DIVISIONS FIN[ S
<br />DIVISION 10 CIALTIES
<br />SECTION 09900 PAINTM
<br />SECTION VWW GY"J I WA1.LigOARD
<br />SECTION 10" TOILET COMPARTMENTS
<br />PART 1 GENERAL
<br />PART 1 GENERAL
<br />PART 1 GENERAL
<br />101 GENERAL
<br />101 GENERAL
<br />A IT IS THE INTENT OF THIS SPECIFICATION TO PRODUCE A PREMIUM JOB, WHICH WILL PROVIDE THE MAXIMUM
<br />1.01 SUBMITTALS
<br />A GYPSUM WALLBOARD WORK SHALL CONFOF;" TO THE GYPSUM ASSOCIATION "RECOMMENDED
<br />DURABILITY, WHICH CAN REASONABLY BE EXPECTED FROM A PAINTED SURFACE.
<br />A PRODUCT DATA: REQUIRED
<br />SPECIFICATIONS FOR THE APPLICATION AND FINISHING OF GYPSUM WALLBOARD"
<br />B. "PAINT" INCLUDES COATING SYSTEMS MATERIALS, PRIMERS, EMULSIONS, ENAMELS, STAINS, SEALERS, AND
<br />B. SHOP DRAWINGS: REQUIRED
<br />B. EXAMINE SUBSTRATES TO WHICH DRY WALL CONSTRUCTION ATTACHES OR ABUTTS, PRESET HOLLOW METAL
<br />FILLERS, AND OTHER APPLIED MATERIALS WHETHER USED AS PRIME, NTER"IEDIATE, OR FINISH COAT.
<br />C. SAMPLES: NOT REQUIRED
<br />FRAMES, CAST-N-ANCORS, AND STRUCTURAL FRAMING FOR COMPLIANCE WITH REQUIREMENTS FOR
<br />C. SPECIFIED PRODUCTS BELOW ARE MANUFACTURED BY SHERWIN WILLIAMS, EXPECT WERE OTHER
<br />INSTALLATION TOLERANCE AND OTHER CONDITIONS AFFECTING PERFORMANCE OF DRY WALL
<br />MANUFACTURERS ARE INDICATED, AND ESTABLISH A STANDARD OF QUALITY. EQUIVALENT PRODUCTS OF
<br />1.02 QUALITY ASSURANCE
<br />CONSTRUCTION. DO NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN
<br />OTHER ACCEPTABLE MANUFACTURERS MAY NOT BE USED UNLESS APPROVED BY ARCHITECT.
<br />A REGULATORY REQUIREMENTS: APPLICABLE CODE FOR PROVISIONS FOR THE PHYSICALLY HANDICAPPED.
<br />CORRECTED.
<br />D.PROVIDE BEST GRADE AND QUALITY MATERIALS AND PRODUCTS MANUFACTURED BY SHERWN WILLIAMS.
<br />C. DO NOT TAPE AND FINISH GYPSUM BOARD WHEN THE TEMPERATURE IS BELOW 60 DEGREES FAHRENHEIT.
<br />MATCH COLORS AS INDICATED ON THE DRAWINGS. USE PREMIXED PANTS INSOFAR AS POSSIBLE. THIN ONLY
<br />THE TEMPERATURE OF THE ROOMS SHALL BE HELD At 60 DEGREES FAHRENHEIT FOR 46 HOURS BEFORE
<br />AS PERMITTED ANY MANUFACTURER'S LABEL INSTRUCTIONS, AND AVOID UNNECESSARY THNNWA
<br />PART 2 PRODUCTS
<br />TAPING AND FNISHNG IS TO BEGIN. MAINTAIN 60 DEGREES FAHRENHEIT DURING AND AFTER INSTALLATION.
<br />E. PROTECT FINISHED SURFACES, WORK OF OTHER TRADES, AND PROPERTY OF THE OWNER FROM DAMAGE AND
<br />VENTILATES AS REQUIRED TO REMOVE EXCESS HUMIDITY.
<br />DEFACEMENT. COVER FLOORS AND FIXED EQUIPMENT WITH DROP CLOTHS.
