Laserfiche WebLink
MNk;E I Akr:dl& <br />I. THE STRUCTURAL SYSTEM IS UNSTABLE UNTIL ALL CONNECTIONS HAVE BEEN MADE AND ALL CONCRETE HAS <br />REACHED ITS MINIMUM DESIGN STRENGTH, AS SHOWN N THE STRUCTURAL DOCUMENTS. <br />2. CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION TO ENSURE THE SAFETY OF THE <br />BUILDING UNTIL STRUCTURAL SYSTEM IS COMPLETED. THIS INCLUDES, BUT IS NOT LIMITED To, THE ADDITION OF <br />WHATEVER TEMPORARY BRACING, SHORNG, GUYS OR TIE-DOWS THAT MAY BE NECESSARY. SUCH MATERIAL SHALL <br />BE REMOVED AND SHALL REMAIN THE PROPERTY OF THE CONTRACTOR AFTER COMPLETION OF THE PROJECT. <br />3. CONTRACTOR TO SUPPORT, BRACE, AND SECURE EXISTING STRUCTURE AS REQUIRED. CONTRACTOR IS SOLELY <br />RESPONSIBLE FOR THE SAFETY OF THE BUILDING DURING CONSTRUCTION. <br />4. APPLICABLE BUILDING CODE: FLORIDA BUILDING CODE bth EDITION (20M) - BUILDING <br />5. ALL MATERIALS AND WORKMANSHIP SHALL BE N ACCORDANCE WITH THE FLORIDA BUILDING CODE 6th EDITION <br />(2011) - BUILDING. <br />6. DESIGN LOADS <br />AREA SUPERIMPOSED LIVE LOAD DEAD LOAD <br />ROOF 20 PSF 10 PW <br />1. BASIC WIND SPEED - 119 M.P.H. (3 SEC. GUST-ULT) : V (ASD) - 100 MPH EXPOSURE CATEGORY - B <br />8. COORDINATE ALL DIMENSIONS AND ELEVATIONS WITH THE ARCHITECTURAL DRAWINGS. DO NOT SCALE DRAWINGS. <br />9. CONTACT ENGINEER / ARCHITECT WITH ANY QUESTIONS OR DISCREPANCIES FOUND ON DRAWINGS. <br />10. SUBMIT SHOP DRAWNGS AS SEQUIRED HEREIN. ALLOW FOR TWO WEEKS REVIEW TIME AFTER RECEIPT OF SUBMITTALS <br />BY THIS FIR1"I. ALL SUBMITTALS SHALL BE CHECKED AND SIGNED BY THE GENERAL CONTRACTOR AND <br />SIGNED/SEALED BY THE SPECIALTY ENGINEER, WHERE SPECIFIED HEREN. <br />11. CONTRACTOR SHALL NOT BE RELIEVED FROM RESPONSIBILITY FOR ERRORS OR OMISSIONS IN SHOP DRAWINGS OR <br />MIX DESIGNS BY THE ENGINEER'S REVIEW THEREOF. <br />12. CONTRACTOR SHALL NOTIFY THIS OFFICE WHEN THE STRUCTURAL SYSTEM IS SUBSTANTIALLY COMPLETED, AND <br />BEFORE SHEATHING, CEILINGS, OR ROOFING IS INSTALLED. <br />I. ASSUMED SOIL BEARING PRESSURE - 2,000 PSF. <br />2. A QUALIFIED TESTING LABORATORY SHALL BE RETAINED BY OWNER / GENERAL <br />CONTRACTOR TO PERFORM( WHATEVER SUBGR:ADE TESTING THAT IS NECESSARY TO <br />CONFIRM THE ASSUMED BEARING WITHOUT EXCESSIVE SETTLEMENT. <br />3. TESTING MAY INCLUDE, BUT IS NOT LIMITED TO, DENSITY TESTS, AUGER BORINGS, OR <br />STANDARD PENETRATION BORINGS. <br />4. A COPY OF ALL TEST REPORTS SHALL BE SENT DIRECTLY TO OWNER ARCHITECT, <br />STRUCTURAL ENGINEER AND GENERAL CONTRACTOR <br />5. THE TESTING LABORATORY SHALL SPECIFY SOIL PREPARATION PROCEDURES AND <br />COMPACTION REQUIREMENTS NECESSARY TO OBTAIN THE DESIGN SOIL BEARING <br />PRESSURE. <br />fo. THE SIDES OF FOOTINGS MAY BE EARTH -FORMED IF THE EXCAVATION CAN BE KEPT <br />VERTICAL, CLEAN, AND STABLEt OTHERWISE, PLYWOOD FORMS MUST BE USED. <br />CAST IN PLACE CONCRETE <br />1. CONCRETE TO BE NORMAL WEIGHT WITH THE FOLLOWING MINIMUM COMPRESSIVE <br />STRENGTHS AT 28 DAYS: <br />I.I. FOOTINGS, SLAB ON GRADE 3,000 PSI <br />12. FORMED COLUMNS, BEAMS 4,0001051 <br />2. CONCRETE SHALL BE IREADYMIX PER ASTM CS4: <br />2.1. PORTLAND CEMENT - ASTM C 150 <br />22. AC5GREGATES - ASTM C33 (P