Laserfiche WebLink
1 <br />2 <br />3 I 4 <br />5 <br />0 <br />IN <br />1.1 <br />A <br />2 <br />a <br />0 <br />M <br />CV <br />N <br />v <br />0 <br />N <br />O <br />L0 <br />N <br />M <br />1000 GENERAL NOTES: <br />1. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH PROJECT SPECIFICATIONS <br />AND ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND SITE DRAWINGS. <br />CONSULT THESE DRAWINGS FOR OPENINGS, DEPRESSIONS, EQUIPMENT WEIGHTS AND <br />LOCATIONS, EMBEDDED ITEMS AND OTHER DETAILS NOT SHOWN ON STRUCTURAL <br />DRAWINGS. <br />2. DIMENSIONS AND CONDITIONS MUST BE VERIFIED IN THE FIELD. ANY DISCREPANCIES SHALL <br />BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD BEFORE PROCEEDING <br />WITH THE AFFECTED PART OF THE WORK. <br />3. NO STRUCTURAL MEMBER OR COMPONENT SHALL BE CUT, NOTCHED, OR OTHERWISE <br />ALTERED UNLESS APPROVED IN WRITING BY THE ENGINEER OF RECORD. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL COSTS INCURRED BY THE <br />ENGINEER OF RECORD FOR REVIEW OF ANY SUCH DEVIATIONS. <br />4. DO NOT SCALE DRAWINGS. <br />5. THE STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER THE BUILDING <br />IS COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE ERECTION <br />PROCEDURES AND SEQUENCE TO ENSURE SAFETY OF THE BUILDING AND ITS <br />COMPONENTS DURING ERECTION. THIS INCLUDES THE ADDITION OF NECESSARY SHORING, <br />SHEETING, TEMPORARY BRACING, GUYS OR TIEDOWNS. <br />6. DETAILS LABELED "TYPICAL DETAILS" ON THE DRAWINGS SHALL APPLY TO ALL SITUATIONS <br />OCCURRING ON THE PROJECT THAT ARE THE SAME OR SIMILAR TO THOSE SPECIFICALLY <br />DETAILED. THE APPLICABILITY OF THE DETAIL TO ITS LOCATION ON THE DRAWINGS CAN BE <br />DETERMINED BY THE TITLE OF DETAIL. SUCH DETAILS SHALL APPLY WHETHER OR NOT <br />THEY ARE REFERENCED AT EACH LOCATION. QUESTIONS REGARDING APPLICABILITY OF <br />TYPICAL DETAILS SHALL BE DETERMINED BY THE ENGINEER OF RECORD. <br />7. THE GENERAL CONTRACTOR SHALL COMPARE THE ARCHITECTURAL, MECHANICAL, <br />ELECTRICAL, PLUMBING, CIVIL AND STRUCTURAL DRAWINGS AND REPORT ANY <br />DISCREPANCIES BETWEEN EACH SET OF DRAWINGS AND WITHIN EACH SET OF DRAWINGS <br />TO THE ARCHITECT AND ENGINEER OF RECORD PRIOR TO THE FABRICATION AND <br />INSTALLATION OF ANY STRUCTURAL MEMBERS. <br />8. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED <br />STRUCTURE, AND DO NOT INDICATE THE METHOD OR MEANS OF CONSTRUCTION. THE <br />CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY <br />RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, PROCEDURES, TECHNIQUES, <br />SEQUENCE AND SAFETY. THE ENGINEER DOES NOT HAVE CONTROL OR CHARGE OF, AND <br />SHALL NOT BE RESPONSIBLE FOR, CONSTRUCTION MEANS, METHODS, TECHNIQUES, <br />SEQUENCES, OR PROCEDURES, FOR SAFETY PRECAUTIONS AND PROGRAMS IN <br />CONNECTION WITH THE WORK, FOR THE ACTS OR OMISSION OF THE CONTRACTOR, <br />SUBCONTRACTOR OR ANY OTHER PERSONS PERFORMING ANY OF THE WORK, OR FOR THE <br />FAILURE OF ANY OF THEM TO CARRY OUT THE WORK IN ACCORDANCE WITH THE <br />CONTRACT DOCUMENTS. <br />9. THE STRUCTURAL ENGINEER'S OBLIGATIONS TO REVIEW SHOP DRAWINGS AND OTHER <br />SUBMITTALS AND TO RETURN THEM IN A TIMELY MANNER ARE CONDITIONED UPON THE <br />PRIOR REVIEW AND APPROVAL OF THE SHOP DRAWINGS OR SUBMITTALS BY THE <br />CONTRACTOR AS REQUIRED IN THE CONSTRUCTION CONTRACT AND THE CONTRACTOR'S <br />SUBMITTAL OF THE SHOP DRAWINGS AND OTHER SUBMITTALS IN ACCORDANCE WITH A <br />WRITTEN SCHEDULE DISTRIBUTED IN ADVANCE TO THE ENGINEER IDENTIFYING THE DATES <br />FOR THE SUBMITTAL OF THE VARIOUS SHOP DRAWINGS AND SUBMITTALS. <br />10. PERIODIC SITE OBSERVATION BY FIELD REPRESENTATIVES OF TLC ENGINEERING <br />SOLUTIONS IS SOLELY FOR THE PURPOSE OF DETERMINING IF THE WORK OF THE <br />CONTRACTOR IS PROCEEDING IN GENERAL ACCORDANCE WITH THE STRUCTURAL <br />CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION SHALL NOT BE CONSTRUED AS <br />EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY OR QUANTITY OF THE WORK. <br />11. ALL STRUCTURES REQUIRE PERIODIC MAINTENANCE TO EXCEED LIFE SPAN AND TO <br />ENSURE STRUCTURAL INTEGRITY FROM EXPOSURE TO THE ENVIRONMENT. A PLANNED <br />PROGRAM OF MAINTENANCE SHALL BE ESTABLISHED BY THE OWNER. THIS PROGRAM <br />SHALL INCLUDE ITEMS SUCH AS, BUT NOT LIMITED TO, PAINTING OF STRUCTURAL STEEL, <br />PROTECTIVE COATINGS FOR CONCRETE, SEALANTS, CAULKED JOINTS, EXPANSION JOINTS, <br />CONTROL JOINTS, SPALLS AND CRACKS IN CONCRETE, AND PRESSURE WASHING OF <br />EXPOSED STRUCTURAL ELEMENTS EXPOSED TO SALT ENVIRONMENT OR OTHER HARSH <br />CHEMICALS. <br />12. STRUCTURAL ENGINEER OF RECORD IS NOT RESPONSIBLE FOR THE DESIGN OF STEEL <br />STAIRS, HANDRAILS, CURTAIN WALL/WINDOW WALL SYSTEMS, COLD -FORMED STEEL <br />FRAMING, OR OTHER SYSTEMS NOT SHOWN IN THE STRUCTURAL DOCUMENTS. SUCH <br />SYSTEMS SHALL BE DESIGNED, FURNISHED, AND INSTALLED AS REQUIRED BY OTHER <br />PORTIONS OF THE CONTRACT DOCUMENTS. <br />13. IN THE PROFESSIONAL OPINION OF TLC ENGINEERING SOLUTIONS, INC. THE STRUCTURAL <br />CONTRACT DOCUMENTS FOR THIS PROJECT HAVE BEEN PREPARED IN ACCORDANCE WITH <br />THE DESIGN CRITERIA AS SET FORTH IN THE FLORIDA BUILDING CODE (FBC) 6th EDITION <br />(2017), <br />14. NO PROVISIONS HAVE BEEN MADE FOR VERTICAL OR HORIZONTAL EXPANSION EXCEPT AS <br />SHOWN ON CONTRACT DOCUMENTS. <br />15. FINISH FLOOR ELEVATION (FIRST FLOOR) OF 0'-0" (100'-0") IS USED AS A REFERENCE <br />ELEVATION. REFERENCE ARCHITECT FOR FLOOR FINISHES AND ENSURE NEW FFE <br />MATCHES EXISTING FLOOR ELEVATION <br />16. THE USE OF REPRODUCTIONS OF THESE CONTRACT DOCUMENTS AND USE OF CAD/REVIT <br />FILES BY ANY CONTRACTOR, SUBCONTRACTOR, ERECTOR, FABRICATOR OR MATERIAL <br />SUPPLIER IN LIEU OF PREPARATION OF SHOP DRAWINGS IS PROHIBITED UNLESS PRIOR <br />WRITTEN APPROVAL IS OBTAINED FROM ENGINEER OF RECORD. <br />17. IN THE EVENT THAT THE STRUCTURAL CONTRACT DRAWINGS AND SPECIFICATIONS <br />CONFLICT ON INFORMATION, THE STRUCTURAL CONTRACT DRAWINGS SHALL SUPERSEDE <br />THE SPECIFICATIONS. <br />1060 DESIGN LOADS: <br />1. THE STRUCTURAL SYSTEM FOR THIS BUILDING HAS BEEN DESIGNED IN ACCORDANCE <br />WITH THE FLORIDA BUILDING CODE, 6th EDITION (2017), AND AS SUPPLEMENTED BY LOCAL <br />AMENDMENTS. <br />2. THE FOLLOWING SUPERIMPOSED LOADINGS HAVE BEEN UTILIZED: <br />A. DEAD LOADS: <br />ROOF 20 PSF <br />B. LIVE LOADS <br />ROOF 20 PSF <br />FLOOR (KITCHEN) 150 PSF <br />C. WIND LOADS: PER FLORIDA BUILDING CODE, SECTION 1609. <br />SEE SHEET S002 FOR COMPONENTS AND CLADDING PRESSURES. <br />ULTIMATE DESIGN WIND SPEED, Vult 145 MPH (3 SEC. GUST) <br />NOMINAL DESIGN WIND SPEED, Vasd 112 MPH (3 SEC. GUST) <br />RISK CATEGORY III <br />EXPOSURE B <br />1330 SHOP DRAWING REVIEW: <br />1. SHOP DRAWINGS SHALL ADEQUATELY DEPICT THE STRUCTURAL ELEMENTS AND <br />CONNECTIONS SHOWN ON THE CONTRACT DOCUMENTS. SHOP DRAWINGS WILL BE <br />REVIEWED FOR GENERAL COMPLIANCE WITH THE DESIGN INTENT OF THE CONTRACT <br />DOCUMENTS ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY <br />COMPLIANCE WITH THE CONTRACT DOCUMENTS AS TO QUANTITY, LENGTH, ELEVATIONS, <br />DIMENSIONS, ETC. REVIEW OF SUBMITTALS AND SHOP DRAWINGS DOES NOT RELIEVE THE <br />CONTRACTOR OF FULL RESPONSIBILITY