Laserfiche WebLink
SIMPSON HGAM1( <br />W/ <br />(4) 1/4"x1 1/2" SDS <br />SCREWS <br />TO BLOCKING & (4 <br />1/4"x2 3/4" <br />TITEN TO CMU <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING AND <br />FASTENERS. (MIN. FIRST 4 BAYS) MAX. 9" <br />SEE STRUCTURAL NOTES AND NAILING TOENAIL w/ UNSUPPORTED, <br />SCHEDULE FOR SHEATHING DETAILS (2) 16d NAILS? IF >9" SEE 10/S6 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2)16d NAILS EA. END. <br />MAX 9" SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />UNSUPPORTED, AND FASTENERS. (MIN. FIRST 4 BAYS) <br />IF >9" SEE 10/S6 <br />BACKNAIL w/ (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND NAILING <br />SCHEDULE FOR SHEATHING DETAIL <br />45' ± SEE STRUCTURAL <br />NOTES AND NAILING <br />2x4 CRO BRACESCHEDULEFOR <br />APPROXROMSHEATHING DETAIL 2x8 SYP#2 "L" BRACE TO <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S6 <br />RIDGE FASTENED AT S <br />EXTEND AT LEAST 90% OF DOUBLE TOP PLATE <br />EACH JOINT W/ (3) 10d "L" BRACE TO EXTEND 2x4 CROSS BRACEWEB LENGTH & NOTCH AT 2x4 CROSS BRACE APPROX. 8" <br />& (2)10d TOE NAILS 1 AT LEAST 90% OF WEB APPROX. 8" FROMBOTTOM CHORD (SEE TABLE) FROM RIDGE FASTENED AT <br />LENGTH (SEE TABLE) RIDGE FASTENED AT EACH JOINT w/ (3) 10d & (2) 10d <br />EA. END @ 48" O.C. SIMPSON H2.5A w/ 10 8d <br />2x8 P.T. GABLE TRUSS EACH JOINT w/ (3) 10d & ( ) TOE NAILS @ EA. END <br />SILL (2)1Od TOE NAILS @ EA. FROM LEDGER TO <br />• 1/2" CDX PLYWOOD OR END BLOCKING 2x FRAME WALL (SEE WALL <br />7/16" OSB SHEATHING GYPSUM WALL BOARD SECTION FOR SIZE & SPACING) <br />ATTACHED W/ 10d GABLE TRUSS 1/2" CDX PLYWOOD OR 7/16" <br />NAILS @ 6" O.C. EDGES 2"x4" PANEL BLOCKING @ 48" O.C. FOR THE FIRST <br />AND 12" FIELD (4) ROWS OF TRUSSES FROM EA. END TYP. BOTTOM 1/2" CDX PLYWOOD OR 7/16" OSB SHEATHING ATTACHED <br />1 AND <br />1 " 3. O.C.. FIELD <br />CORD ATTACHED W/ (2) 16d TOENAILS OSB SHEATHING ATTACHED W/ 10d NAILS @ 6" O.C. EDGES <br />2"x4" LEDGER (MATCH BOTTOM CHORD w/ 10d NAILS @ 6" O.C.I L`Ty AND 12 O.C. FIELD <br />THROUGH CHORD SLOPE D ADJACENT SCISSOR TRUSS)EDGES AND 12" O.C. FIELD (2) 16d NAILS <br />INTO 2"x6" P.T. PLATE 2x4 PANEL BLOCKING @ 48" O.C. FOR 2x BLOCKING <br />2x4 "T" ON TOP OF PANEL BLOCKING, 2"x6" P.T. SILL NOTCH "L" BRACE HERE <br />FASTEN WITH 10dx3" 4" O/C SPACED WEEP SCREED THE FIRST (4) ROWS OF TRUSSES 2x4 "T" ON TOP OF PANEL <br />INSTALLED PER MANUF. 