MAX. NOMINAL) <br />23. NO CALCIUM CHLORIDE <br />2A. AIR ENTRAINING - ASTM C260 <br />25. WATER REDUCING - ASTM C4214 <br />21o. FLYASH - ASTM C618 CLASS F (20% MAXIMUM BY WEIGHT) <br />2.1. WATER - CLEAN AND POTABLE <br />3. REINFORCING STEEL: ASTM AWE, GRADE 60. <br />4. REQUIRED SLUMP RANGE = 3" TO 511. <br />5. WELDED WIRE FABRIC: ASTM A-1064. FURNISH IN SHEETS, NOT ROLLS. <br />6. MOISTURE BARRIER: 10 MIL POLYETHYLENE. LAP 6" AND TAPE ALL JOINTS. <br />1. CODES AND STANDARDS: (CURRENT EDITION) <br />ACI 301 "SPEC FOR STRUCTURAL CONCRETE FOR BUILDINGS." <br />ACI 305 "RECOMMENDED PRACTICE FOR HOT WEATHER CONCRETING" <br />ACI 318 "BLDG. CODE REQUIREMENTS FOR REINF. CONCRETE" <br />ACI 315 "DETAILS AND DETAILING OF CONCRETE REINFORCEMENT" <br />8. MINIMUM LAP SPLICE - 30 BAR DIAMETERS (2'-0" MIN.) UNLESS NOTED OTHERWISE <br />S. PROVIDE PROPERLY TIED SPACERS, CHAIRS, BOLSTERS, ETC, AS REQUIRED AND <br />NECESSARY TO ASSEMBLE, PLACE AND SUPPORT ALL REINFORCING IN PLACE. USE <br />WIRE BAR TYPE SUPPORTS COMPLYING WITH CRSI RECOMMENDATIONS. USE PLASTIC <br />TIP LEGS ON ALL EXPOSED SURFACES. <br />10. ALL BEAMS AND SLABS SHALL 15E POURED MONOLITHICALLY, EXCEPT FOR REQUIRED <br />CONSTRUCTION JOINTS. PROPOSED CONSTRUCTION JOINT LOCATIONS SHALL BE <br />SUBMITTED TO ENGINEER FOR APPROVAL. <br />11. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL OPENINGS, SLEEVES, AND SLAB <br />RECESSES AS REQUIRED BY OTHER TIRADES BEFORE CONCRETE IS PLACED. NO <br />SLEEVE, OPENING, OR INSERT MAY BE PLACED IN BEAMS, JOISTS, OR COLUMNS UNLESS <br />APPROVED BY THE ENGINEER <br />12. CONTRACTOR SHALL VERIFY EMBEDDED ITEMS, INCLUDING BUT NOT LIMITED TO <br />ANCHOR BOLTS, BOLT CLUSTERS, WELD PLATES, ETC_, BEFORE PLACING CONCRETE. <br />NOTIFY ENGINEER OF ANY CONFLICTS WITH 1RE5AR <br />13. SEE ARCHITECTURAL DRAWINGS FOR REQUIRED CONCRETE FINISHES. <br />14. ALL CONCRETE SHALL BE CURED IMMEDIATELY AFTER FINISHING OPERATIONS IN <br />ACCORDANCE WITH ONE OF THE FOLLOWING METHODS: <br />14.1. APPLY A LIQUID MEMBRANE FORMING CHEMICAL CURING COMPOUND IN <br />ACCORDANCE WITH ASTM C-309 <br />142. PROVIDE CONTINUOUS MOISTURE TO CONCRETE IN ACCORDANCE WITH ACI 301 <br />15. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROPER DESIGN AND <br />CONSTRUCTION OF ALL FORMWORK, SHORING, AND IRESHORING. <br />16. A QUALIFIED TESTING LABORATORY SHALL BE RETAINED TO PERFORMM THE <br />FOLLOWING CONCRETE TESTS ON SITE. <br />16.1. CYLINDER STRENGTH TESTS - ASTM C3% ONE SET OF FOUR CYLINDERS FOR <br />EACH 50 CUBIC YARDS OR FRACTION THEUREOF. TEST ONE CYLINDER AT i <br />DAYS AND TWO AT 28 DAYS. HOLD THE FINAL CYLINDER IN RESERVE. <br />162. SLUMP TESTS - ASTM CI43 <br />li. ONE COPY OF ALL TEST REPORTS SHALL BE SENT DIRECTLY TO OWNER, ARCHITECT, <br />STRUCTURAL ENGINEER, AND GENERAL CONTRACTOR. <br />18. RESTRICT THE ADDITION OF MIX WATER AT THE JOB SITE. DO NOT ADD WATER WITHOUT <br />THE APPROVAL OF THE GENERAL CONTRACTOR AND DO NOT EXCEED SLUMP <br />LIMITATIONS OR TOTAL ALLOWABLE WATER TO CEMENT RATIO. USE COLD WATER <br />FROM THE TRUCK TANK AND REMIX TO ACHIEVE CONSISTENCY. TEST REPORTS SHALL <br />INDICATE QUANTITY OF WATER ADDED AT THE JOB SITE. ALL TESTS SHALL BE <br />PREPARED AFTER THE ADDITION OF WATER TO THE MIX. <br />M. MAXIMUM WATER TO CEMENT RATIO WHEN NO BACK-UP DATA IS AVAILABLE: <br />IS.1. 