Laserfiche WebLink
4 1/2" DRYWALL DOOR JAMB (REFER 1x4 1/2" DRYWALL DOOR JAMB (REFER 1x4 1/2" DRYWALL <br />UNACCEPTABLE INSTALLTION <br />♦� <br />DOOR JAMB (REFER TO PRODUCT <br />TO PRODUCT . TO PRODUCT <br />M'' 8., <br />DO NOT DO THIS ♦♦ <br />PROPER INSTALLATION ♦ ♦ <br />2"x BOT. PLATE W/ (2)10d @ 6" O.C.. <br />APPROVAL FOR CONN. APPROVAL FOR CONN. <br />APPROVAL FOR CO1x4 E 1 X 4 <br />1 x4 P.T. L <br />7 <br />t <br />♦ ♦ <br />�♦ #5 REBAR (TYP,) ♦♦ <br />♦♦ <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />BOTTOM PLATE W/ 8d 4" <br />3/16"0 X 3" LONG FURRING <br />3-1/4" LONG X 31'16"0 ' " E FURRING i - FURRING (2) ROWS 3/16" x 3-1/2" <br />#5 REBAR ♦♦ <br />TYP ♦♦ ♦♦ <br />(TYP,) <br />AND NAILED W/ 8d COMMON @ <br />6" O.C. EDGES AND 12" O.C. FIELD <br />O. D <br />O.C., 2 ROWS STAGGERED <br />TAPCON @ 16" O.C. & 4"LL,2X8 <br />TAPCON. INTO STAGGERED <br />STAGGERED IN 16 <br />♦♦ ♦♦ <br />1x8 P.T. FROM EACH END w/ MIN. 1X8 <br />BLOCK@ SPACING 1" DETAIL O.C. 2-ROWS INTO 2" EDGE DIST. ATTACH <br />JOIST W/ FACE NAIL <br />PER MANUFACTURE MASONRY THROUGH „ <br />1-1 /2 DETAIL 1x8 w/ (2) ROWS 8d NALS 3rr DETAIL <br />♦ #s�D.90 HOOK (�'P) <br />'♦♦♦ <br />@BAND <br />@TOP & BTTM CHORD, AND (8) <br />8) <br />1x4 P.T. & 1x8 P.T. STAGGERED @ 12" O.C. <br />FILL SOLID HOOK (TYP.) �•• <br />BOTH CELLS ♦ ♦ <br />FACE NAILS 10d TRUSS VERT. <br />WEB <br />TAP x 3 -1/2" DOOR JAMB (REFER <br />TAPCON @ 16" 1x4 P.T. TO PRODUCT <br />J <br />METAL SEAT PLATE <br />O.C. & 4" FROM DOOR JAMB (REFER 1/2" DRYWALL <br />NOTE: <br />APPROVAL FOR CONN. 1x4 <br />EACH END W/ MIN TO PRODUCT <br />1117 M/ <br />LAP SHEAOF THING TO <br />DOOR JAMB (REFER <br />2" EDGE DIST. APPROVAL FOR CONN. 2x8 P.T. w/ (2) ROWS 3/IL <br />16" <br />TO PRODUCT <br />♦♦ ♦♦ <br />BOTTOMD <br />PICAL ND <br />x 3-1/2" TAPCON @ 16" <br />♦ ♦ <br />APPROVAL FOR CONN. (2) ROWS 3/16 x 3-1/2 1x4 <br />O.C. & 4" FROM EACH FURRING <br />it <br />♦ ♦♦ <br />TAPCON @ 16" O.C. & END w/ MIN. 2"EDGE DIST. <br />1:14" <br />♦ NOTC,,�I=o FIRST COURSE <br />"�♦: <br />SIMPSON HGAMIOKTA @ 12" O.C. <br />FROM EACH END w/ 2x8 P.T. ATTACH SECOND PLY w/ <br />♦♦♦ +2r <br />w/ (4)114x1 1/2" SDS SCREWS <br />MIN. 2" EDGE DIST. 2 ROWS 10dx3" 2x8 <br />2x P.T. AS REQ D ( ) <br />♦ ♦ <br />INTO BAND JOIST & (4) 1/4"x2 3/4" <br />2x DETAIL 2 1 /4" DETAIL STAGGERED @ 12" O.C. 3-1 /4" DETAIL <br />NOTCH WEB AT THE ♦♦♦ ♦♦♦ <br />FIRST 2 COURSESFILLED <br />TITEN INTO K.O. BLOCK <br />#5" ♦♦♦. <br />, <br />.♦♦♦ <br />BUILDOUT OVER SIZE DOOR -WINDOW ROUGH OPENINGS CC <br />CELL PER <br />FOUNDATION PLAN <br />FILLED CELL INSTALLATION KH"� <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. SS <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />SCALE: N.T.S. <br />SS <br />2x8 P.T. BUCK -CONNECT TO BLOCK SECTION <br />A <br />-A <br />UPLIFT CAPACITY = 805 # FOR 1 STRAP <br />W/ 1/4" x 31/4" TAPCON (1 1/4" MIN. <br />=1610 # FOR 2 STRAPS <br />FILL 1st4 COURSES <br />EMBEDMENT INTO BILK.) 1/4" MAX <br />� SOLID WIGROUT <br />7-0. 