<br />HVAC GENERAL NOTES
<br />THE FOLLOWING HVAC GENERAL NOTES APPLY TO GENERAL CONDITIONS OF HEATING,
<br />VENTILATING, AND AIR CONDITIONING (HVAC) WORK REQUIRED FOR THIS PROJECT.
<br />NO EXCLUSIONS FROM OR LIMITATIONS IN THE LANGUAGE USED IN THE CONTRACT
<br />DOCUMENTS SHALL BE INTERPRETED AS MEANING THAT THE EQUIPMENT,
<br />APPURTENANCES, AND/OR ACCESSORIES NECESSARY FOR A COMPLETE AND
<br />OPERATIONAL SYSTEM ARE NOT TO BE PROVIDED AS REQUIRED. THE SEPARATE
<br />DIVISIONAL CONTRACT DOCUMENTS DO NOT RELIEVE THE CONTRACTOR FROM THE
<br />RESPONSIBILITY TO PROVIDE THE WORK WHICH IS INDICATED ON ANY OF THE DIVISIONAL
<br />CONTRACT DOCUMENTS. REVIEW AND COORDINATE THE SCOPE OF WORK WITH ALL
<br />DOCUMENTS AND TRADES TO ASSURE A COMPLETE AND FUNCTIONAL SYSTEM IS BID AND
<br />INSTALLED.
<br />THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES, AND INSPECTIONS
<br />REQUIRED TO COMMENCE AND COMPLETE HVAC WORK.
<br />SUBMIT FULL SUBMITTALS OF ALL HVAC EQUIPMENT AND MATERIALS TO THE ENGINEER
<br />FOR REVIEW, WHETHER IT IS EXACTLY AS SPECIFIED OR NOT. WHERE ALTERNATE
<br />MANUFACTURERS ARE LISTED, ONE OF THOSE MANUFACTURERS SHALL BE PROVIDED
<br />UNLESS A REQUEST FOR SUBSTITUTION HAS BEEN SUBMITTED PRIOR TO BID AND THE
<br />MANUFACTURER SUBSEQUENTLY IS LISTED AS AN ACCEPTABLE MANUFACTURER IN AN
<br />ADDENDUM. FOR ALL EQUIPMENT WHICH HAS BEEN SCHEDULED DIRECTLY ON THE DESIGN
<br />DRAWINGS, PROVIDE WITHIN THE SUBMITTAL A PERFORMANCE SCHEDULE FOR THE
<br />PROPOSED EQUIPMENT IN THE SAME FORMAT AS INCLUDED ON THE DRAWINGS. FAILURE
<br />TO PROVIDE REQUIRED PERFORMANCE SCHEDULE WILL RESULT IN REJECTION OF THE
<br />ENTIRE SUBMITTAL.
<br />BIND COMPLETE SUBMITTALS IN A THREE RING BINDER(S) WITH A TITLE SHEET AND
<br />IDENTIFICATION ON FRONT AND SIDE OF THE BINDER. CONTACT ENGINEER FOR PRIOR
<br />APPROVAL TO SUBMIT PDF EMAILED SUBMITTALS. SUBMIT ALL HVAC PRODUCTS
<br />SUBMITTALS ALL AT ONE TIME. PARTIAL SUBMITTALS WILL NOT BE ACCEPTED FOR REVIEW
<br />AND APPROVAL. INDEX ALL ITEMS AS APPLICABLE. SUBMITTALS THAT DEVIATE FROM THE
<br />REQUIREMENTS OF THE CONTRACT DOCUMENTS SHALL LIST ALL DIFFERENCES IN A COVER
<br />LETTER ATTACHED TO FRONT OF THE SUBMITTAL. ANY UNLISTED DEVIATIONS FOUND
<br />DURING REVIEW WILL RESULT IN THE REJECTION OF THE ENTIRE SUBMITTAL. FOR ITEMS
<br />REVIEWED AND MARKED "REJECTED" OR "REVISE AND RESUBMIT-, ONLY ONE ADDITIONAL
<br />RE -SUBMITTAL WILL BE REVIEWED TO VERIFY PRODUCT COMPLIANCE WITH THE CONTRACT
<br />DOCUMENTS. SHOULD FURTHER SUBMITTALS BE REQUIRED BY THE ENGINEER TO VERIFY
<br />THE SUBMITTAL WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS, THE HOURLY
<br />RATE OF $150.00 WILL BE BILLED TO THE CONTRACTOR FOR THE ENGINEER'S TIME SPENT
<br />ON THE REVIEW.
