Laserfiche WebLink
DOOR JAMB (REFER 1x4 1/2" DRYWALL <br />DOOR JAMB (REFER <br />1x4 1/2" DRYWALL <br />DOOR JAMB REFER <br />1x4 <br />1/2" DRYWALL <br />P.T. <br />TO PRODUCT <br />TO PRODUCT <br />TO PRODUCT <br />APPROVAL FOR CONN. <br />APPROVAL FOR CONN. <br />APPROVAL FOR CONN. <br />ix4 <br />1 X 4 <br />3-1/4" LONG X 3/16" 0 <br />1x4 P.T. <br />FURRING <br />3/16"0 X 3" LONG <br />TAPCONS <br />FURRING <br />(2) ROWS 3/16" x 3-1/2" <br />FURRING <br />TAPCON. INTO <br />STAGGERED @ 16 <br />TAPCON @ 16" O.C. & 4" <br />2X8 <br />BLOCK@ SPACING „ <br />1 <br />DETAIL <br />O.C. 2-ROWS INTO <br />1x8 P.T. <br />FROM EACH END w/ MIN. <br />2" EDGE DIST. ATTACH <br />1X8 <br />PER MANUFACTURE <br />MASONRY THROUGH _� /2�� DETAIL <br />1x8 w/ (2) ROWS 8d NAILS <br />3 DETAIL <br />1x4 P.T. & 1x8 P.T. <br />STAGGERED @ 12" O.C. <br />3/16" x 3 -1/2" <br />1x4 P.T. <br />DOOR JAMB (REFER <br />TAPCON @ 16" <br />TO PRODUCT <br />O.C. & 4" FROM <br />DOOR JAMB (REFER <br />APPROVAL FOR CONN. <br />1x4 <br />1/2" DRYWALL <br />DOOR JAMB (REFER <br />EACH END W/ MIN. <br />TO PRODUCT <br />TO PRODUCT <br />2" EDGE DIST. <br />APPROVAL FOR CONN. <br />2x8 P.T. w/ (2) ROWS 3/16" <br />APPROVAL FOR CONN. <br />(2) ROWS 3/16" x 3-1/2" <br />x O.C.& TAPCON @ H <br />& 4" FROM EACH <br />1x4 <br />TAPCON @ 16" O.C. & <br />.C. <br />END w/ MIN. 2" EDGE DIST. <br />FURRING <br />4" FROM EACH END w/ <br />2x8 P.T. <br />ATTACH SECOND PLY w/ <br />2x P.T. AS REQ'D <br />MIN. 2" EDGE DIST. <br />(2) ROWS 10dx3" <br />2x8 <br />2x DETAIL <br />2 1/4" <br />DETAIL <br />STAGGERED@12"o.C, <br />3-1/4" DETAIL <br />BUILDOUT a" OVER SIZE DOOR -WINDOW ROUGH OPENINGS CC <br />SCALE: N.T.S. SS <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />W/ 1/4" x 3 1/4" TAPCON (1 1/4" MIN. <br />EMBEDMENT INTO BLK.) <br />1 X 4 FURRING <br />BLOCK HEADER <br />1/2" DRYWALL <br />8d NAILS AT 8" O.C. AT BUCK <br />2 x 8 45^ DIAGONAL (4) 10d NAILS INTO <br />BRACE(S) 2 x 8 BRACE/ BLKG. ' <br />7/16" OSB <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />SCRIBE (NOTCH) POLY -CELL IN THIS AREA <br />BACKSIDE TO FIT ARCH (4) 10d NAILS INTO 2 x 8 <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />\\_2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />ARCH FACES W (4) 10d NAILS THRU OSB INTO x 8 <br />A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU —� <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />ARCH DETAIL J <br />SCALE: N.T.S. SS <br />INSTALL WDW. SCREW ANCHORJ( <br />INTO ARCH BLKG, PER <br />INSTALLATION DETAILS <br />1/4" MAX <br />SOLID BLKG. AT TOP BTWN. <br />ARCH BLKG. & BUCK —� <br />2 x 8 BUCK - CONNECT TO BLOCK <br />Z-0" <br />WITH <br />1/4" x 3 1/4" TAPCON (1 1/4" MIN, <br />1/4" MAX EMBEDMENT