FOR ERRORS AND OMISSIONS ASSOCIATED WITH <br />THE PREPARATION OF THE SHOP DRAWINGS. <br />2. SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTOR AND MARKED "APPROVED" <br />PRIOR TO SUBMITTAL TO THE ARCHITECT/ENGINEER. NON -CONFORMING DRAWING <br />SUBMITTALS WILL BE RETURNED WITHOUT REVIEW. <br />3. SHOP DRAWING SUBMITTALS SHALL EITHER BE SUBMITTED ELECTRONICALLY OR SHALL <br />INCLUDE, AT A MINIMUM, FOUR HARD COPIES. ONE SET OF PRINTS WILL BE RETAINED BY THE <br />ENGINEER OF RECORD, ONE BY THE ARCHITECT, ONE BY THE LOCAL BUILDING DEPARTMENT <br />(WHERE REQUIRED) AND THE CONTRACTOR SHALL MAKE PRINTS AS REQUIRED FOR <br />DISTRIBUTION. <br />4. THE CONTRACT DOCUMENTS WILL GOVERN OVER THE SHOP DRAWINGS UNLESS OTHERWISE <br />SPECIFIED IN WRITING BY THE ENGINEER OF RECORD. <br />5. CHANGES AND ADDITIONS MADE ON RE -SUBMITTALS SHALL BE CLEARLY FLAGGED AND NOTED <br />THE PURPOSE OF THE RE -SUBMITTALS SHALL BE CLEARLY NOTED ON THE LETTER OF <br />TRANSMITTAL. ARCHITECT/ENGINEER OF RECORD REVIEW WILL BE LIMITED TO THOSE ITEMS <br />CAUSING THE RE -SUBMITTAL. CONTRACTOR IS RESPONSIBLE FOR COSTS CAUSED BY <br />MULTIPLE RE -SUBMITTALS (MORE THAN ONE) AT ARCHITECT/ENGINEERS' CURRENT HOURLY <br />RATES. <br />1333 SUBMITTALS: <br />1. ALL SHOP DRAWINGS MUST BE REVIEWED AND STAMPED APPROVED BY THE GENERAL <br />CONTRACTOR PRIOR TO SUBMITTAL. <br />2. THE GENERAL CONTRACTOR SHALL SUBMIT FOR ENGINEER REVIEW SHOP DRAWINGS FOR <br />THE FOLLOWING ITEMS: <br />• ITEMS MARKED (D) SHALL HAVE SHOP DRAWINGS SEALED BY A PROFESSIONAL <br />ENGINEER REGISTERED IN THE STATE OF FLORIDA. <br />• ITEMS MARKED (#) SHALL BE SUBMITTED FOR ENGINEER'S RECORD ONLY. <br />A. STRUCTURAL STEEL <br />B. REINFORCING STEEL <br />C. CONCRETE MIX DESIGNS <br />D. CONSTRUCTION JOINT LOCATIONS IN STRUCTURAL FLOORS <br />E. MORTAR AND GROUT FOR MASONRY. <br />3. MANUFACTURER'S LITERATURE. SUBMIT TWO COPIES OF MANUFACTURER'S LITERATURE <br />FOR ALL MATERIALS AND PRODUCTS USED IN CONSTRUCTION ON THE PROJECT. <br />1334 REQUEST FOR INTERPRETATION: <br />1. RFI SHALL ORIGINATE WITH CONTRACTOR AND SHALL BE SUBMITTED IN THE FORM <br />SPECIFIED WITHIN CONTRACT DOCUMENTS. RFI SHALL BE SUBMITTED IN A PROMPT <br />MANNER AS TO AVOID DELAYS IN CONTRACTORS WORK. <br />2. RFI SHALL BE SUBMITTED AS SPECIFIED WITHIN THE CONTRACT DOCUMENTS AND SHALL <br />BE FORWARDED TO THE ENGINEER VIA THE ARCHITECT OR DIRECTLY TO THE ENGINEER BY <br />THE CONTRACTOR WHEN APPROVED BY THE ARCHITECT. <br />3. ENGINEER SHALL TAKE UP TO 5 BUSINESS DAYS TO REVIEW AND RETURN RFI'S. HOWEVER, <br />THE ENGINEER WILL ATTEMPT TO EXPEDITE THE REVIEW OF ALL RFI'S WITHIN A <br />REASONABLE TIME FRAME. <br />4. RFI RESPONSES ARE NOT INTENDED TO AUTHORIZE ANY INCREASE IN CONSTRUCTION <br />COST, SCHEDULE OR TIME EXTENSIONS, OR CONSTRUCTION IN CONFLICT WITH ANY <br />APPLICABLE CODES OR SPECIFIED DESIGN STANDARDS. IT IS THE RESPONSIBILITY OF THE <br />CONTRACTOR TO NOTIFY THE DESIGN TEAM IMMEDIATELY OF ANY PERCEIVED SCOPE, <br />SCHEDULE, OR COST IMPACTS OR ADJUSTMENTS. IF CONTRACTOR REQUESTS ANY <br />ADDITIONAL COST, INCREASE IN SCHEDULE OR ADJUSTMENT IN SCOPE, THE CONTRACTOR <br />SHALL NOT PROCEED WITH ADDITIONAL WORK UNTIL APPROVED IN WRITING BY THE <br />CONSTRUCTION ADMINISTRATOR. <br />2210 DEMOLITION NOTES: <br />1. THE CONTRACTOR IS REQUIRED TO PROVIDE ALL TEMPORARY SCAFFOLDING, PLATFORMS, <br />BARRICADES, RAILINGS, SCREENING, ETC. NECESSARY TO PROTECT EXISTING FACILITIES, <br />STRUCTURES AND THE PUBLIC DURING DEMOLITION AND ERECTION OF THE NEW <br />CONSTRUCTION, AS WELL AS FOR JOB SAFETY. JOB SAFETY, CONSTRUCTION