<br />THE CONTRACT DOCUMENTS AND SUBMITTALS OF ALL TRADES SHALL BE COORDINATED
<br />AND BE VIEWED IN CONNECTION AND CONJUNCTION WITH EACH OTHER TO INSURE THE
<br />PROPER LOCATION AND INSTALLATION OF ALL DEVICES AND EQUIPMENT. MAKE
<br />PARTICULAR NOTE OF LOCATIONS AND DIMENSIONS SHOWN ON THE ARCHITECTURAL
<br />FLOOR PLANS AND ELEVATIONS.
<br />HVAC DRAWINGS INDICATE THE SCHEMATIC LAYOUT AND LOCATION OF THE HVAC SYSTEM
<br />COMPONENTS. UNLESS SPECIFIC DIMENSIONS ARE NOTED, THE ACTUAL LOCATION OF
<br />THESE COMPONENTS SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTOR IN
<br />COORDINATION WITH THE WORK OF OTHER TRADES, THE USE OF MANUFACTURER'S
<br />SUBMITTALS, AND SIMILAR CERTIFIED DATA.
<br />ALL HVAC EQUIPMENT INSTALLED OUTDOORS SHALL BE SECURED TO ITS CURB OR
<br />HOUSEKEEPING PAD AS DETAILED BY THE STRUCTURAL ENGINEER FOR THE REQUIRED
<br />WIND LOAD DESIGN.
<br />ALL EXTERIOR EXPOSED MATERIALS SHALL BE CONSTRUCTED OF NON-FERROUS
<br />MATERIALS AND BE PAINTED WITH TWO COATS OF RUST INHIBITOR PAINT.
<br />INSTALL AND TEST ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH THE
<br />MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. MAINTAIN ADEQUATE
<br />SERVICE SPACE AS REQUIRED. SERVICE SPACE SHALL BE CLEAR OF DUCTS, PIPES,
<br />CONDUITS, WALL STUDS, CEILING HANGERS, AND ANY OTHER CONSTRUCTION
<br />APPURTENANCE.
<br />CONTRACTOR SHALL COORDINATE AND PROVIDE ALL CEILING/FLOOR/WALL ACCESS
<br />PANELS THAT MAY BE REQUIRED FOR THE INSTALLATION, INSPECTION, AND SERVICE OF
<br />HVAC EQUIPMENT WHETHER OR NOT IT IS SHOWN. ACCESS PANELS TO BE SELECTED BY
<br />THE ARCHITECT.
<br />ALL HVAC EQUIPMENT SHALL BE LABELED WITH ENGRAVED, LAMINATED, PLASTIC SIGNS.
<br />SIGNS SHALL BE 1/8" THICK AND A MINIMUM OF 1-3/4" HIGH WITH 1"HIGH LETTERS. LENGTH
<br />OF THE SIGN SHALL BE THE SUM OF THE LETTERS/NUMBERS PLUS 3/4" ON EACH END.
<br />EXTERIOR SIGNS SHALL BE UV RATED, DESIGNATED AND MANUFACTURED TO BE EXPOSED
<br />TO THE ELEMENTS.
<br />ALL WALL MOUNTED THERMOSTATS AND SIMILAR SENSORS SHALL BE INSTALLED AT A
<br />MAXIMUM ELEVATION OF 4'-O"ABOVE FINISHED FLOOR TO THE TOP OF THE DEVICE, UNLESS
<br />OTHERWISE NOTED ON DRAWINGS. LOCATION OF THE SENSORS SHALL BE COORDINATED
<br />WITH THE OTHER TRADES FOR A NEAT APPEARANCE. FINAL LOCATION OF THE SENSORS
<br />SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER. WHEN INSTALLED ON EXTERIOR
<br />WALLS, PROVIDE AN INSULATED SUB -BASE.
