Laserfiche WebLink
8 <br />1/2" DRYWALL DOOR JAMB REFER 1x4 1/2" DRYWALL <br />ix4 1/2" DRYWALL DOOR JAMB (REFER 1x4 F_ <br />�♦ UNACCEPTABLE INSTALLTION •� <br />DOOR JAMB (REFER TO PRODUCT <br />TO PRODUCT P.T. TO PRODUCT <br />MAX 8„ <br />PROPER INSTALLATION ♦♦ DO NOT DO THIS •• <br />2"x BOT. PLATE W/ (2)1Od @ 6" O.C. <br />APPROVAL FOR CONN. APPROVAL FOR CONN. <br />APPROVAL FOR CONN. 1 x4 C 1 X 4 <br />1x4 P.T. L <br />♦ <br />♦♦ #5 REBAR (TYP,) �� <br />♦ • <br />3!4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />2X BOTTOM PLATE w/ 8d @ 4° <br />r 3/16" 0 X 3" LONG If FURRING FURRING <br />� ` FURRING `- (2) ROWS 3/16" x 3-1/2" <br />#5 REBAR ♦♦ •� <br />AND NAILED w/ 8d COMMON @ <br />12" <br />11 <br />O.C., 2 ROWS STAGGERED <br />3-1/4" LONG X 3/16"0 TAPCONS TAPCON @ 16" O.C. & 4" 2X8 <br />(TYP,) ♦♦ •• <br />6" O.C. EDGES AND O.C. FIELD <br />TAPCON. INTO STAGGERED @ 16" 1x8 P.T. FROM EACH END w/ MIN. 1X8 <br />BLOCK@ SPACING <br />♦♦ ••• <br />„ O.C. 2-ROWS INTO 2" EDGE DIST. ATTACH <br />PER MANUFACTURE 1 DETAIL MASONRYTHROUGH 1� <br />♦ �S�D. 90° HOOK (TYP.) <br />♦• <br />2x BAND JOIST W/ FACE NAIL 10d <br />1-1 /2 DETAIL 1 x8 w/ (2) ROWS 8d NALS 3" DETAIL <br />STD. 90^ � ♦ _ <br />@TOP & BTTM CHORD, AND (8) <br />1x4 P.T. & 1x8 P.T. STAGGERED 12" O.C. <br />@ <br />FILL SOLID HOOK (TYP.) ♦♦ •• <br />BOTH CELLS ♦ • <br />FACE NAILS 10d TRUSS VERT. <br />@ <br />WEB <br />3/16" x 3 -1/2" DOOR JAMB (REFER <br />TAPCON @ 16" 1x4 P.T. TO PRODUCT <br />DDI, <br />METAL SEAT PLATE <br />DOOR JAMB <br />NOTE: <br />O.C. & 4" FROM (REFER APPROVAL FOR CONN. 1x4 1/2" DRYWALL <br />LAP SHEATHING TO <br />DOOR JAMB (REFER EACH END W/ MIN.TO PRODUCT <br />2" EDGE DIST. APPROVAL FOR CONN. 2x8 P.T. w/ (2) ROWS 3/16' <br />• ♦♦ <br />ND <br />D <br />BOIST <br />TO PRODUCT <br />El x 3-1/2" TAPCON @ 16" 1X4 <br />1010 ♦ <br />TYPICAL <br />APPROVAL FOR CONN. (2) ROWS 3/16" x 3-1/2" O.C. & 4" FROM EACH <br />♦ ♦♦ <br />TAPCON @ 16" O.C. & END w/ MIN. 2" EDGE DIST. <br />♦ NOTC HB @ FIRST COURSE <br />SIMPSON HGAM1OKTA @ 12" O.C. <br />4" FROM EACH END w/ 2x8 P.T. ATTACH SECOND PLY w/ <br />�" <br />• ♦ <br />• ♦ <br />w/ (4)1/4x1 1/2" SDS SCREWS <br />2x P.T. AS REQ'D MIN. 2" EDGE DIST. (2) ROWS 10dx3" 2x8 <br />• ♦ <br />♦♦♦ <br />INTO BAND JOIST & (4)1/4 x2 3/4" <br />" <br />2x DETAIL 2 1/4" DETAIL STAGGERED @ 12" O.c. 3-1/4" DETAIL <br />NOTCH WEB AT THE •.• <br />FIRST 2 COURSES <br />TITEN INTO K.O. BLOCK <br />t5" <br />♦♦♦ <br />♦LED <br />.•.