�1
<br />',,fj lll�i��l�,-' •
<br />MA50NRY LINTEL A55EMBL I E5
<br />5EE 5GHEDULE AND 5PEGIFIGATION5 FOR ADD'L INFO
<br />L4J1}i- MIN. (1) G005E/BOND I LSJ*~ MIN. O) GOU-IfABOND
<br />I I BEAM ABOVE LINTEL Q BEAM ABOVE LINTEL
<br />GROVT aROUT
<br />BOTTOM REINF.
<br />PREGAST LINTEL W ,,� I I PRECAST LINTEL w/
<br />EMBEDDED REIN. t -�i EMBEDDED REW
<br />MB-I MB-2
<br />rr---,
<br />-- 11 Q TOP OXR5E, IF
<br />I +� TOP Data SE, IF
<br />m 1 L4J I I I REOV PER ARGH.
<br />REab PER ARGH.---
<br />«« TOP REINF. OR GONT. GONT. BOND BEAM
<br />BOND BEAM REIN. REIN. AS REQb
<br />_ CqW
<br />6R UT BOTTOM REIN.
<br />BOTTOM REIN. • __a PRECAST LINTEL w/
<br />EMBED
<br />p. I PREGA5T LINTEL w/ 'DED SIN.
<br />-3C-f EMBEDDED REIN.
<br />MB-3 HQ-4
<br />MASONRY LINTEL DETAILS
<br />REINFORGEMENT
<br />MARK
<br />DE516NATION
<br />TOP
<br />BOTTOM
<br />5HEAR REINFORCEMENT
<br />MB-I
<br />8F8-05/OT
<br />-----
<br />-----
<br />MB-2
<br />8F8-I6/OT
<br />-----
<br />(1) #5
<br />MB-3
<br />SFI6-I13/IT
<br />(1) #5
<br />(1) #5
<br />MB-4
<br />8RFI4-I13
<br />-----
<br />-----
<br />APPROVED LINTEL MANUFAGTURER5 ARE: GA5T-GRETE, QUALITY PREGA5T CO.,
<br />AND LOTT5 GONGRETE.
<br />NOTES:
<br />I. ALL LINTELS w/ 5PAN5 6REATER THAN 14'-O" SHALL BE PRE5TRE55ED.
<br />2. SHORE FILLED LINTEL5 A5 REQURIED.
<br />3. ALL LINTELS SHALL HAVE 4" MINIMUM BEARIN6 U.N.O.
<br />4. DO NOT GUT OR MODIFY PRE5TRE55ED LINTELS.
<br />5. ALL REINFORGEMENT SHALL BE 6RADE 60, fy=60 k5i
<br />b. ALL LINTELS 5PEGIFIED ON PLAN ARE MINIMUM 51ZE REQUIRED BY DE516N.
<br />1. ALL LINTEL5 ARE TO BE LOGATED DIRECTLY ABOVE THE OPENIN6 BELOW
<br />5HEET L 15T INDEX
<br />SHEET DESCRIPTION
<br />SHEET TITLE
<br />5-0.0
<br />STRUCTURAL NOTES
<br />F-1.0
<br />SLAB PLAN
<br />F-2.0
<br />BLOCK PLAN
<br />5-1.3
<br />ROOF FRAMING PLAN
<br />5D-I
<br />FOUNDATION DETAILS
<br />5D-2
<br />STRUCTURAL DETAILS
<br />PB5B-I
<br />ISTRUGTURAL DETAILS
<br />GENERAL 5TRUGTURAL NOTE5
<br />FOUNDATION
<br />• DE516N 15 BASED ON lth EDITION (2020) FLORIDA BUILDING CODE.
<br />• FOOTING DE516N - THESE FOOTIN65 HAVE BEEN ENGINEERED FOR A
<br />MINIMUM ALLOWABLE SOIL BEARIN6 GAPAGITY OF 1,500 P5F.
