My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
39923 Richland Rd
Zephyrhills
>
Building Department
>
Building Plans
>
39923 Richland Rd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 5:51:17 AM
Creation date
2/19/2025 8:21:05 AM
Metadata
Fields
Template:
Building Plans
Street #
39923
Location
Richland Rd
Contractor
RTD Construction
Building Plans - Permit #
13556
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pavt: <br />I <br />.5 <br />5 <br />N <br />2 <br />I <br />NOTE: Spacings shown in this chart are based on having the ground line at the <br />upstream barrier at the same elevation as the overflow of the downstream barrier <br />as shown above. Spacings should be adjusted based on actualsite performance. <br />r Use Of <br />Type I <br />Typ <br />& Type III <br />II <br />Consid <br />50 100 150 200 250 300 350 400 <br />Spacing (In Feet) <br />CHAR T I <br />RECOMMENDED SPACING FOR SYNTHETIC BALES OR BALE TYPE BARRIERS AND TYPE III SIL T FENCE <br />Principle Post Position <br />(Canted 20 ° To ward Flow) <br />Post Options <br />Softwood 2%" Dia. Post Options <br />Softwood 4" Dia. <br />Softwood 2"x4" Optional Post Positions 200,E Softwood 4"x4" <br />Hardwood 1%" x 1%p„ oo Hardwood 3" Dia. <br />Stee/1.33 lbs./ft. Q I Steell.33 lbs./ft. Min. <br />6' Max. I ) <br />Filter Fabric <br />(In Conformance With <br />Sec. 985 FDOT Spec.) I I Filter Fabric <br />� II II I I �� <br />I I I i I Silt Flow <br />j---------------Zr-----� l o <br />LO <br />ELEVATION SECTION �o <br />TYPE III SIL T FENCE <br />—11 , —11U I Ia. <br />Around Ditch Bottom Inlets <br />SIL T FENCE APPL ICA TIONS <br />Limits Of Construction <br />Sod <br />— — —� Silt Barrier <br />II <br />_ _ Sod_ _ I Ditch Bottom Inlet <br />Median Ditch <br />— - 10, (Typ.) <br />— — —I�_ — — — Silt Barrier <br />I� 50' Max. 50 Max. _i Ditch <br />Cross Drain <br />u <br />50' Max. 50' Max. <br />Silt Barrier <br />Endwoll <br />Sod <br />Limits Of Construction <br />DITCH INSTALLATIONS AT DRAINAGE STRUCTURES <br />Optional Post Positions <br />Principle Post Position <br />(Canted 20° Toward Flow) <br />Poultry Mesh (20 Go. Min.) <br />Or Type A Fence Fabric 20°` <br />(Index No. 801 & Section 550 <br />FDOT Spec.J <br />I ! 0' Max. I <br />/ Poultry Mesh <br />Or Typ e A <br />Fence Fabric <br />I 1 <br />I 1 <br />II II I 1 <br />I I Filter Fabric (In Conformance I I 11 Filter Fabric <br />I I With Sec. 985 FDOT Spec.) I I 11 <br />II II I <br />I I I I I I Silt Flow <br />II II I I <br />I <br />I <br />I I I I <br />LJ ELEVATION u SECTION <br />TYPE IV SIL T FENCE <br />3 3 <br />O O <br />Post A\ A\ Post <br />Place The End Post Of One Fence Behind <br />The End Post Of The Other Fence As Shown. <br />Rotate Both Posts At Least 180 Degrees In A <br />Clockwise Direction To Create A Tight Seal With <br />The Fabric Material. <br />Drive Both Posts Into The Ground And Bury Flap. <br />PLAN VIEW <br />JOINING TWO SILT FENCES <br />NOTES FOR SILT FENCES <br />1. Type III Silt Fence to be used at most locations. Where used in ditches, the spacing for 4. Where used as slope protection, Silt Fence is to be constructed on 0/ longitudinal grade to <br />Type III Silt fence shallbe in accordance with Chart 1, Sheet 1. avoid channelizing runoff along the length of the fence. <br />2. Type IV Silt Fence to be used where large sediment loods are anticipated. Suggested use 5. Silt Fence to be paid for under the contract unit price for Staked Silt Fence, CLF). <br />is where fillslope is 1:2 or steeper and length of slope exceeds 25 feet. Avoid use where <br />the detained water may back into travellones or off the right of way. <br />J. Do not construct silt fences across permanent flowing watercourses. Silt fences are to be <br />at upland locations and turbidity barriers used at permanent bodies of water. <br />TEMPORARYEROSIONAND SEDIMENT CONTROL <br />REVISIONS <br />•►••••••."V 