My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6425 Back Forty Lp
Zephyrhills
>
Building Department
>
Building Plans
>
6425 Back Forty Lp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:26:54 PM
Creation date
2/19/2025 8:25:57 AM
Metadata
Fields
Template:
Building Plans
Street #
6425
Location
Back Forty Lp
Contractor
Lennar
Building Plans - Permit #
Unknown
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br />ROOF FINISH PER <br />ROOF FINISH PER <br />12 5 ELEVATION <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOFTRUSS <br />METAL DRIP EDGE <br />2X4 SUB -FASCIA <br />1-0 ALUMINIUM WRAP <br />ALUMINUM <br />NOTE: REFER TO STRUCTURAL SOFFIT SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />SOFFIT DETAIL - 8" TRUSS HEEL <br />61 <br />1-019 <br />/4 =1 <br />HOOF FINISH PER <br />12 ELEVATION <br />15 <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOF TRUSS <br />• METAL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINIUM WRAP <br />ALUMINUM <br />SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />SOFFIT DETAIL <br />7 <br />3/4 it 11-011 <br />6" <br />o co 0 00 <br />EPS <br />i�l FOAM iv <br />BRACKET DETAIL <br />8 <br />5" <br />1" 3" 1, <br />fV CV <br />a <br />o00 00 <br />EPS <br />ii FOAM iv <br />BRACKET DETAIL <br />9 <br />PROVIDE FILLED SOLID CMU ABOVE <br />LINTEL TO TIE BEAM <br />--^ FLASHING <br />PT 2X8 LEDGER ATTACHED TO WALL <br />W/ 3/8" X 5" TITEN HD AT 12" O.C. <br />(S) H10A-2 STAGGERED, SEE DETAIL 11/A5 <br />ROOF FINISH PER ELEVATION <br />UNDERLAYMENT <br />ROOF SHEATHING <br />ELEV AT 8'-8" <br />• 12 T.O.M. <br />—75 METAL DRIP <br />EDGE <br />(S) A23 <br />2X4 FASCIA <br />ALUMINIUM <br />•. 2'_0" WRAP <br />(S) A23 ALUMINUM <br />SOFFIT <br />PT 2X4 LEDGER ATTACHED TO <br />WALL W/ 3116" TAPCONS W/ <br />MIN 2-1/2" EMBEDMENT 6" O.C. <br />BTM AT 7'-6" <br />SOFFIT DETAIL <br />10 <br />PT 2X8 LEDGER ATTACHED TO WALL <br />W/ 3/8" X 5" TITEN HD AT 12" O.C. <br />STAGGERED <br />04 <br />0 0 0 <br />0 0 <br />8" V-0" 1'-0" 1'-0" 1'-0" e. <br />LEDGER DETAIL <br />11 <br />1-011 <br />3/411= 1 <br />ELEV AT 18'-0" <br />T.O.P. <br />_ <br />3/4" STUCCO <br />--- 1 <br />ON FRAME <br />CASING BEAD W/ <br />WEEP HOLES OVER <br />FLASHING <br />ELEV AT 10'-0" <br />2ND FLOOR FF <br />ELEV AT 8'-8" <br />T.O.M. <br />ELEV AT 0'-0" _ <br />1ST FLOOR FF <br />CASING BEAD W/— <br />WEEP HOLES OVER <br />FLASHING <br />12 <br />51 <br />WEEP <br />SCREED <br />------, <br />ASSUMED GRADE <br />FRONT ELEVATION B <br />1 /411 = 11-011 <br />SHINGLE <br />ROOF <br />CONTROL <br />- - <br />JOINTS- <br />- <br />-- <br />C? <br />�O <br />ow <br />lV 2 <br />9 <br />ONTROL <br />JOINTS <br />• r ,III ��IIIII�IIIII�IIIII��r- <br />„�II II�IIIII�IIIII�IIIII�Ip1l�llhl._ <br />• ■I/IIIQi�111�11111�11 11■11111■ IIQ�I1111�11.., <br />�f ��''''�I■IIImI1111i11 Mma�m�II,mI11�I1111r11111�11111�•. <br />: 1 .� 11�111�■1�1m11nmi11��11��111�11■II�III�I�III�/I�III�IrI1,I�rI11I�rI11�lt�r._ <br />.niu un�nr■�nr■mn■n.