Laserfiche WebLink
1 � I <br />AnviBtoNo my <br />i <br />PLUMBING GENERAL NOTES <br />1. FURNISH LABOR, MATERIAL AND EQUIPMENT NECESSARY FOR AND <br />REASONABLY INCIDENTAL TO COMPLETION OF PLUMBING WORK AS <br />INDICATED ON DRAWINGS AND NOTED . BELOW. <br />2. ALL PLUMBING WORK SHALL BE INSTALLED PER THE RULES AND <br />REGULATIONS DEPARTMENT, STATE PLUMBING <br />E TIONS OF THE STALE HEALTH DEPAR TA E <br />CODE ' (LATEST EDITION) AND LOCAL ORDINANCES HAVING <br />JURISDICTION OF PROJECT SITE AREA. PAY FOR ALL PERMITS, <br />FEES AND INSPECTIONS. <br />3. GUARANTEE ALL MATERIALS AND WORKMANSHIP FOR ONE YEAR, <br />4. ARCHITECTURAL DRAWINGS TAKE PRECEDENCE OVER PLUMBING DRAWINGS <br />WITH REFERENCE TO BUILDING CONSTRUCTION. PLUMBING DRAWINGS <br />CPLANS, DIAGRAMS, ETC.) ARE DIAGRAMMATIC AND SHOULD NOT BE <br />SCALED. THE CONTRACTOR SHALL COORDINATE ALL WORK UNDER THIS <br />CONTRACT. <br />S. THE OWNEER WILL NOT BE HELD LIABLE FOR FIELD CHANGES THAT <br />ARISE FROM CONTRACTOR ERROR OR OMISSION OF MATERIAL OR <br />WORKMANSHIP IN WORK PERFORMANCE. <br />S. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR <br />COMMUNICATION WITH THE LOCAL BUILDING DEPARTMENT AND <br />INSPECTION PERSONNEL TO REVIEW CONTRACT DOCUMENTS PRIOR TO <br />INSTALLATION. <br />7. MAINTAIN AS -BUILT DRAWINGS, DAILY. SUBMIT TO ARCHITECT/OWNER <br />AFTER COMPLETION OF ALL WORK. <br />B. CHECK OUT AND CONNECT ALL FIXTURES AND EQUIPMENT REQUIRING <br />PLUMBING. <br />S. NECESSARY, OBVIOUSLY REQUIRED PLUMBING ITEMS THAT ARE NOT <br />SHOWN ON THE DRAWINGS DOES NOT RELIEVE THE CONTRACTOR FROM <br />HIS RESPONSIBILITY TO INSTALL A COMPLETE OPERATING PLUMBING <br />SYSTEM, <br />10. IF ANY DISCREPANCIES SHOULD EXIST THE CONTRACTOR SHALL <br />NOTIFY THE ARCHITECT PRIOR TO BIDDING. <br />11. THE PLUMBING CONTRACTOR SHALL COORDINATE ALL.PLUMBING WORK <br />WITH ALL TRADES THAT MAY BE AFFECTED BY HIS WORK. <br />12. ALL PLUMBING FIXTURES SHALL BE SELECTED BY THE OWNER AND, <br />INSTALLED BY THE CONTRACTOR. (PLUMBING FIXTURES INDICATED ON <br />DRAWINGS ARE FOR REFERENCE ONLY, FIXTURES OF EQUAL QUALITY <br />AND CRAFTSMANSHIP MAY BE USED AS DIRECTED). <br />13. UNDER.FLOOR SEWER AND BRANCHES WITHIN THE BUILDING SHALL BE <br />EXTRA HEAVY CAST IRON SOIL PIPE AND.FITTINGS. (PVC PIPING <br />MAY BE SUBSTITUTED WHERE LOCAL.