4000 PSI, 28 DAY COMPRESSIVE STRENGTH - WATER TO CENTER RATIO, 0.44 <br />MAXIMUM (NON -AIR -ENTRAINED), 036 MAXIMUM (AIR -ENTRAINED) <br />IS2. 3,000 PSI, 28 DAY COMPRESSIVE STRENGTH - WATER TO CENTER RATIO, OB5 <br />MAX" (NON-AIR-ENTRANED), 0.41 MAX" (AIR -ENTRAINED) <br />20. REINFORCING BAR COVER (UAO-� <br />201 FOOTINGS 3' <br />202. COLUMNS 1 1/2' <br />203. BEAMS 11/2" <br />20.4. SLABS 3/4" (INTERIOR)1 1/2" (EXTERIOR) <br />S 1 RLIGTURAL GIFICA 1 1ONS <br />21. CONCRETE SHALL BE PLACED WITHN 90 MINUTES OF BATCH TIME <br />22. WHERE BAR LENGTHS ARE GIVEN ON DRAWINGS, LENGTH OF HOOTS, IF REWIRED, 16 NOT INCLUDED <br />23. PROVIDE COMMERCIAL FORM COATING COMPOUNDS THAT WILL NOT BOND, STAN, OR ADVERSELY AFFECT <br />CONCRETE SURFACES. WET FORMS BEFORE PLACING CONCRETE. <br />24. ALL CONCRETE SHALL BE CONSOLIDATED N PLACE USING INTERNAL VIBRATORS. <br />25. REPAIR AND PATCH DEFECTIVE AREAS WITH CEMENT MORTAR IMMEDIATELY AFTER REMOVAL OF FORMS, EXCEPT <br />WHERE REINFORCING IS VISIBLE. CONTACT STRUCTURAL ENGINEER FOR EVALUATION OF EXPOSED REINFORCING <br />26. PROVIDE 3/4" CHAMFERS ON ALL EXPOSED CORNERS OF COLUMNS, BEAMS, AND WALLS UNLESS NOTED OTHERWISE <br />ON ARCHITECTURAL DRAWINGS. <br />21. PROVIDE CORNER BARS AT ALL BEAM AND WALL FOOTING CORNERS TO MATCH HORIZONTAL BARS. <br />28. SUBMITTALS: <br />28.1. SUBMIT PROPOSED CONCRETE MIX DESIGN PRIOR TO CONSTRUCTION, NCLWNG BACKUP DATA N <br />ACCORDANCE WITH ACI 301-(CURRENT EDITION) CHAPTER 4, SECTION 423, EXCLUDING SECTION 423.413. <br />282. SUBMIT DETAILED SHOP DRAWINGS OF REINFORCING BARS SHOWNG NUMBER SIZE, AND LOCATION. INCLUDE <br />BAR LISTS AND BEND DIAGRAMS. <br />23 ALL BUILDING AND SITE SLAB -ON -GRADE SHALL BE AT LEAST 4' THICK, REINFORCED WITH 6X6-WI.4 X U A W1UF, ON <br />6 MIL VAPOR BARRIER WITH SAW -CUT CONTROL JOINTS W-O" O.C. EACH WAY INCLUDING HOUSE KEEPING PADS AS <br />REQUIRED. SEE PLANS FOR OTHER CONDITIONS. <br />30. STEP AND SLOPE ALL BALCONIES AND WALKWAYS AWAY FROM THE BUILDING. <br />MABONW <br />I. HOLLOW LOAD BEARNG WITS SHALL CONFORM TO ASTM CW, NORMAL MIGHT, TYPE II. MNIMUAM NET <br />COMPRESSIVE WIT STRENGTH - IWO PSI. (NET AREA COMPRESSIVE MASONRY STRENGTH FM - 500 PSI). <br />2. MORTAR SHALL BE TYPE M' OR 'S' AND CONFORM TO ASTM C210 (PROPORTION OR PROPERTY SPECIFICATION). <br />3. COARSE GROUT SHALL CONFORM TO ASTM C416: <br />3.1. 30M PSI AT 28 DAYS. <br />32. 1/4' MAXIMUM AGGREGATE. <br />33. 8" - II' SLUMP. <br />4. CODES AND STANDARDS: <br />41 ACI 530/ASCE 5 'BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES' <br />42. ACI 530RASCE 6 "SPECIFICATIONS FOR MASONRY STRUCTURES" <br />5. A REINFORCED MASONRY TIE BEAM SHALL BE PROVIDED IN ALL WALLS SHOW ON THE STRUCTURAL DRAWINGS AT <br />EACH FLOOR THE ROOF, AND AT TOP OF ANY PARAPET WALL. USE GALVANIZED MESH -TYPE CELL CAPS. PROVIDE <br />CORNER BARS AT ALL BEAM CORNERS TO MATCH HORIZONTAL BARS. <br />6. UNLESS NOTED OTHERWISE, TIE BEAMS SHALL 15E AS FOLLOWS: <br />61 FLOOR LEVELS: 8" X 16" MINIMUM WITH (U 5 TOP AND