8 <br />1 PLY PRE-ENGINEERED TRUSS <br />SEE ARCH PLAN AND <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. <br />1/4" x 31/4" TAPCONS <br />PRSEE <br />BLOCK HEADER ARCH BLKG. & BUCK <br />SIMPSON HM9KT w/ (4)1/4"x1 1/2" SDS <br />OTEUS BELOW70, <br />1/2" DRYWALL * <br />SCREWS & (5)1/4" x 21/4" TITEN (IF TRUSS <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16)16d <br />8d NAILS AT 8" O.C. AT BUCK <br />SINKERS AND (7)1/4"x2 1/4" TITEN = 2150 #) <br />2x SUB FASCIA <br />2 x 8 45 DIAGONAL (4)10d NAILS INTO <br />LEAVE A CUTOUT IN O.S.B.ON THE <br />'�- <br />ALUM DRIP EDGE <br />BRACES) 2 x 8 BRACE/ BLKG. <br />INSIDE TO ALLOW FOR INSULATION <br />7/16" OSB <br />TO BE INSTALLED <br />BOND BEAM OR CAST IN PLACE BEAM <br />I I ALUM FASCIA <br />BRG WALL TYPE —I-- <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />CUT HOLE IN O.S.B. FOR <br />BUILT UP PLWD. BUCK ARCH PANEL POLY -CELL IN THIS AREA <br />2 x 8 45 DIAGONAL BRACE AT EA. <br />I <br />PER PLAN I I 1-3/4" TRIM PAINTED <br />1- <br />CONTACT ENGINEER OF RECORD FOR •. <br />FURTHER INSTRUCTIONS. �• <br />SCRIBE (NOTCH) <br />BACKSIDE TO FIT ARCH (4)10d NAILS INTO 2 x 8 <br />FACE OF ARCH W/ (3)10d NAILS <br />AT EA. END <br />RETROFIT TRUSS DETAIL <br />I I NAIL w/ 5/16" HEAD <br />F CHANNEL, <br />DIA. @ 24 O.C. <br />OVERHANG" <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />N.T.S. <br />FASTENED PER <br />NOTE 2 BELOW—L--�- CONT VENTED OR SOLID SOFFIT <br />INSTALL WDW. SCREW ANCHOR- x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 <br />PROVIDE TAPCON WITHIN <br />CONT 2x4 NAILED TO 2x BLOCKING NAILED TO TOP <br />RETROFIT WALL OVERHANG DETAIL (NTS) <br />INTO ARCH BLKG. PER <br />4" MIN, OF BRACE <br />BLOCKING w/ 2-12d NAILS (**) CHORD EVERY OTHER TRUSS <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />2X6 SYP #2 CONT, (MATCH TRUSS DEPTH <br />w/ 3-12d NAILS, TYP. ("*) <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />START OF ARC <br />) O , �� <br />IFTRUSSES USED O.C.3 #6 X F WOOD <br />SCREWS 16" MAX. OR IF MASONRY WALL <br />--- -- - <br />1. G.C./ BUILDER TO VERIFY/PROVIDE SOFFIT MATERIAL SPAN CAPACITIES BASED <br />NOTE: FOR OVERHANGS LESS THAN 3/4" -NO REPAIR REQ'D. <br />@ . <br />ON THE DESIGN PRESSURES SPECIFIED FOR COMPONENTS AND CLADDING <br />ARCH DETAIL i <br />4' MAX. RAD. <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ , <br />LISTED IN THE DESIGN CRITERIA ON SHEET SN. <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />2. FOR SOFFIT ATTACHMENT AT WALL (PER ALPHA ALUM. INC. FL# 16544 R5 FL <br />Lr L_ n <br />'IL_ O 5 O <br />SCALE: N.T.S. SS <br />i2 <br />JACK TRUSS PROVIDED BY SEE <br />PRODUCT APPROVAL) F CHANNEL FASTENED TO: <br />TRUSS COMPANY OR <br />- CMU w/ T NAIL .097" DIA. @ 24" O.C. w/ 5/8" MIN. EMBEDMENT <br />PLAN <br />x # <br />- WOOD w/ (3) 16 GA. 3/4"x1/4" CROWN STAPLES @ 24" MAX. O.C. IN DIAMOND <br />INISH FLO <br />WITH 1QR <br />SECTION <br />6/4'C 31/4ONNECT TO " TAPCON BLOCK (1 1/4" MIN. <br />ROOF SHEATHING ATTACHED / <br />PATTERN <br />- SUB FASCIA w/ 16 GA. 3/4"x1/4" CROWN STAPLE EACH GROOVE <br />@ <br />�.