15EAL <br />it <br />• <br />• • CL <br />•• <br />STA <br />E <br />+0y�• 1 i <br />�fit <br />MATTHEW S. OVE, P.E. <br />No. 66118 <br />SEAL <br />,n I Shoot No. <br />3of3 <br />°02 <br />v <br />v &CREED <br />3802 Ehrlich Road, Suite 306 <br />Tampa, FL 33624 <br />Phone: (813)549-3740, Fax: (813)549-3744 <br />EB0006691 <br />www.mckimcreed.com <br />° <br />Proposed <br />Inlet OPEN ° <br />RISER <br />° <br />Temp. Drain <br />Rock Bags <br />& Gut <br />I I <br />I I <br />sod <br />° Rail <br />° Ditch <br />Sod—'f ' <br />v v v <br />° PLAN <br />I' Min. Recommended <br />Post <br />PARTIAL INLET COMPLETED INLET DITCH BOTTOM INLET <br />PROTECTION AROUND INLETS OR SIMILAR STRUCTURES n '-----""II <br />& Gutter <br />ELEVATION <br />SYNTHETIC BALES OR BALE <br />TYPE BARRIERS FOR PAVED DITCHES <br />Edge of Shoulder, <br />Grade Varies Woven Filter Fabric In Absence Of <br />Established Grass (Approx. 12'x127. ---i <br />° ° -.F. <br />Secure Edges By Entrenching And 1 <br />O/ Grade, Length Varies ° Sandbags Extend Under Bags and Bales. Fabric I <br />Shall Meet The Requirements Of <br />5' Min. Section 985 Of The Standard <br />Specifications. <br />TO <br />r, <br />/ See Below For Protection Toe Of Slope PLAN <br />At Toe Of Slope Or Ditch Bottom, ° ° ° ° PLAN <br />SECTION AA Grade Varies <br />Note d I <br />Where the slope length exceeds 25 feet, <br />construct one row of bale barriers at 0% <br />longitudinal grade midway up the slope. <br />Construct two rows of bale barriers where <br />the slope length exceeds 50 feet_ <br />ALONG FILL SLOPE <br />ELEVATION <br />50' On Centers (Typ.) ° �3 <br />As Required ° Flow <br />° v <br />o <br />o <br />/r �► <br />PLAN PLAN <br />Natural <br />Ground Overlap Ends 6' In <br />Fill Slope Fill Slope <br />ELEVATION ELEVATION <br />TO BE USED WHERE THE NATURAL GROUND TO BE USED WHERE THE NATURAL GROUND <br />SLOPES TOWARD THE TOE OF SLOPE SLOPES AWAY FROM THE TOE OF SLOPE <br />AT TOE OF SLOPE <br />BARRIERS FOR FILL SLOPES <br />CITY OF ZEPHYRHILLS <br />5335 8th Street <br />Zephyrhills, FL 33542 <br />Phone: (813)780-0000 <br />II <br />II II II II II II <br />1' Min. Recommended 1' Min. Recommended <br />Anchor Top Bales To Lower Bales With 2 Stakes Per Bale. <br />ELEVATION ELEVATION <br />T YPE II TYPE I <br />SYNTHETIC BALES OR BALE TYPE BARRIERS FOR UNPAVED DITCHES <br />NOTES FOR SYNTHETIC BALES OR BALE TYPE BARRIERS <br />1. Type I and II Synthetic Barrier should be spaced in accordance with Chart 1, Sheet 1. <br />2. Bales shallbe trenched 3" to 4" and anchored with 2-1" x 2" (or 1" did.) x 4' wood <br />stakes. Stokes of other moterialor shape providing equivalent strength may be used if approved <br />by the Engineer. Stokes other than wood shallbe removed upon completion of the project. <br />J. Rails and posts shallbe 2" x 4" wood. Other materials providing equivlalent strength may be used if <br />approved by the Engineer. <br />4. Adjacent bales shollbe butted firmly together. <br />5. Where used in conjunction with silt fence, bales shallbe placed on the upstream side of the fence. <br />6. Boles to be paid for under the contract unit price for Synthetic Bales, LF. The unit price shollinclude <br />the cost of filter fabric for Type I and II Barriers. Sandbags shallbe paid for under the unit price <br />for Sandbagging, CY. Rock bags to be paid for under the contract unit price for Rock Bags, EA. <br />PRODUCTION WELLS <br />No. 11 AND No. 12 <br />WELL SITE IMPROVEMENTS <br />EROSION CONTROL DETAILS <br />DATE: <br />FEBRUARY 2012 <br />MCE PROJ. <br /># 4584-0003 <br />DRAWN <br />QES <br />DESIGNED <br />BTN <br />CHECKED <br />JSL <br />PROJ. MGR. <br />MSL <br />ATUS: <br />llr <br />SCALE <br />HORIZONTAL: <br />NA <br />VERTICAL: <br />NA <br />AWING <br />I C-14 I <br />REVISION <br />
The URL can be used to link to this page
Your browser does not support the video tag.