<br />RETAIN THE SERVICES OF A CERTIFIED COMMISSIONING AGENT TO PERFORM
<br />COMMISSIONING WORK IN ACCORDANCE WITH FBCE SECTION C408.
<br />RETAIN THE SERVICES OF A NEBB AND/OR AABC CERTIFIED TEST AND BALANCE AGENCY TO
<br />PERFORM FINAL TESTING AND BALANCING OF ALL HVAC SYSTEMS. RECORD ALL DATA ON
<br />STANDARD "AABC" OR OTHER APPROVED FORMS, AND SUBMIT TO THE ENGINEER FOR
<br />REVIEW.
<br />AT PROJECT COMPLETION, THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 8 HOURS OF
<br />TRAINING ON THE OPERATION AND MAINTENANCE OF THE HVAC EQUIPMENT.
<br />CONTRACTOR SHALL PROVIDE A ONE YEAR WARRANTY ON PARTS AND LABOR FROM THE
<br />DATE OF SUBSTANTIAL COMPLETION.
<br />SUPPLY, RETURN, TRANSFER, EXHAUST, AND OUTSIDE AIR DUCTWORK SHALL BE
<br />GALVANIZED SHEET METAL. SEAL ALL DUCT JOINTS WITH HARDCAST. ALL CONCEALED
<br />SUPPLY, RETURN, TRANSFER, AND OUTSIDE AIR DUCTS SHALL BE INSULATED WITH
<br />BLANKET TYPE INSULATION WITH VAPOR BARRIER (MINIMUM R = 6.0). DUCTWORK EXPOSED
<br />INSIDE MECHANICAL ROOMS SHALL BE EXTERNALLY INSULATED WITH RIGID FIBROUS
<br />DUCTBOARD WITH AN EPA LISTED ANTIMICROBIAL COATING. ALL DUCTWORK INSULATION
<br />SHALL BE LABELED AND MARKED AT REQUIRED INTERVALS PER THE FLORIDA BUILDING
<br />CODE, SECTION 604. EXHAUST AIR DUCTWORK SHALL NOT BE INSULATED UNLESS
<br />OTHERWISE SPECIFIED.
<br />PROVIDE A DEDUCTIVE ALTERNATE FOR: SUPPLY, RETURN, AND TRANSFER AIR DUCTWORK
<br />SHALL BE 1-1/2" THICK (MINIMUM R=6) FIBROUS DUCTBOARD WITH AN EPA LISTED
<br />ANTIMICROBIAL COATING. DUCT TAPE AND TAPE APPLICATION PROCEDURES SHALL BE IN
<br />ACCORDANCE WITH THE LATEST EDITION OF "SMACNA! STANDARDS. TAPE SHALL ALSO BE
<br />APPROVED AND LISTED BY THE FIBERGLASS DUCT BOARD MANUFACTURER FOR USE WITH
<br />THEIR PRODUCT.
<br />ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE LATEST
<br />EDITION OF"SMACNA" DUCT CONSTRUCTION STANDARDS. ALL DUCTWORK SHALL BE LEAK
<br />TESTED IN ACCORDANCE WITH SMACNA AND ASHRAE STANDARDS, AND BE WITNESSED BY
<br />THE TEST AND BALANCE AGENCY. DUCTS WITH A LEAKAGE RATE MORE THAN 2% WILL BE
<br />REJECTED. PROVIDE LEAKAGE TEST RESULTS TO ENGINEER. FABRICATE AND SEAL
<br />DUCTWORK PER THE FOLLOWING SCHEDULE (REFER TO THE EXTERNAL STATIC PRESSURE
<br />CRITERIA IN THE AIR HANDLING UNIT SCHEDULE FOR CORRESPONDING OPERATING
<br />PRESSURE):
<br />OPERATING PRESSURE DUCT PRESSURE CLASS SEAL CLASS
<br />UP TO 3" W.G. 3"W.G. B
<br />WHERE INDICATED ON HVAC EQUIPMENT SCHEDULES, EXTERNAL STATIC PRESSURE IS
<br />DEFINED AS NOT INCLUDING LOSSES DUE TO UNIT MOUNTED FILTERS OR MIXING BOXES.
