Laserfiche WebLink
— BOND —BEAM <br />ONTIN. PRECAST HEADER <br />_T <br />W GMU PIER <br />ENTIRE COLUMN TO <br />BE OROUT FILLED <br />GA5T-GRETE GA5T-GRETE <br />NINDON SILL, NINDON 5ILL, <br />OR EGUIV. OR EGUIv. <br />DOUBLE AINDOA <br />I � �1'1 I � �11 I � I �11 I �Tl �1� <br />FLI iqlv <br />om 9� <br />Im. <br />NOTES: <br />1. UTILIZE 2-PART EPDXY OR <br />OTHER ENC71NEER APPROVED <br />EOUAL (I.E. 5IMP50N ET EPDXY). <br />2. PROVIDE %" DIA. HOLE FOR <br />SEE TTP. FOUNDATION <br />DONEL, BLON OR BRUSH CLEAN. <br />DETAILS FOR ADDITIONAL <br />3. FOLLON MANUF. INSTALLATION <br />INFORMATION NOT 5HONN <br />INSTRUCTIONS. <br />HERE <br />FUTURE b" GMU <br />BLOCK #5 VERT. BAR TO BE <br />LOCATED PER PLAN <br />I !T," � — \\ 11 111 , <br />DRILL 61 INTO EXIST'6 �,�! IN 6ROUTED CELL <br />SLAB, EPDXY 4 DRIVE < <br />#5 DONEL, PROVIDE MIN. <br />C) <br />50" LAP SPLICE n <br />1z <br />GRADE <br />Im <br />M155ED DOAEL RETRO�IT DETAIL <br />vALr:: NTs SIM. @ CMIJ STEM FOR DROMPED 6WE <br />( ) MEN <br />SEE DETAIL I ON <br />STRUCTURAL PLANS FOR <br />AnDITIONAI CONNECTION <br />INFO NOT 5HOViN HERE <br />FASTEN EA. ROOF TRU55 TO GMU W <br />5IMP50N M5TMI(q TN15T STRAP. <br />FASTEN STRAP TO GMU N1 (4) Y4" DIA. x 2 <br />Y4" LON6 TITEN 5GRENS <br />PROVIDE M015TURE BARRIER <br />PLATE (PEP, TRU55 MANUF) @ <br />EACH TRU55. <br />PROVIDE 2x FLAT BLOGKIN6 FIT T16HT TO <br />ROOF TRU55E5 @ EVERY OTHER BAY <br />FASTENED TO GMU W (3) Y4" DIA. x 5 Y2" LONC7 <br />TAPCON5. FASTEN BLOGKINry TO ROOF <br />TRUSSES W (2) 3 Y4"xO.131 " NAILS @ EA. END. <br />4x6 P.T. <br />P05T <br />PROVIDE (1) <br />5IMP50N L5TA18 <br />STRAP ON EACH <br />.......... <br />EXTERIOR FACE <br />OF POST, q" MIN <br />END LEN6TH <br />DROPPED <br />BEANS <br />PER PLAN <br />REAR NOOP LANAI <br />7YF. BEAM TO P05T CONN. <br />WALE: 5/411=11-011 <br />FASTEN EVERY OTHER <br />TRU55 (W NEB BLOGKINC7 <br />AS REOV) TO 2x BLOGKINC7 <br />v41 (1) 5IMP50N A35 CLIP — <br />SEE DETAIL 31 ON <br />STRUCTURAL PLANS FOP, <br />ADDITIONAL CONNECTION <br />INFO NOT 5HONN HERE <br />PROVIDE 50LID <br />BLOCKIN6 AS REQV <br />FOR STRAP FA5TENIN6 <br />FULL DEPTH BLOGKIN& <br />OSB (MIN), 1%" LVL OR TRU55 <br />FLOOR TRUSSES E3LOGKINC7 PEP, MANUF) @ 4W <br />-PER PLAN O.G. FASTENED TO 2x BLOCKIN6 x <br />W (1) 5IMP50N A55 GLIP---,: <br />FASTEN EVERY OTHER TRU55 TO GMU <br />N1 