Laserfiche WebLink
12 ROOF FINISH PER <br />ELEVATION <br />15 <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOFTRUSS <br />METAL DRIP EDGE <br />2X4 SUB -FASCIA <br />1 -0 ALUMINIUM WRAP <br />ALUMINUM <br />NOTE: REFER TO STRUCTURAL SOFFIT SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />SOFFIT DETAIL - 8" TRUSS HEEL <br />6 <br />3/4 - 11-011 <br />ROOF FINISH PER <br />12 ELEVATION <br />15 <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOF TRUSS <br />' METAL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINIUM WRAP <br />ALUMINUM <br />SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />SO�FFI DETAIL <br />7 <br />� <br />3/4 OV <br />6" <br />1" 1" <br />4" 4" <br />N CV <br />o00 o 00 <br />EPS <br />iv FOAM iv <br />BRACKET DETAIL <br />8 <br />1-011 <br />5" <br />1" 3" 1 <br />CV C-4 <br />o;0 900 <br />EPS <br />i� FOAM <br />BRACKET DETAIL <br />9 <br />11 <br />-1If -0 <br />PROVIDE FILLED SOLID CMU ABOVE <br />LINTEL TO TIE BEAM <br />FLASHING <br />PT 2X8 LEDGER ATTACHED TO WALL <br />W/ 3/8" X 5" TITEN HD AT 12" O.C. <br />(S) H10A-2 STAGGERED, SEE DETAIL 11/A5 <br />ROOF FINISH PER ELEVATION <br />UNDERLAYMENT <br />ROOF SHEATHING <br />ELEV AT 8'-8" <br />T.O.M. <br />5 METAL DRIP <br />EDGE <br />(S) A23 <br />-- 2X4 FASCIA <br />ALUMINIUM <br />°> 2'-0" WRAP <br />(S) A23 ALUMINUM <br />SOFFIT <br />PT 2X4 LEDGER ATTACHED TO <br />WALL W/ 3/16" TAPCONS W/ <br />MIN 2-1/2" EMBEDMENT 6" O.C. <br />BTM AT 7'-6" <br />SOFFIT DETAIL <br />10 <br />3/4" = 1'-011 <br />PT 2X8 LEDGER ATTACHED TO WALL <br />W/ 3/8" X 5" TITEN HD AT 12" O.C. <br />STAGGERED <br />N <br />of o 0 <br />o o <br />8" 1'-0" 1'-0" 1'-01, <br />LEDGER DETAIL <br />11 <br />3/4" = 1'-0" <br />6" X 1"THK <br />CEMENT <br />PLASTER BAND <br />16" X 1"THK <br />CEMENT <br />PLASTER <br />BAND <br />DRIP CASING BEAD <br />AT BOTTOM OF <br />STUCCO BAND <br />6" X 1"THK <br />CEMENT <br />PLASTER BAND <br />518" STUCCO ON <br />CMU <br />CONTROL <br />—JOINTS <br />'41 <br />— CASING BEAD W/ <br />WEEP HOLES OVER <br />FLASHING <br />SHINGLE <br />,,—ROOF <br />CONTROL <br />JOINTS <br />FE—TE—IMINININININI <br />INININININININI <br />Imimimimimimimlmi <br />FRONT ELEVATION B <br />1 /4" = 1'-011 <br />12 <br />-15 <br />z= M <br />7/8" STUCCO o 10 <br />w <br />ON FRAME N = CONTROL 5 B <br />JOINT _ <br />MID -WALL <br />WEEP <br />SCREED <br />5/8" STUCCO <br />ON CMU — — — — <br />CASING BEAD W/ <br />WEEP HOLES <br />OVER FLASHING <br />CASING BEAD W/ <br />WEEP HOLES <br />OVER FLASHING <br />ELEV AT 18'-0" <br />T.O.P. <br />ELEV A`f 10'-0" <br />2ND FLOOR FF <br />ELEV AT 8'-8" <br />T.Q.M. <br />A/C UNIT <br />AND PAD <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />�— GRADE LINE <br />3 )REAR ELEVATION B <br />1 /8 - 11-011 <br />I— GRADE LINE <br />ARIGHT ELEVATION B <br />5/8" STUCCO <br />ON CMU <br />12 <br />15 <br />MID -WALL <br />WEEP SCREED <br />ASSUMED GRADE <br />7/8" STUCCO <br />ON FRAME <br />ELEV AT 18'-0" <br />T.O.P. <br />ELEV AT 10'4' <br />ELEV AT 8'-8" <br />T.O.M. <br />A/C UNIT <br />AND PAD <br />ELEV AT 0'-0" <br />1ST FLOOR FF <br />ELEV AT 18'-0" <br />T.O.P. <br />--- 718" STUCCO <br />ON FRAME <br />�— CASING BEAD W/ <br />WEEP HOLES OVER <br />FLASHING <br />ELEV AT 10'-0" <br />2ND FLOOR FF <br />6 <br />5.6 <br />5 12 <br />7/8" STUCCO <br />ON FRAME <br />ELEV AT 18'-0" <br />T.O.P. <br />1'-0" <br />12'-0" <br />18'-0" <br />M <br />ELEV AT 10'41 <br />O <br />`� <br />2'-0" <br />2ND FLOOR FF <br />CON;A <br />TROL <br />= <br />CONTROL <br />JOINT <br />JOINT <br />12 <br />— <br />— — <br />— <br />— — <br />ELEV AT 8'-8" <br />MID -WALL <br />T.O.M. <br />WEEP <br />A/C UNIT 2.0 <br />SCREED <br />AND PAD <br />5/8" STUCCO <br />ON CMU <br />Man <br />ELEV AT 0'-0" <br />_ <br />_ — — <br />— — <br />_ — — r I-- <br />1ST FLOOR FF <br />GRADE LINE <br />LEFT <br />ELEVATION <br />B <br />5 <br />1 /8 - <br />1 -0 <br />_ ELEV AT 8'-8" <br />T.O.M. <br />ELEV AT U-0" <br />1ST FLOOR FF <br />Lma <br />1 ROOF PLAN B <br />1/ = 11-011 <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM'U'-VALUE OF <br />0.4 OR LESS AND A'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />* EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1,FBC 7TH EDITION (2020) -RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />\/RA <br />21 2023 <br />Virtual Review Assist, In+"�ti <br />Plans Review completed and afor compliance with the 2020 FBCh,, nahra Anne Klahr PX2 <br />GENERAL NOTES: <br />* G.C. VERIFY ROOF PITCH <br />ROOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9/12) <br />IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />-PLUMB CUT FASCIA <br />- ROOF PITCH PER ELEVATION <br />- WINDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />-SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN. OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER FBC 7TH EDITION (2020) SECTION R806 <br />FORMULA = S.F. / 150 (1/150) * 144 (TO CONVERT TO SQ. INCHES) _ <br />NET SQ. INCH REQUIREMENT <br />ATTIC AREA = 1222 SQ FT <br />VENTILATION REQUIRED = 586.56 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 276 SQ IN <br />VENTILATION PROVIDED AT SOFFIT =1008 SQ IN <br />ATTIC VENTILATION <br />ATTIC VENTILATION TO BE IN COMPLIANCE WITH THE FLORIDA <br />BUILDING CODE 7TH EDITION (2020) RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALL BE LOCATED NO MORE THAN 3 FEET MEASURE <br />VERTICALLY)BELOW THE RIDGE OR HIGHEST POINT OF TH� SPACE, <br />WITH THE BALANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />RIDGE VENTS - 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />" OFF -RIDGE VENTS - 138 SQ. IN. OF NET FREE AREA / UNIT <br />• SOFFIT VENTS - 7 SQ. IN. OF THE NET FREE AREA / SQ. FT. <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />APPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />* LOMANCO DECK -AIR - 9 SQ. IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA / FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR SIDE -HINGE <br />DOORS SHALL BE TESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACE ABILITY TO MANUFACTURER AND PRODUCT <br />"Y <br />OAll <br />M <br />o <br />N <br />f <br />I --s <br />-x <br />$S IA ¢n <br />W <br />' Y <br />a <br />w <br />0 <br />z <br />SIN N L0 <br />W L 'i 0 � u <br />0 cl) ti <br />(nCh c <br />N -0— m <br />t M <br />Y/ o <br />0 O 2 O O <br />LLo Q <br />p° <br />•N,= w <br />n, 0- N <br />W 0O !` <br />L <br />rz, <br />/) <br />( C <br />n/ LLI <br />LL (.9 W <br />LLI u - W O I- <br />WI-Q �2J W�~zw z <br />=2O�W,U000, O <br />J <br />¢�OJX_,Ua <ZOQ� <br />QU <br />Z) F- F- <br />aQ¢z ¢F- <br />wotROOmzU <br />�0cy <br />CUn Z~W¢O <br />0Wa>zZ0YOzaOaOL¢2_gZ0 <br />UQ <br />zL¢ <br />¢�Q <br />a <br />O <br />O <br />N <br />OF_ <br />� O <br />O <br />z <br />O <br />Q M Ln <br />L.L <br />~ ce a �M-.i-.i <br />O <br />z <br />z <br />W <br />Jo <br />N <br />N <br />co <br />N <br />O <br />O <br />O <br />� <br />Q <br />M <br />T-Te <br />CV <br />0 <br />CV <br />o <br />N <br />O <br />O <br />O <br />� <br />o <br />o6 <br />6 <br />�y'� <br />w <br />co <br />� <br />T- � <br />ao <br />T.-N <br />O <br />O <br />O <br />O <br />O <br />N <br />O <br />CD <br />N <br />CD <br />N <br />N <br />O <br />o <br />N <br />N <br />N <br />o <br />N <br />M <br />LO <br />O <br />M <br />O <br />M <br />Op <br />O <br />N <br />O <br />N <br />C) <br />0 <br />0 <br />0 <br />0 <br />T- <br />T- <br />o <br />o <br />N U <br />� <br />� <br />0 <br />NM <br />M <br />0 <br />d' <br />00 <br />U-) <br />O <br />0 <br />1`­ <br />L <br />(f� <br />COO <br />Z Z <br />z_ <br />O <br />Q <br />Uo>� <br />Q <br />Oa=¢ <br />Lr).� <br />-0 <br />z <br />z <br />W F- I- <br />= <br />m o z <br />I- M z <br />Q <br />Z ?j J <br />� <br />z x <br />Z z <br />>- O <br />00 <br />OM <br />W <br />�Z <br />Z r-I <br />`C p <br />Z <br />U <br />v <br />Oo <br />g <br />z <br />z <br />z <br />W <br />J <br />W <br />M <br />0 <br />� <br />> <br />LAST PLOT DATE <br />May. 8, 23 <br />EXTERIOR <br />Z O <br />ELEVATIONS & <br />ROOF PLAN B <br />