INTO K,) <br />Z-0" <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN, ARCH <br />1 X 4 FURRING <br />BLKG. & BUCK <br />8d NAILS @ 8" O.C. AT BUCK <br />2 x 8 VERT, W/ (2) 10d <br />PROVIDE 2 x 8 DIAG. BRACE B <br />NAILS AT EA. END <br />VERT. BRACES WHEN HGT. OF <br />BRACE EXCEEDS 24" <br />LEAVE A CUT OUT IN O.S.B. ON T <br />2 x 8 VERT. BRACE(S) <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />BUILT UP PLWD. BUCK - <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />TO FIT ARCH CONNECT W/ <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />INSTALL WDW, SCREW <br />ANCHOR INTO ARCH BLKG, <br />BTWN. OSB ARCH FACES W/ (4) 10d NAILS EQUAL <br />THRU OSB INTO 2 x 8 <br />PER INSTALLATION DETAILS <br />B-B <br />ARCH DETAIL rK <br />SCALE: N,T,S. SS <br />SECTION <br />A -A <br />8" <br />1/4" x 3 1/4" TAPCONS <br />-LEAVE A CUT OUT IN O.S.B. ON THE <br />INSIDE TO ALLOW FOR INSULATION <br />TO BE INSTALLED <br />—2 x 8 45 DIAGONAL BRACE AT EA. <br />FACE OF ARCH W/ (3) 10d NAILS <br />AT EA. END <br />PROVIDE TAPCON WITHIN <br />4" MIN. OF BRACE <br />START OF ARC <br />4' MAX. RAD. <br />SECTION <br />B-B <br />8" <br />PROVIDE 2x <br />PROVIDE (2) MIN. CONT. W/ (3) <br />TAPCON AT EA. SIDE 12d NAILS <br />BUCK - (1) WITHIN 4" <br />MIN. OF START OF <br />ARCH <br />START OF ARC <br />EQUAL 4' MAX. RAD. <br />PROPER INSTALLATION MAX. 8 <br />FILL SOLID <br />BOTH CELLS <br />#5 REB, <br />(TYP,) <br />STD. 90' <br />HOOK (" <br />FV <br />1 <br />17 <br />+5^ <br />NOTCH WEB AT <br />FIRST 2 COURSI <br />CAPACITY = 805 # FOR 1 STRAP <br />= 1610 # FOR 2 STRAPS <br />1 PLY PRE-ENGINEERED TRUSS <br />SIMPSON HM9KT w/ (4) 1/4"x1 1/2" SDS <br />SCREWS & (5) 1/4" x 2 1/4" TITEN (IF TRUSS <br />IS 2 PLY INSTALL SIMPSON LGT2 w/ (16) 16d <br />SINKERS AND (7) 1/4"x2 1/4" TITEN = 2150 #) <br />BOND BEAM OR CAST IN PLACE BEAM <br />RETROFIT TRUSS DETAIL <br />N.T.S. <br />2X6 SYP #2 CONT, (MATCH TRUSS DEPTH <br />IF TRUSSES USED) W/ (3) #6 X 4'Y2" WOOD <br />SCREWS @ 16" O.C. MAX, OR IF MASONRY WALL / <br />USE (1) SIMPSON 1/2" HD TITEN (CENTERED) w/ i <br />MIN. 4" EMBEDMENT AT 16" O,C. <br />12 <br />JACK TRUSS PROVIDED BY SEE <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24" O.C. <br />ROOF SHEATHING ATTACHED <br />PER NAILING SCHEDULE ALL <br />(5) 12d NAILS SIMPSON i <br />2X6 TO 2X4 H2.5A w/ (10) <br />8d NAILS <br />JACK TRUSS PROVIDED BY—/ <br />TRUSS COMPANY OR 2x4 <br />#2 SYP @ 24" O.C. <br />00, <br />4'-0" MAX SEE PLAN <br />NOTE: <br />SHED ROOF ENDS TO BE <br />GABLE ONLY, CORNERS <br />SHALL NOT BE FRAMED AS <br />HIP. <br />DESIGNED ONLY FOR THE <br />INSTALLATION OF SHINGLE <br />AND METAL ROOF FINISH <br />I <br />GLASS BLOCK INSTALLATION NOTES <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />ANCHOR <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. <br />1/4" EXPANSION BOLT (2 <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />9 ga. PANEL <br />PER ANCHOR) <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING <br />REINFORCING <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE) <br />EXPANSION STRIP <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />REINFORCING AS FOLLOWS: <br />PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />SEALANT <br />PRESS PANEL REINFORCING INTO PLACE. <br />6" MIN. LAP SPLICE W/ <br />COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />REINFORCING PANEL <br />SMOOTH. DO NO FURROW. <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING -DO NOT <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. <br />° ' 6" MIN, LAP <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE <br />REMAIN FREE OF MORTAR. <br />NOTE: <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />SEE GLASS BLOCK INSTALLATION NOTES. <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) <br />GLASS BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />INSTALLATION OF GLASS BLOCK. <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH J <br />IF TRUSSES USED) W/ (2) #6 X 4%" WOOD <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />WALL USE (2) 1/4" X 3 1/2" TAPCONS AT 16" <br />O.C. <br />SECTION @ ENTRY rL <br />SCALE: 3/4" = V-0" SS <br />(1) #5 BARS CONT. <br />TOP WITH MIN. 3" <br />MASONRY WALL. SEE PLAN FOR <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />W.W.M. AT PERIMETER <br />WHERE THIS CONDITION <br />OCCURS <br />COVER 6-0" <br />F.F. <br />°. <br />D1, <br />p' p <br />1=1 1=1 1=111=1 1=1 I I; <br />gD. ° 1=1 I I-111 <br />1=111=111=� I � <br />D — <br />I I I-111-111- <br />I—I <br />f=1' <br />—IIIIII—I11' <br />GRADE „� I I- <br />Cl) p . <br />z <br />04 <br />•D ' <br />(2) #5 REBAR. MIN. 3" <br />16" MIN. Of COVER EA. WAY <br />SECTION AT DEEP MONO FOUNDATION <br />SCALE: 3/4" = V-0" <br />FILLED CELL PER <br />FOUNDATION PLAN <br />SE <br />YP.) <br />THE <br />:S <br />11KIAt%nCDTADI C IAICTAI I TInKI <br />FILLED CELL INSTALLATION H <br />SCALE: N.T.S. SS <br />FSEE ARCH $L- N -1t <br />P EENt !Scz <br />pj <br />FIR G BALL TYTYEE <br />H R, P L f_ <br />F CHANNEL, -4---- `-- � <br />L.L. ij,_ <br />FASTENED PER 9 <br />NOFFE 2 EELOV'1 I — CONT VEN EG r �L - ;T <br />CeL,N ' NAILED= TO - I— at BLOCKING, NAILED T D Tr <br />:83LI I __ _ Za NAILS 1" CHORD EVERY OTHER TRIG <br />12d "ILS. TYILL°w <br />C BUfLOTER TO VERI1"` "'PRO' `l0E SC F _ ,1 TERIAL SPAN AF°.AC[T <br />>N T HE DES V.35N PRES"" °LIRE"S St -`EC IEL1 F0 R CCt=®1P0NF1 T ANT--) CL, €` <br />-. TED 1N THE DEE` GN CRITERIA ITES A ON SHEET SN <br />2 FOR S F I K` C C HT.IENI AT WALL 0PER ALPHA AL-Ii1,1. INC: FLA 1,65- <br />PRODUCT PFR F CHANNEL FASTENED T Ck: <br />=s, I AIL Lt.I,I IIGA- @� 24 �v r, INN ENIBEDIVIENT <br />^`�>�0 0 Tm' I3 1a ��A. _ `4h'y'�4 ®.R' /N ST: L E � 1 � i AL, <br />N. <br />FATTEP <br />S`I_IB FAS.C1A'00 16 Rl. <br />STRUCTURAL SOFFIT <br />SF0a.LE F 1 "FfIT.I_1:1,N,7 -6TS; 81 " 5 Fw <br />PIES`.