SIMPSON MT5MI6 TN15T STRAP. <br />FASTEN STRAP TO GMU N/ (4),V4" DIA. <br />x 2 J/4" LON& TITEN 5CREN5 <br />2xb FLAT BLOCKIN6 (BETVIEEN TRU55E5 <br />- 16" MIN. LEN6TH) FASTENED DONN TO <br />GMU W (3) YW 0 IA. x 3 YY LON6 <br />TAPCON5 @ EA BAY. FASTEN RIBBONL, <br />THRU HALL 5HTC7., TO 2x BLOGKIN6 N/ <br />%4"xO.151" NAILS @ 5" o.r,. <br />(5) 5IN6LE PLY 2xI2 <br />SOUTHERN PINE #2 <br />(OR BETTER) <br />5TRINC7ER5 <br />(1) 5IMP50N A35 CLIP <br />@ EA. 5TRINC7ER <br />2x(b P.T. BOTTOM PLATE <br />FASTENED TO CONCRETE <br />W (3) %" DIA. x 3Y2" <br />LON6 TAPGONS <br />10, <br />OZ�I �Vi �FT <br />v . `�� <br />r-AC-7r-ki M1 n1'V1K1,1_ T/I rMH / C,1MOCnhi <br />MT5MI(b TN15T STRAP, FASTEN STRAP <br />TO GMU v41 (4) J/4" DIA. x 2 Y4" LONC; <br />TITEN 5GREN5 <br />2xb FLAT BLOGKIN6 TO EA. 51DE OF <br />0513 BLOGKINC7 (16" MIN. LEN6TH) <br />FASTENED DONN TO GMU v41 (3),144" DIA. x <br />5,V2" LOW, TAPCON5. FASTEN LADDER <br />TRUSS, TO 2x BLOGKINC7 N/ 5'0.131" <br />TOENAILS @ 3" o.(,. <br />1�7 �I <br />I_T <br />0 <br />SEE DETAIL 38 ON <br />STRUCTURAL PLANS FOR <br />ADDITIONAL CONNECTION <br />INFO NOT 5HOV4N HERE <br />FLOOR TRUSSES <br />-PER PLAN <br />FLOOR TRU55E5 <br />(5EE PLAN) <br />FLOOR C7.T. <br />- PROVIDE VERTIGAL5 <br />OR 50LID BLOGKINC7 <br />EA. 5TRINC7ER LOCATION <br />LETTERED DETAILS ARE TYPIGAL FOP, NUMBERED DETAILS ARE PLAN <br />TH15 HOME � SHALL BE IMPLEMENTED IN 5PEGIFIG AND ARE ONLY REOUIRED <br />ALL APPLIGABLE AREAS. THESE HHERE SPEGIFIGALLY INDIGATED <br />DETAILS ARE NOT "GUT" ON THE PLANS. ("GUT") ON THE PLANS. <br />seal:: <br />G <br />R A?/ <br />LNO 77 24 <br />TN_ CC <br />i E OF <br />'ge <br />copyrigfi(1,-MULI­iE`R!'N­�- , JWA"�' <br />0 (D <br />. z <br />U.J <br />UJ <br />z <br />C.D <br />z <br />+ _J <br />L<u <br />z <br />L) <br />WF_ <br />W <br />_J <br />z <br />LU <br />CO2 <br />Idw <br />IV <br />C14 <br />C=) <br />CD <br />E <br />A <br />-.d- <br />Zz <br />_v1_ <br />cu <br />_C_ <br />Iz <br />Q) <br />> A <br />0 <br />2 <br />M <br />ce) <br />M M&K project number: <br />068-19029 <br />K p ject n <br />p J. <br />roject mgr: JSB <br />drawn by: BC <br />issue date: 09-15-21 <br />REVISIONS: <br />date: initial: <br />Cz <br />(n 0 <br />LL <br />Ld <br />LLJ 12 z <br />0 x <br />CL <br />(n <br />K� <br />LLJ Lo (f) <br />0 Z <br />LLI J J <br />sheet: <br />SDm3 <br />