<br />THOSE LOSES SHALL BE PART OF THE EQUIPMENT INTERNAL LOSSES, SAME AS THOSE
<br />CAUSED BY COILS, CABINET, ETC.
<br />ALL NEW DUCTWORK SHALL NOT BE STORED IN UNCLEAN AREAS. PROTECT ALL
<br />DUCTWORK FROM DUST AND DEBRIS WHILE IT IS STORED ON SITE. WHILE UNDER
<br />CONSTRUCTION, ALL INSTALLED DUCTWORK SHALL BE TEMPORARILY SEALED WITH
<br />VISQUEEN PRIOR TO TEST AND BALANCE IN ORDER TO LIMIT ACCUMULATION OF
<br />CONSTRUCTION DUST INSIDE DUCTWORK SYSTEM. IF EITHER OF THESE PROCEDURES IS
<br />NOT CONDUCTED, THE ENTIRE ASSOCIATED DUCTWORK SYSTEM AND HVAC EQUIPMENT
<br />SHALL BE CLEANED TO THE ENGINEER'S SATISFACTION.
<br />FLEXIBLE DUCTS SHALL BE FACTORY INSULATED WITH 3/4" THICK GLASS FIBER AND
<br />INCLUDE A VINYL VAPOR JACKET AND HELIX STEEL WIRE. "THERMAFLEX" TYPE MAKE OR
<br />APPROVED EQUAL. FLEXIBLE DUCT SHALL BE ATTACHED WITH "THERMAFLEX" WRAP LOCK
<br />SERIES 0902 CLAMPS. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 61-0".
<br />ALL DUCTWORK ELBOWS SHALL INCLUDE AIR FLOW DIRECTIONAL VANES AS PER IISMACNA"
<br />DUCT CONSTRUCTION STANDARDS. SPLITTER VANES SHALL BE PROVIDED IN ALL ELBOWS
<br />AND DUCT OFFSETS WITH ANGLES BETWEEN 15 DEGREE AND 90 DEGREES AS PER FIG. 2-5
<br />OF THE SMACNA MANUAL. 90 DEGREE ELBOWS SHALL HAVE TURNING VANES.
<br />PROVIDE CONICAL SPIN -IN FITTINGS AT ALL CONNECTIONS OF ROUND SHEET METAL OR
<br />FLEXIBLE SUPPLY AIR DUCTS TO RIGID RECTANGULAR DUCT.
<br />DUCTWORK, AIR DEVICES, AND OTHER ITEMS OF THE AIR DISTRIBUTION SYSTEM SHALL BE
<br />SUPPORTED DIRECTLY FROM THE BUILDING STRUCTURE AND NOT FROM THE CEILING OR
<br />CEILING SUSPENSION SYSTEM. AIR DEVICES SHALL BE SUPPORTED FROM THE BUILDING
<br />STRUCTURE FROM AT LEAST TWO POINTS. COORDINATE LOCATION OF AIR DEVICES,
<br />WALLCAPS, ROOFCAPS, AND LOUVERS WITH ALL OTHER TRADES.
<br />ALL BALANCING DAMPERS SHALL BE OPPOSED BLADE TYPE. PROVIDE A ONE FOOT LONG
<br />PLASTIC STRIP OF MATERIAL FROM ALL DAMPER HANDLES TO ASSIST TEST AND BALANCE
<br />AGENCY IN IDENTIFYING ALL DAMPERS. REMOVE MATERIAL FROM EXPOSED DAMPERS
<br />AFTER SUBSTANTIAL COMPLETION.
<br />IN AREAS WHERE THE BALANCING DAMPER INSTALLATION PROHIBITS ACCESS FOR TEST
<br />AND BALANCE, PROVIDE MANUAL REMOTE CABLE CONTROL EQUAL TO YOUNG REGULATOR
<br />MODEL 830ACC/270-896. ACCESS TO END OF CABLE TO BE FLUSH IN CEILING NEATLY
<br />CONCEALED WITH THREADED CAP. PAINT CAP TO MATCH CEILING COLOR. INDICATE
<br />LOCATIONS OF ALL CAPS IN A FLOOR PLAN INCLUDED IN THE SUBMITTALS AND OBTAIN
<br />APPROVAL FROM ENGINEER PRIOR TO INSTALLATION.