► ► iD <br />B_B <br />EMBEDMENT INTO K.) <br />PER NAILING SCHEDULE ALL <br />• <br />' ►•ILINTOP <br />/4" MAX <br />STRUCTURAL SOFFIT <br />•' #5 BAR <br />10 • CENTERED W/ <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />(5)12d NAILS SIMPSON <br />H2.5A w/ (10) <br />S F01 <br />V .' • .. ► • : g <br />► '► 4 <br />1 X 4 FURRING <br />BLKG, &BUCK <br />2X6 TO 2X4 <br />SCALE: 3/4" = 1'-0" (**) FOR ALUMINUM SOFFITS WITH SPANS <br />• KNOCKOUT / N <br />8d NAILS <br />'-4 ,4 <br />REV. 09.23.2021 > 1 INSTALL MID SPAN BLOCKING PER <br />_ ► •� •• <br />THE SOFFIT FL PA INSTALLATION CRITERIA <br />_. _ :; ° CHAIR BLOCK <br />8d NAILS @ 8" O.C. AT BUCK <br />2 x 8 VERT. W/ (2D <br />NAILS AT EA. END <br />PROVIDE 2x <br />'• <br />*REFER TO THE PRODUCT APPROVAL FOR INSTALLATION DETAILS.* <br />b <br />MONO FOOTING Aj ° <br />PROVIDE 2 x 8 DIAG, BRACE B <br />PROVIDE 2 MIN. <br />O <br />• <br />CONT. W/ (3) <br />' <br />•' i' ► <br />SIZE AND REINF. PER PLAN <br />VERT. BRACES WHEN HGT. OF <br />TAPCON AT EA. SIDE <br />12d NAILS <br />AND SECTION DETAILS � <br />BRACE EXCEEDS 24" <br />BUCK - (1) WITHIN 4" <br />JACK TRUSS PROVIDED BY <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />'" • <br />CLEAN FILL • ► <br />2 x 8 VERT. BRACE(S) <br />INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24" O.C. <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />.► <br />DIRT 6 z <br />TO BE INSTALLED <br />'-k <br />MAXAX <br />TRUSS AS SHOWN FOR O.H. UP TO <br />OVF <br />� <br />STANDARD <br />• ST <br />BUILT UP PLWD. BUCK - <br />Ryq * DOUBLE 2x4 SCAB FOR Z-6" TO 4'-0" O.H. <br />°. 9 <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />+ (F <br />+ + /VGT (2)10d NAILS @ 8" O.C. <br />H <br />HOOK N <br />#5 BAR IN <br />TO FIT ARCH CONNECT W/ <br />START OF ARC <br />NOTE: IF TRUSSES USED) W/ (2) #6 X 4Y2' WOOD <br />+ TO TRUSS TOP CHORD <br />FILLED CELL �.� <br />�.- <br />8d NAILS <br />2 x4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />4' MAX• RAD. <br />SHED ROOF ENDS TO BE SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />+ <br />+ <br />. _ .�• ._ �.