�`CODES PERMIT WITH THE <br />ARCHITECTS APPROVAL. <br />lit. PROVIDE ALL CUTTING REQUIRED FOR THE INSTALLATION OF <br />PLUMBING WORK. FINISH PATCHING SHALL BE COORDINATED WITH <br />THE GENERAL CONTRACTOR. <br />15. PIPING MATERIALS SHALL MATCH EXISTING. CUT AND REPAIR <br />EXISTING FLOOR AS REQUIRED. CIF APPLICABLE) <br />16. ALL SOIL AND WASTE PIPING SHALL HAVE A SLOPE OF 1/4" PER ONE <br />FOOT LENGTH OF.PIPE. <br />17, ALL FLOOR DRAINS TO BE PROVIDED WITH TRAP PRIMER AND VENT <br />PIPE CONNECTION. RUN WATER AND VENT PIPING IN TRENCH WITH <br />WASTE PIPING. RUN VENT PIPING AT A HIGHER ELEVATION IN <br />TRENCH THAN WASTE PIPING TO PREVENT WATER AND GAS BUILD-UP <br />IN VENT, <br />IS. FINAL WATER PIPING ROUTING SHALL BE COORDINATED WITH THE - <br />GENERAL CONTRACTOR. <br />19. ALL EXTERIOR UNDERGROUND WATER PIPING SHALL BE TYPE "L" HARD <br />COPPER TUBING. PIPING INSIDE OF BUILDING SHALL BE TYPE "M" <br />HARD COPPER. <br />20. ALL WATER PIPING SHALL BE SUPPORTED RIGIDLY AND IN LINE <br />FROM BUILDING STRUCTURER. OFFSET PIPING TO AVbID STRUCTURAL <br />MEMBERS, CANTS, FLASHING, MECHANICAL AND ELECTRICAL <br />EQUIPMENT. ETC. <br />21. ALL FIXTURES AND EQUIPMENT SHALL HAVE SHUT-OFF VALVES AT OR <br />NEAR EQUIPMENT. <br />22. AIR CHAMBERS SHALL BE INSTALLED IN ALL LOCATIONS WHERE <br />REQUIRED. (JOSAM OR APPROVED EQUAL). <br />23. ALL HOT WATER PIPING SHALL BE INSULATED WITH 1/2" FOAMED <br />PLASTIC INSULATION. (ARMSTRONG ARAMAFLEX OR, APPROVED <br />EQUAL). <br />rN <br />W [TF11 N --WALLS AS l N1 1 ATD _ AN ID/o1 _ .. _ .FLGoIRL_ STAW0- W ITH - 314 ReLIE= LINE WEST TENANT 97PACE O-R9LL__ REMAI N A9 <br />lei- SEE pL.I,tMj2PING IXTURE: 4- CONHE./I 1014 1E- D AIH 10AN LINE TO D19CAARQE 00- vi E Iv FlEi-D __Y�K1_FY EXACT' I^0�1D1Tt0N <br />:DULE FOI�2 �"[�'[ fJ� 51Z1 NCa Fl I=Lp-CaOl�I Na`�`� _ ACT �1TQ--�RAaa (�� aETAI L) <br />- EX STI N� _ 2" VENT TH IZ�I- �Zo�oF 51-1ALL t 71 H l .t t -1� (FI VE-- <br />- <br />- f2ELOCATEb To W l TH i N t4ew WALL ( FI E:1 RI FY EXACT CoNh1T I ONS) <br />-GNAT <br />-- <br />-- HW------�j <br />THERMOMETER <br />VACUUM RELIEF, <br />— —"" CW <br />— <br />VALVE REQUIRED <br />COLD WATER SUPPLY <br />ON HEATERS (NOT <br />EQUIPPED WITH <br />ANTI -SIPHON <br />TUBES OR BOTTOM <br />INLETS) <br />BLADDER TYPE <br />EXPANSION TANK <br />AMTROL #AST-5 <br />HOT WATER SUPPLY <br />HEAT TRAP <br />ISOLATION <br />TEMP. & PRESSURE <br />BALL VALVES <br />RELIEF VALVE <br />UNIONS (TYP) <br />S li <br />WH <br />ROUTE 1" DRAIN <br />AND RELIEF PIPE <br />SEE E <br />PLASTIC DRAIN, <br />TO OUTSIDE <br />DETAI' <br />PAN, 2" DEEP - <br />111 c <br />HU WATEGI <br />ELECTRIC WATER HEATER PIPING SCHEMATIC <br />NTS <br />2- LEV'EL H IGH1L0W DR1 N KI N(,- FOUWTAIN <br />MALL MOUNTED AT RE ,lrLU AR HAND I CAF— <br />_HE:1 rrHT'a ' (FI ELo CO RD I NATO <br />TABLE 604.4 <br />MAXIMUM FLOW RATES AND CONSUMPTION FOR PLUMBING FIXTURES AND FIXTURE FITTINGS <br />PLUMBING FIXTURE <br />OR FIXTURE FITTING <br />rLava;tor)�,rivate <br />MAXIMUM FLOW RATE <br />OR QUANTITY <br />2,2 gpm at 60 psi <br />Lavatory, public (metering) <br />0,25 gallon per metering cycle <br />Lavatory, public <br />(other than metering) <br />0-5 gpm at 60 psi <br />Shower head <br />2.5 gpm at 80 psi <br />Sink faucet <br />2.2 gpm at 60 psi <br />Urinal <br />1.0 gallon per flushing cycle <br />Water cioset <br />1.6 gallons per flushing cycle <br />PLUMBING SYMBOL LEGEND <br />6YMI50L. <br />1G'3�ScRipiloN <br />c.OLO WATr-e nFle <br />.. <br />NOT WATEK M PE <br />------ <br />VI=QT' PIPS. <br />DI G �j pFtPTMO P IT wor—A-n <br />0 <br />915--L.I9SFr- DRA11J 0RA0J PAID LIW r <br />TE \ALV1r <br />—..—.a TP <br />TRAP C'I�jMir2 <br />- --G Ret <br />3/d" . NOgE vie)b <br />G-0 L�� <br />CL.EAI.I-�T <br />F0.4_ <br />FL00K, OPAA j <br />4f fl` ('�i <br />VE.QT THKk-L KOOF- <br />TMI 1PI5'1;ATUKE y 10RE5W12= AhW F-P- .IMF VALVE <br />�--X I w I l Wq E%L1 LD1 W,- 3/q0} WATEIe. <br />St -Mq-Y L I N E Polk TENANT I I <br />9TU156W OUT W MA 5HuT-OFF --- <br />VALVE Al?)OVE CAI LI NG (FIE/a <br />YWI FY EXAC`I"' COW ID ITI ONs) <br />MT3LCFMTFR BACKFOW IEEJTE:R C ELD <br />VEh1 FY <br />WATER HAMMER ARRESTOR <br />-ONNECTION SCHEDULE <br />FIXTURE TYPE <br />'" 1M —74 111#L,-1_�_r•�•1-d11rA 1 <br />T= <br />MP <br />jTN• <br />rap) 'a/���■I—sri`•�1ii��■�■ <br />rri <br />�� cu� ►. .aka_--w�. �_�►��r►•■ <br />r�•�wi-w <br />--^IiIC•.r�'a�i:��]/� <br />�I�'I•\►�R�7sa1''I"M <br />11.Li <br />�i •_ ,f�..` <br />Gisa�/.:7 <br />"� : J _ :. <br />t� <br />Garr �' <br />� <br />® <br />r:�ru"aiG <br />• <br />�,.E:�� <br />�� � _ - •_. - . � _ z _ - _ f�"T� !' �i ti'9 1. L ,...'.�1 <br />�� <br />�%I�01 <br />zi=1La1 <br />�w[, <br />1 <br />EQUAL TO PRECISION PLLA4*JG <br />PRODUCTS MODEL WITH <br />(SWEAT CONNECTION) --\ LI: <br />BRANCH IN <br />Rao <br />$- a <br />y^j <br />IdolA� <br />If <br />....W. a <br />k > 1d <br />10I x <br />PPP SIZING CHART <br />FlXTURE <br />UNITS <br />SIZE <br />(SWEAT) <br />PART <br />NUMBER <br />SWA-= <br />12-32 <br />3/4' <br />SWA-750 <br />33-60 <br />f <br />SWA-10W <br />61--w <br />r/4" <br />SWA-1250 <br />714--154 <br />11¢" <br />SWA-1500 <br />155-330 <br />z* <br />SWA-2000 <br />DROP TO PLUMBING <br />FIXTURES <br />NOTES: <br />1 . PROVIDE A WATER HAMMER ARRESTOR ON EACH <br />HOT WATER AND COLD WATER DROP, <br />2. ARRESTORS SHOULD ALWAYS BE INSTALLED SO <br />THAT THERE IS AN UNOBSTRUCTED SHOCK PATH <br />TO THE ARRESTOR. <br />3. ARRESTORS SHOULD ALWAYS BE PLACED AS NEAR <br />TO THE SOURCE OF SHOCK AS POSSIBLE. <br />WA <br />SCALE: <br />J <br />I <br />