�■�u■�min�u■�mn�innrnn�run�ram�in... <br />1 <br />1 1 � <br />••- 0 <br />5. • <br />r <br />JOItjT <br />• Ii■I�nl■nuunml <br />r� • <br />• 1 1 <br />1 /811 = 1 1-011 <br />� i •• <br />• - � II■1 1�I <br />1 1 1 �jl� <br />�■1�� <br />1.1�11 <br />Ii � <br />III 1��,11� <br />rrrrnr�rrn�nmram <br />11 <br />w■n <br />� 1 1 <br />CONTROL <br />JOINT <br />I • <br />rl <br />18'-0" II I. 1 <br />z= <br />? U <br />w CONTROL <br />JOINT _ <br />WEEP <br />SCREED <br />- <br />15 <br />2' _0 A/C UNIT _ <br />AND PAD 4 <br />4 <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />G5/8" STUCCO <br />GRADE LINE <br />ON CMU <br />RIGHT ELEVATION B <br />1 /811 = 1 1-011 <br />n 12 <br />7/8" STUCC 5 B 5 <br />ON FRAME <br />ELEV AT 18'-0" _ <br />T.O.P. - <br />1'-0" 12'4" <br />ELEV AT 10'-0" �? <br />2ND FLOOR FF <br />CONTROL <br />_ JOINT <br />ELEV AT 8'-8" _ � <br />T.O.M. <br />A/C UNIT 2_0 <br />AND PAD <br />13'-8" <br />12'-0" <br />z= <br />�O <br />o w <br />CONTROL <br />JOINT _ <br />WEEP <br />SCREED <br />r <br />ELEV AT 0'-0" _ <br />1ST FLOOR FF <br />GRADE LINE 5/8" STUCCO <br />ON CMU <br />5 LEFT ELEVATION B <br />1 /811 = 1 1-011 <br />CASING BEAD V <br />WEEP HOLES <br />OVER FLASHIN( <br />7/8" STUCCO <br />ON FRAME <br />6" X 1 "THK <br />CEMENT <br />PLASTER BAND <br />16" X 1"THK <br />CEMENT <br />PLASTER <br />BAND <br />DRIP CASING BEAD <br />AT BOTTOM OF <br />STUCCO BAND <br />6" X 1"THK <br />CEMENT <br />PLASTER BAND <br />5/8" STUCCO ON <br />CMU <br />19'-0" <br />T-4" .3'-8" <br />0 <br />— — — — — — — — — — N <br />SLa15E 31� <br />w- <br />O N 4'-0" OFF <br />cJi)�ri RIDGE <br />ROOF <br />VEN I <br />SLOPEUlu SLOPE <br />�5:12 5:12—� <br />w <br />CL <br />ON <br />J <br />�6 <br />77 <br />SLOPE SLOPE <br />---- ��5:12 5:12 I <br />SLOPE <br />io 112 <br />L----- -------- ---J <br />' 141 -0 7r) - <br />(D-1 <br />�18 <br />— 1 -0 <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALT. BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM)) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />* EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) -RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />JUL 21 2023 <br />Virtual Review Assist, I c. <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 7th Editio <br />by Debra Anne Klahr PX2300 <br />GENERAL NOTES: <br />* G.C. VERIFY ROOF PITCH <br />ROOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9/12) <br />IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />PLUMB CUT FASCIA <br />- ROOF PITCH PER ELEVATION <br />- WINDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />- SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN, OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER FBC 7TH EDITION (2020) SECTION R806 <br />FORMULA = S.F. / 150 (1/150) " 144 (TO CONVERT TO SQ. INCHES) _ <br />NET SQ. INCH REQUIREMENT <br />ATTIC AREA = 1222 SQ FT <br />VENTILATION REQUIRED = 