Laserfiche WebLink
KEYED NOTES: 0 <br />AHU-I TO BE INSTALLED PER DETAIL ON SHEET M2. HANG UNIT AS <br />HIGH AS POSSIBLE TO ALLOW FOR DUCT CROSSING OVER THE TOP <br />OF AHU-2 DUCT SYSTEM, COORDINATE WITH TRUSSES TO AHU <br />DISCHARGE ALIGNS WITH SPACE BETWEEN TRUSSES. <br />®AHU-2 TO BE INSTALLED AS LOW AS POSSIBLE YET STILL ALLOW <br />FOR DUCT CLEARANCE. COORDINATE AHU DISCHARGE WITH <br />TRUSSES SO DUCT ALIGNS WITH SPACE BETWEEN TRUSSES. <br />® EXTEND FLEX FROM BOTTOM OF DUCT DOWN THROUGH MECH. ROOM <br />FLOOR THEN ACROSS TO GRILLE. FIELD COORDINATE PRIOR TO <br />INSTALLATION. <br />® NEW COOK MODEL PR SIZE 12 INTAKE VENTILATOR FOR OUTSIDE <br />AIR TO AHU'S. TRANSITION FROM THROAT TO 12x12 AND EXTEND <br />DOWN TO ALLOW FOR CONNECTION OF OUTSIDE AIR DUCTS. EXTEND <br />OUTSIDE AIR DUCTS WITH MANUAL VOLUME DAMPERS TO EACH <br />RETURN AS INDICATED. COORDINATE WITH GENERAL CONTRACTOR <br />ON ROOFING AT EARLIEST ONSET OF CONSTRUCTION. <br />®WITH AHU-I INSTALLED HIGHER THAT AHU-2 DUCTS WILL BE ABLE TO <br />CROSS AS INDICATED. COORDINATE WITH TRUSSES TO DETERMINE <br />EXACT LAYOUT OF DUCT PRIOR TO FABRICATION OR INSTALLATION. <br />NOT ALL OFFSETS ARE SHOWN AND IT IT THE CONTRACTOR'S <br />RESPONS15ILTY TO COORDINATE POTENTIAL DUCT LOCATIONS WITH <br />THE TRUSSES DURING HIS PRE -BID SURVEY AND PRIOR TO <br />INSTALLATION. <br />REFRIGERANT COPPER AND CONDENSATE DRAIN LINES DOWN <br />INSIDE WALL TO 6" ABOVE FINISHED GRADE AND OUT TO <br />CONDENSERS AND 24"44"44" DEEP DRYWELL, REPECTIVELY. <br />DRYWELL IS NOT REQUIRED IF PERVIOUS GRADE EX16TIGN ON <br />WHICH TO DRAIN. <br />0 _ <br />0 MECHANICAL PLAN <br />SCALE: 3/16" = 1'-0" <br />OUTSIDE AIR CALCULATION: <br />(PER T"BLE 0-I, AS+-IRAE 02.1, 200-1) <br />OFFICE OCCUPANC:l': <br />NET OCCUPIABLE SPACE = 1980 SQ. FT. <br />TOTAL PERSONS X 5 + .Oro x NET 50. FT. = REQ'D CR f. <br />1980 X :Oro = 115.8 GFI'1 <br />DEFAULT PEOPLE COUNT: <br />1980 / 1000 = 19.8 X 5 = 99 <br />TOTAL PERSONS X 5 + .Oro x NET So. FT, = REQ'D CFM. <br />(19.8 X 5) + (.0& x 1980) = 217.0 CR 1 REQUIRED. <br />OUTSIDE AIR PROVIDED: <br />AHU-I - 100 CFl" 1 <br />AIHU-2 - 140 CFM <br />TOTAL: 240 CFM - IN COMPLIANCE.. <br />HVAC GENERAL NOTES <br />I. DUCT SIZES ARE CLEAR INSIDE DIMENSIONS. VERIFY ALL DIMENSIONS <br />AND LOCATIONS PRIOR TO FABRICATION OR INSTALLATION. ALL NEW <br />DUCTWORK SHALL BE TYPE 800 F15EGLA55 EQUAL TO <br />OWENS-CORNING, 1112" THICK WITH AN 'R'-VALUE OF 6.0. COORDINATE <br />DUCTS WITH STRUCTURE PRIOR TO INSTALLATION. ALL DUCT SHALL <br />BE CONSTRUCTED AND INSTALLED PER SMACNA REQUIREMENTS. <br />2. ALL FLEXIBLE DUCT CONNECTIONS SHALL BE CLASS ONE TYPE. <br />PROVIDE TAB COLLARS AT MAIN DUCT WITH MANUAL VOLUME <br />DAMPER WITH LOCKING QUADRANT. <br />3. AN IONIZATION PRINCIPLE SMOKE DETECTOR SHALL BE <br />INSTALLED IN THE SUPPLY DUCTWORK OF AHU-1 AND AHU-2. THE <br />DETECTOR SHALL BE WIRED TO APPLICABLE FIRE ALARM <br />SYSTEM BY THE FIRE ALARM CONTRACTOR PROVIDE L.E.D. AND <br />HORN ALARM STATIONS (DUCT SMOKE DETECTOR'S REMOTE TEST <br />SWITCH) LOCATED IN NORMALLY OCCUPIED AREA MOUNTED AT <br />48" AF.F. <br />4. ALL ROOF AND WALL PENETRATIONS SHALL BE SEALED BY THE <br />GENERAL CONTRACTOR. <br />5. CONTRACTOR SHALL SURVEY SITE PRIOR TO BID SUBMISSION TO <br />TO VERIFY EXISTING CONDITIONS AND CLEARANCES, <br />6. DEVIATION FROM MATERIALS, METHODS, OR PROCEDURES SET FORTH <br />HEREIN MUST BE APPROVED, IN WRITING, BY ENGINEER PRIOR TO <br />SUBMISSION OF