Laserfiche WebLink
(2) LAYER TYPE 1(#15) UNDERLAYMENT FOR ROOF PITCH > 4:12 <br />(2) LAYERS TYPE I OR TYPE II (#15 OR #30) UNDERLAYMENT FOR <br />ROOF PITCH 4:12 OR LESS. <br />12 PRE ENGINEERED <br />ZZ7WOOD TRUSS @ 24" HURRICANE ANCHOR @ EACH TRUSS <br />O.C. MAX. SHINGLE ROOF <br />SHINGLE ROOF <br />L <br />15/32" CDX PLYWOOD OR 7/16" <br />BAFFLE <br />BAF <br />O.S.B. (SEE ROOF NAILING <br />INSULATION P <br />SCHEDULE ON SHT SN1) <br />CHART ON FLOOR <br />PLAN <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />2x SUB FASCIA <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />SEE SOFFIT SHEET <br />CEILING & 8" O/C WALLS I <br />ATTACHED WALL SHEATHING TO <br />1/2" GYP WB <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />DOUBLE 2x S.P.F. TOP PLATE <br />1x2 NAILER. <br />w <br />PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />FOR MORE INFO <br />W <br />16" O.C. 2X S.P.F. STUDS <br />o m <br />W/ (4) 16d TOENAILS TO TOP PLATE <br />O (n <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />J W <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />= <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />IY <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA < 1000 <br />B R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALS <br />�+ <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />ETAL SEAT <br />ER PLAN O <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " )C@ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS STD. 90 HOOK (SEE DETAIL) <br />1/2" GYP WB 8"x8"X16" CONIC. KNOCKOUT <br />INSTALLATION PER BLK. W/1#5 ROD CONT. FILLED <br />CHART ON FLOOR PLAN Ox <br />SOLID W/GROUT <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />Cl) <br />v 4"x4" INSPECTION PORT AT <br />� <br />a EACH FILL CELL TYPICAL <br />1x WD FURRING @ 24" O.C. <br />a <br />AT GARAGE CONTRACTOR <br />BASEBOARD <br />N <br />TO CUT BLOCK OR POUR <br />MIN. 2500 PSI CONC. SLAB <br />CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER <br />NOTE: EXTEND DECO FINISH <br />MUNICIPALITY <br />4"to 6" BELOW GRADE <br />w <br />° . <br />° a a <br />FINISH GRADE 00 <br />Cl)' I —III <br />El I I —I I I —I I <br />a <br />_ <br />II <br />— <br />1—III—IIElI1 <br />III <br />_ <br />_ _ <br />6x6 w1.4Xw1.4 1 'El I I=III=III=I I <br />WWF OR FIBERMESH II I IIIII I II <br />I I° <br />I I II <br />° <br />.' ' .: a <br />s a <br />_ _ _ <br />I I I —III —III 11- o <br />I II I I <br />z �- <br />:1 I �I I II I <br />I I —III —III <br />I <br />III <br />° ' ° <br />°. <br />I I IIIII I II II 'T <br />IL <br />11 l <br />l I <br />01I° <br />I <br />I I I=111=III <br />III <br />I <br />I <br />�I <br />STD. 900HOOK <br />(3)#5REBARON3"CHAIR <br />•.,111—'III,,,II <br />(SEE DETAIL) <br />W/3" MIN. CLEARANCE <br />4" <br />V-8" <br />TYP 2-STORY WALL SECTION ,1 <br />SCALE:3/4"=1'-0" S6 <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8)1 Od x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL— <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL— <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" - <br />NAILS TO STUD & (8) 1Od x 1 1/2" TO BAND — <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />SCALE: N.T.S. <br />@ WOOD 1ST FLR. SCALE: N.T.S. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />FLOOR TRUSS <br />SPACER <br />BLOCKS <br />"END SHEATHING TO <br />)F BEAM OR GIRDER <br />,TE W/ <br />O.C. <br />IOR TRUSS/JOIST <br />2x STUDS @ 1" ^ ^ <br />2"x BOT. PLATE <br />(2) 1 Od @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUS: <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />FLOOR CONNECTION B <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=1'-0" S6 <br />FOR ADDITIONAL INFORMATION. <br />PROVIDE CONTINUOUS <br />BLOCKING FROM B.U.C. <br />TO MASONRY BELOW <br />2"x BOT. PLATE W/ <br />(2) 10d @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS N <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />PLAN6. INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />O/C FOR THE 1 ST 2-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN K0 BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=1'-0" <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />0 <br />(6) 1/4" x 21/4" TITEN <br />SCREWS TO MANSONRY <br />WALL PER STRAP \ <br />WOOD TO MASONRY <br />CONNECTION W/ MSTAM36 <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />B.U.C. <br />(8)1 Od NAILS TO <br />STUD PER STRAP <br />-�— SIMPSON MSTAM36 <br />MASONRY WALL <br />SCALE: N.T.S. <br />RIBBONS <br />DETAIL (FLOOR TRUSS) 0 <br />SCALE: 1 1 /2"=V-0" S6 <br />NOTE: SEE TYPICAL WALL <br />SEE SHEATHING <br />SECTION C/S3 FOR <br />SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID <br />GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT. <_ 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" <br />EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10)1Od <br />2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />' 1=1 I I a°.... I lll=1 <br />11I- <br />(3) #5 CONT. ON 3" <br />8' L 1-8 8" CHAIR W/ MIN. <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" S6 <br />ADDITIONAL SLAB INFORMATION. <br />w <br />W <br />U) <br />a <br />O <br />U) <br />15/32" OSB <br />EXPOSUREI <br />SHEATHING <br />F <br />x <br />T <br />x <br />11 <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />D <br />o SEC. iON X-X IF <br />NOT FULL <br />F HEIGHT SHEET <br />C <br />Z <br />G <br />FLOOR SYST <br />M <br />(2)- 2x TOP PLATE <br />BEYOND I <br />15/32" OSB <br />EXPOSUREI <br />F <br />SHEATHING W <br />x <br />SOLID 2x <br />C <br />BLOCKING @ ALL j <br />L(DU <br />SHEATHING O <br />U) <br />EDGES (SEE <br />OPENING <br />SECTION X-X <br />d U <br />C <br />x <br />�W <br />x <br />E <br />W <br />2x STUDS W <br />BEYOND, <br />SEE PLAN g <br />Zi <br />"'-2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM WALL ELEVATION DIAGRAM <br />3/8" "S" = NAIL 3/8" <br />SPACING <br />S 3/4" S 1/2" <br />1/2" <br />S' 1/2" <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2) 12d. <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />SECTION X-X <br />T�7 <br />SFF �off, <br />N <br />2x CRIPPLES @ —� <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />hYPICAL (U.N.O.) <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM y" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />OO <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />J <br />PENETRATE SURFACE MORE THAN y". <br />? <br />OA NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />O <br />© NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />Z <br />ti _ <br />Q NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMM <br />O w <br />@ NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />O STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />J o <br />w/ 8d COMMON NAIL <br />J 2 <br />w LL � O <br />O PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADEF <br />J > ¢ r O C <br />a (rPo0u) <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @. TOP & BOTT. <br />V) O� 00 LL ix <br />@ (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />N W O O ~ <br />MEMBER IF