<br />FOR SEALING OF FIRE DAMPER AND PIPE OR DUCT PENETRATION THROUGH FIRE RATED
<br />WALLS, REFER TO ARCHITECTURAL CONTRACT DOCUMENTS. ALL RATED WALL
<br />PENETRATIONS SHALL BE SEALED USING APPROVED UL DETAILS. CORRECT ANY EXISTING
<br />CONDITIONS.
<br />ALL FIRE DAMPERS SHALL BE DYNAMIC TYPE. PROVIDE A DUCT ACCESS DOOR FOR FIRE
<br />DAMPERS.
<br />PROVIDE ADDITIONAL DUCTWORK AND PIPING SUPPORTS ON BOTH SIDES AND WITHIN 18"
<br />OF FIRE RATED WALLS. DUCTWORK OR PIPING SHALL NOT BE SUPPORTED FROM ANY FIRE
<br />RATED WALL. CORRECT ANY EXISTING CONDITIONS.
<br />ALL DUCTWORK AND/OR PIPING MUST BE INSTALLED 6" AWAY FROM ANY FIRE RATED WALL.
<br />CORRECT ANY EXISTING CONDITIONS.
<br />DUCT MOUNTED SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY ELECTRICAL
<br />CONTRACTOR. DETECTORS SHALL COMPLY WITH UL 268A. HVAC DRAWINGS INDICATE THE
<br />APPROXIMATE LOCATION OF DUCT DETECTORS. HVAC CONTRACTOR SHALL ASSIST THE
<br />ELECTRICAL CONTRACTOR IN LOCATING AND INSTALLING THE DETECTORS IN ACCORDANCE
<br />WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. WHEN RECOMMENDED
<br />CLEARANCES CAN NOT BE MAINTAINED, SIMULATE A SMOKE AIRFLOW TEST OF EACH
<br />DEVICE AND PROVIDE A COPY OF THE FIELD TEST TO THE ENGINEER. PROVIDE A DUCT
<br />ACCESS DOOR ADJACENT TO EACH DUCT MOUNTED SMOKE DETECTOR TO FACILITATE
<br />INSPECTION OF DUCT DETECTOR TUBES.
<br />CONTRACTOR SHALL TEST ALL EXISTING/NEW DUCT MOUNTED SMOKE DETECTORS,
<br />FIRE/SMOKE DAMPERS, AIR HANDLING UNIT AND EXHAUST FAN INTERLOCKS AND FIRE
<br />ALARM CONNECTIONS AND REPORT ANY DEFICIENCIES TO OWNER. RETEST AS REQUIRED
<br />UNTIL ALL ARE FUNCTIONAL.
<br />CONTRACTOR SHALL COORDINATE AND PROVIDE ALL DUCTWORK ACCESS PANELS THAT
<br />MAY BE REQUIRED FOR THE INSTALLATION, INSPECTION, AND SERVICE OF HVAC DAMPERS,
<br />SENSORS, ETC., WHETHER OR NOT IT IS SHOWN. DUCT ACCESS DOORS SHALL BE MINIMUM
<br />12"X 12" INSULATED AND DOUBLE GASKETED. ACCESS DOOR SHALL NOT REQUIRE TOOLS
<br />TO BE OPENED.
<br />PROVIDE FLEXIBLE CONNECTIONS BETWEEN ALL AIR MOVING APPARATUS AND DUCTWORK.
<br />RECOMMENDED WIDTH IS 4".
<br />KITCHEN HOOD AND ASSOCIATED EXHAUST DUCTWORK SHALL BE FABRICATED AND
<br />INSTALLED IN FULL COMPLIANCE WITH THE REQUIREMENTS OF NFPA-96 AND THE FLORIDA
<br />BUILDING CODE, INCLUDING CLEARANCES FROM COMBUSTIBLE SURFACES, FIRE
<br />PROTECTION, AND LOCAL CODE REQUIREMENTS. EXHAUST GREASE DUCTWORK TO BE
<br />FULLY WELDED STAINLESS STEEL.