• <br />BUILDOUT OVER SIZE DOOR -WINDOW ROUGH OPENINGS CC <br />CELL PER <br />FOUNDATION PLAN <br />FILLED CELL INSTALLATION(11 <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. SS <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />SCALE: N.T.S. <br />SS <br />2x8 P.T. BUCK -CONNECT TO BLOCK wo SECTION <br />UPLIFT CAPACITY <br />W/ 1/4" x 31/4" TAPCON (1 1/4"MIN. A -A <br />_ 16010 # FOR 2 STRAPS <br />FILL 1st 4 COURSES <br />EMBEDMENT INTO BILK.) 1/4" MAX <br />SOLID w/GRour <br />1 PLY PRE-ENGINEERED TRUSS <br />SEE ARCH PLAN AND <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN.F 1/4" x 31/4" TAPCONS <br />PRE-ENG TRUSS DESIGN <br />BLOCK HEADER ARCH BLKG. & BUCK <br />SIMPSON HM9KT w/ (4)1/4"x1 1/2"SDS <br />SEE NOTE 1 BELOW <br />• <br />1/2" DRYWALL * <br />SCREWS & (5)1/4" x 21/4" TITEN (IF TRUSS <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16)16d <br />. <br />8d NAILS AT 8" O.C. AT BUCK <br />SINKERS AND (7)1/4"x21/4" TITEN = 2150 #) <br />2x SUB FASCIA <br />2 x 8 45" DIAGONAL (4)10d NAILS INTO LEAVE A CUT OUT IN O.S.B. ON THE <br />ALUM DRIP EDGE <br />BRACE(S) 2 x 8 BRACE/ BLKG. INSIDE TO ALLOW FOR INSULATION <br />'. <br />7/16" OSB TO BE INSTALLED <br />BOND BEAM OR CAST IN PLACE BEAM <br />BRG WALL TYPE I I ALUM FASCIA <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />�. <br />POLY -CELL IN THIS AREA2 x 8 45 DIAGONAL BRACE AT EA. <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FORSCRIBE <br />T� I <br />PER PLAN I I 1-3/4"TRIM PAINTEDFURTHER <br />CONTACT ENGINEER OF RECORD FOR <br />INSTRUCTIONS. <br />(NOTCH) FACE OF ARCH W/ (3)10d NAILS <br />TO FIT ARCH (4)10d NAILS INTO 2 x 8 AT EA. END <br />RETROFIT TRUSS DETAIL <br />SS NAIL w/ 5/16" HEADOVERRAN <br />F CHANNEL, DIA. @ 24 O.C. <br />�'BACKSIDE <br />Lfl/ <br />W/ 8d NAILS BRACE/BLKG. <br />N.T.S. <br />FASTENED PERCONNECT <br />NOTE 2 BELOW I IJCONT VENTED OR SOLID SOFFIT <br />INSTALL WDW. SCREW ANCHOR\\_2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) B o OSB PROVIDE TAPCON WITHIN <br />ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 <br />CONT 2x4 NAILED TO 2x BLOCKING NAILED TO TOP <br />RETROFIT WALL OVERHANG DETAIL (NTS) <br />INTO ARCH BLKG. PER 4" MIN. OF BRACE <br />BLOCKING w/ 2-12d NAILS ('*) CHORD EVERY OTHER TRUSS <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />w/ 3-12d NAILS, TYP. (**) <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />START OF ARC <br />IF TRUSSES USED) W/ (3) #6 X 4%a' WOOD <br />_ - - - - - - ------ <br />1. G.C./ BUILDER TO VERIFY/PROVIDE SOFFIT MATERIAL SPAN CAPACITIES BASED <br />NOTE: FOR OVERHANGS LESS THAN 3/4"- NO REPAIR REQ'D. <br />SCREWS @ 16rr O.C. MAX. IF MASONRY WALL <br />ON THE DESIGN PRESSURES SPECIFIED FOR COMPONENTS AND CLADDING <br />4' MAX. RAD. <br />ARCH DETAIL <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ ' <br />! LISTED IN THE DESIGN CRITERIA ON SHEET SN. <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />2. FOR SOFFIT ATTACHMENT AT WALL (PER ALPHA ALUM. INC. FL# 16544 R5 FL <br />1'-0" 5'-O" <br />SCALE: N.T.S. SS <br />12 _ <br />JACK TRUSS PROVIDED BY SEE <br />PRODUCT APPROVAL) F CHANNEL