Laserfiche WebLink
UPDATED 11/02/2020 <br />°r1 <br />&19 <br />X V5 Duo <br />ECS ON FIXED RAIL J MS600 ecs <br />J MS2 ecs <br />J MS440 <br />ECS ON MOVING RAIL <br />FLUSH X-Y CONFIG. <br />J V5 Duo <br />X MS600 ecs <br />./ MS2 ecs <br />X MS440 <br />EMBEDDED X-Y CONFIG. <br />- ALL HARDWARE INCLUDED. <br />(ACCORDING TO STRUCTURE) <br />CONTACT BOX (3X) <br />700-11228 - ECS to ECS wiring kit <br />X V5 Duo <br />J MS600 ec5 <br />J MS2 ecs <br />X MS440 <br />STANDARD X-Y CONFIG. <br />X V5 Duo <br />J MS600 ecsa <br />J MS2 ecs <br />X MS440 <br />WALL MOUNTED X-Y CONFIG. <br />ECS - ECS CHARGING <br />QUANTITY OF ROOMS: Z <br />VA ZEPHYRHILLS <br />CLINIC <br />8AFE <br />`DATC CREATED (DO-MMM-YYYY) : 09JUL-2n2D <br />CnKAWNmr AC LS <br />un001929 <br />f KarmrfmNcar, rnlamNIA <br />_0 <br />0 <br />-07002010 11 111 <br />BRIDGE DETAIL <br />"SPAN" <br />O <br />O <br />DUCT, PIPE <br />OR OTHER <br />OBSTRUCTION <br />AS OCCURS <br />O <br />4 a <br />8 r- <br />STRUT TO BUILDING STRUCTURE <br />REF. PLANS AND DETAILS <br />STRUT BRIDGE PER TABLE <br />BELOW (SLOT. FACE DOWN) <br />MAX. STRUT BRIDGE "SPAN" <br />_._LIFT CAPACITY <br />STRUT <br />1000# <br />HS 158-12 <br />1'-1" <br />P 1000 <br />1'-6" <br />HS 2716-12 <br />2'-1" <br />P5500 <br />2'-9" <br />P1001 <br />X-9" <br />P5000 <br />4'-3" <br />P5501 <br />6'-6" <br />P5001 <br />7'-6" <br />"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, <br />HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE <br />CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION, THE FACILITY MUST VERIFY THE <br />ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM." <br />- ALL HARDWARE INCLUDED. <br />(ACCORDING TO STRUCTURE) <br />Item M <br />Pan M <br />Daacnplion <br />Oty <br />1 <br />000 00094 <br />THMPAnPn MOn alls IN X 10' PN(,1 <br />7 <br />2 <br />000.00405 <br />NUT 310-10 ZINC <br />a <br />3 <br />000.00424 <br />HILTI STRUT 9ADDL9 NUT 3410 <br />2 <br />4 <br />nW 171,11476 <br />1 OC.:KWAXHkH Pills' <br />7 <br />5 <br />000.04430 <br />►LAT WASHER M10 ZINC <br />2 <br />0 <br />000.04075 <br />FLAT WASHER M12 <br />2 <br />7 <br />1 filil" flUUARG X tl4"FLAT PLATG <br />walsHMK <br />1 <br />p <br />QUANTITY OF ROOMS: 0 <br />VA ZEPHYRHILLS <br />CLINIC <br />6AfC WORKING LOAD CCLOW LIFT 10001 @I (05KI31 <br />DATE CREATED (DD-MMM-YYYY) . 00-JUL-2020 <br />L?RAWN Oy <br />un001029 <br />WALE j <br />NIA 1 <br />"1416Nuer: <br />OC•07092010 <br />vAub' <br />10 111 <br />0 <br />U0 <br />Nampa <br />URBANoRDER.tamps, Inc. <br />5006 south elbsron street 33611 <br />813.832AU7 <br />es2002460 <br />Thew plam are mpyrlphted ma are wWA to <br />wpydpN pralscVon as en'emh1lecwrel work' under <br />escum 102 of the copyright as 17 u.s.o. as <br />emended December 1990 end known as &m Ntacmal <br />woke Cop)npnt praec m act of 1990. The <br />ppeclbn OVUM but is not limited to Ve Overall <br />form as wales arrangement and ca "llm or <br />epam ON elernenlc of tle assign. under wcn <br />pmtadbn, umuaeraed m Of VNse plans, work a <br />bona represented, can legallyrewlt in the cessation <br />of ow4haon or bu9aMge being seized and/or <br />nimmawy mrrpwrution to URBANOMERlemye nc., <br />Fiends mgiustlnn AA26002460. <br />ISSUE DATE <br />05/15/2019 <br />REVISIONS <br />L <br />N <br />qqr <br />M <br />M <br />C) <br />ca <br />"o <br />z <br />m <br />-0 <br />LL <br />U <br />Q <br />ca <br />v) <br />>"w"F= <br />L <br />Q <br />CD <br />N <br />C <br />O <br />ca <br />v O <br />�ssa mission <br />fa_ v <br />i <br />J +r <br />C.� <br />JOE TOPH <br />FL.,REG.AR10095 <br />DATE; 111312020 <br />DRWN; <br />CHKD: <br />SCALE: <br />A <br />SHEETNUMBER <br />RIO <br />