<br />PROVIDE P-TRAPS AT ALL CONDENSATE DRAIN LINE CONNECTIONS. SLOPE DRAIN LINES
<br />TOWARD THE POINT OF DISCHARGE (MIN 1/8"/FOOT). INSULATE CONDENSATE DRAIN LINES
<br />WITH 3/4"THICK SEAMLESS CLOSED CELL RUBBER PIPE INSULATION. CONDENSATE DRAIN
<br />LINES TO BE (PVC) (COPPER). LINES SHALL BE ONE DIAMETER LARGER THAN THE UNIT
<br />DRAIN CONNECTION, BUT NOT LESS THAN 3/4 INCH. PROVIDE CLEANOUTS AT ALL CHANGES
<br />OF DIRECTION.
<br />REFRIGERANT LINES SHALL BE SIZED PER THE AIR CONDITIONING EQUIPMENT
<br />MANUFACTURER'S RECOMMENDATIONS. PROVIDE SIZING AND ACCESSORY DATA WITH THE
<br />EQUIPMENT PACKAGE SUBMITTAL. PIPING IS TO BE FILLED WITH DRY NITROGEN WHILE
<br />SOLDERING. TEST, CLEAN, AND DEHYDRATE PIPES AND PROVIDE CRITICAL CHARGE OF
<br />REFRIGERANT AS PER EQUIPMENT MANUFACTURER'S RECOMMENDATION. PROVIDE ALL
<br />NECESSARY VALVES, TRAPS, FILTER/DRYERS, SIGHT GLASS, ETC. AS REQUIRED FOR A
<br />COMPLETE AND READY TO OPERATE INSTALLATION. INCLUDE ACCESSIBLE SERVICE
<br />FITTINGS. BI-FLOW LIQUID LINE FILTER DRYER SHALL BE PROVIDED IN HEAT PUMP UNITS.
<br />ALL REFRIGERANT PIPING SHALL BE INSULATED WITH 3/4"THICK SEAMLESS CLOSED CELL
<br />RUBBER PIPE INSULATION. INSULATION EXPOSED TO THE OUTSIDE ENVIRONMENT SHALL
<br />BE PAINTED WITH TWO COATS OF UV -RESISTANT WHITE ARMAFLEX PAINT.
<br />HVAC CODE CRITERIA
<br />THE FOLLOWING IS A LIST OF ALL CODES ADOPTED DECEMBER 31, 2017 BY THE STATE FIRE
<br />MARSHALL'S RULE 69A3.012 F.A.C.:
<br />FLORIDA BUILDING CODE 6TH EDITION (2017) - ALL SECTIONS
<br />FLORIDA ENERGY EFFICIENCY CODE (FBC 2017), FLORIDA ENERGY CODE SOFTWARE:
<br />ENERGYGAUGE SUMMIT VERSION 6.00
<br />FLORIDA FIRE PREVENTION CODE 6TH EDITION (2017)
<br />69A-3.012 STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION ADOPTED.