<br />• ALL LUMBER EXPOSED TO WEATHER OR IN CONTACT W/ CONCRETE
<br />OR MASONRY FOUNDATION SHALL BE PRESERVATIVE TREATED
<br />SOUTHERN PINE #2.
<br />• FASTEN PARTITION WALL5 TO SLAB WITH Y4" DIA. x 23/4" LONG
<br />TAPGON5 @ 32" o.c. MAX. WITH A MINIMUM OF 2 TAPGON5 PER
<br />PLATE, 12" MAX. FROM PLATE ENDS.
<br />• BUILDER TO VERIFY CORRO5ION-RE515TANGE COMPATIBILITY OF
<br />HARDWARE 4 FASTENERS IN CONTACT w/ PRESERVATIVE -TREATED
<br />WOOD. CONTACT LUMBER $ HARDWARE 5UPPL I ER5 TO GOORD.
<br />• CONCRETE DESIGN BASED ON AGI 315. CONCRETE SHALL ATTAIN
<br />THE FOLLOWING MINIMUM COMPRESSIVE 5TREN6TH5 IN 28 DAYS,
<br />U.N.O.:
<br />f'c = 2,500 psi: ....... FOOTIN65
<br />2,500 psi:....... SLABS ON GRADE (INTERIOR 4 EXTERIOR)
<br />fy = 60,000 psi ...... REBAR
<br />• ALL GONGRETE EXPOSED TO THE WEATHER SHALL NOT HAVE LE55
<br />THAN 5% OR MORE THAN 1% AIR ENTRAINMENT.
<br />• ALL FOOTIN65 SHALL BEAR AT LEAST 12" BELOW FIN15H GRADE.
<br />• FOOTINGS AND SLABS ON GRADE SHALL BEAR ON GLEAN, FIRM
<br />VIR61N 501L OR GLEAN FILL COMPACTED TO A q5% PROCTOR VALUE
<br />• MINIMUM LAP SPLICES ON ALL REINFORCEMENT SHALL BE 48 BAR
<br />DIA.
<br />• HOOKS SHALL BE PROVIDED AT D15GONTIN0005 END OF REINF.
<br />• GROUT SHALL BE A5TM G416 F'c=3000 P51 w/ MAX 3/8" AGGREGATE
<br />• CONCRETE MA50NRY UNIT5 SHALL BE A5TM GqO WITH A MINIMUM
<br />COMPRESSIVE STRENGTH OF MOO PSI (F'M = 1500 P50. ALL
<br />MORTAR SHALL BE A5TM G210, TYPE 5. GMU DESIGN BASED ON
<br />AGI 550/530.1
<br />• REINFORCED GMU GORES (A5 INDICATED ON PLAN) SHALL
<br />BE REINFORCED w/ (1) #5 BAR VERTICAL. BAR SHALL
<br />EXTEND INTO BOND BEAM AT TOP WALL AND SHALL
<br />ALIGN WITH FOOTING DOWEL BELOW. PROVIDE MIN 30"
<br />LAP SPLICE WITH FOOTING DOWEL.
<br />• GROUT SOLID ALL REINFORCED GMU GELL5 AND BOND BEAMS
<br />• ALL BOND BEAMS ARE TO BE 8" GONT. FULL LENGTH OF WALL w/
<br />(1) #5 BAR GONT. (TYP. @ EXT. PERIMETER)
<br />• PROVIDE (1) #5 BAR GROUTED SOLID ON EACH 51DE OF ALL
<br />MA50NRY OPENINGS AND AT ALL WALL CORNERS.
<br />• VERTICAL REINFORCEMENT SHALL BE HELD IN PLACE AT THE TOP
<br />AND BOTTOM, SHALL BE LOCATED IN THE CENTER OF THE MASONRY
<br />CELL, AND SHALL BE LOCATED AT A MAXIMUM OF 8'-0" O.G. IN
<br />EXTERIOR HALLS. (A5 5HOWN ON PLANS)
<br />• ROUGH OPENINGS ARE GALLED OUT ON PLAN -
<br />BUILDER TO VERIFY.