°°. ? ,.gal,°I 1 4 , IIP �;I A�..lu.1It111 I S.�{shy H 1 X, I <br />91-I1 a._,1f <br />-REFER TO THE PRODUCT APPROVAL INSTALLATIONETAILSs. <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />�RUS <br />S AS SHOWN FOR O.H. UP TO 2'-6" <br />DOUBLE 2X4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />k (2) 10d NAILS @ 8" O.C. <br />O�FRygN TO TRUSS TOP CHORD <br />+ + CRNGTy PLYWOOD SHEATHING <br />+ <br />+ + <br />+ + <br />+ BLOCKING AS <br />+ REQUIRED <br />TO SUPPORT <br />TRUSS + SOFFIT <br />+ + <br />2X4 SYP + <br />EACH TRUSS <br />CONNECTOR <br />SEE LINTEL <br />SCHED. <br />CENTER SOFFIT <br />- <br />PRECAST LINTEL <br />SEE ELEVATION <br />2X2 #2 P.T. MIN. <br />FOR OVER HANG <br />W/J-CHANNEL SECURED <br />(MAX. 4'-0") <br />@24" O.C. FASTENED TO <br />CMU W/ 3" LONG T-NAILS @ <br />24" O.C. <br />SECTION @ ROOF EXTENSION M <br />SCALE: 3/4" = V-0" <br />SS <br />SIMPSON HTT4 w/ (18) 10d x 1 <br />1/2" NAILS TO STUDS & (1) - <br />5/8" DIA. ALL THREAD ROD <br />EPDXIED w/ SIMPSON SET" <br />EPDXY MIN. 6" EMBEDMENT 8 <br />3" MIN. EDGE DISTANCE <br />RETROFIT FOR MIr <br />MSTAM STRAP <br />RCAI F• 3/d <br />cGG cuGr:T n") ANin <br />z <br />0 <br />Il <br />O <br />Lu <br />0 <br />LL <br />I— <br />M <br />0 <br />U) <br />2"x BOT. PLATE W/ (2) 1 Od @ 6" O.C. <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />AND NAILED W/ 8d COMMON @ <br />2X BOTTOM PLATE W/ 8d @ 4" <br />6" O.C. EDGES AND 12" O.C. FIELD <br />O.C., 2 ROWS STAGGERED <br />2x BAND JOIST W/ FACE NAIL 1 Od <br />@ TOP & BTTM CHORD, AND (8) <br />FACE NAILS 1 Od @ TRUSS VERT. <br />WEB <br />METAL SEAT PLATE <br />NOTE: <br />LAP SHEATHING TO <br />BOTTOM OF BAND <br />JOIST TYPICAL <br />SIMPSON HGAMIOKTA @ 12" O.C. <br />w/ (4) 1/4x1 1/2" SIDS SCREWS <br />INTO BAND JOIST & (4) 1/4"x2 3/4" <br />TITEN INTO K.O. BLOCK <br />—z <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />FILL 1st4 COURSES <br />SOLID W/GROUT <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. a' <br />OVERHAN <br />a. <br />RETROFIT WALL OVERHANG DETAIL (NTS <br />FOR OVERHANGS BETWEEN 3/4" TO 1 1/2" <br />NOTE: FOR OVERHANGS LESS THAN 3/4" - NO REPAIR REQ'D, <br />V-0" F-0" <br />INISH FLO <br />,, <br />, <br />E <br />,. <br />pj <br />°€" <br />W <br />L <br />0"" <br />0 <br />Q M^ <br />ai <br />4- <br />co <br />.� <br />W <br />_ M ` O <br />'}- <br />.