GABLE END <br />`: <br />NOTE: <br />rc WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />S4 <br />INTERIOR HEADER: <br />BOX HEADER <br />(1) 2x SILL PLATE W/ (2) <br />ONLY <br />12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 1 Od x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />�FTFR% FLOOR TRUSS / <br />'Q BEAM <br />SEE PLAN FOR REQUIRED ---- <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />`* WWF OR FIBERMESH <br />4 ° <br />a. <br />(V.n ' <br />Cl) III —III— I —I I ° ° " <br />III —III I I I I I a <br />- <br />IIIIIIII�IIIIIIiI a °. . <br />'�I,IIII <br />(3) # 5 REBAR ON 3" CHAIR 4" 1'-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />• 8d NAILS FOR WALL SHEATHING MUST BE MIN .131" X 21/2" <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />SIZE <br />JACKS <br />STUDS <br />JACKS <br />ISTUDS <br />EA END <br />I EA END <br />EA END <br />EA END <br />SIMPSON <br />1'4 <br />(1) <br />1 (2) <br />(1) <br />(2) <br />(1) LSTA30 <br />4'-9' <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />(3) <br />(3) <br />(2) <br />(3) <br />(2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10) 1Od NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />00 <br />FINISH GRADE <br />00 <br />J I I -I' o Z T <br />—I I .- <br />@ WOOD 1 ST FLR. SEE JIS6 FOR SCALE: 3/4"=V-0" <br />ADDITIONAL INFORMATION. <br />V <br />S6 <br />Y ? 4 2022 <br />VIRTUAL REVIEW ASSIST <br />Virtual Review Assist, Inc. <br />Plans Review completed and approved <br />for compliance with the 2020 FBC 7th <br />:-dition by Debra Anne Klahr PX2300 <br />f. <br />N <br />Fr, ke <br />Jam," " . <br />9' <br />to <br />CD <br />00 <br />L0 <br />g <br />s a <br />z J 5 a <br />®� <br />�4 Q <br />�C4 W <br />s <br />� y <br />O <br />0 <br />y � <br />W <br />Z <br />Q <br />^N` LO <br />j 00 <br />W L i ,O r? U <br />0 �( di <br />i 5 <br />M U co <br />_ CO <br />A' i t 0 <br />W 0 0 ` <br />TZ1•� O �o M 0 <br />lJ! U Q <br />o <br />.N w 0_;; N <br />i 00 E c <br />U� <br />a � <br />W <br />O W <br />0�LU WOI- <br />W~Q ofg_ x - Ozx z <br />Of O J 0� W U_ U U_-0 <br />Q Q <br />U <br />W <br />Qox ZLLW°z�°�� a� <br />0 <br />0 <br />OcnxgozoiOomoz <br />_,OD-0zYUj OZz�OWL) <br />O <br />(/) LL <br />Z <br />J<QOWQFn_Wz� Oa <br />QOW _��� i�Z�QU Q <br />°Q o O�QLL <br />O <br />O <br />N <br />0 F- <br />U) O <br />0 <br />CM � O <br />Q L0 <br />W � <br />awQL? <br />0� IZ CM <br />Q Q O <br />z 0�- <br />z� <br />W <br />W <br />J O <br />O <br />N <br />N <br />' <br />O <br />1` <br />N <br />0 <br />4 <br />ss <br />c) <br />i <br />CO <br />CO <br />(D <br />O <br />O <br />r <br />r <br />C)C)'O <br />N <br />N <br />O <br />N <br />C) <br />N <br />C)O <br />N <br />N <br />O <br />N <br />O <br />'QD <br />C)r <br />6 <br />OO <br />CDr <br />M <br />r <br />N <br />O <br />M <br />co <br />C) <br />T_ <br />C:)O <br />r <br />CDO <br />\— <br />C <br />1 <br />U <br />C:) <br />:o <br />N <br />C) <br />('M <br />C:) <br />4 <br />C) <br />L6 <br />CD <br />O <br />C:)O <br />t` <br />P <br />Cr <br />co00 <br />z z <br />O <br />OWfn <br />I—o <br />aQ <br />r� <br />Vl <br />OW <br />I-Q <br />Zof <br />I.-W <br />=moz <br />H <br />Z <br />z j <br />N <br />J <br />W <br />M <br />Z <br />zU- <br />M <br />W N <br />( <br />J�z <br />Ua}U) <br />Ln <br />z <br />Q0 <br />Z <br />U <br />U <br />J <br />o0a <br />�m <br />z <br />z <br />z <br />W <br />W <br />W <br />N <br />N <br />0 <br />LAST PLOT DATE <br />Apr. 11, 22 <br />O <br />STRUCTURAL <br />J <br />DETAILS -MONO <br />