<br />• PROVIDE CONTROL JOINTS AT ALL IN51DE GORNER5 OF SLAB
<br />EDGES, AND OTHER LOGATION5 WHERE SLAB GRAGK5 ARE LIKELY
<br />TO DEVELOP. EXACT LOCATIONS PER BUILDER.
<br />• SAW GUT OR TOOLED JOINT DEPTH SHALL BE Y4 OF THE DEPTH
<br />OF THE SLAB (I" FOR A 4" SLAB)
<br />• JOINTS SHALL BE LOCATED @ 12'-0" O.G. (RECOMMENDED) OR
<br />15-0" O.G. (MAXIMUM)
<br />• JOINT GRID PATTERN SHALL BE A5 GL05E TO 5QUARE5 A5
<br />P0551BLE (I:I RATIO), WITH A MAXIMUM OF 1:1.5 RATIO
<br />CONNECTION 5PEG I P I GATI ON5 (TYP. U.N.O.)
<br />DESCRIPTION OF B1-06. ELEMENT
<br />3"xO.131" NAILS
<br />3"xO.120" NAILS
<br />J015T TO SOLE PLATE
<br />(3) TOENAILS
<br />(3) TOENAIL5*
<br />50LE PLATE TO J015T/BLK'6.
<br />(3) NAILS @ 4" o.c.
<br />(3) NAILS @ 4" o.G.
<br />STUD TO 50LE PLATE
<br />2 TOENAILS
<br />(3) TOENAIL5*
<br />TOP OR 50LE PLATE TO STUD
<br />2 NAIL5
<br />3 NAILS
<br />RIM TO TOP PLATE
<br />TOENAILS @ 8" o.c.
<br />TOENAILS @ 6" o.c.*
<br />BLK'6. BTWN. J0I5T5 TO TOP PL.
<br />(3) TOENAILS
<br />(3) TOENAIL5*
<br />DOUBLE STUD
<br />NAILS 0 24" o.c.
<br />NAILS 0 16" o.G.
<br />DOUBLE TOP PLATE
<br />NAILS 0 24" o.c.
<br />NAILS a 16" o.c.
<br />DOUBLE TOP PLATE LAP SPLICE
<br />q NAILS IN LAPPED AREA
<br />(II) NAILS IN LAPPED AREA
<br />TOP PLATE LAP @ CORNERS 4
<br />INTER5EGTIN6 WALLS
<br />(2) NAILS
<br />(2) NAILS
<br />* 2Y2"xO.113 15 AN ACCEPTABLE ALTERNATIVE TO A 3x0.120", SAME SPACING OR NUMBER OF
<br />NAILS. (ONLY ACCEPTABLE WHERE * ARE SHOWN)
<br />TH 15 MODEL HAS BEEN DE516NED IN
<br />ACCORDANCE WITH THE �th EDITION (2020)
<br />FLORIDA BU I LD I N6 CODE (5EGT1 ON 160q)
<br />LITERAL DE516N REQUIREMENTS FOR THE
<br />FOLLOWIN6 WIND SPEED � EXPOSURE ONLY:
<br />40 MPH - EXP. B
<br />WIND IMPORTANCE FACTOR = 1.0
<br />INTERNAL PRE55URE COEFFICIENT =
<br />ENCLOSED, +/- 0.15
<br />ANY WIND 5PEED/EXP05URE NOT L15TED HERE
<br />REQUIRES FORMAL EVALUATION $ APPROVAL
<br />FROM M+K 5TRUGTURAL EN61 NEERI N6.
<br />EXTERIOR 4 5HEAR JNALL
<br />5HEATH I NG 5PEG I P I CAT I ON5
<br />INDICATES LOCATION AND EXTENT OF
<br />5HEARWALL WHIGH REQUIRE5 SHEATHING AND/ OR
<br />FASTENING SPECIFICATIONS BEYOND THAT OF
<br />5TNDRD CONSTRUCTION
<br />SYMBOL SHEAR PANEL SPEC.