<br />201 MANUFACTURERS/PRODUCTS
<br />F. PREPARE SURFACES ACCORDING TO PANT MANUFACTURER'S INSTRUCTIONS. EXAMINE FACTORY FINISHED AND
<br />A SOURCE: AMPCO
<br />1.02 GYPSUM WALLBOARD
<br />PRIMED SURFACES TO BE PAINTED, AND VERIFY COMPATIBILITY OF EXISTING MATERIAL WITH PANT TO BE
<br />B. PANEL CONSTRUCTION: PLASTIC LAMINATE - METAL SUN %'322-58
<br />A GYPSUM WALLBOARD SHALL BE MANUFACTURED BY US. GYPSUM. WALLBOARD IS TO MEET. ASTM C36-84A
<br />APPLIED. APPLY PANT IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS ONLY
<br />C. HEAD RAILS: ALUMINUM
<br />AND 88-L-30d 1/2 NO -ES THICK, 48 INCHES WIDE WITH TAPERED EDGES.
<br />TO SURFACES MCH ARE THOROUGHLY DRY, SMOOTH, EVEN, CLEAN, FREE OF DUST AND PROPERLY
<br />D. HARDWARE: HINGES, LATCH AND KEEPER AND COAT WOOKaU lMR
<br />B. AT FIRE RATED PARTITIONS INSTALL WALLBOARD TO MEET SEPARATE REQUIREMENTS, USE TYPE III, GRADE
<br />PREPARED TO RECEIVE THE INTENDED FINISH.
<br />X CLASS 1, 5/8 INCHES THICK FIRE RETARDANT WALLBOARD.
<br />2.02 FABRICATION
<br />C. NSTALL GYPSUM BOARD WITH TRUE, EVEN SURFACES AND STRAIGHT, SHARP CORNERS. USE FULL LENGTH
<br />IM PAINTING
<br />A URINAL SCREENS, VESTIBULE SCREENS, CONFIGURATION: WALL HUNG, BRACKET SUPPORTED.
<br />BOARDS WERE POSSIBLE. END JOINTS ON THE SAME SIDE OF A WALL SHALL BE STAGGERED AND JOINTS
<br />A, ACCEPTABLE MATERIALS
<br />B. PARTITION CONFIGURATION: FLOOR MOUNTED WITH HEADRAIL
<br />ON OPPOSITE SIDE SHALL NOT OCCUR OVER THE SAME SUPPORT. DO NOT LOCATE NORMAL END JOINTS At
<br />EDGE OF OPENINGS. FORM JOINTS NEATLY. BUTT BOARDS TOGETHER BUT DO NOT FORCE INTO PLACE. DO
<br />NOT BUTT EDGES AGAINST TAPERED EDGES. NO JOINT SHALL HAVE A GAP GREATER THAN V4 INCH.
<br />1. ALL PANTING TO BE SCHEDULED IN THE FINISH SCHEDULE.
<br />2. EQUIVALENT PRODUCTS OF THE FOLLOWING ARE ALSO ACCEPTABLE:
<br />PRATT U LAU,IBERTT
<br />C. PANEL CONSTRUCTION
<br />L USE 5/8" FOR THE MINIMUM THICKNESS.
<br />2. ALL HARDWARE MUST HAVE RUBBER GROMMETS BETWEEN THE HARDWARE AND THE AVONITE MATERIAL.
<br />p. IN GENERAL, INSTALL GYPSUM BOARD ON CEILING BEFORE WALLS. CONSTRUCT CEILINGS WITH LONG
<br />GLIDDEN
<br />3. USE I" THICK PLATERS FOR THE POST GONG FROM THE GROIAND TO HEADRAIL, OBTAINED BY UTILIZING
<br />DIMENSION OF GYPSUM BOARD APPLIED At RIGHT ANGLES TO SUPPORT.
<br />PORTER
<br />5/8" THICK PIECES.
<br />E. SCREW GYPSUM BOARD TO FRAMING WITH SCREWS NOT OVER 8 INCHES ON CENTER FASTEN GYPSUM
<br />BENJAMINE MOORE
<br />4. FULL CHANNEL GROOVES CAN BE USED WHEN CONSTRUCTNG THE HORIZONTAL SEAMS FOR VERTICAL
<br />BOARD BEGINNING AT THE CENTER AND WORK TOWARDS OUTER EDGES. HOLD BOARD FIRMLY AGAINST
<br />B. UNDERCOATS AND T14 ERS
<br />PANELS N THE PARTITIONS.
