Laserfiche WebLink
ABBREVIATIONS GENE-RAL NOTES VERSION CHANGES INDEX OF DRAWINGS <br />ABV -ABOVE MLDG -MOULDING VERSION DESCRIPTION OF CHANGES SHT NO: TITLE <br />THE FOLLOWING TECHNICAL CODES SHALL APPLY: <br />AFF -ABOVE FINISH FLOOR MNT - MOUNT OR MOUNTING 1.0 PLAN REVISIONS CS COVER SHEET co <br />AHU - AIR HANDLER UNIT MO - MASONRY OPENING Al FOUNDATION PLAN N <br />A/C -AIR CONDITIONING MUNT - MUNTINS 2020 FLORIDA BUILDING CODE RESIDENTIAL, PLUMBING, MECHANICAL, FUEL GAS, 2.0 PLAN REVISIONS ` N <br />A2 1ST AND 2ND FLOOR PLAN A <br />ALUM - ALUMINUM # -NUMBER ENERGY EFFICIENCY, ACCESSIBILITY, AND NFPA 70 NATIONAL ELECTRICAL CODES 2017 co <br />3.0 TRUSS CONNECTOR REVISION A3 STAIR DETAILS <br />AT - ALUMINUM AB - ANCHOR BOLT RESHOLD OC - ON CENTEROGD - OVERHEAD GARAGE DOOR 2020 FBC PLUMBING RESIDENTIAL SECTION 604 4.0 FLORIDA BUILDING CODE 7TH EDITION 2020 UPDATE A4 FRAMING PLANS A �� G�O�fi LO <br />( ) A5 EXTERIOR ELEVATIONS & ROOF PLAN �' 2 <br />AVG -AVERAGE OPNG -OPENING 1. TANK TYPE WATER CLOSET VOLUME ° Q' e o <br />00 <br />BFE - BASE FLOOD ELEVATION OPP - OPPOSITE 1.6 GALLONS 5.0 ADDING K, L & M ELEVATIONS A6.1 1ST FLOOR ELECTRICAL PLAN a �1 , ® LO <br />BM -BEAM OPT - OPTIONAL A6.2 2ND FLOOR ELECTRICAL PLAN <br />BLK -BLOCK OH - OVER HANG 6.0 ADDED SHEETS WP2.0 AND WP2.1 TO SHEET INDEX SNO STRUCTURAL NOTES y 5805 ° <br />BLDG - BUILDING OH CABS- OVERHEAD CABS 2. WATER -FLOW RATE. SN1 STRUCTURAL NOTES 00 •`� <br />PUBLIC FACILITIES LAV 0.5 G.P.M. A • �°� z <br />BRD -BOARD PNT - PAINT FINISH S3 FOUNDATION DETAILS <br />BRG - BEARING PTD - PAINTED PRIVATE FACILITIES LAV 2.2 G.P.M. e _ w <br />S4 FRAME WALL DETAILS _ <br />BTM -BOTTOM PED -PEDESTAL SHOWER HEADS 2.5 G.P.M. <br />BUC - BUILT UP COLUMN PERF -PERFORATED S5 STRUCTURAL DETAILS o <br />CAB - CABINET t LT -PLATE 3. ALL PLUMBING WATER LINES S6 WALL SECTION DETAILS <br />CD - CONSTRUCTION DOCUMENTS PLYWD - PLYWOOD TO BE CPVC ST STAIR DETAILS <br />SS RETRO FIT DETAILS -' <br />CLG -CEILING PKT -POCKET VTR LOCATIONS ARE APPROXIMATE AND MAY CHANGE DUE TO S11 PRECAST DETAILS ���p w <br />CLG HT -CEILING HEIGHT LB - POUND p <br />CEMT - CEMENTITIOUS PSF - POUNDS PER SQUARE FOOT JOBSITE CONDITIONS S12 PRECAST DETAILS Q <br />CL - CENTERLINE PSI - POUNDS PER SQUARE PA 1.0 PRODUCT APPROVAL Z <br />COL -COLUMN PT - PRESSURE TREATED THE FOLLOWING SHALL COMPLY WITH THE 2020 FBC RESIDENTIAL PA 1.1 PRODUCT APPROVAL <br />CONC - CONCRETE PB - PUSH BUTTON CODE PA 1.2 PRODUCT APPROVAL <br />CMU - CONCRETE MASONRY UNIT REF - REFRIGERATOR PA 1.3 PRODUCT APPROVAL <br />CONST - CONSTRUCT OR CONSTRUCTION RECP -RECEPTACLE