<br />(1) EXCEPT AS SPECIFICALLY MODIFIED BY STATUTE OR BY THE STATE FIRE MARSHAL'S RULES, THE
<br />"FLORIDA FIRE PREVENTION CODE, 6TH EDITION (2017),- WHICH IS COMPRISED OF THE FLORIDA
<br />SPECIFIC EDITION OF NFPA 101, THE LIFE SAFETY CODE (2015 EDITION) AND THE FLORIDA SPECIFIC
<br />EDITION OF NFPA 1, THE FIRE CODE (2015 EDITION), ARE HEREBY ADOPTED AND INCORPORATED BY
<br />REFERENCE AND ARE APPLICABLE TO THOSE BUILDINGS AND STRUCTURES SPECIFIED IN
<br />PARAGRAPHS (A) AND (B) OF SUBSECTION (1) OF SECTION 633.206, F.S. IN ADDITION, THE FOLLOWING
<br />STANDARDS, EXCEPT AS SPECIFICALLY MODIFIED IN THE RULE CHAPTERS IN RULE TITLE 69A, ARE
<br />HEREBY ADOPTED AND INCORPORATED BY REFERENCE AND SHALL TAKE EFFECT ON THE EFFECTIVE
<br />DATE OF THIS RULE, AS A PART OF THE UNIFORM FIRE SAFETY STANDARDS ADOPTED BY RULE BY THE
<br />STATE FIRE MARSHAL AND ARE APPLICABLE TO THOSE BUILDINGS AND STRUCTURES SPECIFIED IN
<br />PARAGRAPHS (A) AND (B) OF SUBSECTION (1) OF SECTION 633.206, F.S.:
<br />NFPA 70,2014 EDITION, NATIONAL ELECTRICAL CODE
<br />NFPA 72,2013 EDITION, NATIONAL FIRE ALARM AND SIGNALING CODE
<br />NFPA 90A, 2015 EDITION, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND
<br />VENTILATING SYSTEMS
<br />NFPA 90B, 2015 EDITION, STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND
<br />AIR-CONDITONING SYSTEMS
<br />AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR CONDITIONING ENGINEERS, INC. (ASHRAE)
<br />(INCLUDING ALL APPROVED ADDENDUM):
<br />ASHRAE FUNDAMENTALS 2017
<br />ASHRAE GUIDELINE 4-2008, PREPARATION OF OPERATING AND MAINTENANCE DOCUMENTATION
<br />FOR BUILDING SYSTEMS
<br />ASHRAE GUIDELINE 11-2009, FIELD TESTING OF HVAC CONTROL COMPONENTS
<br />ASHRAE STANDARD 55-2013, THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY
<br />ASHRAE STANDARD 62.1-2016, VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
<br />ASHRAE STANDARD 111-2008, MEASUREMENT, TESTING, ADJUSTING AND BALANCING OF BUILDING
<br />HEATING, VENTILATION AND AIR-CONDITIONING SYSTEMS
<br />ASHRAE STANDARD 126-2016, METHODS OF TESTING HVAC AIR DUCTS
<br />ASHRAE STANDARD 152-2014, VENTILATION FOR COMMERCIAL COOKING OPERATIONS
<br />SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA) (INCLUDING
<br />ALL APPROVED ADDENDUM):
<br />HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE, 3RD EDITION, 2005
<br />FIBROUS GLASS DUCT CONSTRUCTION STANDARDS, 7TH EDITION, 2003
<br />HVAC SYSTEM DUCT DESIGN, 4TH EDITION, 2006
<br />HVAC AIR DUCT LEAKAGE TEST MANUAL, 2ND EDITION, 2012
<br />FIRE, SMOKE AND RADIATION DAMPER INSTALLATION GUIDE FOR HVAC, 5TH EDITION, 2002
<br />OTHER:
<br />* LOCAL CODES AND ORDINANCES
<br />NOTE: TO THE BEST OF THE ENGINEER'S KNOWLEDGE, THESE HVAC DESIGN DRAWINGS COMPLY
<br />WITH THE ABOVE CODE CRITERIA. WHEN TWO OR MORE CODES OR STANDARDS ARE IN
<br />CONFLICT, THE MORE STRINGENT SHALL APPLY
<br />0 A
<br />HVAC COORDINATION DRAWING REQUIREMENT
<br />PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL SUBMIT DETAILED HVAC
<br />COORDINATION DRAWINGS AT 1/4" = V-0" SCALE. THESE DRAWINGS ARE NOT TO BE CONFUSED WITH
<br />SUBMITTALS. THEY ARE NOT SUBMITTALS. THEY ARE A TOOL TO AIDE THE CONTRACTORS IN THE
<br />INSTALLATION OF THEIR SYSTEMS. DRAWINGS ARE TO INCLUDE, BUT NOT NECESSARILY BE LIMITED
<br />TO, THE FOLLOWING ITEMS:
<br />1 . MECHANICAL ROOMS AND CHILLER/BOILER PLANTS WITH ALL EQUIPMENT (FROM APPROVED
<br />SUBMITTALS) DRAWN TO SCALE. INDICATE SERVICE CLEARANCES.