<br />15/32" PLYWOOD OR 05B FA5TENED W
<br />PI 2Y2"xO.131" NAILS @ 6" o.G. ALON6 PANEL
<br />ED6E5 AND 12" o.G. IN THE PANEL FIELD.
<br />15/32" PLYWOOD OR 05B FA5TENED W
<br />P3 2Y211xO.131 " NAIL5 @ 3" o.G. ALON6 PANEL
<br />ED6E5 AND 12" o.G. IN THE PANEL FIELD.
<br />STANDARD EXTERIOR WALL SHEATHING REQUIREMENTS:
<br />SHEATHE ALL EXTERIOR WOOD FRAMED WALL5 w/ 15/32"
<br />PLYWOOD OR 056 FASTENED w/ 2Y2"x0.131" NAILS @ 6" O.G. AT
<br />ALL PANEL EDOE5 AND @ 12" O.G. AT CENTER. (U.N.O. ON PLANS)
<br />I. ALL PANEL ED6E5 SHALL OCCUR OVER FRAMING OR 2X
<br />BLOGKIN6 SHALL BE PROVIDED TO SUPPORT PANEL EDGE
<br />AND FASTENING
<br />2. ALL STRUCTURAL PANELS ARE TO BE DIRECTLY APPLIED TO
<br />STUD FRAMING @ 16"o.G. MAX. U.N.O. ON PLAN.
<br />3. ALL SHEARWALLS SHALL HAVE DOUBLE TOP PLATES
<br />FASTENED T06ETHER w/ 3Y2"x0.131" NAILS @ 16"o.c. USE (8)
<br />3Y2"xO.131" NAILS @ EA. LAP SPLICE. (TYP. U.N.O.)
<br />4. LATERAL ANALY515 A55UME5 ALL INTERIOR SHEARWALLS
<br />AND EXTERIOR HALLS ARE CONTINUOUS SHEATHED ABOVE
<br />AND BELOW OPENINGS.
<br />5. SEE ARCHITECTURAL DRAWIN65 FOR ADD'L WALL
<br />CONSTRUCTION REQUIREMENTS.
<br />6. ALL EXTERIOR HALLS ARE CONSIDERED 5HEARWALL5.
<br />1. WHERE PANELS ARE APPLIED TO BOTH FACES OF WALL,
<br />PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT
<br />FRAMING MEMBERS.
<br />8. A MAXIMUM OF TWO 1'-4" WIDE X 2'-0" TALL OPENINC75 ARE
<br />PERMITTED TO BE GUT INTO INTERIOR SHEARWALLS 50
<br />LON6 A5 THEY ARE FRAMED OUT TO PROVIDE THE
<br />SHEATHING EDGE NAILING REQUIRED AND OCCUR 16" MINIMUM
<br />FROM THE ENDS OF THE 5HEARWALL.
<br />q. ALL SHEATHING PANELS TO MEET U.S. PRODUCT STANDARD
<br />P51 OR P52, OR APA PRP-108 WITH 32fb SPAN RATING (MAX.)
<br />10. NOTE: IF FIRE -RATED DETAILS ARE REQUIRED BY THE
<br />ARCHITECTURAL PLANS, THE SHEATHING USED IN THE -FIRE
<br />RATED A55EMBLIE5 SHALL BE NOMINAL 1�32" THICK, APA
<br />RATED SHEATHING 23 b EXPOSURE 105E OR PLYWOOD PER
<br />U.S. PRODUCT STANDARD PSI OR P52 OR APA PRP-108 IN
<br />ACCORDANCE WITH THE UL DE516N5 SPECIFIED.
<br />Window i Door Allowable Wind Pre55ure5
<br />140 MPH Wind Zone Ex o5ure E3"
<br />OPENING 51ZE
<br />INTERIOR ZONES
<br />END ZONES
<br />8' 6arage Door
<br />+18.5 PSF/-20.q P5F
<br />+18.5 PSF/-20.q PSF
<br />16Garage Door
<br />+I1.1 P5F/-Iq.1 PSF
<br />+I1.1 PSF/-Iq.1 P5F
<br />10 SOFT.