FASTENED TO: <br />TRUSS COMPANY OR <br />- CMU w/ T NAIL .097" DIA. @ 24" O.C. w/ 5/8" MIN. EMBEDMENT <br />PLAN <br />2X6 #2 SYP @ 24" O.C. <br />- WOOD w/ (3) 16 GA. 3/4"xl/4" CROWN STAPLES @ 24" MAX. O.C. IN DIAMOND <br />INISH FLO <br />2 x 8 BUCK - CONNECT TO BLOCK SECTION <br />WITH 1/4" x 31/4" TAPCON (1 1/4" MIN. <br />ROOF SHEATHING ATTACHED <br />PATTERN <br />- SUB FASCIA w/ 16 GA. 3/4"xl/4" CROWN STAPLE @ EACH GROOVE <br />' ► <br />B_B <br />/4" MAX EMBEDMENT INTO K.) <br />PER NAILING SCHEDULE ALL <br />- - - - <br />r p <br />° !•• #5 BAR <br />2-0 8 <br />SIMPSON <br />STRUCTURAL SOFFIT <br />' ► �'o"�° .'• CENTERED W/ <br />D r ' ' <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />(5)12d NAILS <br />H2.5A <br />FO <br />_ r : <br />' °► IN TOP 4 <br />1 X 4 FURRING <br />BLKG. &BUCK <br />2X6 TO 2X4 w/ (10) <br />SCALE: 314" = V-0" ('*) FOR ALUMINUM SOFFITS WITH SPANS <br />► • <br />' KNOCKOUT / iv <br />8d NAILS <br />REV. 09.23.2021 > V-4", INSTALL MID SPAN BLOCKING PER <br />► P . <br />THE SOFFIT FL PA INSTALLATION CRITERIA <br />;; CHAIR BLOCK <br />8d NAILS @ 8" O.C. AT BUCK <br />2 x 8 VERT. W/ (2)10d <br />NAILS AT EA. END <br />PROVIDE 2x <br />"REFER TO THE PRODUCT APPROVAL FOR INSTALLATION DETAILS." <br />MONO FOOTING ► • <br />PROVIDE 2 x 8 DIAG. BRACE B <br />VERT. BRACES WHEN HGT. OF <br />BRACE EXCEEDS 24" <br />PROVIDE (2) MIN. <br />TAPCON AT EA. SIDE <br />BUCK - (1) WITHIN 4" <br />CONT. W/ (3) <br />12d NAILS ' <br />JACK TRUSS PROVIDED BY JAND <br />•�. :' <br />SIZE AND REINF. PER PLAN <br />SECTION DETAILS <br />LEAVE A CUT OUT IN O.S.B. ON T MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />CLEAN FILL :► .. ► <br />2 x 8 VERT. BRACE(S) <br />INSIDE TO ALLOW FOR INSULATION ARCH <br />#2 SYP @ 24" O.C. <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />DIRT d Z <br />TO BE INSTALLED <br />,_0" MAX SEE PLAN <br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6" <br />2kO�FRHq <br />• --STANDARD <br />BUILT UP PLWD. BUCK - <br />* DOUBLE 2X4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />N <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />+ 4- <br />+ NCr (2)10d NAILS @ 8 O.C. <br />N <br />lit <br />#5 BAR IN <br />TO FIT ARCH CONNECT W/ <br />START OF ARC <br />NEQUAL4' <br />NOTE: IF TRUSSES USED) W/ (2) #6 X 4%" WOOD <br />+ * TO TRUSS TOP CHORD <br />FILLED CELL — <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />MAX. RAD. <br />SHED ROOF ENDS TO BE SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />+ + <br />r : V 16 1 L. . j r ., r : r., <br />INSTALL WDW, SCREW <br />BTWN. OSB ARCH FACES W/ (4)10d NAILS EQUAL <br />GABLE ONLY, CORNERS WALL USE (2)1/4" X 31/2" TAPCONS AT 16" <br />+ <br />+ PLYWOOD SHEATHING <br />�: <br />THRU OSB INTO 2 x 8 <br />SHALL NOT BE FRAMED AS O.C. <br />ANCHOR