� <br />' <br />BTWN. OSB ARCH FACES W/ (4)1 Od NAILS EQUAL EQUAL <br />GABLE ONLY, CORNERS WALL USE 2 1/4" X 31/2" TAPCONS AT 16" <br />() <br />PLYWOOD SHEATHING <br />•; <br />INSTALL WDW, SCREW <br />THRU OSB INTO 2 x 8 <br />SHALL NOT BE FRAMED AS O.C. <br />+ <br />' b* <br />ANCHOR INTO ARCH BLKG. <br />HIP. <br />+ <br />STEMWALL FOOTING SIZE AND <br />PER INSTALLATION DETAILS <br />ARCH DETAIL �( <br />B_B <br />DESIGNED ONLY FOR THE SECTION @ENTRY L <br />BLOCKING AS <br />REINF. PERLAN AND STEMWALL <br />_ <br />SCALE: N.T.S. SS <br />INSTALLATION OF SHINGLE „_ <br />SCALE: 3/4 - 1-0 SS <br />TRUSS + REQUIRED TO <br />I <br />MONO TO STEMWALL FOOTING SECTION DETAILS <br />AND METAL ROOF FINISH <br />SUPPORT SOFFIT <br />2X4 SYP L. L. <br />SCALE: 3/4" = V-0" <br />EACH TRUSS <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJECT, <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />CONNECTOR °'� ° <br />CONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />SEE LINTEL <br />EXTENDS TO SILL. <br />EXISTING BOND BEAM. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />SCHED. <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />REINFORCING. PROVIDE LOWER HOOKED DOWEL <br />ENTER SO IT <br />DRILL 3/4"x5"MIN. HOLE SET BAR IN <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />EPDXY CAP TO PREVENT LEAKAGE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE EXPANSION STRIP <br />PRECAST LINTEL —/ <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />% I <br />SEE ELEVATION <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />FOR OVER HANG <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY ± 2") <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />W.W.M. AT PERIMETER <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. 1/4" EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />(MAX. 4'-0") <br />} #5x6' EMBEDDED INTO EXISTING BOND BEAM <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS 9 ga. PANEL PER ANCHOR) <br />#5 CONT. TOP & MID OCCURS <br />SECTION @ ROOF EXTENSION rM <br />z <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING REINFORCING <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />WITH MIN. 3"COVER 6r�rr <br />SCALE: 3/4" = 1'-0" <br />SS <br />0 <br />(EVERY OTHER <br />< FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. COURSE) EXPANSION STRIP <br />U. w NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />° <br />p c� <br />SEE SHEET D2 AND <br />SIMPSON HTT4 w/ (18)10d x 1 <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />a X <br />w A <br />a <br />REINFORCING AS FOLLOWS: <br />;.:;; <`; SEALANT <br />r <br />FLOOR PLAN FOR <br />1/2„NAILS TO STUDS & (1) - MORE INFO <br />Q Cn 1 <br />* LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />PLACE LO 0 <br />e <br />5/8 DIA. ALL THREAD ROD <br />J <br />#5x6' EMBEDDED INTO <br />T <br />* PRESS PANEL REINFORCING INTO PLACE. = <br />6" MIN. LAP SPLICE W/ <br />° ° <br />EPDXIED w/ SIMPSON "SET" <br />z <br />EXISTING FOOTING (2) #5x6' IN CONC. <br />* COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL REINFORCING PANEL <br />EPDXY MI NT & <br />N. 6" EMBEDM E <br />FILLED CELL <br />SMOOTH. DO NO FURROW, <br />° o ° <br />3" MIN. EDGE DISTANCE <br />c`nv <br />DRILL 3/4"4" MIN. HOLE <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />GRADE >. o <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. 