586.56 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 414 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =1008 SQ IN <br />ATTIC VENTILATION <br />ATTIC VENTILATION TO BE IN COMPLIANCE WITH THE FLORIDA <br />BUILDING CODE 7TH EDITION (2020) RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALT. BE LOCATED NO MORE THAN 3 FEET (MEASURE <br />VERTICALLY) BELOW THE RIDGE OR HIGHEST POINT OF THE SPACE, <br />WITH THE BALANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />RIDGE VENTS - 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />" OFF -RIDGE VENTS - 138 SQ. IN. OF NET FREE AREA / UNIT <br />` SOFFIT VENTS - 7 SQ. IN. OF THE NET FREE AREA / SQ. FT. <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />APPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />LOMANCO DECK -AIR - 9 SQ. IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA / FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR SIDE -HINGE <br />DOORS SHALL BE TESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACEABILITY TO MANUFACTURER AND PRODUCT <br />,r <br />/ <br />M <br />� <br />o <br />. <br />N <br />00 <br />L0 <br />uO <br />00 <br />d <br />LO <br />46 <br />• <br />° °�s. <br />w <br />0 <br />u,- <br />0; <br />��✓I,. <br />Uj <br />z <br />N L N E <br />U <br />C v <br />E <br />N V �� a <br />r q <br />A, .o <br />W 2 <br />• ^N, LU C) N <br />Eco <br />L <br />W 0 <br />LLI W <br />wW~q WgJ 0C -O C z <br />r1WX_0 <br />< C) <br />LL0 <br />W OzmO <br />�On'oZLL rcoOmDz <br />]OI_Q <br />I,_ I.-_ <br />Z <br />o <br />Q00Jl<<o)z <br />WO_Wa <br />-C1 <br />WLL <br />Ow 9-F_�zow0p0¢ <br />0 <br />cV <br />OW <br />V = O <br />H O <br />O <br />Ln <br />Q � L,f) <br />J <br />U-) <br />LL <br />Z <br />00 <br />z� <br />W <br />Jo <br />�o <br />N <br />N <br />M <br />N'N <br />M <br />O <br />O <br />o <br />Mtn <br />N <br />CD <br />A!N <br />o <br />; o <br />C) <br />oho <br />00 <br />0i <br />, <br />CO <br />00 <br />00 <br />O <br />O <br />O <br />CV <br />N <br />CV <br />N <br />N <br />N <br />N <br />CA <br />N <br />0) <br />O <br />..O <br />C:) <br />00 <br />O <br />N <br />M <br />O <br />O <br />O <br />O <br />O <br />O <br />r <br />O <br />r- <br />CV <br />O <br />C) <br />o <br />N L <br />e- <br />O <br />N <br />o <br />M <br />0 <br />'t I <br />0 <br />6f) <br />0 <br />(0 <br />0 <br />P, <br />Cr <br />CO � <br />Z Z <br />° <br />LUoyo <br />LU oW(0 <br />a <br />0 <br />Of LU <br />-0 <br />Z <br />ZW�- <br />Q <br />W F-H <br />r� <br />~m0Z <br />(LZ3: <br />Q <br />0 <br />%- <br />�LU ZW <br />Z Z <br />� <br />g 0 <br />� <br />CL W <br />C)�z <br />z �„� <br />Q o <br />• <br />Z <br />U <br />OUa <br />o <br />W <br />� <br />Z <br />z <br />Z <br />w <br />J <br />W <br />M <br />0 <br />LAST PLOT DATE <br />May. 8, 23 <br />EXTERIOR <br />Z0 <br />ELEVATIONS <br />& ROOF <br />PLAN B <br />
The URL can be used to link to this page
Your browser does not support the video tag.