<br />+21.2 P5F/-22.q PSF
<br />+21.4 P5F/-28.3 P5F
<br />20 SOFT.
<br />+20.2 P5F/-22.0 P5F
<br />+20.2 P5F/-26.4 P5F
<br />50 SOFT.
<br />+Iq.O PSF/-20.8 P5F
<br />+lq.O P5F/-23.q PSF
<br />100 SOFT.
<br />+18.0 P5F/-Iq.8 P5F
<br />+18.0 P5F/-22.0 P5F
<br />500 SOFT.
<br />+15.8 P51`/-I1.6 P5F
<br />+15.5 P5F/-11.6 P5F
<br />(DEnd Zone 15 defined a5 the Smaller of 10% of least horiz. dim. or 40%
<br />of mean roof height.
<br />®Pre55ure5 have been derived from 2020 FBG Table R301.2(2).
<br />©Pre55ure5 charted here are allowable pre55ure5 and have been
<br />reduced per A5GE 1-16 Section 2.4.1 from ultimate pre55ure5. Divide
<br />allowable pre55ure5 above by a factor of 0.6 for ult. pre55ure5.
<br />ROOF FRAMING
<br />• SEE ROOF TRU55 UPLIFT CONNECTOR SCHEDULE FOR ALL ROOF
<br />TRU55 CONNECTORS.
<br />• ROOF SHEATHING SHALL BE 1/16" MIN. 05B/PLYWOOD SHEATHING 24/b,
<br />EXP05URE I. FASTEN SHEATHING TO ROOF MEMBERS W 2 3/8"xO.113"
<br />RING SHANK NAILS (R5R5-01 OR EQUIV) 0 6" O.G. AT PANEL EDGES $
<br />@ 6" O.G. IN FIELD. FASTEN SHEATHING TO GABLE END $ DRAG
<br />TRUSSES N/ RING SHANK NAILS 0 3" O.G. (U.N.O.). PROVIDE BLOCKING
<br />ALONG PANEL ED6E5 AT FIRST 2 TRU55 BAYS FROM GABLE END.
<br />PROVIDE "H" STYLE GLIP5 ALONG UNSUPPORTED EDGES.
<br />• ROOF SHEATHING FOR MAIN ROOF TRU55E5 SHALL EXTEND
<br />CONTINUOUSLY UNDER ALL OVERFRAMIN6.
<br />• TRU55 ALL VALLEY SETS. FASTEN EACH TO TRUSS BELOW w/
<br />51MP50N VTGR CLIPS @ 24" O.G.
<br />• ALL METAL HANGERS SHALL BE SPECIFIED BY THE TRU55
<br />MANUFACTURER, UNLESS OTHERWISE NOTED.
<br />• ERECT AND INSTALL ROOF TRUSSES PER WTGA 4 TPI'5 BG51 I
<br />GUIDE TO 600D PRACTICE FOR HANDLING, INSTALLING 4 BRACING
<br />OF METAL PLATE CONNECTED WOOD TRUSSES."
<br />• ROOF TRU55 SHOP DW65. SHALL BE SUBMITTED TO ARCH $ EN6.
<br />FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OR DELIVERY.
<br />• SUPPORT PORCH $ SHORT SPAN ROOF TRUSSES w/ 2x4 LEDGER
<br />FASTENED TO FRAMING w/(2) 3"xO.131" NAILS a 16" O.G.
