I <br />2 3 4 5 6 <br />GENERAL NOTES: <br />1 ALL NORMAL CIRCUITS ORIGINATE IN PANEL'3NOR', UNLESS OTHERWISE NOTED. <br />2 ALL CRITICAL CIRCUITS ORIGINATE IN PANEL'3CBOR', UNLESS OTHERWISE NOTED. <br />3 VENDOR SPECIFIC DRAWINGS WERE NOT AVAILABLE AT THE TIME OF DESIGN. THE <br />INFORMATION NECESSARY TO BID THE PROJECT IS PROVIDED. ALL FINAL <br />CONNECTIONS WILL NEED TO BE VERIFIED WITH VENDOR SPECIFIC DRAWINGS <br />PRIOR TO ROUGH -IN OF ANY CONDUITS, RACEWAYS AND JUNCTION BOXES, <br />4 VERTICAL RACEWAYS VD1 AND VD2 NOTED ON THIS SHEET MUST BE DIVIDED INTO <br />SECTIONS FOR SEPARATION OF DIFFERENT VOLTAGE CLASSES WITHIN THE <br />RACEWAY. REMOVABLE OPENINGS SHALL BE PROVIDED WITH GROMMETED <br />- - - - - OPENINGS IN THE FACE FOR CABLING CONNECTIONS. VERIFY WITH THE <br />E - - - EQUIPEMENT VENDOR. E <br />5 CONTRACTOR TO CONFIRM CRITICAL LIGHT FIXTURES IN THE ROOM ARE <br />j s <X> PROVIDED WITH INTEGRAL BATTERY PACKS. FIXTURES WITHOUT INTEGRAL <br />1 I BATTERY PACKS SHALL BE RETROFITTED WITH NEW INTEGRAL BATTERY PACKS. <br />BATTERY PACK SENSE LEGS SHALL BE TAPPED ON THE LINE SIDE OF THE SWITCH. <br />s� KEY NOTES <br /><X> < <br />�� ,- 1201 NEW EMERGENCY POWER OFF (EPO) SWITCH. PROVIDE 2#12 & 1#12G IN 1/2" CONDUIT <br />R,.-.N, BETWEEN MAIN POWER SWITCH FOR EQUIPMENT (SEE NOTE 204) AND FROM THE FIRST EPO <br />ZU TO THE SECOND EPO. EPO SHALL SHUNT TRIP THE MAIN POWER SWITCH. <br />202 EXISTING "IN -USE" LIGHT TO BE REUSED. PROVIDE A 1/2" CONDUIT WITH 2#12 AND 1#12G <br />FROM THIS LOCATION THROUGH VD1 (REFER TO NOT 205) AND CONNECT TO RELAY <br />CIRCUITRY PROVIDED BY CYSTO EQUIPMENT VENDOR. EXTEND POWER CONNECTIONS <br />FROM EXISTING LIGHT LOCATION. CONTRACTOR TO REUSE EXISTING DOOR SWITCH TO <br />09 <br /><X> CONTROL "IN -USE" LIGHT. <br />203 EXISTING LINE ISOLATION MONITORS FOR ISOLATION POWER PANELS. <br /><R> <R> 204 NEW ENCLOSED CIRCUIT BREAKER MAIN POWER (MP) SWITCH WITH SHUNT TRIP. <br />205 NEW VERTICAL WALL DUCT (VD1) FOR THE INSTALLATION OF THE RELOCATED CYSTO <br />EQUIPMENT. WALL DUCT 18" WIDE, 3-1/2" DEEP AND SHALL BE EXTEND FROM FLOOR TO <br />CEILING. PROVIDE AN 18" SQUARE OPENING IN THE BOTTOM OF THE DUCT FOR <br />< < CONNECTIONS TO THE CYSTO EQUIPMENT CABINET. <br />206 NEW VERTICAL WALL DUCT (VD2) FOR THE INSTALLATION OF THE RELOCATED CYSTO <br />a - - EQUIPMENT. WALL DUCT 10" WIDE, 3 1/2" DEEP AND SHALL BE EXTEND FROM FLOOR TO <br />I CEILING. PROVIDE AN 10" REMOVABLE SQUARE OPENING IN THE BOTTOM OF THE DUCT FOR <br />CONNECTIONS TO THE CYSTO CONTROL EQUIPMENT. <br />207 NEW JUNCTION BOX (P2) ABOVE CEILING WITH FACE MOUNTED FLUSH TO THE CEILING. SIZE <br />. , JUNCTION BOX TO ALLOW FOR CONDUIT CONNECTIONS AS INDICATED IN THE CONDUIT <br /><X> <X> SCHEDULE. PROVIDE A 4" GROMMETED OPENING IN THE FACE OF THE JUNCTION BOX FOR <br />Sod .»> r <br />_- ---- = ---.