BOTTOM IN GROUTED KNOCK -OUT BLOCKS. <br />62. ROOF LEVEL: 8' X 16' MINIMUM WITH (U 5 TOP AND BOTTOM IN GROUTED KNOCK -OUT BLOCKS. <br />1. VERTICAL BARS SHALL BE HELD N POSITION AT THE TOP AND BOTTOM OF BAR AND AT V-0" O.C. MAXIMUM WITH <br />A MINIMUM CLEARANCE OF 1/2" FROM MASONRY. THE CLEAR DISTANCE BETWEEN BARS SHALL NOT BE LESS THAN <br />ONE BAR DIAMETER NOR LESS THAN I". CENTER BARS N WALLS UNA. <br />& VERTICAL REINFORCING SHALL BE AS SHOW ON THE DRAWINGS. FILL CELLS WITH COARSE GROUT AS SPECIFIED. <br />PROVIDE ACI W DEGREE STANDARD HOOKS INTO FOOTING AND ROOF TIE BEAM. LAP SPLICE VERTICAL <br />REINFORCEMENT ABOVE FOOTING AND ABOVE EACH FLOOR LEVEL UNLESS NOTED OTHERWISE. MAINTAIN VERTICAL <br />REINFORCING SHOW ON PLANS ABOVE AND 13ELOW MASONRY OPENINGS. CONTNUE= FOUNDATION DOWELS BELOW <br />ALL MASONRY OPENINGS. <br />% REMOVE ANY FOREIGN MATERIAL FROM FILL CELLS, INCLUDING POLYSTYRENE INSULATING INSERTS, PRIOR TO <br />GROUT POUR. <br />10. REINFORCING BARS SHALL BE STRAIGHT EXCEPT FOR BENDS AROUND CORNERS AND WHERE BENDS OR HOOKS <br />ARE DETAILED ON THE PLANS. <br />11. REINFORCING BARS SHALL BE LAPPED 48 BAR DIAMETERS WHERE SPLICED AND SHALL BE WIRED TOGETHER <br />12. WHEN A FOUNDATION DOWEL DOES NOT LINE UP WITH A VERTICAL CORE, IT SHALL NOT BE SLOPED MORE THAN ONE <br />HORIZONTAL N SIX VERTICALS. DOWELS SHALL BE GROUTED INTO A CORE IN VERTICAL ALIGNMENT, EVEN THOUGH <br />IT IS IN AN ADJACENT CELL To THE VERTICAL WALL REINFORCEMENT. <br />13. PROVIDE HORIZONTAL WALL REINFORCING 9 GA GALVANIZED LADDER TYPE DUR-O-WALL (OR EQUIVALENT) AT 16' <br />O.C. <br />14. PROVIDE HORIZONTAL JOINT REINFORCEMENT AT DOORS AND WINDOWS FOR FIRST AND SECOND BLOCK COURSE <br />ABOVE AND BELOW APERTURES. RN REINFORCING CONTINUOUS OR EXTEND TWO FEET FROM APERTURE EDGE. <br />S. WIRE REINFORCEMENT SHALL BE LAPPED AT LEAST 6" AT SPLICES AND SHALL COWAN AT LEAST ONE CROSS <br />WIRE OF EACH PIECE OF REINFORCEMENT N THE LAPPED DISTANCE. <br />16. CLEANOUTS SHALL BE PROVIDED N THE BOTTOM COURSE OF MASONRY N EACH GROUT POUR WHEN THE POUR <br />HEIGHT EXCEEDS 5'. CLEANOUTS TO BE SAW -CUT 4' X 4'. <br />Il. GROUT POUR HEIGHT SHALL NOT EXCEED 12'. PLACE GROUT IN 4' MAX LIFTS HEIGHTS. <br />I& CONSOLIDATE GROUT LIFTS AT THE TIME OF PLACEMENT BY MECHANICAL MEANS AND RECONSOLIDATE AFTER <br />INITIAL WATER LOSS AND SETTLEMENT. <br />13 STORE BLOCKS ON PALLETS AND COVER WITH VISQUEEN. <br />20. PLACE ALL MASONRY IN RNNING BOND WITH 3/8" MORTAR JOINTS. PROVIDE COMPLETE COVERAGE FACE SHELL <br />MORTAR BEDDING, HORIZONTAL AND VERTICAL FULLY MORTAR WEBS IN ALL COURSES OF PIERS, COLUMNS, <br />AND PILASTERS AND ADJACENT TO GROUTED CELLS. <br />21. SEE DRAWINGS FOR SPECIFIC MASONRY CONTROL JOINT LOCATIONS. SPACE AT 32'-0" O.C. UNLESS NOTED <br />OTHERWISE. <br />22. MASONRY INSPECTION SHALL BE PROVIDED BY A QUALIFIED AGENT IN ACCORDANCE WITH ACI 530-Ib. <br />INSPECTION SERVICES SHALL INCLUDE, BUT ARE NOT LIMITED TO, THE WORK IN PROGRESS AS WELL AS MATERIALS, <br />EQUIPMENT, AND PROCEDURES. <br />23. SUBMITTALS: <br />23.1. SUBMIT PROPOSED GROUT MIX DESIGN PRIOR TO CONSTRUCTION <br />232. SUBMIT PROPOSED MORTAR MIX DESIGN PRIOR TO CONSTRUCTION. <br />233. SUBMIT DETAILED SHOP DRAWINGS OF REINFORCING BARS SHOWING NUMBER, SIZE, AND LOCATION. INCLUDE <br />BAR LISTS AND BEND DIAGRAMS. <br />23.4. SUBMIT COMPRESSIVE STRENGTH TESTS OF PROPOSED MASONRY WITS PRIOR TO CONSTRUCTION. <br />MASONRY UNITS ARE TO 13E TESTED IN ACCORDANCE WITH ASTM CWO <br />24. A QUALIFIED TESTING LABORATORY SHALL BE RETAINED TO PERFORM THE FOLLOWING TESTS: <br />24.1. SAMPLE AND TEST GROUT N ACCORDANCE WITH ASTM CI019 FOR EACH 50M SQ. FT. OF MASONRY. <br />242. SLUMP TESTS - ASTM CI43. <br />25. PROVIDE 8" DEEP PRECAST REINFORCED CONCRETE LINTELS OVERALL MASONRY OPENINGS NOT SHOW TO HAVE <br />A STRUCTURAL BEAM. MINIMUM END BEARING - 8". LINTEL WIDTH TO MATCH MASONRY WIDTH. <br />26. 114E TOP OF PARTIALLY CONSTRUCTED WALLS SHALL BE COVERED WITH VISQIEEN AT THE END OF EACH WORK DAY <br />AND WHENEVER RAN OCCURS. <br />C <br />L DIMENSIONED LUMBER SHALL BE DRESSED SAS, AND SHALL BEAR THE GRADE STAMP OF THE MANUFACTURER'S <br />ASSOCIATION. <br />2. ALL LUMBER SHALL BE SOUND, SEASONED, AND FREE FROM WARP. <br />3. ALL LUMBER SHALL BE SOUTHERN PINE NO.2 GRADE OR BETTER - WITH IS% MAX" MOISTURE CONTENT, U.N.O. <br />ON THE PLANS <br />4. ALL LUMBER N CONTACT WITH MASONRY OR CONCRETE SHALL BE PRESSURE TREATED. <br />5. PRESSURE TREATED LUMBER SHALL BE IMPREGNATED WITH A ACQ (ALKALINE COPPER QUATERNARY) TREATMENT <br />IN ACCORDANCE WITH THE REQUIREMENTS OF THE AMERICAN WOOD PRESERVERS INSTITUTE <br />b. PLYWOOD WALL AND ROOF SHEATHNNG SHALL BE APA RATED SHEATHING, EXTERIOR GRADE. <br />T ROOF SHEATHING TO BE INSTALLED WITH ONE PLYWOOD CLIP PER SPAN BETWEEN PANEL EDGES. <br />& INSTALL BLOCKING IN ALL WAIL STUDS AT 4'- 0" O.C. MAXIMUM, LOCATED AT S14EAT14NNG PANEL EDGES. <br />9. ALL NAILING AND BOLTNNG SHALL COMPLY WITH AMERICAN INSTITUTE OF TIMBER CONSTRUCTION REQUIREMENTS. <br />10. ALL CONNECTION HARDWARE SHALL BE GALVANIZED AND SUPPLIED BY SIMPSON STRONG -TIE OR EQUIVALENT. <br />IL ALL CONNECTION HARDWARE IS TO BE FULLY FASTENED PER MANUFACTURERS REQUIREMENTS UNLESS NOTED <br />OTHERWISE. <br />12, PROVIDE A SINGLE PLATE AT THE BOTTOM AND DOUBLE PLATE AT THE TOP OF ALL STUD WALLS. SILL PLATES <br />SHALL BE BOLTED TO FOUNDATION AT A MAXIMUM OF 4'-0' O.C. UNLESS NOTED OTHERWISE. <br />13. STUDS SHALL BE DOUBLED AT ALL ANGLES AND AROUND ALL OPENINGS. STUDS SHAD. BE TRIPLED AT ALL <br />CORNERS. <br />14. UNLESS NOTED OTHERWISE, WOOD LINTELS OVER OPENINGS SHALL BE DOUBLE 2 X 6 FADERS FOR SPANS UP TO <br />4'-0" AND DOUBLE 2 X 8 HEADERS FROM 4'-0' TO V-0". SEE PLANS FOR SPANS GREATER THAN V-0". USE <br />TRIPLE MEMBERS FOR 2 X b STUD FRAMING. DOUBLE AND TRIPLE 2X HEADERS TO HAVE CONTINUOUS " PLYWOOD <br />FILLER CUT TO FULL DEPTH OF HEADER BETWEEN 1X MEMBERS. NAIL ASSEMBLY WIN 16D NAILS AT 12" ON CENTER <br />TOP AND BOTTOM. <br />5. NAILING SCHEDULE <br />SOLE PLATE TO JOIST OR BLOCKING <br />Ibd <br />16, oz. <br />STUD TO SOLE PLATE, TOE NAIL <br />8d <br />4 <br />STUDS TO SOLE PLATE, END NAIL <br />Ibd <br />2 <br />DOUBLE STUDS, FACE NAIL <br />10d <br />24' O.C. <br />DOUBLE TOP PLATES, FACE NAIL <br />10d <br />I6' oz. <br />TOP PLATES, LAPS, AND INTERSECTIONS IOd <br />3 <br />JOISTS, LAP OVER