<br />UPL I f2T GONNEGTOR5
<br />BEARING CONDITION
<br />TRU55
<br />CONNECTOR
<br />LENGTH
<br />< 15'
<br />SIMP50N H2.5T
<br />SINGLE ROOF TRU55 BEARING ON
<br />> 15'
<br />51MP50N HIOA
<br />WOOD STUD WALL/WOOD BEAM
<br />ROOF GIRDER TRU55 BEARING ON
<br />ALL
<br />51MPSON HT520
<br />WOOD STUD WALL/WOOD BEAM
<br />SINGLE ROOF TRU55 OR PORCH
<br />ALL
<br />51MP50N HETAI6
<br />BEAM BEARIN6 ON GMU WALL
<br />ROOF 6.T., FLUSH BEAM OR
<br />ALL
<br />(2) 51MP50N HETAI6
<br />FLUSH 63. BR6. ON GMU WALL
<br />ALL BEARING POINTS OF EACH ROOF TRU55 SHALL BE CONNECTED
<br />WITH CONNECTOR AS LISTED ABOVE.
<br />IT 15 THE RESPONSIBILITY OF THE ENGINEER OF RECORD TO DESIGN
<br />THE UPLIFT GONNEGTOR5 PER SECTION 2.2 OF AN5I/TPI-2014
<br />"NATIONAL DESIGN STANDARDS FOR METAL PLATE CONNECTED WOOD
<br />TRU55 CONSTRUCTION". MW HAS ENGINEERED ALL ROOF TRU55 UPLIFT
<br />CONNECTORS IN ACCORDANCE WITH THE REQUIREMENTS OF A5GE-1-16.
<br />ALL UPLIFT CONNECTORS AND LOAD5 PER THI5 DRAWING SHALL
<br />SUPERSEDE THE TRU55 MANUFAGTURER'5 UPLIFT CONNECTOR
<br />5PEGIFIGATION5 AND LOAD5 5HOWN ON THE SHOP CARDS.
<br />LEGEND
<br />uuu�uu� • � • � • •
<br />• _ _ _ BEARING WALL ABOVE
<br />• BEAM / HEADER
<br />• LOCATION AND EXTENT OF 5HEARWALL
<br />EXTENT OF OVERFRAMIN6
<br />• 1 - -I - INDICATES I/8"A" SAW GUT CONTROL JOINT
<br />INDICATES LOCATION OF REINFORCED GMU GORE
<br />(5EE NOTES)
<br />J L METAL HANGER
<br />INDICATE5 P05T ABOVE. PROVIDE 50LID
<br />BLOCKING UNDER P05T OR JAMB ABOVE.
<br />GENERAL 5TRUGTURAL NOTE5
<br />• DESIGN 15 BASED ON lth EDITION (2020) FLORIDA BUILDING CODE.
<br />• WOOD FRAME ENGINEERING 15 BASED ON ND5, "NATIONAL DE516N
<br />SPECIFICATION FOR WOOD CONSTRUCTION" - LATEST EDITION.
<br />• DESIGN LOADS:
<br />ROOF LIVE = 20 PSF
<br />DEAD = 1 P5F T.G., 10 P5F B.G.
<br />LOAD DURATION FACTOR = 1.25
<br />FLOOR LIVE = 40 P5F (INCLUDING 5TAIR5 $ DEGK5)
<br />= 30 P5F @ SLEEPING AREAS
<br />= 50 PSF @ GARAGE
<br />= 200 # POINT LOAD @ 6UARD5/HANDRAIL5
<br />= 50 PSF @ GUARD IN -FILL COMPONENTS
<br />DEAD = 10 PSF (20 PSF TOTAL @ TILE)
<br />WIND ULTIMATE WIND SPEED $ EXPOSURE AS LISTED
<br />R15K GATEC70RY II
<br />GENERAL FRAMIN6
<br />• EXTERIOR WOOD STUD BEARIN6 HALLS SHALL BE 2x 5PF#2 OR
<br />5YP#2 0 16" O.G., OR BETTER (TYP. U.N.O. ON PLANS).
<br />• INTERIOR WOOD STUD BEARING WALLS SHALL BE 2x 5PF OR 5YP
<br />'STUD' 6RADE LUMBER @ 16" O.G., OR BETTER (TYP. U.N.O. ON PLANS).
