spreading of dirt and debris associated with construction.
<br />3. Maintain negative air pressure within work site
<br />3. Vacuum work area with HEPA filtered vacuums.
<br />utilizing HEPA equipped air filtration units.
<br />4. Wet mop area with disinfectant.
<br />4. Contain construction waste before transport in tightly
<br />5. Remove isolation of HVAC system in areas where
<br />covered containers.
<br />work is being performed.
<br />5. Cover transport receptacles or carts. Tape covering
<br />unless solid lid
<br />1. Isolate HVAC system in area where work is being
<br />1. Remove barrier material carefully to minimize
<br />done to prevent contamination of duct system.
<br />spreading of dirt and debris associated with construction.
<br />2. Complete all critical barriers i.e. sheetrock, plywood,
<br />2. Contain construction waste before transport in tightly
<br />plastic, to seal area from non work area or implement
<br />covered containers.
<br />control cube method (cart with plastic covering and sealed
<br />3. Cover transport receptacles or carts. Tape covering
<br />connection to work site with HEPA vacuum for vacuuming
<br />unless solid lid
<br />prior to exit) before construction begins.
<br />4. Vacuum work area with HEPA filtered vacuums.
<br />3. Maintain negative air pressure within work site
<br />5. Wet mop area with disinfectant.
<br />>
<br />utilizing HEPA equipped air filtration units.
<br />6. Remove isolation of HVAC system in areas where
<br />cO
<br />co
<br />4. Seal holes, pipes, conduits, and punctures
<br />work is being performed,
<br />v
<br />appropriately.
<br />5. Construct anteroom and require all personnel to pass
<br />through this room so they can be vacuumed using a
<br />HEPA vacuum cleaner before leaving work site or they
<br />can wear cloth or paper coveralls that are removed each
<br />time they leave the work site.
<br />6. All personnel entering work site are required to wear
<br />shoe covers. Shoe covers must be changed each time
<br />the worker exits the work area.
<br />7. Do not remove barriers from work area until
<br />completed project is inspected by the owner's Safety
<br />Department and Infection Control Department and
<br />thoroughly cleaned by the owner's Environmental
<br />Services Department.
<br />SUB -PROJECT
<br />AREA C
<br />SUB -PROJECT
<br />AREA D
<br />OVERALL PROJECT
<br />AREA A
<br />SUB -PROJECT
<br />AREA E
<br />SUB -PROJECT
<br />AREA F
<br />WALL RATINGS:
<br />1 HOUR FIRE
<br />-*S-♦S-♦S- 1 HOUR FIRE/ SMOKE BARRIER
<br />2 HOUR FIRE
<br />-44-S-- *S-**S- 2 HOUR FIRE/ SMOKE BARRIER
<br />-�-T ------ *T TEMPORARY 1 HOUR FIRE
<br />S S SMOKE BARRIER
<br />PARTITIONS:
<br />EXISTING/REMAINING
<br />NEW WORK
<br />F_ _ _ DEMOLISHED
<br />PROJECT AREA WORK
<br />DESCRIPTION
<br />PROJECT
<br />GENERAL: SKIM COAT EXISTING WALL
<br />AREA A
<br />PAPER W/ DRYWALL MUD & APPLY NEW
<br />PAINT.
<br />SEE BELOW FOR SUB -PROJECT AREA
<br />WORK.
<br />PROJECT
<br />DEMOLISH EXISTING WALL BETWEEN
<br />AREA B
<br />ADULT & PEDIATRIC WAITING.
<br />UPGRADE FINISHES.
<br />SUB -PROJECT
<br />CONSTRUCT NEW FLOORING
<br />AREA C
<br />PLATFORM OVER POOL AREA. ADD
<br />DOUBLE DOOR AT EXTERIOR WALL TO
<br />DOCK/ RECEIVING AREA. INFILL DOORS
<br />TO OTHER ROOMS.
<br />SUB -PROJECT
<br />CONVERT EXISTING RESTROOMS
<br />AREA D
<br />STAFF LOUNGE INTO NEW LARGE
<br />EXAM ROOMS.