WALLS, FACE NAIL <br />10d <br />4 <br />BUILT-UP CORNER STUDS <br />Ibd <br />24" O.C. <br />16. FASTENER SUBSTITUTIONS: ALL NAILS AR COMMON NAILS, UNLESS NOTED OTHERWISE. THE FOLLOWNG FASTENERS <br />ARE ACCEPTABLE SUBSTITUTIONS. ALL <br />ALTERNATE FASTENERS SHALL BE SPACED AT THE SAME SPACING AS THE <br />SCHEDULED FASTENERS. <br />SCHEDULED FASTENERS <br />ALTERNATE FASTENERS <br />9d COMMON NAIL <br />8d RING SHAW NAIL <br />8d SCREW SHANK NAIL <br />0131 P-NAIL <br />Wd COMMON NAIL <br />10d RNG SHANK NAIL <br />Wd SCREW SHANK NAIL <br />OAS P-NAIL. <br />n. GW DRIVEN NAILS MUST BE SUBMITTED FOR REVIEW WITH APPROPRIATE BACKOIIP DATA <br />OESICMNI LOADS <br />WALL PRESSURE ZONES <br />(ISOMETRIC VIEW) <br />r=P M <br />N <br />Edge Strip <br />rl <br />® Q Q Q TYP. GABLE <br />R011F <br />MINE <br />TYP. HIP <br />® ( ® RO0F <br />o- <br />WL <br />n =Width of Edge Strip o- <br />RW PRESSURE Z�IES <br />(PLAN VIEW) <br />BUILDING DATA <br />WIND VELOCITY: 145 mph AD) <br />INTERNAL PRESSURE COEFFICIENT: +/- 0.18 <br />(Basic Wind Speed, 3 second gust) 113 mph ASD) (Enclosed Building per ASCE 7-98 Table 6-7) <br />WIND IMPORTANCE FACTOR: 1.0 WIDTH OF EDGE STRIP (FT): 4.4 <br />BUILDING CATEGORY: <br />(Per ASCE 7-98 Table 1-1) II HEIGHT & EXPOSURE ADJUSTMENT COEFFICIENT: 1.00 <br />ROOF ANGLE, A (degrees) 0: 7.0 < 0 < 27.0 ROOF DEAD LOAD RESISTING UPLIFT (psf): 10.0 <br />WIND EXPOSURE CATEGORY: B <br />DESIGN WIND LOADS - WINDOWS, DOORS, COMPONENTS & CLADDING <br />ROOF <br />WALL <br />ZONE <br />AREA 11f <br />DESIGN PRESSURE s <br />ZONE <br />AREA ftZ <br />DESIGN PRESSURE s <br />(Positive) <br />(Negative) <br />(Net Uplift) <br />1 <br />10.0 <br />15.4 <br />-19.9 <br />-10.7 <br />4 <br />10.0 <br />37.9 <br />-41.1 <br />1 <br />20.0 <br />14.4 <br />-18.9 <br />-10.1 <br />4 <br />20.0 <br />36.2 <br />-39.4 <br />1 <br />50.0 <br />13.2 <br />-17.7 <br />-10.0 <br />4 <br />50.0 <br />33.9 <br />-37.2 <br />1 <br />100.0 <br />12.2 <br />-16.7 <br />-10.0 <br />4 <br />100.0 <br />32.2 <br />-35.4 <br />2 <br />10.0 <br />15.4 <br />-45.6 <br />-26.1 <br />5 <br />10.0 <br />37.9 <br />-50.7 <br />2 <br />20.0 <br />14.4 <br />-38.8 <br />-22.1 <br />5 <br />20.0 <br />36.2 <br />-47.3 <br />2 <br />50.0 <br />13.2 <br />-29.8 <br />-16.7 <br />5 <br />50.0 <br />1 33.9 <br />-42.8 <br />2 <br />100.0 <br />12.2 <br />-23.1 <br />-12.6 <br />5 <br />100.0 <br />32.2 <br />-39.4 <br />3 <br />10.0 <br />15.4 <br />-77.6 <br />-45.4 <br />3 <br />20.0 <br />14.4 <br />-61.3 <br />-36.6 <br />3 <br />50.0 <br />1 13.2 <br />-39.55 <br />1 -22.5 <br />3 <br />100.0 <br />1 12.2 <br />-23.1 <br />1 -12.6 <br />Notes: <br />1) For effective areas between those given above the load may be interpolated, otherwise use the load <br />associated with the lower effective area. <br />2) Plus and minus signs signify pressures acting toward and away from the building surfaces, respectively. <br />3) See pressure zone diagrams above for corresponding zones. <br />TAKE W6023(1) <br />FASTER SC M Ul.S FOR STRUCTURAL MA RS <br />WN16 ION F,4GMW 0 OF SPACES <br />JOIST To SILL OR GIRDER TOE NAIL 3-2d - <br />P X 6" SUBFLOOR OR LESS