Q PORCHES AND BALCONIES V) LO N F <br />4 PRODUCT APPROVAL PA 1. <br />CONT -CONTINUOUS OR CONTINUES REINF -REINFORCING CHAP. 3 (3) s` �o:� ° <br />CTR -CENTER REQD - REQUIRED <br />PA 1.5 PRODUCT APPROVAL cy) <br />CJ - CONTROL JOINT R/A - RETURN AIR Q HANDRAILS - CHAP. 3 SH 1.0 HURRICANE SHUTTERS } � � <br />DP - DEEP OR DEPTH RO - ROUGH OPENING SH 1.1 HURRICANE SHUTTERS to V -0 70- } M <br />DTL - DETAIL RS - ROUGH SAWN Q GUARDRAILS - CHAP. 3 SH 1.2 HURRICANE SHUTTERS C . Q) : '0 2 o <br />DIA - DIAMETER SC - SOLID CORE SH 1.3 HURRICANE SHUTTERS � p � o N Q <br />DIM - DIMENSION SCP -SCUPPER SH 1.4 HURRICANE SHUTTERS ,� U 0 '° '5° <br />DISCON -DISCONNECT SCRN -SCREEN Q STAIRS - CHAP. 3 N w � <br />SH 1.5 HURRICANE SHUTTERS V D_N <br />DW - DISHWASHER SIM -SIMILAR Q CHIMNEY & FIREPLACE WP 1.0 WATERPROOFING DETAILS ` i o °' <br />DR -DOOR SHLVS - SHELVES WP 2.0 WATERPROOFING DETAILS ° °'a <br />DBL - DOUBLE S/R - SHELF & ROD CHAP. 10 <br />DWG - DRAWING SH - SINGLE HUNG WINDOW WP 2.1 WATERPROOFING DETAILS <br />EA -EACH SGD - SLIDING GLASS DOOR Q EGRESS WINDOWS <br />ELEC - ELECTRICAL SPECS - SPECIFICATIONS CHAP. 3 l <br />ELEV - ELEVATOR SQ FT - SQUARE FEET 5. ALL OPENINGS SHALL COMPLY WITH 2O20 FBC RESIDENTIAL WIND LOADS AS STATED C-:4 4 <br />EQ -EQUAL SQIN -SQUARE INCH <br />EQUP - EQUIPMENT STD -STANDARD BELOW. ATTACHMENTS OF WINDOWS, DOORS, SLIDING GLASS DOORS AND O.H. <br />EXP JT - EXPANSION JOINT STL -STEEL GARAGE DOORS ARE TO DELEGATED THE MANUFACTURER OF THESE ITEMS. THE <br />EXT - EXTERIOR STRUCT -STRUCTURAL MANUFACTURER OF THESE ITEMS SHALL SUBMIT ATTACHMENTS FOR SITE <br />FIN FLR - FINISHED FLOOR TEMP -TEMPERED INSTALLATION. �--- <br />FIN - FIN THK - THICK OR THICKNESS <br />EW - EACH WAY TB - TOWEL BAR <br />FG -FIXED GLASS TOC - TOP OF CONCRETE SEE ATTACHED SPECIFICATION SHEETS FOR MANUFACTURERS DESIGN CRITERIA <br />AND INSTALLATION METHODS FOR WINDOWS, DOORS, SLIDING GLASS DOORS, <br />FD - FLOOR DRAIN TOM - TOP OF MASONRY <br />FE - FIRE EXTINGUISHER TOP - TOP OF PLATE OVERHEAD GARAGE DOORS, AND ROOFING. <br />FLR - FLOOR TP - TOILET PAPER HOLDER <br />FLOUR - FLUORESCENT TYP - TYPICAL 6. ALL DOORS INTERIOR & EXTERIOR ARE 6-8" UNLESS OTHERWISE NOTED ALL <br />FTG - FOOTING UNO - UNLESS NOTED OTHERWISE SHOWER ENCLOSURES TO BE TEMPERED GLASS o L v) w O <br />FR DR - FRENCH DOOR VAC -VACUUM LLILu < x u z � <br />GALV -GALVANIZED VAL -VALANCE 7. ALL WINDOWS WITHIN 24" OF DOORS (INTERIOR &EXTERIOR) AND WITHIN 18" OF FLR U W � ° J o Q u- 0 o o J o <br />GA -GAUGE VERT - VERTICAL TO BE TEMPERED GLASS. (SECTION R308) Q U o o � o it o o m o Z <br />GB - GRAB BAR VIF -VERIFY IN FIELD 0 Cn w aa.. w �n w w w v5 = 0 ¢< M <br />GFI / GFCI - GROUND FAULT CIRCUIT INTERRUPTOR VTR -VENT THROUGH ROOF DIMENSIONING: Q Z ¢ o w ¢ o K w z o W ov o <br />GLS -GLASS V -VOLT CD L Qpw �_f-i- �_wo<v Q <br />Y Z Q Q <br />GWB - GYPSUM WALL BOARD WC - WATER CLOSET A. DIMENSIONS INDICATED ARE TO: o Q 0 <br />GYPBRD - GYPSUM BOARD WH - WATER HEATER <br />HD - HEAD WL - WIND LOAD A.1. CMU WALL: OUTSIDE FACE OF WALL: <br />HVAC - HEATING, VENTILATING, AIR CONDITIONING WP -WEATHERPROOF A.2. INTERIOR FRAMED WALLS: PLAN' WEST (OR PLAN NORTH) FROM FACE OF <br />HT - HEIGHT WWM - WELDED WIRE MESH CORE -STUD <br />HB - HOSE BIB W - WIDE OR WIDTH A.2.1. DIMENSIONS ARE NOT FROM ELEMENTS ATTACHED TO CORE STUD - LE_,. O <br />HC -HANDICAP WDW -WINDOW FURRING\ <br />O <br />INSUL - INSULATION W/ - WITH A.3 'EXTERIOR FRAMED WALLS: TO OUTSIDE FACE OF STRUCTURAL CORE -STUD Z cV <br />INT - INTERIOR WD - WOOD A.4. WINDOW OPENINGS: 0 W <br />LVL - LAMINATED VENEER LUMBER <br />A.4.1. CMU WALLS: TO LEFT SIDE OF ROUGH OPENING <br />LT - LAUNDRY TUB A.4.2. EXTERIOR FRAMED WALLS: TO CENTER OF OPENING r <br />MAX - MAXIMUM A.5. DOOR OPENINGS: - CD O <br />MATL - MATERIAL A.5.1. CMU WALLS: TO LEFT SIDE OF ROUGH OPENING 0 1.-. M O <br />MFR -MANUFACTURER A.5.2. EXTERIOR FRAMED WALLS: TO CENTER OF OPENING Q (f LO <br />MECH - MECHANICAL A.5.3. INTERIOR FRAMED WALLS: ADJACENT TO SIDE WALL: 5" RETURN MEASURED <br />MTL -METAL <br />FROM THE FINISH FACE OF ADJACENT WALL TO INTERIOR FACE OF DOOR <br />MC - MEDICINE CABINET <br />MIN - MINIMUM FRAME Q lW Q LO <br />A.5.4. INTERIOR FRAMED WALLS: AWAY FROM SIDE WALLS: DIMENSIONED TO CENTER 1- (l_ IZ M <br />OF DOOR cj� LL T C <br />A.6. SPECIAL AND CODE REQUIRED CLEARANCES -AS INDICATED ON PLANS OR FINISH Q Q <br />SURFACE TO FINISH SURFACE Z U <br />SYMBOL LEGEND. A.6.1. EXAMPLE: 3'-0" CLEAR INSIDE FINISH FOR ADA TRANSFER SHOWER <br />B. ALIGNMENT OF WALLS AND FINISHES AS SCHEDULED SHALL BE STRAIGHT, TRUE AND W PLUMB. W , <br />�A = STAIR CALL OUT HEIGHT OF SHEET NUMBER C. THE PRIORITY FOR PROJECT DIMENSIONS SHALL BE IN THE FOLLOWING ORDER: O <br />3OW-'STEP DOWN to�E <br />"ARROW <br />NT ELEV NUMBER C.1. CODE MINIMUM - MAXIMUM DIMENSIONS AND CLEARANCES d' <br />FOOTING CALL OUT - STEP DOWN SHOWS C.2. LOAD BEARING CONCRETE MASONRY UNIT WALLS <br />C - SEE FOOTING SCHEDULE CALLOUT DIRECTION OF VIEW C.3. FRAMED WALLS EXTERIOR <br />ARROW SHOWS INTERIOR ELEVATION CA. FRAMED WALLS INTERIOR <br />= KEYNOTE CALL OUT DIRECTION OF VIEW MARKER C.5. DOORS AND WINDOWS <br />1 D. FLOOR ELEVATIONS ARE INDICATED TO THE FACE OF THE