INTO ARCH BLKG. <br />HIP. <br />+ <br />STEMWALL FOOTING SIZE AND <br />PER INSTALLATION DETAILS <br />ARCH DETAIL �( <br />B-B <br />DESIGNED ONLY FOR THE SECTION @ ENTRY L <br />BLOCKING AS <br />REINF. PERLAN AND STEMWALL <br />SCALE: N.T.S. SS <br />INSTALLATION OF SHINGLE SCALE: 3/4" =1'-0" <br />TRUSS + + REQUIRED TO <br />MONO TO STEMWALL FOOTING SECTION DETAILS <br />AND METAL ROOF FINISH SS <br />+ SUPPORT SOFFIT <br />2X4 SYP ... <br />SCALE: 3/4" = V-0" <br />EACH TRUSS <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJECT, <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />CONNECTOR ��� <br />CONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />SEE LINTEL <br />EXTENDS TO SILL. <br />EXISTING BOND BEAM. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />SCHED. <br />D) SET LOWER COURSE OF BLOCK, MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />ENTER SO IT <br />DRILL 3/4"x5" MIN. HOLE SET BAR IN <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />EPDXY CAP TO PREVENT LEAKAGE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE EXPANSION STRIP <br />PRECAST LINTEL <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT 20 ga. PANEL <br />SI <br />SEE ELEVATION <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS ANCHOR <br />FOR OVER HANG <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY t 2") <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />W.W.M. AT PERIMETER <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. 1/4" EXPANSION BOLT (2 <br />I HWHERE THIS CONDITION <br />(MAX. 4'-0") <br />r #5x6' EMBEDDED INTO EXISTING BOND BEAM <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS 9 ga. PANEL PER ANCHOR) <br />#5 CONT. TOP &MID OCCURS <br />SECTION @ ROOF EXTENSION M <br />z <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING REINFORCING <br />TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />WITH MIN. 3" COVER g�_0 <br />SCALE: 3/4" =1'-0" <br />O <br />SHALL APPLY (EVERY OTHER <br />CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. COURSE) EXPANSION STRIP�12�LL- <br />wFILL <br />NON SHRINK GROUT, <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />° <br />O 9 <br />A <br />SEE SHEET D2 AND <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />° x , <br />° ° <br />SIMPSON HTT4 w/ (18)10d x 1 <br />w CL <br />REINFORCING AS FOLLOWS: <br />SEALANT <br />FLOOR PLAN FOR <br />1/2" NAILS TO STUDS & (1) - MORE INFO <br />¢ 1 <br />u- a <br />* PLACE LOWER HALF OF MORTAR IN BED JOINT, DO NOT FURROW. <br />_ <br />5/8 DIA. ALL THREAD ROD <br />~ #5x6' EMBEDDED INTO <br />* PRESS PANEL REINFORCING INTO PLACE. " 6" MIN. LAP SPLICE W/ <br />> ° <br />EPDXIED w/ SIMPSON "SET"' i' <br />v z <br />EXISTING FOOTING (2) #5x6' IN CONC. <br />* COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL REINFORCING PANEL <br />EPDXY MIN. 6 EMBEDMENT & <br />v¢i in FILLED CELL <br />SMOOTH. DO NO FURROW. <br />° ► ° <br />3 MIN. EDGE DISTANCE <br />`~1 fl DRILL 3/4"4"MIN. HOLE <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />GRADE o, . o <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. 