AND <br />DEMOLITION PROCEDURES ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE <br />CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONS TO MINIMIZE VIBRATION, NOISE, <br />DUST AND DEBRIS IN ALL AREAS ADJACENT TO AREAS OF DEMOLITION. <br />2. THE CONTRACTOR IS REQUIRED TO COORDINATE WITH THE OWNER FOR THE TEMPORARY <br />SUSPENSION OF USE OF ANY FACILITY OR PORTION THEREOF, AND THE ASSOCIATED <br />BARRICADING REQUIREMENTS WITHIN A MINIMUM OF 7 DAYS PRIOR TO COMMENCING <br />WORK. <br />3. THE CONTRACTOR IS REQUIRED TO PERFORM HIS WORK IN A MANNER, WHICH WILL NOT <br />CONFLICT WITH ANY OPERATION, WHICH IS TO REMAIN FUNCTIONAL DURING THE COURSE <br />OF THE PROJECT, UNTIL SUCH OPERATION IS SCHEDULED TO BE SHUT DOWN. <br />4. THE CONTRACTOR IS REQUIRED TO COORDINATE WITH OWNER FOR THE TEMPORARY <br />SUSPENSION OF USE OF ANY UTILITY SYSTEM, A MINIMUM OF 3 DAYS PRIOR TO <br />COMMENCING WORK. <br />5. AT ALL LOCATIONS WHERE NEW CONSTRUCTION WILL INTERFACE WITH EXISTING <br />ELEMENTS, CUT THROUGH EXISTING STRUCTURE IN STRAIGHT AND TRUE LINES TO <br />ENSURE A NEAT INTERFACE. <br />6. BEFORE DEMOLISHING ANY STRUCTURAL ELEMENT, INSTALL ALL REQUIRED TEMPORARY <br />AND/OR PERMANENT BRACING AND SUPPORTS. <br />7. PROVIDE TEMPORARY CLOSURE OF ALL ROOF FASCIA, WALL AND OTHER OPENINGS TO <br />PROTECT BUILDING FROM EXPOSURE TO UNDESIRABLE ELEMENTS UNTIL NEW <br />CONSTRUCTION IS WEATHERPROOFED, AT WHICH TIME SUCH TEMPORARY CONSTRUCTION <br />SHALL BE REMOVED. ALL TEMPORARY EXTERIOR WALLS THAT ARE SUBJECT TO WIND <br />LOADS ARE TO BE DESIGNED BY A DELEGATED ENGINEER. <br />8. UPON COMPLETION OF NEW CONSTRUCTION UNDER EACH PHASE, ALL DEMOLISHED <br />AREAS SHALL BE RESTORED TO ACCEPTABLE USAGE ACCORDING TO THE CONTRACT <br />DOCUMENTS AS DETERMINED BY THE ARCHITECT/ENGINEER. <br />9. REMOVE COMPLETELY FROM THE SITE AND LEGALLY DISPOSE ALL DEBRIS GENERATED BY <br />THE DEMOLITION WORK AS THE WORK PROGRESSES. STOCKPILING OF DEBRIS AND <br />BURNING OF DEBRIS ON THE PREMISES IS STRICTLY PROHIBITED. <br />2220 EXISTING STRUCTURE: <br />1. INFORMATION SHOWN FOR THE EXISTING STRUCTURE ON THESE DRAWINGS WAS TAKEN <br />FROM THE DRAWINGS THAT WERE PREPARED FOR: <br />PREPARED BY: SDL & ASSOCIATES <br />ENTITLED: DINING ROOM ADDITION, EAST PASCO MEDICAL CENTER <br />DATED: 04-17-2002 <br />AND: <br />PREPARED BY: HOSPITAL DESIGNERS, INC. <br />ENTITLED: EAST PASCO MEDICAL CENTER <br />DATED: UNKNOWN, POSSIBLY 1985 <br />2. WORK SHOWN ON THESE DRAWINGS ASSUMES THAT THE ORIGINAL CONSTRUCTION WAS <br />PERFORMED IN ACCORDANCE WITH THE ABOVE INDICATED ORIGINAL DRAWINGS <br />INCLUDING (BUT NOT LIMITED TO) DIMENSIONS, ELEVATIONS, MEMBER SIZES, MATERIALS, <br />DETAILS, ETC. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE <br />CONDITIONS RELATING TO THE EXISTING STRUCTURE AND TO NOTIFY THE ENGINEER <br />IMMEDIATELY OF ANY DISCREPANCIES OR CONFLICTS. <br />3. WORK SHOWN ON THESE DRAWINGS IS INCIDENTAL TO THE STRUCTURAL SYSTEM OF THE <br />BUILDING AND IS THEREFORE LIMITED TO SPECIFIC ITEMS SHOW HEREIN. THE <br />RESPONSIBILITY FOR THE OVERALL STRUCTURAL SYSTEM REMAINS WITH THE ORIGINAL <br />ENGINEER AND DESIGNERS OF RECORD. <br />2300 FOUNDATIONS - W/O SOIL REPORTS: <br />1. 