STRUCTURAL SLAB - <br />ELEV NUMBER ARROW SHOWS UNLESS OTHERWISE NOTED <br />A9 <br />PRE -CAST LINTEL CALL SHEET NUMBER DIRECTION OF CUT E. VERTICAL DIMENSIONS ARE INDICATED FROM THE FLOOR ELEVATION TO THE FACE <br />O OCHEDU ELENTEL ELEVAEXTERIOR TION MARKER 1 OF MATERIAL AT THE DIMENSION POINT - UNLESS OTHERWISE NOTED <br />Al SECTION NUMBER F. CEILING HEIGHTS ARE INDICATED FROM THE FLOOR ELEVATION TO FACE OF THE <br />STRUCTURAL MATERIAL ABOVE AS SCHEDULED <br />l -ELEV NUMBER SHEET NUMBER G. DIMENSIONS SHOWN ON THE DRAWINGS SHALL INDICATE THE REQUIRED SIZE, <br />LEDGER CALL OUT - LEDGER SCHEDULE SEE 4 A15 2 SHEET NUMBER CLEARANCE AND DIMENSIONAL RELATIONSHIP BETWEEN PROJECT SYSTEMS AND <br />LOCATION OF CUT COMPONENTS - DIMENSIONS SHALL NOT BE DETERMINED BY SCALING THE <br />�---ARROW SHOWS DRAWINGS. <br />3 DIRECTION OF VIEW 00 <br />MULTI VIEW INTERIOR SECTION <br />ELEVATION MARKER MARKER O o o' o o N o <br />APR 0 82023 Q0 N Na N N N N <br />� r <br />O 0 0 O N N N II <br />O O �- O O O <br />Z <br />O <br />NW o 0 0 <br />> � N: M � Lr) co i <br />LO <br />Virtual Review Assist. Inc. ' <br />Plans liavi � <Z <br />ew carnF;iecetl and anPrav d � Zz <br />for co P€i"r,- With the 2020 Ff3C Mi E on Q W <br />OV Debra Anne hiahr PX2360 O . r W �p0 <br />LC) E N m oW? <br />°z Or< <br />LENNAR TAMPA DIVISION Ln = mLU�- <br />=W <br />Ln c� ��� <br />4600 W CYPRESS ST, SUITE 200 z=cn <br />NOTICE TO BUILDER & ALL SUBCONTRACTORS W <br />2 ZW& <br />TAM PA, FL 33607 IT IS THE INTENT OF DESIGN PROFESSIONAL LISTED IN THE TITLE (0 Q q <br />Z U a.Z� <br />813.574.5700 BLOCK THAT THESE DOCUMENTS ARE ACCURATE, PROVIDING .`1. Z Ln< <br />LICENSED PROFESSIONALS CLEAR INFORMATION. EVERY ATTEMPT Q <br />HAS BEEN MADE TO PREVENT ERRORS: THE BUILDER AND ALL O J <br />SUBCONTRACTORS ARE REQUIRED TO REVIEW ALL THE O W <br />INFORMATION CONTAINED IN THESE DOCUMENTS, PRIOR TO THE <br />COMMENCEMENT OF ANY WORK. THE DESIGN PROFESSIONAL ARE W <br />NOT RESPONSIBLE FOR ANY PLAN ERRORS, OMISSIONS,OR <br />MISINTERPRETATIONS UNDETECTED AND NOT REPORTED TO THE Q <br />DESIGN PROFESSIONAL PRIOR TO CONSTRUCTION. ALL z C Sw <br />CONSTRUCTION MUST BE IN ACCORDANCE TO THE INFORMATION <br />FOUND IN THESE DOCUMENTS. ANY QUESTIONS REGARDING THEuj INFORMATION FOUND IN THESE PLANS SHOULD BE DIRECTED TO THE O <br />DESIGN PROFESSIONAL LISTED IN THIS TITLE PAGE. NO BACK 00 LAST PLOT DATE <br />CHARGES WILL BE CONSIDERED FOR REIMBURSEMENT BY THE > March 23, 2023 <br />2551 DESIGN PROFESSIONAL WITHOUT ADVANCED NOTIFICATION AND Z O <br />APPROVAL BY THE DESIGN PROFESSIONAL. <br />_I COVER SHEET <br />