<br />• ALL INTERIOR SHEARWALLS SHALL BE CONSTRUCTED WITH 2x
<br />'STUD' 6RADE MEMBERS SPACED @ 16" O.G. (MAX.).
<br />• ALL NON-BEARIN6 INTERIOR STUD HALLS SHALL BE CONSTRUCTED
<br />WITH 2x '5TUD' 6RADE MEMBERS SPACED @ 24" O.G. (MAX.).
<br />• ALL HEADERS SHALL BE SUPPORTED BY (1)2x JACK STUD 4 (1)2x
<br />KING STUD, MINIMUM.
<br />- THE NUMBER OF STUDS SPECIFIED AT A SUPPORT INDICATES THE
<br />NUMBER OF JACK STUDS REQUIRED, U.N.O..
<br />• ALL HEADERS, BEAM5 $ OTHER STRUCTURAL MEMBERS SHALL BE
<br />5PRUGE-PINE-FIR #2 (5PF) OR SOUTHERN PINE #2 (5YP) LUMBER, OR
<br />BETTER (KILN -DRIED).
<br />• FACE NAIL MULTI -PLY 2x BEAMS 4 HEADERS W/ 3-ROW5 OF 3"xO.131"
<br />NAILS 0 12" O.G. STAGGERED. APPLY NAILING FROM BOTH FAGE5 0
<br />3-PLY OR MORE CONDITIONS. UTILIZE 2 ROW5 OF NAILS FOR 2x6 $
<br />2x8 MEMBERS.
<br />• FACE NAIL BUILT UP 2x P05T5 W/ 3"xO.131" NAILS @ 16" O.G.
<br />STAGGERED. APPLY NAILING FROM BOTH FAGE5 0 3-PLY OR
<br />MORE CONDITIONS.
<br />• REFER TO CONNECTION 5PEGIFIGATION5 TABLE FOR ALL
<br />CONNECTIONS (TYP. U.N.O. ON PLANS).
<br />• SHEATH ALL WOOD FRAMED EXTERIOR HALLS W 1/16" 0513
<br />FASTENED w/ 2S'2"xO.131" NAILS @ 6" O.G. @ EDGES $ 12" O.G.
<br />CENTER FIELD. PROVIDE HORIZONTAL 2x BLOCKING AT ALL
<br />UNSUPPORTED PANEL EDGES. TYPICAL U.N.O. ON THE PLANS.
<br />• PROVIDE SOLID BLOGKIN6 IN FLOOR SYSTEM UNDER ALL P05T5
<br />CONTINUOUS TO FOUNDATION/BEARIN6.
<br />• ENGINEERED LUMBER TO MEET OR EXCEED THE FOLLOWING:
<br />• L5L - Fb=2325 psi; Fv=310 psi; E=1.55x10^6 psi
<br />• LVL - Fb=2600 psi; Fv=285 psi; E=2.Ox10^6 psi
<br />. FOR 2 $ 3 PLY BEAMS OF EQUAL WIDTH, FASTEN PLIES TOGETHER
<br />WITH 3 ROW5 OF 3"xO.131" NAILS @ 8" O/G OR 2 ROW5Y4"x3Y2"
<br />SIMP50N 51)5 5GREW5 (OR 3Y2" TRU55LOK 5GREW5) @ 16" O/G. USE
<br />A MINIMUM OF 3 ROW5 FOR BEAM DEPTHS OF 14" OR GREATER.
<br />APPLY FASTENING AT BOTH FAGE5 FOR 3-PLY CONDITION. LOCATE
<br />TOP $ BOTTOM NAIL5/5GREW5 2" FROM EDGE. 50LID 3 Y2" OR 5 Y4"
<br />BEAMS ARE ACCEPTABLE. USE 2 ROW5 OF NAILS FOR 2x6 4 2x8
<br />MEMBERS.
