Laserfiche WebLink
1/2" DRYWALL DOOR JAMB REFER 1x4 1/2" DRYWALL <br />1x4 1/2" DRYWALL DOOR JAMB (REFER 1x4 ( <br />UNACCEPTABLE INSTALLTION <br />DOOR JAMB (REFER TO PRODUCT <br />TO PRODUCT P.T. TO PRODUCT <br />MAX.8" ♦♦ DO NOT DO THIS �� <br />PROPER INSTALLATION <br />2"x BOT. PLATE W/ (2) 1Od @ 6" O.C. <br />APPROVAL FOR CONN. APPROVAL FOR CONN. <br />APPROVAL FOR CONN. 1x4 r 1 X 4 <br />71x4 P.T. LT <br />♦♦ #5 REBAR (TYP,) �� <br />♦♦♦♦ <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />BOTTOM 4 <br />3/111 X 3" LONG FURRING <br />FURRING 2 ROWS 3/16" x 3-1/2" <br />( ) <br />#TMPEBAR <br />AND NAILED W/ 8d COMMON @ <br />O.C., ROWS STAGGERED <br />3-1/4" LONG X 3/16"0� FURRING TAPCONS <br />..�� <br />(TYP,) ♦♦ <br />6" O.C. EDGES AND 12" O.C. FIELD44 <br />TAPCON. INTO @ �� TAPCON @ 16" O.C. & 4" 2Xg <br />STAGGERED 16 <br />.� <br />♦ <br />1x8 P.T. FROM EACH END w/ MIN. 1X8 <br />BLOCK@ SPACING ,r O.C. 2-ROWS INTO 2" EDGE DIST. ATTACH <br />PER MANUFACTURE 1 DETAIL <br />o <br />♦ �S�D. 0 HOOK (TYP.) <br />2x BAND JOIST W/ FACE NAIL d <br />MASONRY THROUGH �� <br />1-1 /2 DETAIL 1x8 w/ (2) ROWS 8d NALS �� <br />3 DETAIL <br />STD. 90" ♦♦ �� ♦' <br />FILL <br />♦♦♦ <br />@ TOP & BTTM CHORD, AND (8) <br />1x4 P.T. & 1x8 P.T. STAGGERED @ 12" O.C. <br />OLIDLS HOOK (TYP.) .�� <br />BOTHTAPCON <br />FACE <br />BE NAILS 10d @ TRUSS VERT. <br />TAP@ 116" 1x4 P.T. DOOR JAMB (REFER <br />TO PRODUCT <br />El L: 41, <br />Lil <br />METAL SEAT PLATE <br />O.C. & 4" FROM DOOR JAMB (REFER 1/2" DRYWALL <br />NOTE: <br />EACH END W/ MIN TO PRODUCT APPROVAL FOR CONN. ix4 <br />LAP SHEATHING TO <br />DOOR JAMB (REFER <br />TO PRODUCT 2" EDGE DIST. APPROVAL FOR CONN. 2x8 P.T. w/ (2) ROWS 3/16" <br />n x 3-1/2" TAPCON @ 16" <br />.�1 ♦♦♦ <br />BOTTOM OF BAND <br />JOIST TYPICAL <br />APPROVAL FOR CONN. (2) ROWS 3/16" x 3-1/2" `�' O.C. & 4" FROM EACH 1x4 <br />@ END w/ MIN. 2" EDGE DIST. FURRING♦ <br />TAPCON 16" O.C. & <br />+2" NOTCH�t�B @ FIRST COURSE <br />SIMPSON HGAMIOKTA @ 12" O.C. <br />4" FROM EACH END w/ 2x8 P.T. ATTACH SECOND PLY w/ <br />- ♦ <br />♦♦♦ <br />w/ (4)1/4xl 1/2" SDS SCREWS <br />2x P.T. AS REQ'D MIN. 2" EDGE DIST. (2) ROWS 10dx3" 2x8 <br />.�� <br />INTO BAND JOIST & 4 1/4"x2 3/4" <br />( ) <br />2x DETAIL 2 1 /4" DETAIL STAGGERED @ 12" O.C. 3_ 1 /4�� DETAIL <br />NOTCH WEB AT THE �� ♦♦ <br />TITEN INTO K.O. BLOCK <br />t5 FIRST 2 COURSES <br />010 <br />BUILDOUT OVER SIZE DOOR -WINDOW ROUGH OPENINGS CC <br />FILLED CELL PER <br />FOUNDATION PLAN <br />FILLED CELL INSTALLATION H <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. SS <br />SEE TYP, 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />SCALE: N.T.S. <br />SS <br />2x8 P.T. BUCK -CONNECT TO BLOCK SECTION <br />UPLIFT CAPACITY <br />W/ 1/4" x 31/4" TAPCON (1 1/4" MIN. A -A <br />_ 1610 # FOR 2 STRAPS <br />FILL RSES <br />EMBEDMENT INTO BLK.) 1/4" MAX <br />„ 2 -0 8" <br />1 PLY PRE-ENGINEERED TRUSS <br />SEE ARCH PLAN AND <br />D W/GR UT <br />•oo SOLID w/cRour <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. 