1. IN THE ABSENCE OF ANY GEOTECHNICAL RECOMMENDATIONS, THE FOUNDATIONS ARE <br />DESIGNED FOR A PRESUMPTIVE ALLOWABLE SOIL BEARING PRESSURE OF 1,500 PSF ON <br />COMPACTED FILL. <br />2. PRESUMPTIVE SOIL CONDITIONS ARE IN ACCORDANCE WITH TABLE 1806.2 OF THE 6TH <br />EDITION (2017) FLORIDA BUILDING CODE. <br />3. IN THE ABSENCE OF ANY GEOTECHNICAL RECOMMENDATIONS, NO WARRANTIES, <br />EXPRESSED OR IMPLIED, ARE MADE BY TLC FOR THE PERFORMANCE OF THE FOUNDATION. <br />4. AT A MINIMUM, SITE PREPARATION WORK SHALL INCLUDE: <br />A. STRIPPING AND GRUBBING OF THE BUILDING FOOTPRINT PLUS A MARGIN OF 5 FEET <br />AROUND THE BUILDING, REMOVING ALL ORGANIC MATERIALS WITHIN X FEET OF THE <br />SURFACE. <br />B. PROOF ROLLING THE BUILDING SITE TO LOCATE ANY UNFORESEEN SOFT AREAS. ANY <br />SOFT AREAS SHALL BE EXCAVATED AND REPLACED WITH CLEAN FILL. A DENSITY OF AT <br />LEAST 95% FOR A DEPTH OF 2 FEET IS REQUIRED UNDER THE BUILDING FOOTPRINT. <br />C. ALL FILL SHALL BE CLEAN SAND AND FREE OF ORGANIC MATERIALS. COMPACT FILL IN <br />12 INCH (UNCOMPACTED THICKNESS) LIFTS TO A MINIMUM OF 95% OF THE MODIFIED <br />PROCTOR MAXIMUM DRY DENSITY VALUE. <br />D. EXCAVATIONS FOR FOUNDATIONS SHALL BE COMPACTED TO 95% FOR A DEPTH OF AT <br />LEAST 2 FEET BELOW THE BOTTOM OF THE FOUNDATION AND SLABS. <br />E. DEWATERING MAY BE REQUIRED TO ACHIEVE THE REQUIRED COMPACTION VALUES, <br />AND IF USED, SHOULD DRAW DOWN THE WATER LEVEL TO AT LEAST 2 FEET BELOW <br />THE BOTTOM OF THE EXCAVATION. <br />5. SLABS ON GRADE SHALL BE PLACED OVER A 15 MIL, CLASS "A" VAPOR RETARDER. VAPOR <br />RETARDER SHALL BE LAPPED A MINIMUM OF 6", OR AS RECOMMENDED BY THE <br />MANUFACTURER (WHICHEVER IS GREATER) AND TAPED AT ALL JOINTS. ALL PUNCTURES IN <br />THE VAPOR RETARDER SHALL BE REPAIRED PER MANUFACTURER'S WRITTEN <br />INSTRUCTIONS. ALL PENETRATIONS THROUGH THE VAPOR RETARDER (COLUMNS, <br />PLUMBING, CONDUITS, ETC) SHALL BE SEALED PER MANUFACTURER'S WRITTEN <br />INSTRUCTIONS. VAPOR RETARDER SHALL BE CONTINUOUS UNDER WALL FOUNDATIONS OR <br />SEALED TO EXTERIOR WALLS PER MANUFACTURER'S WRITTEN INSTRUCTIONS. <br />3302 CONCRETE: <br />1. SHALL BE PER AN APPROVED MIX DESIGN PROPORTIONED TO ACHIEVE A STRENGTH AT 28 <br />DAYS AS LISTED BELOW WITH A PLASTIC AND WORKABLE MIX: <br />CONCRETE STRUCTURE TYPE COMPRESSIVE SLUMP COARSE MAXIMUM <br />STRENGTH AGGREGATE W/C RATIO <br />FOUNDATIONS 3000 PSI 4-6" 1" 0.50 <br />SLABS -ON -GRADE 3000 PSI 4-6" 3/4" 0.50 <br />BEAMS AND COLUMNS 4000 PSI 4-6" 3/8" 0.48 <br />2. CONCRETE SHALL BE PLACED AND CURED ACCORDING TO ACI STANDARDS AND <br />SPECIFICATIONS. <br />3. SUBMIT PROPOSED MIX DESIGN WITH RECENT FIELD CYLINDER OR LAB TESTS FOR REVIEW <br />PRIOR TO USE. MIX SHALL BE UNIQUELY IDENTIFIED BY MIX NUMBER OR OTHER POSITIVE <br />IDENTIFICATION. MIX SHALL MEET THE REQUIREMENTS OF ASTM C33 FOR COARSE <br />AGGREGATE. <br />4. CONCRETE SHALL COMPLY WITH THE REQUIREMENTS OF ASTM STANDARD C94 FOR <br />MEASURING, MIXING, TRANSPORTING, ETC. CONCRETE TICKETS SHALL BE TIME STAMPED <br />WHEN CONCRETE IS BATCHED. <br />5. THE MAXIMUM TIME ALLOWED FROM THE TIME THE MIXING WATER IS ADDED UNTIL IT IS <br />DEPOSITED IN ITS FINAL POSITION SHALL NOT EXCEED ONE AND ONE HALF (1-1/2) HOURS. <br />IF FOR ANY REASON THERE IS A LONGER DELAY THAN THAT STATED ABOVE, THE <br />CONCRETE SHALL BE DISCARDED. IT SHALL BE THE RESPONSIBILITY OF THE TESTING LAB <br />TO NOTIFY THE OWNER'S REPRESENTATIVE AND THE CONTRACTOR OF ANY <br />NONCOMPLIANCE WITH THE ABOVE. <br />6. SLABS SHALL BE CURED USING A DISSIPATING CURING COMPOUND MEETING ASTM <br />STANDARD C309 TYPE 1-CLASS D AND SHALL HAVE A FUGITIVE DYE. THE COMPOUND SHALL <br />BE PLACED AS SOON AS THE FINISHING IS COMPLETED OR AS SOON AS THE WATER HAS <br />LEFT THE UNFINISHED CONCRETE. SCUFFED OR BROKEN AREAS IN THE CURING <br />MEMBRANE SHALL BE RECOATED DAILY. <br />7. CALCIUM CHLORIDES SHALL NOT BE UTILIZED; OTHER ADMIXTURES MAY BE USED ONLY <br />WITH THE APPROVAL OF THE ENGINEER. <br />8. CONCRETE MIX DESIGNS SHALL INCLUDE A WRITTEN DESCRIPTION INDICATING WHERE <br />EACH PARTICULAR MIX IS TO BE PLACED WITHIN THE STRUCTURE. <br />9. CONDUITS, PIPES AND SLEEVES SHALL BE PLACED AND SPACED IN ACCORDANCE WITH ACI <br />318, 6.3. <br />10. CONCRETE DESIGN MIX SUBMITTALS SHALL INCLUDE TESTED, STATISTICAL BACK-UP DATA <br />AS PER CHAPTER 5 OF ACI 318. <br />11. ALL COLUMNS AND BEAMS INTEGRATED IN CMU WALLS ARE 8" AND 12" NOMINAL AND 7-5/8" <br />AND 11-5/8" ACTUAL DIMENSIONS, RESPECTIVELY, <br />3310 REINFORCING STEEL: <br />1. SHALL BE ASTM A615 GRADE 60 DEFORMED BARS, FREE FROM OIL, SCALE AND RUST AND <br />PLACED IN ACCORDANCE WITH THE TYPICAL BENDING DIAGRAM AND PLACING DETAILS OF <br />ACI STANDARDS AND SPECIFICATIONS. <br />2. PROVIDE CONCRETE COVER OVER PRIMARY REINFORCEMENT, TIES, AND STIRRUPS, AS <br />FOLLOWS, UNLESS OTHERWISE NOTED: <br />LOCATION AND CONDITION MINIMUM COVER <br />A. CONCRETE CAST AGAINST AND ALL BARS 3" <br />PERMANENTLY EXPOSED TO EARTH. <br />B. CONCRETE EXPOSED TO EARTH OR WEATHER #6 OR GREATER 2" <br />#5 OR SMALLER 1.5" <br />C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND <br />SLABS #11 OR SMALLER 3/4" <br />3. SECURE APPROVAL OF SHOP DRAWINGS PRIOR TO COMMENCING FABRICATION. <br />4. PROVIDE STANDARD HOOKS AT DISCONTINUOUS ENDS OF ALL TOP BARS. <br />5. WHERE REINFORCING IS SHOWN CONTINUOUS, SPLICE BOTTOM BARS OVER SUPPORTS <br />AND TOP BARS AT CENTER OF SPAN. ALL OTHER LAP SPLICES SHALL BE IN ACCORDANCE <br />WITH SPLICE TABLES AND DETAILS SHOWN ON DRAWINGS. <br />6. PROVIDE DOWELS INTO FOOTINGS, PILE CAPS, SUPPORT BEAMS, ETC. TO MATCH VERTICAL <br />BARS WITH CLASS B TENSION LAP SPLICES, U.N.O. <br />7. LENGTH OF LAP SPLICES AND BAR EMBEDMENT SHALL BE AS SHOWN IN TABLE, UNLESS <br />OTHERWISE NOTED: <br />BAR SIZE <br />3000 PSI <br />4000 PSI <br />5000 PSI <br />T<12" #6 OR LESS <br />57 Db <br />49 Db <br />44 Db <br />T>12" #6 OR LESS <br />74 Db <br />65 Db <br />57 Db <br />WHERE "T" IS DEPTH OF CONCRETE UNDER BARS AND "Db" IS BAR DIAMETER <br />UTILIZE CLASS "B" SPLICE FOR ALL SPLICES, U.N.O. ON PLANS OR DETAILS. <br />ULTIMATE C&C WIND PRESSURE PLAN NOTES: <br />1. WIND PRESSURE TABLE IS BASED ON FBC 6th EDITION 2017/ASCE 7-10 ULTIMATE WIND SPEED, <br />PRESSURES SHOWN ABOVE ARE ULTIMATE COMPONENTS AND CLADDING PRESSURES. <br />2. ROOF TOP EQUIPMENT SHALL BE DESIGNED FOR A LATERAL PRESSURE OF 100 psf AND A <br />SIMULTANEOUS UPLIFT PRESSURE OF 49 psf (ROOF TOP EQUIPMENT PER FBC SECTION 1620.6 <br />WITH Qh = 33 psf) <br />8. AT CHANGES IN DIRECTION OF CONCRETE WALLS AND TIE BEAMS, PROVIDE CORNER BARS OF <br />SAME SIZE AND SPACING AS HORIZONTAL STEEL. <br />9. HERE HOOKS ARE SHOWN ON THE PLANS OR DETAILS, HOOKS SHALL BE DETAILED TO EXTEND <br />DEEP ENOUGH INTO SUPPORTING STRUCTURE TO DEVELOP THE FULL STRENGTH OF THE <br />HOOKED BAR. PROVIDE ADDITIONAL TIES OR STIRRUPS IN SUPPORTING STRUCTURE AS <br />REQUIRED TO SATISFY ACI 318 HOOK DEVELOPMENT, CONFINEMENT, AND ANCHORAGE <br />CRITERIA. <br />10. AT CANTILEVER SLABS AND BEAMS, REINFORCING BARS IN DIRECTION OF CANTILEVER SHALL <br />BE DETAILED TO FULLY DEVELOP THE BAR STRENGTH INTO THE SUPPORTING STRUCTURE, <br />EITHER BY PROVIDING FULL CLASS B LAP SPLICE OR STANDARD ACI HOOKS EMBEDDED DEEP <br />ENOUGH BEYOND SUPPORT TO DEVELOP STRENGTH OF BAR. <br />3400 CONCRETE TESTING: <br />1. AN INDEPENDENT TESTING LABORATORY SHALL PERFORM THE FOLLOWING TESTS ON <br />CAST IN PLACE CONCRETE: <br />A. ASTM C143 - "STANDARD TEST METHOD FOR SLUMP OF PORTLAND CEMENT <br />CONCRETE." <br />B. ASTM C39 - "STANDARD TEST METHOD FOR