---_ - CONNECTIONS TO CYSTO EQUIPMENT. ALL CABLING IN THE JUNCTION BOX THAT IS NOT <br /><X> <X> RATED FOR 600V INSULATION SHALL BE PROVIDED WITH ZIPPER TUBING RATED AT 600V. <br />SIMILAR VOLTAGE CLASSES MAY BE GROUPED TOGETHER IN THE SAME ZIPPER TUBING. <br />- - - JUNCTION BOX SHALL HAVE REMOVABLE COVER. <br />209 EXISTING DOWNLIGHTS TO BE DEMOLISHED. ALL OTHER LIGHTING AND CONTROLS IN THIS <br />SPACE ARE EXISTING TO REMAIN. <br />0 <br />C <br />U <br />A <br />v <br />rn <br />0 <br />v <br />N <br />O <br />(V <br />CD <br />3 ELECTRICAL DEMO LIGHTING PLAN <br />1/4" = V-0" <br />CYSTO EQUIPMENT CONDUIT SCHEDULE <br />FROM <br />TO <br />DESCRIPTION <br />MP <br />VD1 <br />MAIN POWER FEED. REFER TO ONELINE. <br />P2 <br />VD1 <br />(3) 3" - MAXIMUM LENGTH OF 25' <br />P2 <br />VD1 <br />(2) 2-1/2" - MAXIMUM LENGTH OF 25' <br />P2 <br />VD1 <br />(1) 1" - MAXIMUM LENGTH OF 25' <br />P2 <br />VD2 <br />(1) 3% MAXIMUM LENGTH OF 41' <br />P2 <br />VD1 <br />VD2 <br />VD2 <br />(1) 2-1/2" - MAXIMUM LENGTH OF 35' <br />(2) 2-1/2" - MAXIMUM LENGTH OF 39' <br />VD1 <br />VD2 <br />(1) 2" - MAXIMUM LENGTH OF 39' <br />E <br /><2> - <br />�� <br /><5> <br />3> I - <br />3> <br /><R> <br />_ <br /><X> x= <br /><X> <br />7 <br />15 .... ,-.._.,.. <br /><X> <br /><X> <br />X> <br /><X> <br />10 <br />10 <br /><X> <br />r M L, <br />r'' <br />_ <br /><X> <br /><X> <br />11 <br />7 <br />8 <br /><X>' <br />5 <br /><XXX><X> <br />3 9 9 <br /><X> <br />3 <br /><X> <br />11 <br /><X> <br />03 <br />11 <br /><X> <br />_ <br />6 <br />03 <br />CODE BLUE <br />STAFF <br /><X> <br />ASSIST <br /><X> <br /><X> <br />4 <br />-6 <br />-MON <br />wt <br />3NOR 3COR <br />0 <br />Q <br />2 ELECTRICAL NEW POWER PLAN <br />1/4" = 1'-0" <br />ELECTRICAL DEMO POWER PLAN <br />1/4" = 1'-0" <br />chapuis design group <br />arch itecture. pa <br />510 Vonderburg Drive I Suite 216 Brandon, <br />Florida 33511 1813.667.2340 <br />CGDPA - FL # AA-26003049 <br />exp U.S. Services Inc. <br />t: +1.407.660.0088 f: <br />+1.407.660A655 <br />2601 Westhall Lane <br />Maitland, FL 32751 <br />USA <br />www.exp.com <br />•��> <br />Project #: 21005054 <br />x <br />Cert of Auth: 29701 <br />• <br />P <br />D <br />PROJECT FOR <br />ADVENT HEALTH - <br />ZEPHRYHILLS <br />OPERATING ROOM <br />5- CYSTOSCOPY <br />7050 GALL BLVD. <br />ZEPHYRHILLS, FL 33541 <br />,.ventrHea1th <br />MARK DATE DESCRIPTION <br />PROJECT NUMBER 042-21-177.01 <br />ORIGINAL ISSUE 03/17/21 <br />PROJECT MANAGER TEC <br />PROJECT DESIGNER n/a <br />PROJECT ARCHITECT THOMAS E. CHAPUIS AR 97109 <br />B LANDSCAPE ARCHITECT +n/a <br />CIVIL ENGINEER <br />n/a <br />STRUCTURAL ENGINEER <br />n/a <br />MECHANICAL ENGINEER <br />TIMOTHY P. PENNOCK PE 54516 <br />ELECTRICAL ENGINEER <br />CHARLES T. ALEXANDER PE 76422 <br />INTERIOR DESIGNER <br />n/a <br />EQUIPMENT PLANNER <br />n/a <br />DRAWN BY <br />Author <br />-0di' � tTt•r A L� r f� ffdf <br />x94,, <br />4 � • P <br />4 � <br />V No. 76422 • �� <br />51/ylam l <br />STATE OF • 40 <br />NAI. v <br />'��r►rrrttt`�� <br />ELECTRICAL PLANS <br />DEMO AND NEW <br />A <br />PROJECT <br />NORTH SCALE �1/4"=,'-0" <br />El 01 <br />m <br />2 <br />3 <br />4 <br />5 <br />6 <br />Project Status <br />