� <br />0 o <br />0 0 <br />•Ln <br />Ud.. <br />Q)� <br />U <br />LU <br />c <br />W <br />L <br />0O004 <br />❑I - 0 WLU 20H <br />LU W F-Ld Q (Z'�J IL'Q~zQs UJIz <br />�' LI.I QD-�UO?��UILUO��O <br />U maaW O20❑I-xQyWzWoom?ZW�YZQ❑000 <br />IL W QOO oWUz�w<L7Q00W QJ¢ <br />0 Z) OQQ�Q <br />U_ Q O F- LL <br />H <br />>. <br />#5 BAR O <br />° n p <br />CENTERED W/ 2 O <br />q0T H IN TOP o z N <br />KNOCKOUT / iv O Uj <br />CHAIR BLOCK <br />D (n Q0 CDMONO FOOTING _—_ <br />SIZE AND REINF. PER PLAN I — °p °, p f— M Ln <br />AND SECTION DETAILS -I Q <br />CLEAN FILL <br />DIRT z M <br />d <br />° STANDARD C)N U Q 00 <br />Vy <br />#5 BAR IN ° ° 99 HOOK <br />FILLED CELLl <br />eLU <br />JO <br />STEMWALL FOOTING SIZE AND <br />MONO TO STEMWALL FOOTING REINF. PERLAN AND STEMWALL <br />SECTION DETAILS <br />SCALE: 3/4" = V-0" Jul 7 12023 N N N <br />O O'O <br />N N N <br />DTE: IF RETROFIT FILLED CELL CONDITIONS EXCEED (3) PER PROJEC' <br />ONTACT ENGINEER OF RECORD FOR ADDITIONAL INSTRUCTION. <br />M <br />N <br />0 <br />N <br />w <br />LO <br />0 <br />00 <br />LID <br />z <br />w <br />2 <br />O <br />0 <br />w <br />0 <br />Q <br />­ <br />M <br />4 <br />CD <br />I <br />CD <br />00 <br />t <br />EXISTING BOND BEAM, Virtual Review Assist,Inc. <br />Plans Review completed an approv O O O <br />DRILL 3/4"x5" MIN. HOLE SET BAR IN for compliance with the 2020 F C 7t ditiorl 06 6 ' <br />EPDXY CAP TO PREVENT LEAKAGE by Debra Anne Klahr P 30f�� O O 100 O O O <br />(1, — r <T- N N N N <br />O O O O O O O <br />TOP SPACE BETWEEN EXISTING GROUT & NEW GROUT N N s N N N N N <br />MUST BE PACKED WITH NON -SHRINK GROUT (USUALLY ± 2") O & & o 6 00 CV M <br />N O- r 0 CD <br />CD 4 O O O O N <br />#5x6' EMBEDDED INTO EXISTING BOND BEAM O O O O r 0 <br />0 <br />FILL CELL FULL HEIGHT W/ <br />NON SHRINK GROUT. ,^ 0 0 0 0 0 0 <br />u , c- N C7 4 Ln (6r <br />LO <br />45x5' EMBEDDED INTO z z <br />EXISTING FOOTING 0 0 LU C <br />2 #5x6' IN CONC. _ <br />M w v' W <br />FILLED CELL O W U H <br />DRILL 3/4"x5" MIN. HOLE 0 (_� a <br />SET BAR IN EPDXY L �— O a <br />O z LU P <br />~ca0Z <br />U EXISTING FOOTING <br />RETROFIT FILLED CELL DETAIL <br />4 SAW CUT <br />A SECTION <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />a <br />Z � c <br />�2za <br />T . <br />Z Z LL <br />LU <br />a <br />O_j2Z <br />U�Zz <br />N <br />z T_ <br />a C <br />.. <br />U� <br />® <br />O <br />W <br />Of <br />z <br />Q <br />Z <br />z <br />W <br />J <br />Uj <br />M <br />Ch <br />o <br />O <br />LAST PLOT DATE <br />May. 8, 23 <br />z <br />Q <br />STRUCTURAL <br />J <br />DETAILS—RFTRO FIT <br />r-rn F-I- -i ,-_. TT T___ _—__. — __— __— -. _. _ - ___._ — - -T _ — �__ �.,—C _- f—s7F i,7�li� om. 7 IT— -.a —if _31 i:„ <br />