<br />WOOD FRAMING U4ILE FASTENING. FASTENERS AT EDGES OF BOARDS SHALL BE 1/2 NCH FROM THE EDGE.
<br />I. PROVIDE UNDERCOAT PANT PRODUCED BY THE SAME MANUFACTURER
<br />5. SECURE WALL PANELS TO BACK OF THE WALL AND TO PILASTER WITH FULL LENGTH "U" CHANNEL.
<br />F. OPENINGS FOR ELECTRICAL DEVICES, PIPNG, GRILLS, AND REGISTERS SHALL BE ACCURATELY LOCATED
<br />OF FINISH COAT.
<br />AND NEATLY MADE TO CLOSELY FIT THE DEVICES AND BE COMPLETELY COVERED BY PLATES AND
<br />2. USE ONLY THINNERS RECOMMENDED BY THE PANT MANUFACTURER AND USE ONLY
<br />ESCUTCHEONS.
<br />THE RECOMMENDED LIMITS.
<br />PART 3 EXECUTION
<br />C. COLOR SCHEDULES
<br />1D3 TRIM PIECES
<br />A PROVIDE TRIM ACCESSORIES OF THE SIZES REQUIRED FOR THE WALLBOARD APPLICATION AS
<br />MANUFACTURED BY U.S. GYPSUM. PROVIDE OUR -A -BEAD CORNER BEAD AT EXTERNAL. CORNERS AND NO.
<br />1. PROVIDE PANTNG AS SCHEDULED IN THE FINISH MATERIALS SCHEDULE.
<br />a. ON GYPSUM DRYWALL, USE:
<br />I. FIRST COAT - PIGMENTED PRIMER/SEALER
<br />301 SCHEDULES
<br />A ON DRAWINGS.
<br />200-A METAL CASING BEAD WERE WALLBOARD ABUTTS OTHER MATERIALS.
<br />2. SECOND COAT - ACRYLIC LATEX ENAMEL
<br />END OF SECTION 10155
<br />3. THIRD COAT - ACRYLIC LATEX ENAMEL
<br />1.04 FASTENERS
<br />b. ON FERROUS METAL, USE:
<br />A PROVIDE SCREWS, NAILS, CLIPS, TIES, AND OTHER FASTENERS AS RECOMMENDED BY THE GYPSUM
<br />I. FIRST COAT - RUST INHIBITIVE ALKYD METAL PRIMER
<br />MANUFACTURER
<br />2. SECOND COAT - SEMI -GLOSS ALKYD ENAMEL
<br />3. THIRD COAT - SEMI -GLOSS ALKYD ENAMEL
<br />105 JOINT TREATMENT SYSTEMS
<br />a ON WOOD DOORS, USE:
<br />A SYSTEM SHALL BE PERFORATED TAPE AND CEMENT RECOMMENDED THE GYPSUM MANUFACTURER
<br />I. FIRST COAT - STAN (SEE FINISH SCHEDULE)
<br />B. APPLY MATERIALS IN STRICT ACCORDANCE TO MANUFACTURER'S RECOMMENDATIONS. FILL JOINTS WITH
<br />2. SECOND COAT - STAN (SEE FINISH SCHEDULE)
<br />JOINT COMPOUND, EMBED PERFORATED TAPE AND APPLY A SKIM COAT OF JOINT COMPOUND OVER TAPE.
<br />3. THIRD COAT - VARNISH LOW SHEEN "RUBBED EFFECT"
<br />APPLY TWO ADDITIONAL COATS OF JOINT CA 1POUND ALLOWING AT LEAST 24 HOURS BETWEEN EACH COAT.
<br />SAND EACH COAT. FINISH SURFACES SHALL BE UNIFORMLY SMOOTH, TRUE AND IN SATISFACTORY CONDITION
<br />t0 RECEIVE PANT.
<br />END OF SECTION 09900
<br />END OF SECTION 09250
<br />SECTION 093M CERAMIC TILE
<br />PART 1 GENERAL
<br />101 GENERAL
<br />A CERAMIC AND TYPES ARE INDICATED ON THE DRAWINGS AND ARE FROM A SINGLE MANUFACTURER. OTHER
<br />MANUFACTURERS WILL NOT BE CONSIDERED.