1/2" x 8" "J" BOLT @ 48" O.C. WEEP SCREED FROM EA. END TYP. TOP & BOTTOM <br />@ 48" O.C. SIMPSON META12 w/ (7) 10dx1 1/2" NAILS AT 6'-0" INSTALLED PER MANUF. ATTACHED w/ (2) 16d TOENAILS BLOCKING, FASTEN WITH <br />1/2"x 8" "J" BOLT @ 32" O.C. MINIMUM 6" FROM MOISTURE BARRIER O.C. MAX w/MIN. 4" EMBEDMENT IN KO BLOCK - 1 Odx3" @ 4" O/C <br />PLATE SPLICES w/ 3/16"x2" 0 PLATE WASHER4 MOISTURE BARRIER 2x4 LEDGER (MATCH BOTTOM CHORD <br />SIMPSON META12 w/ (7) ALTERNATE SIMPSON MSTAM24 w/ (7) 10d NAILS SLOPE OF ADJACENT TRUSS) <br />NOTE: IF EMBEDDED 10dx1 1/2" NAILS AT EA. & (4) 1/4"x2 1/4" TITEN @ 4'-0" 0/C ALIGNED WITH <br />STRAP MISSED VERTICAL SECTION TRUSS VERTICAL WEB (24" GABLE WEB SECTION SECTION <br />WEB, USE MSTAM36 w/ (7) � O.C. MAX) w/ MIN. 4" <br />2 3 <br />1Od NAILS & (4) 1/4"x2 1/4" SCALE: N.T.S. EMBEDMENT IN KO BLOCKIN"TITEN ON OUTSIDE S5 SCALE: N.T.S. Srj SCALE: N.T.S. S5 <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING MAX. 9" <br />REFER TO DETAIL J AND FASTENERS. (MIN. FIRST 4 BAYS) UNSUPPORTED, <br />ON SHEET S5 FOR N N IF >9" SEE 10/S6 <br />X-BRACING, AND TOP N M M <br />SEE STRUCTURAL <br />CHORD BLOCKING N NOTES AND NAILING <br />00 00 x x <br />INFORMATION CO SCHEDULE FOR <br />SHEATHING DETAIL BACKNAIL w/ <br />111 2' 1 / ". <br />WOOD TRUSSES (2) 16d NAILS <br />`° 0o 00 2"x4" CROSS BRACE <br />2x4 RAT RUN BRACING APPROX. 8" FROM <br />AT 24" O.C. ON TOP OF <br />1 <br />12" <br />1 <br />1 2" <br />RIDGE FASTENED AT <br />"L" BRACE TO EXTEND <br />BOTT. CHORD FOR 4 <br />EACH JOINT w/ (3) <br />10d & (2) 10d TOE <br />AT LEAST 90% OF WEB <br />TRUSS SPANS <br />NAILS @ EA. END <br />LENGTH (SEE TABLE) <br />GABLE TRUSS <br />ATTACHED W/ 2 - 16d <br />AT EA. TRUSS JOINT <br />(2) 2 x 4 LAMINATIONS W/ (1) ROW <br />(3) 2 x 4 LAMINATIONS W/ (1) ROW <br />(3) 2" x 6' LAMINATIONS W/ (2) ROWS OF <br />2x4 PANEL BLOCKING <br />1/2" CDX PLYWOOD OR 7/16" <br />OSB SHEATHING ATTACHED <br />2x4O/C L(2) IN <br />2x4 BLOCKING @ 24" <br />OF STAGGERED 10d COMMON WIRE NAILS <br />OF STAGGERED 30d COMMON WIRE NAILS <br />STAGGERED 30d COMMON WIRE NAILS <br />@ 48" 0/C FOR THE <br />FIRST (4) ROWS OF <br />2 <br />() 16d NAILS <br />W/ 10d NAILS @ 6" O.C. <br />(D = 0.148", L = 3") OR EQUAL <br />(D = 0.207", L = 4 1/2") OR EQUAL <br />(D = 0.207", L = 4 1/2") OR EQUAL <br />TRUSSES FROM EA. <br />E <br />ES AND 12" O.C. FIELD <br />TOENAILS @ EA. END <br />NOTES: <br />END TYP. TOP & <br />JACK TRUSS <br />1) ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES 4) FOR 4-PLY, PROVIDE 1/4" DIA, x 5 1/2" LAG SCREWS OR EQUAL <br />BOTTOM ATTACHED <br />SEE PLAN FOR <br />MASONRY WALL <br />OF THE COLUMN <br />(SPACE AS SHOWN FOR 3-PLY) <br />w/ (2) 16d TOENAILS <br />CONNECTION <br />ARCHITECTURAL FINISH 2) ALL NAILS PENETRATE AT LEAST 3/4 OF THE THICKNESS 5) FOR 5-PLY, PROVIDE 1/4" DIA. x 7" LAG SCREWS OR EQUAL <br />OF THE LAST LAMINATION (SPACE AS SHOWN FOR 3-PLY) <br />2x4 "T" ON TOP OF PANEL <br />BLOCKING FASTEN WITH 2x4 BLOCKING W/ <br />EXT. WALL CONN. @ 3) EACH 30d COMMON NAIL MAY BE REPLACED W/ (2) 16d 6) REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFORMATION 1Odx3" @ 4" O/C (2) 12d TOENAILS <br />NON -LOAD BEARING LOCATION