COMPRESSIVE STRENGTH OF CYLINDRICAL <br />CONCRETE SPECIMENS." A SEPARATE TEST SHALL BE CONDUCTED FOR EACH CLASS, <br />FOR EVERY 50 CUBIC YARDS (OR FRACTION THEREOF), PLACED PER DAY. REQUIRED <br />LAB CURED CYLINDER QUANTITIES AND TEST AGE AS FOLLOWS: <br />(2) AT 7 DAYS <br />(2) AT 28 DAYS <br />ONE ADDITIONAL RESERVE CYLINDER TO BE TESTED UNDER THE DIRECTION OF THE <br />ENGINEER, IF REQUIRED. IF 28-DAY STRENGTH IS ACHIEVED, THE ADDITIONAL CYLINDER(S) <br />MAY BE DISCARDED. <br />4810 MASONRY WALLS: <br />1. ALL MASONRY CONSTRUCTION SHALL CONFORM TO TMS 402 "BUILDING CODE REQUIREMENTS <br />FOR MASONRY STRUCTURES" AND TMS 602 "SPECIFICATION FOR MASONRY STRUCTURES", <br />LATEST EDITION. <br />2. MASONRY UNITS SHALL MEET ASTM C-90 FOR HOLLOW LOAD BEARING TYPE MASONRY WITH <br />UNIT STRENGTH OF 2000 PSI ON THE NET AREA (fm = 2000 PSI). MORTAR SHALL BE TYPE "M" <br />OR "S" AND MEET ASTM C-270. <br />3. GROUT SHALL BE 3000 PSI MINIMUM COMPRESSIVE STRENGTH AND MEET ASTM C-476 AND <br />HAVE A SLUMP BETWEEN 8" AND 11" WITH WATER CM RATIO OF 0.55 MAXIMUM AND WITH 3/8" <br />MAXIMUM AGGREGATE. <br />4. PROVIDE HOOKED DOWELS IN FOUNDATIONS FOR VERTICAL REINFORCING ABOVE. LAP <br />SPLICES SHALL BE PER LAP SPLICE SCHEDULE SHOWN IN TYPICAL DETAIL. <br />5. BLOCK CELLS SHALL BE GROUT FILLED WITH VERTICAL REINFORCING BARS AT CORNERS, <br />INTERSECTIONS, EACH SIDE OF OPENINGS AND AS SHOWN ON THE DRAWINGS. <br />6. DOWELS SHALL BE USED TO PROVIDE CONTINUITY INTO THE STRUCTURE ABOVE AND/OR <br />BELOW, UNLESS NOTED OTHERWISE. <br />7. USE METAL LATH, MORTAR OR SPECIAL UNITS TO CONFINE CONCRETE AND GROUT TO AREA <br />AS REQUIRED. <br />8. MASONRY SHALL BE LAID IN RUNNING BOND PATTERN UNLESS NOTED OTHERWISE. AT FILLED <br />CELLS LAY UNITS WITH FULL BED JOINTS AROUND CELLS. <br />9. PROVIDE 9 GAGE GALVANIZED HORIZONTAL JOINT REINFORCING (DUR-O-WALL OR ENGINEER <br />APPROVED SUBSTITUTION) AT ALTERNATE BLOCK COURSES. LADDER TYPE IS <br />RECOMMENDED WITH REINFORCED FILLED CELLS. PROVIDE PREFABRICATED "TEE" OR <br />CORNER SECTIONS AT WALL INTERSECTIONS. <br />10. CONTROL JOINTS SHALL BE CONSTRUCTED IN CONCRETE MASONRY CONSTRUCTION AT A <br />MAXIMUM HORIZONTAL SPACING BETWEEN JOINTS OF 25'-0" AND NOT MORE THAN 12'-6" FROM <br />CORNERS. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS, CONSTRUCT INTERIOR <br />CONTROL JOINTS AT A MAXIMUM HORIZONTAL SPACING OF 32'-0" OR 16-0" FROM CORNERS. <br />NO JOINTS SHALL BE LOCATED WITHIN 2'-0" OF STEEL BEAM BEARINGS. HORIZONTAL WALL <br />REINFORCING SHALL BE STOPPED EACH SIDE OF CONTROL JOINTS. SEE ARCHITECTURAL <br />DRAWINGS FOR SEALANT REQUIREMENTS AT CONTROL JOINTS. <br />11. SUBMIT PROPOSED GROUT MIX DESIGNS FOR REVIEW PRIOR TO USE. MIX NUMBER OR <br />OTHER POSITIVE IDENTIFICATION SHALL UNIQUELY IDENTIFY MIX. <br />12. USE OF SUPERPLASTICIZER IS PROHIBITED. <br />13. CELLS TO BE GROUT FILLED SHALL HAVE VERTICAL ALIGNMENT SUFFICIENT TO MAINTAIN A <br />CLEAR, UNOBSTRUCTED, CONTINUOUS VERTICAL GROUT SPACE. <br />14. CLEANOUT OPENINGS SHALL BE PROVIDED AT THE BOTTOM OF CELLS TO BE GROUT FILLED IN <br />EACH POUR IN EXCESS OF 5 FEET IN HEIGHT. AFTER INSPECTION AND BEFORE GROUTING, <br />THE REBAR SHALL BE TIED AT THE CLEANOUTS AND THE CLEANOUTS SHALL BE SEALED. <br />15. ANY OVERHANGING MORTAR OR OTHER OBSTRUCTION OR DEBRIS SHALL BE REMOVED FROM <br />THE INSIDES OF SUCH CELL WALLS. <br />16. VERTICAL REINFORCEMENT SHALL BE HELD IN POSITION AT TOP AND BOTTOM AND AT <br />INTERVALS NOT EXCEEDING 192 BAR DIAMETERS. <br />17. CELLS CONTAINING REINFORCEMENT SHALL BE FILLED SOLIDLY WITH GROUT. SAMPLE AND <br />TEST