Laserfiche WebLink
TABLE OF CONTENTS <br />SHEET# I SHEET NAME <br />CITY OF ZEPHYRHILLS <br />SARAH VANDE BERG TENNIS CENTER <br />ZEPHYRHILLS, FLORIDA <br />PERMIT DOCUMENTS <br />6/21/2019 <br />FGA PROJECT#: <br />19020 <br />-'LEI SIC HIMANG ARC 14 <br />. E PLANNING INTERIORS <br />SAFETY HARBOR OFFICE TAMPA OFFICE SARASOTA OFFICE <br />195 FOURTH AVENUE NORTH 324 HYDE PARK AVENUE, SUITE 300 5967 CATTLEMAN LANE <br />SAFETY HARBOR, FLORIDA 34695 TAMPA, FLORIDA 33606 SARASOTA, FLORIDA 34232 <br />PHONE: (727) 725-8880 PHONE: (813) 251-4400 PHONE: (941) 342-9293 <br />FAX: (727) 725-3900 FAX: (813) 251-1994 FAX: (941) 342-9253 <br />REGISTRATION NUMBER: AAC000123 <br />MEP ENGINEERS: <br />Emerald Enaineerina Inc. <br />9942 CURRIE DAVIS DRIVE, SUITE H <br />TAMPA, FLORIDA 33619 <br />PHONE - (813) 995-0300 <br />AO.0 <br />COVER <br />REFERENCE SHEET <br />AO.1 <br />AO.2 <br />LIFE SAFETY FLOOR PLAN & BUILDING CODE DATA <br />A1.1 <br />SITE PLAN <br />A2.1 <br />FIRST FLOOR PLAN <br />A2.2 <br />ENLARGED PLANS, SCHEDULES & WALL TYPES <br />A4.1 <br />OPENING SCHEDULE & DETAILS <br />A4.2 <br />OPENING SCHEDULE & DETAILS <br />A4.3 <br />OPENING DETAILS & SIGNAGE SCHEDULE & DETAILS <br />A5.1 <br />EXTERIOR ELEVATIONS <br />A6.1 <br />BUILDING SECTIONS <br />A6.2 <br />WALL SECTIONS <br />A6.3 <br />WALL SECTIONS <br />A6.4 <br />WALL SECTIONS <br />A6.5 <br />IWALLSECTIONS <br />A6.6 <br />WALL SECTIONS <br />A7.1 <br />INTERIOR DETAILS <br />A8.1 <br />REFLECTED CEILING PLAN <br />A9.1 <br />ROOF PLAN <br />A9.2 <br />ROOF DETAILS <br />S1.1 <br />FOUNDATION PLAN <br />S1.2 <br />FRAMING PLAN <br />S2.1 <br />STRUCTURAL DETAILS <br />S2.2 <br />STRUCTURAL DETAILS <br />S3.1 <br />WALL SECTIONS <br />S3.2 <br />WALL SECTIONS <br />S3.3 IWALLSECTIONS <br />MECHANICAL <br />M0-1 <br />HVAC GENERAL INFORMATION <br />MO-2 <br />HVAC GENERAL INFORMATION <br />M1-1 <br />HVAC FLOOR PLAN <br />M1-2 <br />HVAC ROOF PLAN <br />M5-1 <br />HVAC DETAILS <br />M5-2 <br />HVAC DETAILS <br />M6-1 <br />HVAC SCHEDULES <br />PLUMBING <br />PO-1 <br />PLUMBING GENERAL NOTES, LEGEND & SPECIFICATIONS <br />P1.1 <br />Unnamed <br />P2-1 <br />PLUMBING FLOOR PLAN <br />P2-2 <br />PLUMBING ROOF PLAN <br />P6-1 <br />PLUMBING SCHEDULES AND DETAILS <br />P7-1 <br />PLUMBING RISER DIAGRAMS <br />EO-1 <br />ELECTRICAL SPECIFICATIONS AND SCHEDULES <br />E1-0 <br />ELECTRICAL SITE PLAN <br />E1-1 <br />ELECTRICAL FLOOR PLAN - LIGHTING <br />E2-1 <br />ELECTRICAL FLOOR PLAN - POWER <br />E2-2 <br />ELECTRICAL ROOF PLAN <br />E2-3 <br />LIGHTNING PROTECTION DETAILS <br />E6-1 <br />ELECTRICAL SCHEDULES <br />E7-1 <br />POWER RISER DIAGRAM <br />SITE LOCATION MAP (NTS) <br />L.L <br />w <br />I— <br />Z <br />w <br />U) CU <br />J (n <br />J z <br />= Z <br />LLI <br />CD <br />w 0� <br />N W <br />LL m <br />O w <br />0 <br />z <br />U > <br />_ <br />Q <br />ry <br />Q <br />s�g <br />y,;� u - <br />I— <br />Z <br />W <br />U <br />O <br />0 <br />SOL J. FLEISCHMAN, ,JR. <br />AR0005569 <br />6-21-19 <br />