<br />B. DELIVER MATERIALS N ORIGINAL CONTANERS WITH SEALS UNBROKEN AND LABELS INTACT UNTIL TIME OF
<br />USES. ENGAGE AN EXPERIENCED INSTALLER WHO HAS SUCCESSFULLY COMPLETED TILE NSTALLATIONS
<br />SIMILAR IN MATERIAL, DESIGN, AND EXTENT t0 THAT INDICATED FOR THE PROJECT.
<br />C. COMPLY WITH PARTS OF ANSI 106 SERIES OF FINE INSTALLATION STANDARDS INCLUDED UNDER "AMERICAN
<br />NATIONAL STANDARD SPECIFICATIONS FOR THE INSTALLER OF CERAMIC TILE" THAT APPLY TO TYPE OF
<br />SETTNG AND GROUT MATERIALS AND METHODS INDICATED. TILE MAY BE THIN -SET.
<br />1.02 MORTAR *0 GROUT
<br />A MORTAR SHALL BE PORTLAND CEMENT ASTM CI50, TYPE 1. GROUT SHALL BE ACID RESISTANT UPCO
<br />HYDROMENT, TYPE AS RECOMMENDED BY THE MANUFACTURER FOR THE SPECIFIC TYPE OF TILE AND
<br />METHOD OF INSTALLATION. COLR FOR FLOOR TILE IS SPECIFIED ON THE DRAWINGS.
<br />B. DO NOT GROUT TILE UNTIL TILE IS FIRMLY SET. SOAK OR DAMPEN JOINTS OF THE TILE TO BE GROUTED WITH
<br />PORTLAND CEMENT GROUT. SOAK OR DAMPEN OTHER JOINTS AS RECOMMENDED BY THE GROUT
<br />MANUFACTURER FORCE GROUT INTO JOINT LINES COMPLETELY IDILINIG JOINTS WITH COMPACTED GROUT AND
<br />COVERING MORTAR FINISH JONTS OF SQUARE EDGED TILE FLUSH WITH SURFACE. STRIKE OFF TOOL JOINTS
<br />OF CUSHION EDGED TILE TO DEPTH OF CUSHION. FILL GAPS AND SKIPS, AND RETOOL.
<br />1.03 CLEANING
<br />A UPON COMPLETION OF THE PLACEMENT AND GROUTING, CLEAN TILE SURFACE SO THAT THEY ARE FREE OF
<br />FOREIGN MATTER REMOVE LATEX-F'ORTLAND CEMENT GROUT RESIDUE FROM TILE AS SOON AS POSSIBLE
<br />UNGLAZED TILE MAY BE CLEANED WITH ACID SOLUTIONS ONLY WHEN PERMITTED BY TILE AND GROUT
<br />MANUFACTURER'S PRINTED INSTRUCTIONS, BUT SOONER THAN 14 DAYS AFTER INSTALLATION. FLUSH SURFACE
<br />WITH CLEAN WATER BEFORE AND AFTER CLEANING.
<br />END OF SECTION 0S300
<br />DIVISION 11 EQUIPMENT
<br />SECTION OWII ACOUSTIC PAWL CEILINCsB
<br />PART 1 GENERAL.
<br />SEE SHEET KI
<br />I.0IGENERAL
<br />A COORDINATE LAYOUT AND INSTALLATION OF ACOUSTICAL CEILING UNITS AND SUSPENSION SYSTEM
<br />COMPPONENTS WITH OTHER CONSTRUCTION THAT PENETRATES CEILINGS OR IS SUPPORTED BY THEM,
<br />INCLUDING LIGHTAl FIXTURES p HVAC EQUIPMENT.
<br />i'
<br />DIVISION 12 FURNIS�IIN�S
<br />B. INSTALL N STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTRUCTIONS. ARRANGE ACOUSTICAL
<br />UNITS AND ORIENT DIRECTIONAL PATTERN OF TILES FOR A UNIFORM APPEARANCE. REST PANELS ON
<br />FLANGES OR INVERTED TEES WITH TILE UNITS FITTING NEATLY AGAINST BUTTING SURFACE AND SUPPORT BY
<br />WALL ANGLES.
<br />NONE SPECIFIED
<br />1.02 MNERAL-FIBER ACOUSTICAL PANELS
<br />A PROVIDE ACOUSTICAL PANELS AS MANUFACTURED BY USG OR AR'MSTRONG, 24 INCHES BY 24 INCHES BY
<br />5/8 INCH THICK SQUARE EDGE. USG'2210-105 RADAR - FLAT BLACK REFER TO CEILING PLAN FOR
<br />DIVISION 13 SPACIAL CONSTRLICTION
<br />LOCATIONS.