<br />SUB -PROJECT
<br />CONSTRUCT NEW WALLS & DOORS TO
<br />AREA E
<br />SEPARATE STAFF WORK AREAS FROM
<br />OPEN GYM SPACE.
<br />SUB -PROJECT
<br />REMOVE STAGE. CONSTRUCT NEW
<br />AREA F
<br />WALLS TO CREATE FOUR SEPARATE
<br />OFFICES. REARRANGING LIGHTING FOR
<br />INDIVIDUAI R OMS.
<br />SUB- R JE T
<br />C N R OFFICE IN O EW V AL
<br />AREA G
<br />STATISTICS ROOM. RELOCATE
<br />RESTROOM DOOR TO OPEN INTO NEW
<br />VITALS ROOM.
<br />SUB -PROJECT
<br />SKIM COAT EXISTING WALL PAPER
<br />AREA H
<br />WITHIN EXAM ROOMS W/ DRYWALL
<br />MUD & APPLY NEW PAINT. CONSTRUCT
<br />WALLS TO ENCLOSE OPEN EXAM
<br />ROOMS. INFILL EXISTING DOOR TO
<br />CORRIDOR.
<br />SUB -PROJECT
<br />CONVERT THERAPY ROOMS INTO NEW
<br />AREA I
<br />EXAM ROOMS. UPGRADE FINISHES
<br />WITHIN EXISTING RESTROOM.
<br />cha uis design
<br />group
<br />architecture.pa
<br />510 VONDERBURG DR. SUITE 216
<br />BRANDON, FL 33511
<br />Tel. 813-667-2340
<br />CGDPA - FL # AA-26003049
<br />exp U.S. Services Inc.
<br />t: +1.407.660.0088 f: +1.407.660.1655
<br />2601 Westhall Lane
<br />Maitland, FL 32751
<br />USA 04
<br />A&Z 0
<br />www.exp.com
<br />Project #: 21000928
<br />Cert of Ruth: 29701
<br />ex P
<br />PROJECT FOR
<br />ADVENT HEALTH
<br />ZEPHYRHILLS
<br />UROLOGY SUITE
<br />RENOVATION
<br />7050 Gall Blvd.
<br />Zephyrhills, FL 33541
<br />c In
<br />vent Health
<br />AHCA CLIENT CODE / FILE NUMBER: 23/100046-126
<br />B
<br />3
<br />APRIL 14, 2021
<br />ASI No. 1- AHCA & OWNER REVISIONS
<br />2
<br />MARCH 17, 2021
<br />AHCA STAGE 3 DOCUMENT SET
<br />1
<br />FEB.19, 2021
<br />ADDENDUM 1 -
<br />MARK
<br />I DATE
<br />DESCRIPTION
<br />PROJECT NUMBER
<br />042-20.164.01
<br />ORIGINAL ISSUE
<br />MAR. 17, 2021-
<br />PROJECT MANAGER
<br />TEC
<br />PROJECT DESIGNER
<br />TEC
<br />PROJECT ARCHITECT
<br />THOMAS E. CHAPUIS - AR97109
<br />LANDSCAPE ARCHITECT
<br />NiA
<br />CIVIL ENGINEER
<br />N/A
<br />STRUCTURAL ENGINEER
<br />N/A
<br />MECHANICAL ENGINEER
<br />N/A
<br />ELECTRICAL ENGINEER
<br />N/A
<br />INTERIOR DESIGNER
<br />TEC
<br />EQUIPMENT PLANNER
<br />N/A
<br />DRAWN BY
<br />SDL
<br />OVERALL PLAN -
<br />DEMOLITION &NEW
<br />A WORK
<br />As indicated
<br />d
<br />- - - PLAN - 1 ST FLOOR - OVERALL PLAN - NEW WORK PROJECT Awl
<br />�, PLAN 1ST FLOOR OVERALL PLAN DEMOLITION NORTH OO
<br />A 1 1 /8" = 1'-0"
<br />9 N
<br />O
<br />d'
<br />1 2 3 4 5 6 1 Project Status
<br />---T--- -r7 r-rrtr-- -T-- -
<br />I I ili-�T �i ��� of �I. �.:I iLillf--Tiii k l-,ll uidL i Ill Al i I Ill1 1 11 11 I i
<br />
|