TO EACH JOIST, FACE NAIL 2-8d - <br />2 STAPLES, 1-3/4" <br />2" SUBFLOOR TO JOIST OR GIRDER BLIND AND FACE NAIL 2-16d - <br />SOLE PLATE TO LOIST OR BLOCKING, FACE NAIL lbd 16" O.C. <br />TOP OR SOLE PLATE TO STUD, END NAIL 2-16d - <br />STUD OR SOLE PLATE, TOE NAIL 3-8d OR 246d - <br />DOUBLE STUDS, FACE NAIL 10d 24" OZ. <br />DOUBLE TOP PLATES, FACE NAIL I0d 24" OZ. <br />SOLE PLATE TO JOIST OR BLOCKING AT BRACED WALL PANELS 3-16d 161, O.C. <br />DOUBLE TOP PLATES, MINIMUM 24-NC44 OFFSET OF END JONTS, <br />FACE NAIL IN LAPPED AREA <br />8-lbd <br />- <br />BLOCKING BETWEEN JOISTS OR RAFTERS TO TOP PLATE, TOE <br />NAIL <br />3-Sd <br />- <br />RIM JOIST TO TOP PLATE, TOE NAIL <br />8d <br />6" O.G. <br />TOP PLATES, LAPS AT CORNERS AND INTERSECTIONS, FACE <br />NAIL <br />2-10d <br />- <br />BUILT-UP HEADER TWO PIECES WITH 1/2" SPACER <br />Ibd <br />16' O.C. ALONG EACH EDGE <br />CONTINUED HEADER TWO PIECES <br />Ibd <br />16" O.C. ALONG EACH EDGE <br />CEILING JOISTS TO PLATE, TOE NAIL <br />3-ad <br />- <br />CONTINUOUS HEADER TO STUD, TOE NAIL <br />4-8d <br />- <br />CEILING JOISTS, LAPS OVER PARTITIONS, FACE NAIL <br />3-10d <br />- <br />CEILNG JOISTS, TO PARALLEL RAFTERS, FACE NAIL <br />3-10d <br />- <br />RAFTER TO PLATE, TOE NAIL <br />2-16d <br />- <br />P BRACE TO EACH STUD AND PLATE, FACE NAIL <br />2-Sd <br />1 STAPLES, 1-3/4" <br />- <br />P X 6" SHEATHING TO EACH BEARING, FACE NAIL <br />1-8d <br />1 STAPLES, 1-3/4" <br />- <br />I" X 8" SHEATHING TO EACH BEARING, FACE NAIL <br />2-Sd <br />3 STAPLES,1-3/4" <br />- <br />WIDER THEN P X 8' SHEATHING TO EACH BEARING, FACE NAIL <br />2-ed <br />4 STAPLES, 1-3/4" <br />- <br />BUILT-UP CORNER STUDS <br />10d <br />24' O.C. <br />BUILT-UP GIRDERS AND BEAMS, 2-NCH LUMBER LAYERS <br />Wd <br />NAIL EACH LAYER AS FOLLOWS: 32" OZ. AT <br />TOP AND BOTTOM AND STAGGERED. TWO <br />NAILS AT ENDS AND AT EACH SPLICE <br />2" PLANKS 2-I6d AT EACH BEARING <br />ROOF RAFTERS TO RIDGE, VALLEY OR HIP 4-16d <br />RAFTERS: 3-16d <br />TOE NAIL <br />FACE NAIL <br />RAFTERS TIES TO RAFTERS, FACE <br />3-ed <br />- <br />TAN-9 Wo023(1) - C 0NTNJED <br />FASTER SCHEDULE FOR STRUCTURAL t-ow <br />15"WA <br />SPACM OF <br />FASTENERS <br />MATEN" <br />I� OF br s <br />EDGES <br />M M MEDIATE SUPPORTS =� <br />WOOD STRUCTURAL PANELS, SUBROOR ROOF AND UL4LL SHEATHING TO FRAMING, AND PARTICLEBOARD IA&L SHEATHING TO FRAMING: <br />5/I6" - 1/2" <br />bd COMMON NAIL (SUEIFLOOR WALL) <br />6 <br />12 e <br />8d COMMON NAIL (ROOF) <br />P <br />Sd COMMON NAIL <br />6 <br />12 e <br />1-1/8" - 1-1/4" <br />10d COMMON NAIL Sd DEFORMED NAIL <br />6 <br />12 <br />OTHER WALL SHEATHINGS ^ <br />1/2" REGULAR CELLULOSIC <br />1-011 GALVANIZED ROOFING NAIL 6d COMMON NAIL STAPLE I6 <br />3 <br />6 <br />FIBERBOARD SHEATHING <br />GA, 1-1/2' LONG: <br />1/2" STRUCTURAL CELLULOSIC <br />1-1/2" GALVANIZED ROOFING NAIL Sd COMMON NAIL STAPLE 16 <br />3 <br />6 <br />FIBERBOARD SHEAT14NG <br />GA, 1-1/21 LONG <br />25/32" STRUCTURAL FIBERBOARD <br />1-3/4' GALVANIZED ROOFING NAIL Sd COMMON NAIL STAPLE <br />3 <br />6 <br />SHEATHING <br />16 GA,1-3/4' LONG <br />1/2" GYPSUM SHEATHING <br />1-1/2" GALVANIZED