<br />2. DETAILED FLOOR PLANS INDICATING ALL DUCTWORK, AIR DEVICES, DAMPERS, ACCESS DOORS,
<br />ALL OTHER DUCT MOUNTED AIR DISTRIBUTION RELATED EQUIPMENT, AND HVAC PIPING, VALVES,
<br />AND ACCESSORIES.
<br />3. INDICATE FLOOR, WALL, AND ROOF PENETRATION SIZES THAT ARE REQUIRED FOR ALL HVAC
<br />EQUIPMENT.
<br />4. SHOW MAJOR STRUCTURAL MEMBERS, MAJOR ELECTRICAL CONDUITS AND EQUIPMENT, AND
<br />MAJOR PLUMBING AND FIRE PROTECTION PIPING AND ACCESSORIES TO CONFIRM
<br />COORDINATION HAS OCCURRED.
<br />5. AFTER HVAC COORDINATION DRAWINGS ARE COMPLETED AND REVIEWED BY THE DESIGN TEAM,
<br />ANY ADDITIONAL WORK REQUIRED IN ANY OF THESE TRADES TO PROVIDE SYSTEMS THAT DO
<br />NOT CONFLICT WITH EACH OTHER SHALL BE PROVIDED BY THE CONTRACTOR AT NO E—OST TO
<br />Sheet
<br />List Table
<br />SMd Noubw
<br />SMA Tft
<br />MO-1
<br />HVAC
<br />GENERAL INFORMATION
<br />MO-2
<br />HVAC
<br />GENERAL INFORMATION
<br />Ml-1
<br />HVAC
<br />FLOOR PLAN
<br />M1-2
<br />HVAC
<br />ROOF PLAN
<br />M5-1
<br />HVAC
<br />DETAILS
<br />M5-2
<br />HVAC
<br />DETAILS
<br />M6-1
<br />HVAC
<br />SCHEDULES
<br />fA
<br />LAJ
<br />mi
<br />d rp
<br />Z '0
<br />00
<br />WE,
<br />z P:
<br />20
<br />3!
<br />LL Lu
<br />Lu
<br />W
<br />wui
<br />Z 79-
<br />UA 0,
<br />9 ��_
<br />co I -�
<br />Z N _j
<br />ui
<br />W
<br />E
<br />0
<br />Lu
<br />8
<br />12
<br />U- e '41
<br />U. Lzu 10%
<br />0
<br />c
<br />ca
<br />> a-
<br />=z) E
<br />ON
<br />IL2,
<br />w CL
<br />x
<br />cwn
<br />W
<br />z
<br />U)
<br />z
<br />W
<br />3:
<br />cq
<br />w
<br />0
<br />m
<br />00
<br />W
<br />_J
<br />LL
<br />w
<br />w
<br />z
<br />_j
<br />N
<br />W
<br />LL
<br />z
<br /><
<br />C)
<br />w
<br />0
<br />>
<br />N
<br />0
<br />W
<br />THIS DESIGN AND DRAWING IS THE
<br />SOLE PROPERTY OF
<br />FLEISCHMANGARCIA. NO PART OF THIS
<br />WORK MAY BE REPRODUCED WITHOUT
<br />PRIOR WRITTEN PERMISSION FROM
<br />F1 FISCHMANGARMA
<br />I CERTIFY TO THE BEST OF MY
<br />KNOWLEDGE THAT THESE DRAWINGS
<br />'OMPLY WITH ALL RELEVANT BUILDING
<br />CODES
<br />,P,�.ERMIT
<br />it
<br />D s
<br />0C.Ul 14
<br />N, Q. 14 6
<br />S *TE F
<br />I CX'l OR k
<br />'9/0NAl—
<br />WICHA44 At 'COSTELLO, PE
<br />FL. REG. NO. PE81436
<br />FGA PROJECT NUMBER
<br />19020
<br />ISSUE
<br />DATE
<br />6/21/2019
<br />I REVISIONS
<br />INOI DATE I NOTES
<br />SHEET NAME
<br />HVAC GENERAL
<br />INFORMATION
<br />SHEET NUMBER
<br />mo—i
<br />
|