Laserfiche WebLink
INSULATION — <br />BAFFLE <br />INSULATION PER - <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS <br />1/2" GYP WB <br />DOUBLE 2x S.P.F. TOP PLATE <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH > 4:12 AND ATTACHED PER <br />TABLE R905.1.1.1 OF THE FBC 7TH EDITION (2020)-RESIDENTIAL <br />(2) LAYERS ASTM TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH 4:12 OR LESS AND ATTACHED <br />PER SECTION R905.1.1.1, ITEM 4 OF THE FBC 7TH EDITION <br />(2020)-RESIDENTIAL <br />PRE ENGINEERED HURRICANE ANCHOR @ EACH TRUSS <br />WOOD TRUSS @ 24" <br />O.C. MAX. SHINGLE ROOF <br />-SHINGLE ROOF <br />15/32" CDX PLYWOOD OR 7/16" <br />O.S.B. (SEE ROOF NAILING <br />SCHEDULE ON SHT SN1) <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />2x SUB FASCIA <br />SEE SOFFIT SHEET <br />ATTACHED WALL SHEATHING TO <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />1x2 NAILER <br />w PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />W <br />16" O.C. 2X S.P.F. STUDS <br />o = <br />W/ (4)16d TOENAILS TO TOP PLATE <br />O <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/TOTAL THICKNESS 7I8" OVER <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />w <br />LAYER 118"THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />LL = <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />I <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA 51000 <br />B R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALE <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />fETAL <br />SEAT <br />FLOOR SYSTEM <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" — <br />GYP, TYPE " X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />v <br />E <br />N <br />s+> <br />6x6 W1.4xW1.4 <br />WWF OR FIBEI <br />0 OR FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />. . JA <br />STD. 90 HOOK (SEE DETAIL) <br />8"x8"X16" CONC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />0 4"x4" INSPECTION PORT AT <br />w o. EACH FILL CELL TYPICAL <br />'I 74" <br />I-II II,.r,-1ISTD.90°HOOK <br />(3) # 5 REBAR ON 3" CHAIR <br />r— (SEE DETAIL) <br />W/3" MIN. CLEARANCE <br />TYP 2-STORY WALL SECTION ,1 <br />SCALE: 3/4"=V-0" <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL---, <br />BAND JOIST <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2" <br />NAILS TO STUD & (8) 1Od x 1 1/2" TO BAND — <br />JOIST AT EA. S fUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />SEND SHEATHING TO <br />)F BEAM OR GIRDER <br />ATE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 10d @ 6" O.C. <br />NOTES: " USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY, <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS N <br />SCALE: N.T.S. S6 <br />1x WD FURRING @ 24" O.C. o- AT GARAGE CONTRACTOR 2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" 0/C, 2 ROWS STAGGERED <br />TI/ <br />o FINISH GRADE oo FLOOR TRUSS SEE FRAMING PLAN <br />_ °a <br />Tf —III=I I — FLOOR TRUSS <br />— f = a0 SEE FRAMING WEEP SCREED <br />'H I ICI I I� ♦ ° e. I T_ c T PLAN INSTALLED PER MANUF, <br />III ��I I I III - „ SIMPSON HETA20 w/ (8)10dx1 1/2" <br />2 x4 CROSS BRACE @ 48 <br />O/C FOR THE 1ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=1' <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />E <br />S6 <br />BASEBOARD <br />M <br />TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB <br />CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER <br />NOTE: EXTEND DECO FINISH <br />MUNICIPALITY <br />4"to 6" BELOW GRADE <br />2x STUDS @1-"" <br />2"x BOT. PLATE <br />(2)10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUS: <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8)10dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />FLOOR CONNECTION B <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=V-0" S6 <br />FOR ADDITIONAL INFORMATION. <br />B.U.C. <br />PROVIDE CONTINUOUS (8)1Od NAILS TO <br />BLOCKING FROM B.U.C. STUD PER STRAP <br />TO MASONRY BELOW <br />(6) 1/4" x 21/4" TITEN <br />SCREWS TO MANSONRY I� <br />WALL PER STRAP \ <br />WOOD TO MASONRY <br />CONNECTION W/ MSTAM36 <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SYSTEM <br />SIMPSON MSTAM36 <br />MASONRY WALL <br />SCALE: N.T.S. <br />RIBBONS <br />LL <br />S6 <br />DETAIL FLOOR TRUSS 0 <br />SCALE: 1 1/2"=V-0" S6 <br />NOTE: SEE TYPICAL WALL <br />SEE SHEATHING <br />SECTION C/S3 FOR <br />SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID <br />GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT.:5 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'.6" <br />EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10)10d <br />2"DIA.X 3/16" PLATE WASHER <br />V <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />11 <br />49 <br />7 A-M <br />TI II - <br />-I I I,�1ILLmf f1 1f 1ri� I I 1-(3) #5 CONT. ON 3" <br />8" Il V-8„ 8' CHAIR W/ 3" MIN. <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=1'-0" Gv'6 <br />ADDITIONAL SLAB INFORMATION. <br />W <br />In <br />15/32" OSB <br />EXPOSUREI <br />SHEATHING <br />x <br />x <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />D <br />p SECTION X-X IF <br />U-'{ NOT FULL <br />a HEIGHT SHEET <br />C <br />z <br />G <br />FLOOR <br />SYST M <br />(2)- 2x TOP PLATE <br />15/32" OSB <br />EXPOSUREI <br />F <br />SHEATHING W <br />SOLID 2x <br />C <br />BLOCKING @ ALL 0 <br />C <br />SHEATHING <br />EDGES (SEE <br />OPENING <br />SECTION X-X <br />d U u <br />C <br />x <br />3 w <br />x <br />E <br />2x STUDS w <br />BEYOND. <br />SEE PLAN <br />N <br />'J..A DT DACC <br />2x RIBBON OR VERTICAL �AYHORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM %AIAI I rl r\/ATl^kl r%I.1/' MA11A <br />3/8" "S" = NAIL <br />SPACING <br />S 3/4" S <br />1l2" <br />e e o <br />SINGLE NAIL EDGE SPACING DOUBLE NA <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/7/16" <br />FLITCH PLATE TO wl (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />VERTICAL BLOCI„NG <br />SECTION X-X <br />SFF �Off, <br />N <br />2x CRIPPLES @ - <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x — <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />S <br />1/2" <br />(1/2" <br />SPACING <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM y" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />u <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />j <br />PENETRATE SURFACE MORE THAN Ya". <br />OA NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />© NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />_ <br />© NAIL OPENING PERIMETER wl (2) ROWS @ 4" O.C. w/ 8d COMMON NAIL. <br />OD NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />U <br />O STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />w/ 8d COMMON NAIL <br />J UJ 2 <br />Ij LL 0 cr <br />O PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />^ <br />> 00 <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />i <br />n m + <br />OG (2) 8d NAILS @ Y O.C. TO EACH TRUSS END OR @ VERTICAL <br />= LL <br />N Lu p ~ <br />MEMBER IF GABLE END <br />U. <br />NOTE: <br />8d NAILS FOR WALL SHEATHING MUST BE MIN .131" X 2 1/2" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />S4 <br />• INTERIOR HEADER: <br />BOX HEADER <br />(1) 2x SILL PLATE W/ (2) <br />ONLY <br />12d TOENAILS <br />e EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 1Od x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS / <br />SEE PLAN FOR REQUIRED' \ <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR <br />FRAME WALL HEADER DETAIL <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />' SHEAR 3500#. MIN, TYPICAL <br />TENSION 2600#,) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 WlAxW1.4 <br />WWF OR FIBERMESH <br />d' ° <br />N -III—III—III—I I ° ° ♦ a <br />M <br />4. <br />III- <br />1IIIIIIIIIIIIIIII ° <br />11 <br />a <br />� III-1I� <br />(3) # 5 REBAR ON Y CHAIR 4" V-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />SIZE <br />EA END <br />EA END <br />EA END <br />EA END <br />1'4 <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />4'-9' <br />(2) <br />3 <br />(2) <br />(2) <br />(1) LSTA30 <br />(3) <br />3) <br />(2) <br />(3) <br />(2) LSTA30 <br />M pL 21 202' <br />S6 / <br />Review Assist,�ln� <br />Vi ual <br />Plans Review complete a aVPT <br />FBC 7il <br />PLYWOOD SHEATHING NAILED PER NAILING for comptianc alAnneeK ahOr PX2300 <br />DebSCHEDULE SEE DETAIL C/S6 FOR MORE INFO Y <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10)10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER, MANUF. <br />VY. FINISH GRADE CO <br />@ WOOD 1 ST FLR. SEE J/S6 FOR SCALE: 3/4"=1'-0" <br />ADDITIONAL INFORMATION. <br />O <br />r <br />) <br />M <br />0 <br />• ����, <br />u� <br />- <br />LO <br />O <br />j U <br />� <br />*k <br />LL <br />Q <br />9 <br />to (D LO - E <br />> O 0 <br />L. 'C �0 <br />W U <br />N V � C) <br />/1) E 0 t <br />Y}/ U <br />5 U: $ <br />Q <br />. N i w <br />n, CQC N C <br />W ` C 2) <br />C ^ 11 a <br />W <br />W <br />�lll vi' W0 <br />WI-¢ Q�� WW zx Z <br />u- <br />(� W <br />Q Q U <br />tr0���O�W co <br />�Ox I= 0zg�0l-Q►= <br />0u- 0 <br />L) <br />0 E- <br />Cl <br />cyLLJ oZO�oomZ� <br />�0a>Zycp za6180a. <br />U) Z <br /><F-- Q-�'-gwO¢ <br />oQ o 0 o¢z <br />a <br />p <br />O <br />fV <br />0� <br />h <br />u4 <br />4 M k O <br />O <br />Ln <br />Q J Ln <br />0. <br />LL� <br />z <br />W ce LA <br />C- m: rI <br />< b <br />I— <br />O <br />< <br />Z <br />Z <br />Lu <br />Jo <br />N <br />04 <br />N <br />N <br />04 <br />N <br />O <br />A <br />V- <br />-4 <br />N <br />O <br />N <br />0'j0 <br />:T- <br />.N <br />10 <br />O <br />00 <br />0 <br />of <br />. <br />c0 <br />T- <br />o0 <br />T- <br />CO <br />I'- <br />O <br />N <br />O <br />N <br />0 <br />N <br />N <br />d. on <br />0 <br />N <br />0;CD <br />N <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />0 <br />N <br />c� <br />0! <br />O <br />Irl0 <br />O <br />o0 <br />N <br />`_ <br />A <br />Q <br />1140) <br />O <br />0 <br />O <br />O'O <br />O <br />6 <br />O <br />O <br />O <br />N <br />0 <br />O <br />' <br />L <br />N� <br />� <br />r <br />�- <br />0 <br />N <br />0 <br />M <br />0 <br />"t <br />0 <br />Ln <br />0 <br />W <br />0 <br />1�_ <br />07 <br />�� <br />�WvM W (OnZZ <br />o <br />~ <br />Q <br />O 0- <br />Oa=Q <br />�� <br />Z <br />�P� <br />~co0Z <br />V <br />Z J <br />Z <br />1� <br />- <br />Z Z 0 <br />w IM\ <br />Q w <br />O-12z <br />U� <br />ul <br />z <br />O <br />z <br />Z <br />Q O <br />. . <br />Z <br />U <br />Oo <br />m <br />o: <br />z <br />S6 <br />a <br />z <br />z <br />J <br />L1J <br />M <br />O <br />r <br />LAST PLOT DATE <br />> <br />May. 8, 23 '. <br />STRUCTURAL <br />z Q <br />J <br />DETAILS —MONO <br />