COMMON NAILS. (ONE INTO EACH OUTSIDE FACE OF <br />D B.U.C., SAME NUMBER OF ROWS, SAME SPACING) SECTION <br />SEE TYP, WALL SECTION FOR SCALE:3/4"=1'-0" S5 TYPICAL NAILING SCHEDULES FOR BUILT-UP COLUMNS 8 9 <br />ADDITIONAL INFORMATION. SCALE: N.T.S. <br />SCALE: N.T.S. S5 SCJ <br />IINIMUM 2x <br />:ROSS BRACING <br />3EE PLAN FOR <br />OCATIONS) <br />(2) 16d PER <br />JOINT <br />CONTINUOUS BOTTOM CORD BRACING 2"x4" MIN. SEE M/S5 <br />CROSS BRACING DETAIL J <br />SCALE: N.T.S. S5 <br />GABLE END BRACING DETAIL <br />TOENAIL <br />(2) 16d NA <br />12" <br />`SH SCHEDULE <br />,TTACHMENT <br />t SYP BLK'G @ 16" O.C. <br />I x 0.131" <br />AILS EA. SIDE <br />2x4 #2 SYP w/ 1 Od <br />XO.131" @ 8" O.C. <br />ALTERNATE NON -DROP <br />GABLE END DETAIL 10 <br />SCALE: N.T.S. S5 <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SCALE: N.T.S. <br />PRE-ENGINEERED <br />WOOD TRUSSES <br />OVERLAP TRUSS BRACING <br />AT LEAST TWO TRUSS SPACES 6" OVERLAP <br />MINIMUM (2) 16d PER JOINT MINIMUM 2x4 TRUSS BRACING <br />TRUSS BRACING OVERLAP DETAIL M <br />SCALE: N.T.S. Srj <br />"L" BRACE W/ 10d @ 4" O/C <br />(SEE SCHEDULE FOR SIZE <br />AND LOCATION) <br />2x4 #2 SYP BLK'G @ 16" O.C. w/ (2) 16d NAILS EA. END. <br />SEE SCHEDULE - [RSH] - ON FRAMING SHEET FOR SHEATHING <br />AND FASTENERS. (MIN. FIRST 4 BAYS) <br />BACKNAIL w/ (2) 16d NAILS <br />SEE STRUCTURAL NOTES AND <br />NAILING SCHEDULE FOR SHEATHING <br />DETAIL <br />MAX. 9" <br />UNSUPPORTED, <br />IF >9" SEE 10/S6 <br />2"x4" CROSS BRACE <br />APPROX. 8" FROM <br />RIDGE FASTENED AT <br />"L" BRACE TO EXTEND <br />EACH JOINT w/ (3) <br />AT LEAST 90% OF WEB <br />10d & (2) 10d TOE <br />LENGTH (SEE TABLE) <br />NAILS @ EA. END <br />GABLE TRUSS <br />2x4 PANEL BLOCKING <br />1/2" CDX PLYWOOD OR <br />@ 48" O/C FOR THE <br />(2) 16d <br />7/16" OSB SHEATHING <br />FIRST (4) ROWS OF <br />NAILS <br />ATTACHED w/ 10d NAILS <br />TRUSSES FROM EA. <br />@ 6" O.C. EDGES AND 12" <br />END TYP. TOP & <br />O.C. FIELD <br />BOTTOM ATTACHED <br />W/ (2) 16d TOENAILS <br />2x4 "T" ON TOP OF PANEL <br />BLOCKING, FASTEN WITH <br />1Odx3" @ 4" O/C <br />SIMPSON HGA1OKT w/ (4) 1/4"xl 1/2" SDS SCREWS TO <br />TRUSS & (4) 1/4"x3" SDS SCREWS TO PLATES AT 24" O.C. <br />SIMPSON SP2 w/ (12) 10d <br />8d @ 6"O/C <br />WOOD TRUSSES <br />SIMPSON HGAM10KTA w/ (4) <br />1/4"x1 1/2" SDS SCREWS TO <br />BLOCKING & (4) 1/4"x2 3/4" <br />TITEN TO CMU <br />EXT. WALL CONN. @ NON - LOAD <br />BEARING LOCATION (UNEVEN CLG.) <br />SEE TYP. WALL SECTION FOR <br />ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />"L" BRACING REQUIREMENTS <br />STUD <br />SPACING <br />NO <br />"L" BRACE <br />(1) 2"x4" (U N.O.) <br />"L" BRACE <br />2"x6" (U.N.O.) <br />"L" BRACE <br />24" <br />0'0" - 3'-0" <br />T-O" - 6'-0" <br />6'-0" & GREATER <br />SCISSOR