6" MIN. LAP <br />p e <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST 7 SPLICE <br />NOTE: <br />�•, ► <br />`' <br />REMAIN FREE OF MORTAR. <br />z \ <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS SEE GLASS BLOCK INSTALLATION NOTES. <br />g <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE SEALANT <br />, ° <br />4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. GLASS BLOCK DETAIL <br />\ ' (2) #5 REBAR. (1-STORY) <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16 " MIN. (1 STORY) (3) #5 REBAR. (2-STORY) <br />A SECTION <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />20" MIN. (2-STORY) WITH MIN. 3" COVER EA. WAY <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />SECTION AT DEEP MONO FOUNDATION <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAYBE INSTALLED IN ANY OPENING. <br />REV. 07.28.21 SCALE: 3/4" =1'-0" <br />RETROFIT FOR MISSING <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />MSTAM STRAP <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />SCALE: 3/4" = V-0" <br />en <br />C'V <br />o <br />0 <br />cm- <br />CU =a <br />Q <br />v cr- o <br />�, <br />m tV <br />-'a <br />N C W a <br />m <br />4 <br />H d N <br />-¢ .d N <br />�y 13.E W <br />Cu <br />CY <br />�W <br />r, CD <br />O <br />C E <br />J <br />M. <br />N <br />O <br />N <br />X <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />f� <br />8[Q� <br />� J J <br />WW LL tL <br />W <br />a <br />�Ncs, LL uj <br />a Y <br />_ <br />0 <br />LL U_ U• <br />o $ <br />c <br />rm$ 0,90 <br />m <br />c W <br />W <br />�1ON`° J0 <br />turn d z <br />Z <br />U0 <br />�oW <br />ODIL <br />N M z U tUA <br />Z <br />OU ❑❑❑ <br />W <br />z <br />z <br />z <br />$ <br />Q <br />W <br />f <br />z <br />CzlJ <br />0 <br />w <br />ANEWw <br />MID <br />M <br />Fo <br />�h <br />¢s <br />o <br />o <br />z® <br />wa <br />CL <br />U <br />j� <br />� ° <br />Z <br />I-- <br />� <br />ao <br />wg <br />ms <br />yC <br />Buz <br />Z <br />3 <br />83 <br />__ <br />ao <br />Wm <br />�dp <br />� <br />°LL <br />H w <br />O h <br />� <br />iIK <br />U5 <br />O <br />= <br />> LO <br />CC <br />0 <br />rn <br />W <br />W <br />Lid <br />(0 <br />N <br />:3 CV <br />^ <br />Q <br />$ <br />Jam+CN <br />N <br />') <br />O <br />LO <br />� <br />a..+ <br />O <br />Y <br />M <br />U CO <br />O <br />°0 o <br />Ln <br />r <br />Q <br />n LO <br />r <br />E <br />Ln <br />z <br />E N <br />JOB <br />NO: <br />23-03654 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />SS <br />