1/4" x 3 1/4"TAPCONS <br />PRE-ENG TRUSS DESIGN <br />BLOCK HEADER ARCH BLKG. & BUCK <br />SIMPSON HM9KT w/ (4)1/4"x1 1/2" SDS <br />SEE NOTE 1 BELOW <br />1/2" DRYWALL * <br />SCREWS & (5)1/4" x 21/4" TITEN (IF TRUSS <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16)16d <br />8d NAILS AT 8" O.C. AT BUCK <br />SINKERS AND (7) 1/4"x2 1/4" TITEN = 2150 #) <br />2x SUB FASCIA <br />2 x 8 45' DIAGONAL (4)10d NAILS INTO LEAVE A CUTOUT IN O.S.B. ON THE <br />j <br />ALUM DRIP EDGE <br />BRACE(S) 2 x 8 BRACE/ BLKG. INSIDE TO ALLOW FOR INSULATION <br />7/16" OSB TO BE INSTALLED <br />BOND BEAM OR CAST IN PLACE BEAM <br />I I ALUM FASCIA <br />WALL TYPE <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />POLY -CELL IN THIS AREA 2 x 8 45 DIAGONAL BRACE AT EA. <br />BRG �--- 1 <br />PER PLAN 1 I 1-3/4" TRIM PAINTED <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. <br />:e' <br />SCRIBE (NOTCH) <br />BACKSIDE TO FIT ARCH FACE OF ARCH W/ (3)10d NAILS <br />(BRACENBLKG NTO 2 x 8 AT EA. END <br />RETROFIT TRUSS DETAIL <br />I I <br />F CHANNEL, I SS NAIL w/ 5/16 HEAD <br />DIA. @ 24" O.C. <br />.,:• . <br />OVERHANG'�' •,+ , <br />.,. �. <br />CONNECT W! 8d NAILS <br />\_2 <br />N.T.S. <br />FASTENED PER 1 <br />NOTE 2 BELOW-1—- CONT VENTED OR SOLID SOFFIT <br />I L <br />x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />INSTALL WDW. SCREW ANCHOR ARCH FACES W (4)10d NAILS THRU OSB INTO 2 x 8 PROVIDE WITHIN <br />CONT <br />CEVERY <br />RETROFIT WALL OVERHANG DETAIL (NTS) <br />INTO ARCH BLKG. PER 4 MIN. OF BRACE <br />RACE <br />OTHER TRUSS <br />BLOCKING w/ 2-12d NAILS (*o CHORD TR SS <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />w/ 3-12d NAILS, TYP. (**) <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />START OF ARC <br />IF TRUSSES USED 'YV WOOD <br />) W/3 () #6 X 4 <br />- — - <br />1. G.C./ BUILDER TO VERIFY/PROVIDE SOFFIT MATERIAL SPAN CAPACITIES BASED <br />NOTE: FOR OVERHANGS LESS THAN 3/4" • NO REPAIR REO'D. <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY WALL <br />ON THE DESIGN PRESSURES SPECIFIED FOR COMPONENTS AND CLADDING <br />4' MAX. RAD. <br />ARCH DETAIL ri <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ , <br />I LISTED IN THE DESIGN CRITERIA ON SHEET SN. <br />MIN. 4" EMBEDMENT AT 16" O.C. <br />2. FOR SOFFIT ATTACHMENT AT WALL (PER ALPHA ALUM. INC. FL# 165" R5 FL <br />r_ <br />11- Qrr 5 10n <br />SCALE: N.T.S. SS <br />12 <br />JACK TRUSS PROVIDED BY SEE <br />PRODUCT APPROVAL) F CHANNEL FASTENED TO: <br />TRUSS COMPANY OR <br />- CMU w/ T NAIL .097" DIA. @ 24" O.C. w/ 5/8" MIN. EMBEDMENT <br />PLAN <br />2x6 #2 SYP @ 24" O.C. <br />- WOOD w/ (3) 16 GA. 3/4"x1/4" CROWN STAPLES @ 24" MAX. O.C. IN DIAMONDAt-,FINISH <br />PATTERN <br />FLO <br />2 x 8 BUCK - CONNECT TO BLOCK SECTION <br />WITH 1/4 x 3 1/4TAPCON (1 1/4' MIN. <br />ROOF SHEATHING ATTACHED i <br />- SUB FASCIA w/ 16 GA. 3/4"x1/4" CROWN STAPLE @ EACH GROOVE <br />° <br />B-B <br />/4" MAX EMBEDMENT IN TO K.) <br />" <br />PER NAILING SCHEDULE ALL <br />- <br />• '� , ►: #5 BAR <br />2 -0 8 <br />SIMPSON <br />STRUCTURAL SOFFIT <br />1. ►' " P <br />1-0 • CENTERED W/ <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />(5)12d NAILS <br />H2.5A w/ (10) <br />S F01 <br />`' <br />► ' IN TOP c <br />1 X 4 FURRING <br />BLKG. &BUCK <br />2X6 TO 2X4 <br />8d NAILS <br />SCALE: 3/4" = V-0" (**) FOR ALUMINUM SOFFITS WITH SPANS <br />° <br />► ' KNOCKOUT / iv <br />REV. 09.23.2021 > V-4", INSTALL MID SPAN BLOCKING PER <br />, <br />i <br />THE SOFFIT FL PA INSTALLATION CRITERIA <br />:; ° CHAIR BLOCK <br />8d NAILS @ 8" O.C. AT BUCK <br />2 x 8 VERT. W/ (2D <br />NAILS AT EA. END <br />PROVIDE 2x <br />*REFER TO THE PRODUCT APPROVAL FOR INSTALLATION DETAILS.* <br />MONO FOOTING 1 - d ►• <br />PROVIDE 2 x 8 DIAG. BRACE B <br />PROVIDE 2 O MIN. <br />CONT. W/ (3) <br />' <br />A <br />SIZE AND REINF. PER PLAN <br />VERT. BRACES WHEN HGT. OF <br />TAPCON AT EA. SIDE <br />12d NAILS <br />AND SECTION DETAILS <br />BRACE EXCEEDS 24" <br />BUCK - (1) WITHIN 4" <br />JACK TRUSS PROVIDED BY <br />LEAVE A CUT OUT IN O.S.B. ON TI MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />CLEAN FILL ° • ° <br />2 x 8 VERT. BRACES <br />() <br />INSIDE TO ALLOW FOR INSULATION ARCH <br />#2 SYP @ 24" O.C. � <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />.► <br />DIRT . 4 Z <br />TO BE INSTALLED <br />4'-0" SEE <br />2 xOV TRUSS AS SHOWN FOR O.H. UP TO 7-6" <br />� STANDARD <br />BUILT UP PLWD. BUCK - <br />EiQ * DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />Nq <br />. <br />°'• �? <br />i 99 HOOK iv <br />SCRIBE (NOTCH) BACKSIDE <br />„ <br />7/16 OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />+ + �FNGT (2)10d NAILS @ 8" O.C. <br />H <br />#5 BAR IN <br />TO FIT ARCH CONNECT W/ <br />NOTE: IF TRUSSES USED) W/ (2) #6 X 4Yz' WOOD <br />+ TO TRUSS TOP CHORD <br />FILLED CELL - - <br />8d NAILS <br />START OF ARC <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />SHED ROOF ENDS TO BE SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />+ + <br />.• , �.,�. �., .�� �.� .: • ., <br />BTWN. OSB ARCH FACES W/ (4)10d NAILS EQUAL EQUAL 4' MAX. RAD. <br />GABLE ONLY, CORNERS WALL USE (2) 1/4' X 31/2" TAPCONS AT 16" <br />+ + PLYWOOD SHEATHING <br />•: � � �'� <br />� � � <br />INSTALL WDW, SCREW <br />THRU OSB INTO 2 x 8 <br />SHALL NOT BE FRAMED AS O.C. <br />+ + <br />"� '� `� ' ' <br />ANCHOR INTO ARCH BLKG. <br />HIP. <br />+ <br />STEMWALL FOOTING SIZE AND <br />PER INSTALLATION DETAILS <br />ARCH DETAIL �( <br />B-B <br />DESIGNED ONLY FOR THE SECTION @ ENTRY KT <br />BLOCKING AS <br />+ <br />REINF. PERLAN AND STEMWALL <br />SCALE: N.T.S. SS <br />INSTALLATION OF SHINGLE SCALE: 3/4" = V-0" <br />SS <br />TRUSS + REQUIRED TO <br />MONO TO STEMWALL FOOTING SECTION DETAILS <br />AND METAL ROOF FINISH <br />+ SUPPORT SOFFIT <br />2X4 SYP ... <br />SCALE: 3/4" =1'-0" <br />EACH TRUSS <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJECT, <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />CONNECTOR �'� <br />CONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />SEE LINTEL <br />EXTENDS TO SILL. <br />EXISTING BOND BEAM. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />SCHED. <br />X. <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />ENTER SO IT <br />DRILL 3/4"x5"MIN. HOLE SET BAR IN <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />EPDXY CAP TO PREVENT LEAKAGE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE EXPANSION STRIP <br />PRECAST LINTEL <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT 20 ga. PANEL <br />SEE ELEVATION <br />TOP SPACE BETWEEN EXISTING GROUT &NEW GROUT <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS ANCHOR <br />FOR OVER <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY t 2") <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />W.W.M. AT PERIMETER <br />HANG <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT, 1/4" EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />(MAX. 4'-0") <br />} <br />#5x6' EMBEDDED INTO EXISTING BOND BEAM <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS 9 ga. PANEL PER ANCHOR) <br />#5 CONT. TOP &MID OCCURS <br />SECTION @ ROOF EXTENSION M <br />z <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING REINFORCING <br />WHEN AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />WITH MIN. 3" COVER V-011 <br />SCALE: 3/4" =1'-0" <br />0 <br />¢ <br />SHALL APPLY TO PANEL ANCHORS USED (EVERY OTHER <br />FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS. RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. COURSE) EXPANSION STRIP <br />� v <br />NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />° ♦—� <br />O <br />A <br />SEE SHEET D2 AND <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />► ° > ► S-T <br />SIMPSON HTT4 w/ (18)10d x 1 <br />W a <br />U <br />REINFORCING AS FOLLOWS: _ <br />y. SEALANT <br />FLOOR PLAN FOR <br />1/2" NAILS TO STUDS & 1) - <br />( MORE INFO <br />a <br />* PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />g► ° „� — <br />_ <br />5/8" DIA. ALL THREAD ROD <br />= g <br />#5x6 EMBEDDED INTO <br />* PRESS PANEL REINFORCING INTO PLACE. 6" MIN. LAP SPLICE W/ <br />► ° <br />EPDXIED w/ SIMPSON "SET" :. <br />0 ? <br />EXISTING FOOTING (2) #5x6' IN CONC. <br />* COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL REINFORCING PANEL <br />° <br />NT & EPDXY MIN 6" EMBEDMENT <br />3" MIN. EDGE DISTANCE <br />¢ <br />"' <br />N <br />FILLED CELL <br />SMOOTH. DO NO FURROW. <br />► _ <br />° <br />DRILL 3/4"x5" MIN. HOLE <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />GRADE >. a <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. 