BID, ORDER, FABRICATION OR INSTALLATION. <br />1. ANY AND ALL QUESTIONS AS TO THE INTENT OF OR PROCEDURES SET <br />FORTH IN THESE DRAWINGS MUST BE BROUGHT TO THE ATTENTION OF <br />THE ENGINEER PRIOR TO SUBMISSION OF A BID, LACK OF KNOWLEDGE <br />OR UNDERSTANDING OF THE PLANS SHALL NOT JUSTIFY ANY CLAWS <br />OR ADDITIONAL COMPENSATION. <br />8. INSTALLATION SHALL COMPLY WITH ALL APPLICABLE LAWS, CODES <br />AND ORDINANCES. <br />9. THE HVAC CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCT, <br />PIPING; LOUVERS, DIFFUSERS, ETC. INCLUDING LOCATIONS AND <br />CLEARANCES, WITH ALL OTHER TRADES ON PROJECT IN <br />PRE -CONSTRUCTION MEETING, PRIOR TO ANY ORDER, FABRICATION <br />OR INSTALLATION. <br />10. COORDINATE WITH ELECTRICAL DRAWINGS ON NEW RTU SENSORS <br />TO BE INSTALLED AT LOCATIONS AS INDICATED ON PLANS. <br />11. SUPPLY DUCTWORK SHALL BE CONSTRUCTED, FABRICATED AND <br />INSTALLED IN ACCORDANCE WITH SMACNA REQUIREMENTS FORA P <br />POSITIVE PRESSURE CLASSIFICATION. <br />12. RETURN AND EXHAUST DUCTWORK SHALL BE CONSTRUCTED, FABRICATED <br />AND INSTALLED IN ACCORDANCE WITH SMACNA REQUIREMENTS FORA I" <br />NEGATIVE STATIC PRESSURE. <br />13. ALL EXHAUST FAN DISCHARGES AND PLUMBING VENTS SHALL BE A <br />MINIMUM OF 10'-0'' FROM FRESH -AIR INTAKES. COORDINATE WITH <br />PLUMBING PLANS PRIOR TO INSTALLATION. <br />14. THE MECHANICAL CONTRACTOR SHALL BALANCE ALL SYSTEMS TO <br />WITHIN TEN PERCENT OF DESIGN VALUES SPECIFIED HEREIN, <br />15. EXAMINE EXISTING CONDENSATE DRAIN LINES FROM RTU'S TO ROOF <br />DRAINS AND/OR DOWNSPOUTS WHICH DRAIN TO STORM SEWER. <br />VERIFY CONDITION OF EXISTING DRAIN PIPING AND REPLACE AS <br />REQUIRED. <br />PLAN NOTES: <br />I. AIR CONDITIONING EQUIPMENT IS TO BE INSTALLED IN ATTIC <br />MECHANICAL ROOM. MOUNT AHU-1 HIGHER THAN 4HU-2 FOR ACCESS <br />CLEARANCE AND FOR DUCT CLEARANCE AS INDICATED ON <br />DRAWINGS. COORDINATE WITH THE GENERAL CONTRACTOR AND <br />FIELD CONDITIONS/TRUSS LAYOUT PRIOR TO DUCT FABRICATION OR <br />INSTALLATION- <br />5UILDING AIR BALANCE SCHEDULE <br />POSITIVE SOURCES: NEGATIVE SOURCES: <br />RTU-1 250 CFM EF-1 15 CFM <br />RTU-2 250 CFM EF-2 15 CFM <br />EXFILTRATION: 200 CFM <br />TOTAL: 500 CFM TOTAL: 350 CFM <br />RESULTING TOTAL AIR BALANCE: 150 CFM (POS.) <br />HVAC Lf=-Cf=-ND <br />CEILING SUPPLY DIFFUSER <br />CEILING RETURN <br />CEILING EXHAUST FAN <br />10 <br />THERMOSTAT <br />SMOKE DETECTOR <br />VOLUME DAMPER <br />.{0 <br />1YJLV_Y.1111 <br />NEW RIGID DUCT <br />CLASS I FLEXIBLE DUCT <br />REVISIONS <br />BY <br />Y0C <br />Cn N <br />L Ii • <br />L G <br />Q1 � ti U <br />O r U <br />00 U • L <br />N <br />o <br />00 3 <br />a� ti <br />3 ti 3 <br />O N <br />ti <br />p � v <br />E ti <br />0 a <br />�O N <br />/ <br />co <br />1 <br />_ <br />1 <br />Ud� <br />x z <br />L <br />why <br />a�ax <br />a <br />Q <br />p0oaoaa0000 <br />°°o�� p o <br />E9 <br />STATE OF °o <br />o0�`0 4®°��s�o°o <br />ooPell �00000 <br />r <br />N O <br />Z <br />- NM O N U <br />. <br />Z r N <br />-0p <br />0 3 L O d <br />00 <br />NE C <br />J ai� m 11 <br />c 0N <br />N p <br />L3 <br />.�'•?. Q 01 <br />O N W r O <br />U <br />C � <br />G a O <br />O <br />"- Z_ - <br />c J <br />U c <br />•= O J <br />J u- <br />m Q <br />v U N vi <br />t <br />O <br />a m m <br />Q N <br />.0 <br />0 W <br />m J <br />Z ILL - <br />Date: 04. 15. 13 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: ARF <br />Job: 13-08b <br />Sheet <br />m 1 <br />a <br />s <br />