<br />B. PROVIDE METAL CEILING PANELS AS MANUFACTURED BY ARCHITECTURAL PRODUCTS OUTWATER LLC.
<br />MODEL SM2-204 (6" MULTIPLE PLATE) 24 INCHES BY 24 INCHES. RIETER TO CEILING PLAN FOR LOCATIONS.
<br />NONE SPECIFIED
<br />1.04 METAL SUSPENSION SYSTEM
<br />A PROVIDE SYSTEM AS MANUFACTURED BY DONN (USG). SUSPENSION SYSTEM SHALL BE EXPOSED TEE -GRID,
<br />DOUBLE WEB, INTERMEDIATE DUTY (ASTM C635), ELECTROGALVANIZED, COLD -ROLLED STEEL,1546 INCHES
<br />WIDE, CAPPED BOTTOM FLANGE. SYSTEM TO INCLUDE ALL CROSS TEES, BRIDGNG TREES, INTERSECTION
<br />CLIPS, SPLICES, COMPLETE EXPOSED GRID SYSTEM. SEE CEILING PLAN FOR TEE GRID COLOR
<br />B. LAY OUT PATTERN IN ACCORDANCE WITH THE DRAWINGS, LEVEL, TRUE TO PLANE, AND AT THE REQUIRED
<br />ELEVATION. FRAME AROUND ALL OPENINGS IN CEILING LIGHTS AND GRILLES WITH MAN RUNNERS. HANGERS
<br />ARE TO BE SPACED AT *-0"-0" ON CENTER MAXIMUM. PROVIDE ADDITIONAL HANGERS AS REQUIRED TO
<br />SUPPORT LIGHT FIXTURES AND HVAC REGISTERS AND GRILLES AND INTERFERENCES OF DUCT WORK
<br />�y�� 1� �/ 1 I�1/+
<br />DIVISION 11%x
<br />C. SECURES WIRES BY LOOPING AND WIRE -TYING, EITHER DIRECTLY TO STF41CTUMS OR TO INSERTS, EYE
<br />NONE SPECIFIED
<br />SCREWS, OR OTHER DEVICES APPROPRIATE FOR SUBSTRATE. SCREW ATTACH EDGE MOLDINGS TO
<br />SUBSTRATE AT INTERVALS NOT OVER 16 INCHES ON CENTER AND NOT MORE THAN 3 INCHES FROM ENDS.
<br />LEVEL GRID TO A TOLERANCE OF I/SNCH IN 12 FEET.
<br />END OF SECTION OS511
<br />DIVISION 15 MECHANICAL
<br />SEE MECHANICAL DRAWINCs.5
<br />DIVISION 116 ELECTRICAL
<br />SEE ELECTRICAL DRAWINGS
<br />OF 16PSEECFICATIONS
<br />REVISIONS
<br />BY
<br />00
<br />400
<br />M
<br />°•�' m �
<br />LL
<br />0- oiti
<br />U
<br />�xC\1Y
<br />U
<br />/ •
<br />O G cU.
<br />o m
<br />U N R
<br />•
<br />ti
<br />QQ ::
<br />P_ 3
<br />Y TO 3
<br />3ti 3
<br />oxC\1 .
<br />0
<br />N
<br />co
<br />• 1
<br />1
<br />,a
<br />J
<br />O.' 00
<br />i.
<br />LL. Q o0.
<br />�C
<br />Q
<br />d
<br />A O°
<br />ri N
<br />o
<br />O o�
<br />u
<br />�C/)
<br />a�
<br />O
<br />L
<br />O
<br />N
<br />C m -
<br />0 0U)
<br />' M
<br />m M }
<br />UD 0 < J 7
<br />m m LL.0
<br />UD y 0
<br />C w L W
<br />O �•-•
<br />0 .0
<br />o Z to m
<br />C O N
<br />m N
<br />Date: 05. 17. 21
<br />Scale: AS NOTED
<br />Project Mgr: DG
<br />Drawn: DD
<br />Job: 21-018
<br />Sheet
<br />N2
<br />F — E - —..-T I a T__ I I I _— _.I - _ I-,
<br />
|