<br />• FOR 4 PLY BEAMS OF EQUAL WIDTH, FASTEN PLIES T06ETHER
<br />WITH 3 ROW5 OFY4"x6" 51MP50N 5D5 5GREW5 (OR 6 3/4" TRU55LOK
<br />5GREW5) 0 16" O/G. USE A MINIMUM OF 4 ROW5 FOR BEAM DEPTHS
<br />OF 14" OR GREATER. APPLY FASTENING AT BOTH FAGE5 (ONE 51DE
<br />ONLY FOR TRU55LOK 5GREW5). LOCATE TOP AND BOTTOM 5GREW5
<br />2" FROM EDGE. A 50LID 1" BEAM 15 ACCEPTABLE.
<br />• ALL INTERIOR WALL 5TUD5 IN CONTACT w/ GMU HALLS SHALL BE
<br />PRESERVATIVE TREATED AND FASTENED w/Y4" DIA. X 4" LONG
<br />TAPGON5 0 24" O.G.
<br />FLOOR FRAMING
<br />• I-J015T5/TRU55E5 SHALL BE DE516NED BY MANUF. TO MEET OR
<br />EXCEED L/480 LIVE LOAD DEFLECTION CRITERIA.
<br />• ALL METAL HANGERS SHALL BE SPECIFIED BY I -JOIST /TRU55
<br />MANUFACTURER, UNLE55 OTHERWISE NOTED.
<br />• I-J015T/TRU55 SHOP DW65. SHALL BE SUBMITTED TO ARCH. $ EN6.
<br />FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OR DELIVERY.
<br />• FLOOR 5HEATHIN6 SHALL BE 23152" CONFORMING TO P52-04,
<br />24" O.G., EXPOSURE I, TONGUE AND GROOVE EDGES, FASTEN
<br />SHEATHING TO FRAMING MEMBERS W/ GLUE AND 3"xO.131" NAILS
<br />6" O.G. AT PANEL E06E5 4 12" O.G. AT INTERMEDIATE SUPPORTS.
<br />TYPIGAL STAIR GON5TRUGTION NOTES
<br />• (5) SINGLE PLY 2x12 5TRIN6ER5 FASTENED TO HEADER AT TOP OR
<br />LANDING, WHERE APPLICABLE, AND 2x6 P.T. PLATE AT BOTTOM w/
<br />(1) SIMP50N A35 CLIP AT EACH STRINGER.
<br />• FASTEN 2x6 P.T. PLATE TO CONCRETE SLAB w/ (3) 3/b" DIA. x 3 Y2"
<br />LONG TAPGON5.
<br />• FASTEN END 5TRIN6ER5 TO ADJACENT HALLS, W (2) 3"4.131" NAILS
<br />AT EACH STUD, WHERE APPLICABLE.
<br />• PROVIDE 5/4" FLOOR DECKING ON RI5ER5 AND I" FLOOR DECKING
<br />ON TREADS.
<br />• SEE STAIR FRAMING SECTION FOR MORE INFO.
<br />4
<br />PON7
<br />:SIB •: * .
<br />% FR \.
<br />© copyright &TU1tJ,1 2lac.
<br />0 cD
<br />z
<br />Is
<br />W
<br />W
<br />z
<br />o
<br />CD
<br />z
<br />W
<br />aa.
<br />+
<br />J
<br /><
<br />LZ
<br />N
<br />Z
<br />U
<br />A
<br />.' Q
<br />c
<br />W�
<br />�a
<br />0° E
<br />JZ
<br />,
<br />LU
<br />�o
<br />y op
<br />CO
<br />22
<br />m L6
<br />W
<br />C N
<br />cc
<br />M Iz
<br />IV
<br />M&K project number:
<br />068-2001 1
<br />project mgr:
<br />drawn by:
<br />issue date:
<br />JSB
<br />DR
<br />10-04-21
<br />REVISIONS:
<br />date: initial:
<br />W
<br />1--
<br />O
<br />z
<br />J
<br />d
<br />U
<br />W
<br />sheet:
<br />SM0.0
<br />Q
<br />x
<br />0
<br />J
<br />LL.
<br />
|