6" MIN. LAP <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST SPLICE <br />NOTE: <br />M <br />REMAIN FREE OF MORTAR. <br />SEE GLASS BLOCK INSTALLATION NOTES. <br />r <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />° <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE SEALANT <br />° <br />4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. GLASS BLOCK DETAIL <br />\ ' (2) #5 REBAR. (1-STORY) <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16" MIN. (1-STORY) (3) #5 REBAR. (2-STORY) <br />(' ) <br />A SECTION <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />O <br />20"MIN. (2-STORY) WITH MIN. 3" COVER EA. WAY <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />1 SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />SECTION AT DEEP MONO FOUNDATION <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT <br />FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />REV.07.28.21 SCALE:3/4"=1'-0" <br />RETROFIT FOR MISSING :b <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />MSTAM STRAP <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />SCALE: 3/4" = V-0" <br />N po <br />O <br />co <br />X <br />CL <br />L <br />(a <br />C N Y <br />N QS Q <br />Q o 3 <br />zcp <br />N <br />3 Q.0 <br />E : <br />:3 C: 0 <br />o �o <br />>�dw-w <br />\\{tfi!(llfr <br />r' <br />F20 W ♦f`�ri <br />•�, <br />• ��ASE <br />v '• G ' q <br />ti <br />o <br />••• �\ \p <br />•• <br />F l-O'• 4' <br />C,FEsS10� <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building <br />Code - <br />Residential 7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal, <br />a <br />00 <br />I <br />O N <br />v N �� <br />N <br />�u� <br />C <br />cn <br /># - a <br />L <br />rrNi v 2S <br />d�1 <br />�LLLLS <br />— <br />LL <br />a <br />_ _ `2m <br />0 <br />O <br />o� <br />1 <br />W U) <br />co <br />Ia <br />Go <br />Z � MZ <br />QIL <br />�2¢Ln0 <br />ZN O U <br />U <br />W <br />❑ ❑ ❑ <br />z <br />z <br />z <br />a <br />- N <br />Qz <br />1 0 LL <br />CLU <br />O o <br />�N <br />j <br />_ <br />u <br />¢ Y <br />< <br />0 <br />N � <br />r— <br />0 <br />_j <br />M <br />o <br />_ <br />E <br />SE <br />�= <br />Ze <br />oa <br />zo <br />N <br />� <br />�? M <br />�o <br />z <br />yj <br />C/7 <br />.0 <br />)� <br />W <br />S <br />8 <br />a <br />W <br />D_ � <br />U� <br />m w <br />�= <br />o <br />xQ <br />tCD <br />D <br />�Iy�y <br />04 <br />glS <br />US <br />. <br />sn <br />�L <br />J <br />O <br />9 <br />0 <br />M <br />ca <br />O <br />m <br />O <br />� <br />CV <br />O <br />T <br />N <br />co <br />♦— <br />E <br />M "� <br />0 <br />Z <br />c <br />E 10 N <br />E ti <br />�° <br />= <br />a <br />v . <br />i <br />c0 a o <br />c <br />JOB <br />NO: 22-02353 <br />SCALE : AS NOTED <br />SHEET NO. <br />SS <br />