GROUT PER ASTM C1019. <br />18. GROUT SHALL BE POURED IN LIFTS OF 4 FEET MAXIMUM HEIGHT. GROUT SHALL BE <br />CONSOLIDATED AT TIME OF PLACING BY VIBRATING AND RECONSOLIDATED LATER BY <br />VIBRATING BEFORE PLASTICITY IS LOST. <br />19. WHEN TOTAL GROUT POUR EXCEEDS 5'-4" FEET IN HEIGHT, (HIGH LIFT GROUTING), THE <br />GROUT SHALL BE PLACED IN 4-FOOT LIFTS WITH A MINIMUM OF A 30 MINUTE DELAY BETWEEN <br />LIFTS. MINIMUM CELL DIMENSION SHALL BE IN ACCORDANCE WITH TABLE 5 OF TMS 402 (3" X 3" <br />FOR COARSE GROUT, 12 FT. MAXIMUM POUR HEIGHT). <br />20. WHEN THE GROUTING IS STOPPED FOR ONE HOUR OR LONGER, HORIZONTAL CONSTRUCTION <br />JOINTS SHALL BE MADE BY STOPPING THE POUR OF GROUT NOT LESS THAN 1-1/2 INCH <br />BELOW THE TOP OF THE UPPERMOST UNIT GROUTED. <br />21. WHERE CONCRETE BEAMS ARE INSTALLED IN CONCRETE MASONRY WALL, SUPPORT <br />CONCRETE WITH 6" SIDE CONTINUOUS STRIPS OF 1/8 SQUARE MESH SOFFIT SCREENING OR <br />PUR-O-STOP OF EQUAL CENTERED OVER BLOCK WORK. USE OF ROOFING FELT STRIPS WILL <br />NOT BE PERMITTED. <br />22. REINFORCING SHALL BE ASTM A615 GRADE 60 DEFORMED BARS, FREE FROM OIL, SCALE AND <br />RUST AND PLACED IN ACCORDANCE WITH THE TYPICAL BENDING DIAGRAM AND PLACING <br />DETAILS OF ACI STANDARDS AND SPECIFICATIONS. <br />23. SECURE APPROVAL OF REINFORCING SHOP DRAWINGS PRIOR TO COMMENCING <br />FABRICATION. <br />24. PROVIDE STANDARD HOOKS AT ENDS OF ALL BARS WHICH TERMINATE IN TIE BEAMS OR BOND <br />BEAMS. <br />25. AT CHANGES IN DIRECTION OF BOND BEAMS, PROVIDE CORNER BARS OF SAME SIZE AND <br />SPACING AS HORIZONTAL STEEL. <br />1715 N. Westshore Blvd., Suite 600 <br />Tampa„ Florida 33607-3999 <br />904-256-2500 Fax 904-256-2503 <br />www.rsandh.com <br />FL Cert. Nos. AAC001886 * IB26000956 <br />5620 * LCC000210' GB238 <br />TLC <br />ENGINEERING <br />S O L U T 1 0 N S <br />255 S. Orange Avenue <br />Suite 1600 <br />Orlando, FL 32801 <br />P 407.841.9050 <br />www.tic-engineers.com <br />COA 15 <br />© Copyright 2019 TLC Engineering Solutions, Inc. <br />TLC Project No.: 119333 <br />PROJECT TITLE: <br />KITCHEN RENOVATION <br />ADVENT HEALTH ZEPHYRHILLS <br />PROJECT ADDRESS: <br />7050 Gall Blvd Zephyrhills, FI 33541 <br />James R. Mitchell, P.E. <br />State of Florida <br />Professional Engineer <br />License No. 66911 <br />This item has been electronically signed <br />and sealed by the individual named above, <br />sing a dated Digital Signature in the spat <br />A <br />elow, per F.A.C. Rule <br />V_ <br />1G15-23.004. Printed copies of this <br />C6 <br />ocument are not considered signed and <br />c <br />ealed, and the signature must be verified <br />o <br />n any electronic copies. <br />N <br />�..�� G ENS.'• ���'� <br />V <br />No.66911 = Digitally signed by James R Mitchell <br />DN: CN=JamesR Mitchell, <br />Z <br />= OU=A01427E00000169C9FDEC4500000D6G <br />' = 0--TLC Engineering Solutions, C=US <br />S' TE OF i ✓� <br />W <br />Date: 2020,0325 17:11:17-04'00' <br />OR i <br />ss� ..........��c, ,. <br />Q <br />� <br />Q <br />REVISIONS <br />NO. DESCRIPTION DATE <br />DATE ISSUED: 03/20/2020 <br />REVIEWED BY: JRM <br />DRAWN BY: BAS <br />DESIGNED BY: BMM, JFS <br />PROJECT NUMBER: <br />504-0226-000 <br />0 2019 RS&H, INC. <br />SHEET TITLE: <br />STRUCTURAL <br />GENERAL NOTES & <br />WIND PRESSURE <br />NOTES <br />SHEET ID: <br />S002 <br />PROJECT STATUS: <br />CONSTRUCTION <br />DOCUMENTS <br />Copyright 0 2018. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the <br />expressed written consent of this corporation is prohibited. All rights reserved. <br />2 <br />3 1 4 <br />5 <br />