ROOFING NAIL 8d COMMON NAIL STAPLE <br />4 <br />8 <br />GALVANIZED,1-1/2" LONG 1-1/4" SCREWS, TYPE W OR S <br />5/8" GYPSUM SHEATHING <br />1-3/4GALVANIZED ROOFING NAIL Sd COMMON NAIL STAPLE <br />4 <br />8 <br />GALVANIZED, 1-5/8" LONG 1-5/8" SCREWS, TYPE W OR S <br />WOOD STRUCTURAL PANELS, COMBINATION SUBFI.00R INDERL.AYMENT TO FRAMING <br />3/4' AND LESS <br />6d DEFORMED NAIL OR Sd COMMON NAIL <br />6 <br />12 <br />1/8" - I" <br />6d COMMON NAIL OR 8d DEFORMED NAIL <br />6 <br />12 <br />1-1/8" - 1-1/4" <br />10d COMMON NAIL OR 8d DEFORMED NAIL <br />6 <br />12 <br />FOR 61: 1 INCH - 25.4 MM, I FOOT - 1.605 KM/H. <br />A ALL NAILS ARE SMOOTH -COMMON, BOX OR DEFORMED SHANKS EXCEPT WHERE OTHERWISE STATED. NAILS <br />USED FOR FRAMING AND SHEATHING CONNECTIONS SHALL HAVE MINIMUM AVERAGE WONG YIELD <br />STRENGTHS AS SHOWN: 80 KSI (%I MPa) FOR SHANK DIAMETER OF OJ12 INCH (20d COMMON NAIL), <br />90 KSI (620 MPa) FOR SHANK DIAMETERS LARGER THEN 0.142 NCH BUT NOT LARGER THEN 0.111 INCH, <br />AND 100 KIS (68S MPa) FOR SHANK DIAMETERS OF 0.142 INCH OR LESS. <br />B. STAPLES ARE 16 GAGE WIRE AND HAVE A MINIMUM 1/I6 INCH ON DIAMETER CROW WIDTH. <br />C. NAILS SHALL BE SPACED AT NOT MORE THEN 6 INCHES ON CENTER AT ALL SUPPORTS WHERE SPANS <br />ARE 48 INCHES OR GREATER <br />D. FOUR-FOOT-BY-8-FOOT OR 4-5Y-9-FOOT PANELS SHALL BE APPLIED VERTICALLY. <br />E. SPACNG OF FASTENERS NOT INCLUDED IN THIS TABLE SHALL BE BASED ON TABLE R6023(2). <br />F. RESERVED. <br />G. FOR REGIONS HAVING BASIC WIND SPEED OF LESS THEN 100 MPH, NAILS FOR ATTACHING WOOD STRUCTURAL <br />PANEL ROOF SHEATHING TO GABLE END WALL FRAMING SHALL BE SPACED 6 INCHES ON CENTER <br />H. GYPSUM SHEATHING SHALL CONFORM TO ASTM C 19 AND SHALL BE INSTALLED IN ACCORDANCE WITH GA <br />253, FIBERBOARD SHEATHING SHALL CONFORM TO EITHER AHA 154.1 OR ASTM C 208. <br />I. SPACING OF FASTENERS ON FLOOR SHEATHING PANEL EDGES APPLIES TO PANEL EDGES SUPPORTED BY <br />FRAMING MEMBERS AND AT ALL FLOOR PERIMETERS ONLY. SPACING OF FASTENERS ON ROOF SHEAT14NG <br />PANEL EDGES APPLIES TO PANEL EDGES SUPPORTED BY FRAMING MEMBERS AND AT ALL ROOF PLANE <br />PERIMETERS. BLOCKING OF RDOF OR FLOOR SHEATWNG PANEL EDGES PERPENDICULAR TO THE FRAMING <br />MEMBERS SHALL NOT BE REQUIRED EXCEPT AT INTERSECTION OF ADJACENT ROOF PLANES. FLOOR AND <br />ROOF PERIMETER SHALL BE SUPPORTED BY FRAMING MEMBERS OR SOLID BLOCKING. <br />REVISIONS <br />EIY <br />00 <br />Y � N <br />CO <br />to <br />¢ 0� <br />0 <br />~~ <br />U co U <br />U <br />N.� N cxd Y <br />�T Z <br />a. <br />�-• C �n <br />U N c <br />Q 10 <br />> <br />°' °° 3 <br />N <br />0rl- <br />p o <br />m <br />I� <br />Ng <br />�F,:,•<. Via' . <br />`VN <br />I 5 <br />tii .� <br />0 <br />O. <br />00 <br />o <br />u- ; _J <br />0 •. <br />La <br />Q <br />Q <br />00 <br />.^ o <br />w x <br />Q o <br />a <br />Ili <br />a <br />N <br />O <br />L <br />O <br />N <br />C m <br />M <br />4D <br />C <br />0 Q 'O J Z3 <br />m t>0 L` U <br />U/1 <br />O s <br />O Z (0 <br />N <br />O <br />m <br />Date: 05. 17. 21 <br />Scale: AS NOTED <br />Project Mgr: DG <br />Drawn: JDS <br />Job: 21-018 <br />Sheet <br />S3a <br />--i ITT --i <br />