GABLE - (1) 2"X8" #2 S.P.F. @ EACH VERTICAL AND <br />(2) 2"x811 FULL HEIGHT @ DIAPHRAGM BLOCKING <br />NOTE: <br />1) "L" BRACE MUST EXTEND AT LEAST 90% OF WEB LENGTH EXCEPT, SCISSOR GABLE WHICH REQUIRES <br />BRACE TO EXTEND FULL HEIGHT OF GABLE. <br />2) "L" BRACE TO BE FASTENED TO GABLE STUD WITH 10dx3" NAILS @ 4" 0/C. <br />3) SEE 6/S5 FOR MORE INFO. <br />SIMPSON HGAI OKT w/ (4) 1/4"x1 1/2" SDS <br />SCREWS TO TRUSS & (4) 1/4"x3" SDS SCREWS <br />TO PLATES (TYP.) <br />GABLE TRUSS <br />`STUDS @ 16" O.C. <br />GABLE END BRACING DETAIL SCALE:3/4"=1'-0" <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />SIMPSON SP2 w/ (12) <br />1 Od NAILS AT EACH <br />STUD <br />HIP FRAMING REFERENCE PLAN <br />2x4 BLOCKING 2x4 "T" BLOCKING <br />@ 48" O.C. 16d NAIL <br />"L" BRACE <br />ATTACHED W/ <br />10d NAILS @ 4" <br />O.C. TYPICAL <br />GABLE TRUSS WEB <br />DOUBLE "L" BRACING DETAIL i <br />SCALE: N.T.S. (S5) <br />2x4 "T" BLOCKING <br />2x4 BLOCKING @ <br />48" O.C. <br />"L" BRACE ATTACHED 16d NAIL <br />W/ 10d NAILS @ 4" O.C� <br />TYPICAL <br />GABLE TRUSS WEB <br />SINGLE "L" BRACING DETAIL/ 6 <br />SCALE: N.T.S. \ <br />DIAPHRAGM <br />BLOCKING @ <br />48" O/C GABLE TRUSS <br />TRUSS VERTICAL <br />DBL. TOP PLATE NAILS AT EACH STUD (2) 2"x8" "L" BRACE J <br />STUD WALL (SEE TYP. SEC.) FASTENED WITH (3) <br />16d PER SIDE <br />SECTION 4 SCISSOR GABLE "T" BRACE 7 <br />SCALE: N.T.S. S5 AS PER HIB 91 SCALE: N.T.S. S5 <br />2 x 4 BLOCKING w/ (2) 1 Od <br />TOE NAILS AT EACH END @ <br />24" O/C (TYP) <br />❑ <br />z <br />w <br />\-BRACING w/ (3) 1 Od x 3" AT <br />EACH CONN. @ 24" O/C <br />MOISTURE BARRIER <br />-BOND BEAM <br />-MASONRY WALL <br />ARCHITECTURAL FINISH NOTE: ZTOP CHORD 2x4 #2 SYP BRACING O <br />1) SEE TRUSS MANUFACTURER'S TRUSS ENGINEERING @ 16" O.C. MAX. FOR FIRST (4) 0 <br />CUT SHEETS FOR ADDITIONAL PERMANENT BRACING BAYS <br />THAT MY BE REQUIRED ZBOTTOM CHORD GABLE END BRACING - � O <br />2) "T" BRACING MAY BE USED IN PLACE OF PERMANENT @ 4'-0" O.C. MAX. FOR FIRST (4) BAYS 0 I.-: co O <br />BRACING PROVIDED IT EXTENDS OVER AT LEAST 90% OF THE WEB. Q ( co n <br />REQUIRED MINIMUM PERMANENT TRUSS BRACING PLAN L to <br />20'-0" MAX 20'-0" MAX <br />"X" BRACE SEE DET. J/S5 7 rCONTINUOUS BOTTO CHORD BRACING 2X4 MIN. <br />cM <br />N <br />g <br />� <br />o <br />00 <br />9q <br />Lo <br />4r <br />C-0 <br />If' e <br />gk2 <br />Z5 Nd� <br />c <br />a <br />w <br />s <br />0 <br />w <br />0 <br />z <br />¢ <br />= <br />(1)i <br />C) co <br />U <br />ai <br />�� <br />N <br />D <br />NU <br />M <br />_002 <br />Um <br />w• <br />W <br />S M <br />L o <br />yr.o <br />-2 <br />O <br />0 <br />m <br />•� <br />'o <br />N <br />U <br />w QN <br />� <br />CD �-o <br />d <br />d <br />w <br />LU <br />0 <br />o <br />w o <br />1�t <br />w <br />m - <br />< o <br />— <br />— <br />— <br />— <br />o <br />o <br />¢ <br />-- <br />— <br />— <br />— <br />— <br />o <br />o <br />Q <br />T� <br />�. <br />o <br />= <br />CU <br />w <br />w <br />AS PER BCSI <br />SCISSOR TRUSS <br />SCISSOR TRUSS <br />W/ DROP CEILING BRACINGDETAIL <br />MEAN ROOF HEIGHT UP TO 30'-0" <br />SEE STRUCTURAL NOTES FOR WIND SPEED SPECIFICATION <br />F- ❑ZwOIw0ofQzL1j �~f- <br />LU <br />�0 <br />Zg�CD gOIxcnU_0 U_ J¢O <br />QQ QaxJIO20°�� <br />°000mocn�ooz <br />O O J U Z Y❑ Z Z LL Q W d <br />U) 0 Z ¢¢WOW1 05-wzi3 U❑¢ <br />oQ o 0 oQ<T_ <br />w <br />a � <br />�~ O <br />O <br />Z N <br />SCALE: N.T.S. S5 <br />Q W Q L~ <br />f— 0� <br />IZ cM <br />IZ q5; — <br />Z U <br />z� <br />W W� <br />J <br />O <br />2X4 BRACING @ 48" O.C. CONTINUOUS TO <br />CO <br />FIXED LOCATION ATTACHED W/ (2) 10d AT <br />EA. TRUSS (NOTE: BRACING MAY BE <br />PLACED ON EITHER TOP OR BOTTOM OF <br />THE BOTTOM CORD) <br />N <br />CM <br />.•. M <br />N <br />CD <br />N <br />O <br />N <br />r <br />,O <br />04 <br />r <br />O <br />N <br />O <br />N <br />O <br />COSMETIC DROP CEILING FRAMIN <br />Virtual! Review Assist, inc. <br />O <br />C6 <br />O <br />0')o <br />O <br />Plena Review completed and app <br />for vord"eace with <br />ov <br />T- <br />� <br />co <br />�;N <br />= O <br />O <br />N <br />O <br />N <br />CN <br />N <br />N <br />N <br />the 2020 F8E 7t <br />hY Rebra Anne Klahr PX230 <br />E idii'®a <br />1� <br />O <br />N <br />O: <br />N <br />1 <br />O <br />1-- N <br />j 1 <br />O <br />N <br />1 <br />O <br />N <br />I <br />O <br />N <br />O <br />N <br />SCALE: NTS <br />Lo <br />0) <br />N <br />001 <br />O <br />; L(i <br />T- <br />00 <br />O <br />M <br />T <br />04 <br />O <br />M <br />® <br />d' <br />0 <br />CD <br />O <br />CD <br />O <br />O <br />r <br />T' <br />0 <br />(D <br />0 <br />o <br />N1^ <br />�1 J <br />> <br />O <br />O'O <br />N <br />: M <br />O <br />d <br />O <br />to <br />O <br />(o <br />O <br />I` <br />' n <br />�^ <br />00 VJ <br />Z Z <br />O <br />O+ <br />WUF-'- <br />OWf/J <br />w <br />2X4 LEDGER <br />O <br />V <br />�OLIJ <br />c Q <br />�d <br />SIMPSON LSTA18 <br />Lo <br />0 <br />Q <br />w HLLJ <br />~ <br />co 0 Z <br />WOOD FRAMED GABLE END BRACING DETAIL <br />MEAN WALL HEIGHT UP TO 30'-0" - SEE STRUCTURAL NOTES SCALE: N.T.S. <br />FOR WIND SPEED SPECIFICATION <br />rn <br />V <br />O > J <br />Z <br />N <br />00 <br />>-�Z°W <br />}o'er <br />M <br />oQa� <br />U- <br />� <br />w <br />c11 <br />OZ <br />0 <br />U�z� <br />z <br />�Qo <br />ryQ <br />U <br />O"J <br />O <br />a <br />Z <br />z <br />z <br />J <br />W <br />M <br />O <br />O <br />T— <br />LAST PLOT DATE <br />> <br />May. <br />9, 23 <br />Z.�i <br />O <br />d <br />STRUCTURAL <br />— <br />J <br />DETAILS <br />rii <br />