6" MIN. LAP <br />u . <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST SPLICE <br />NOTE: <br />i" p <br />`' <br />REMAIN FREE OF MORTAR. <br />z \ ' <br />' <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS SEE GLASS BLOCK INSTALLATION NOTES. <br />r <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE SEALANT <br />, ° <br />4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. GLASS BLOCK DETAIL <br />xv\ ° (2) #5 REBAR. (1-STORY) <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16" MIN. (1-STORY) (3) #5 REBAR. (2-STORY) <br />A SECTION <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />20"MIN. (2 STORY) WITH MIN. 3" COVER EA. WAY <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />00, <br />SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />SECTION AT DEEP MONO FOUNDATION <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS, <br />RETROFIT FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />REV. 07.28.21 SCALE: 3/4" = V-0" <br />RETROFIT FOR MISSING <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />MSTAM STRAP <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />SCALE: 3/4" = V-0" <br />o o <br />C" Cal <br />cC - 0. <br />-a <br />Q C. fi <br />a, <br />'N <br />C}- D <br />C ric <br />s � JI Li <br />C <br />°W <br />0 <br />CV <br />CM <br />aLC <br />����!1! <br />. <br />.` O ' GES G`in'��� <br />Co <br />No PVF.'* <br />STAT <br />"+/ �i <br />r 1` <br />`•��:iiPlt�tti``� <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code _ <br />Residential 7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />a U9 <br />n <br />O ao �i u wa <br />di N E, V LL ry <br />Q <br />LL LL a <br />113 <br />°IL <br />io <br />EG xO <br />� <br />Wrnca _j <br />¢d <br />_ <br />z O <br />it " <br />8Z d< 58 <br />W ❑ ❑ ❑ <br />z <br />z <br />z <br />� <br />aE3 <br />a <br />N <br />- <br />� z <br />LL <br />�-JLU <br />N <br />U � <br />—� <br />O Lir <br />Un <br />c m <br />C <br />U � <br />0• <br />Q N <br />Cl) <br />M <br />M <br />J <br />y <br />z Q <br />LL_ <br />E 0 <br />c g <br />s <br />Q <br />0o <br />a <br />Z <br />O E <br />R° <br />�� <br />n <br />a <br />N <br />no <br />(p C <br />C <br />or <br />y� <br />�LL <br />ri <br />N J� <br />f <br />4Z4 <br />JU <br />az <br />W <br />T <br />U <br />�w <br />JCD <br />NLL <br />-0 <br />LO <br />> (O <br />T <br />ca <br />ca <br />� <br />c�fl <br />r <br />� <br />L <br />NLMO <br />CV <br />1co <br />,-- <br />CO <br />V <br />U) co <br />T <br />N <br />�— <br />0 <br />� <br />+-r <br />CV <br />LO <br />-� o <br />M <br />T— <br />N <br />U-) <br />CO <br />r C7 <br />r <br />E <br />M <br />o <br />Z <br />N <br />Z <br />W <br />j N <br />E r <br />`m <br />c <br />a <br />U 0 Q oO <br />JOB <br />NO: 22-01714-01709 <br />SCALE : AS NOTED <br />SHEET NO. <br />