1 I 2 I
<br />3 I
<br />4 I
<br />5
<br />C
<br />0
<br />A
<br />a
<br />rn
<br />0
<br />N
<br />0
<br />N
<br />O
<br />N
<br />N
<br />Ci
<br />-CEILING DIFFUSER, ROUND NECK
<br />(CEILING DIFFUSERS ARE 4-WAY THROW UNO)
<br />(0) -ROUND DIFFUSER
<br />-CEILING RETURN
<br />® -CEILING EXHAUST
<br />-CEILING DIFFUSER, RECTANGULAR OR
<br />SQUARE NECK (CEILING DIFFUSERS
<br />ARE 4-WAY THROW UNO)
<br />-SUPPLY REGISTER OR GRILLE
<br />(VERTICAL MOUNT, SIDEWALL)
<br />-RETURN/EXHAUST REGISTER OR GRILLE
<br />(VERTICAL MOUNT, SIDEWALL)
<br />Al -REVISION REFERENCE
<br />-DETAIL REFERENCE: TOP -DETAIL#,
<br />M-1 BOTTOM -DRAWING# SHOWN ON
<br />T-THERMOSTAT/TEMPERATURE SENSOR
<br />®-HUMIDISTAT/HUMIDITY SENSOR
<br />-DUCT SMOKE DETECTOR
<br />�♦ -CONNECT TO EXISTING
<br />Q--� -DEMOLISH TO POINT INDICATED
<br />M-- -MOTORIZED CONTROL DAMPER
<br />f�— -TEMPERATURE SENSOR
<br />©— -PRESSURE SENSOR
<br />-BACKDRAFT DAMPER
<br />0 -NEUTRAL RELATIVE PRESSURE
<br />0 -POSITIVE RELATIVE PRESSURE
<br />-NEGATIVE RELATIVE PRESSURE
<br />-SHEET NOTE CALLOUT
<br />-- -SHEET NOTE CALLOUT
<br />�► -SHEET NOTE CALLOUT
<br />-CEILING MOUNTED ACCESS DOOR
<br />-SQUARE THROAT ELBOW
<br />W/TURNING VANES
<br />-RADIUS ELBOW
<br />RECTANGULAR/ROUND BRANCH TAKE -OFF
<br />OR ROUND/ROUND BRANCH TAKE -OFF
<br />O -EXHAUST DUCT UP THROUGH SLAB W/
<br />FAN ON ROOF ABOVE
<br />O -EXHAUST FAN ON ROOF W/ DUCT DOWN
<br />THROUGH ROOF
<br />IPTION
<br />CWJ
<br />-CONDENSER WATER SUPPLY
<br />CWR
<br />-CONDENSER WATER RETURN
<br />CHWS
<br />-CHILLED WATER SUPPLY
<br />CHWR
<br />-CHILLED WATER RETURN
<br />CD
<br />-CONDENSATE
<br />CR
<br />-CONDENSATE RETURN
<br />PC
<br />-PUMPED CONDENSATE
<br />HWR
<br />-HOT WATER RETURN
<br />HWS
<br />-HOT WATER SUPPLY
<br />HPS
<br />-HIGH PRESSURE STEAM SUPPLY
<br />MPS
<br />-MEDIUM PRESSURE STEAM SUPPLY
<br />LPS
<br />-LOW PRESSURE STEAM SUPPLY
<br />HPR
<br />-HIGH PRESSURE STEAM RETURN
<br />MPR
<br />-MEDIUM PRESSURE STEAM RETURN
<br />LPR
<br />-LOW PRESSURE STEAM RETURN
<br />RL
<br />-REFRIGERANT LIQUID
<br />IRS
<br />-REFRIGERANT SUCTION
<br />-TEE, OUTLET DOWN
<br />-TEE, OUTLET UP
<br />D D
<br />—�
<br />-45° PIPE RISE (R) / DROP (D)
<br />PIPE ANCHORS
<br />-CONCENTRIC REDUCER
<br />>
<br />11
<br />-ECCENTRIC REDUCER
<br />HVAC SYMBOL LEGEND
<br />SYMBOL
<br />DESCRIPTION
<br />-FIRE DAMPER
<br />1
<br />(WITH ACCESS PANEL)
<br />-FIRE & SMOKE DAMPER
<br />(WITH ACCESS PANEL)
<br />-EXISTING FIRE DAMPER TO REMAIN
<br />-EXISTING FIRE & SMOKE DAMPER TO REMAIN
<br />SA 1
<br />-SOUND ATTENUATOR
<br />-MOTOR OPERATED CONTROL DAMPER (MOD)
<br />M
<br />F
<br />-AIR FLOW MEASURING STATION
<br />-MANUAL BALANCING DAMPER
<br />-DOOR GRILLE
<br />-UNDERCUT DOOR
<br />®
<br />-ACCESS DOORS, VERTICAL OR HORIZONTAL
<br />-STAINLESS STEEL DUCTWORK
<br />-FLEXIBLE CONNECTION
<br />12x8 e
<br />-FLAT OVAL DUCT
<br />24x12
<br />-NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN
<br />2412
<br />-EXISTING DUCTWORK TO REMAIN
<br />2412
<br />-EXISTING DUCTWORK TO BE REMOVED
<br />2412
<br />-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST
<br />DOWN UP W/IN FLOOR
<br />DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING
<br />-DUCT ELBOW, EXHAUST
<br />-DUCT ELBOW, NEGATIVE PRESSURE, RETURN
<br />-DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE
<br />B-RECTANGULAR
<br />DUCT SECTION UP, POSITIVE PRESSURE,
<br />SUPPLY OR OUTSIDE AIR
<br />-RECTANGULAR DUCT SECTION UP,
<br />NEGATIVE PRESSURE, RETURN
<br />-RECTANGULAR DUCT SECTION UP, EXHAUST
<br />O-ROUND
<br />DUCT SECTION UP
<br />O-FLAT
<br />OVAL DUCT SECTION UP
<br />HVAC PIPING SYMBOL LEGEND
<br />-FLOW DIRECTION
<br />-GATE VALVE
<br />-BALL VALVE
<br />-CALIBRATING BALANCING VALVE
<br />-BUTTERFLY VALVE
<br />-GAS COCK
<br />-UNION
<br />-STRAINER
<br />-CONTROL VALVE
<br />-SOLENOID VALVE
<br />-PSI REG.
<br />-CHECK VALVE
<br />-FLOW SWITCH
<br />-SLOPE DIRECTION (DOWN)
<br />-FLEX CONNECTION
<br />-O.S.&Y. GATE VALVE
<br />-STEAM TRAP
<br />-THREE-WAY CONTROL VALVE
<br />-THERMOMETER
<br />NOTE; SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
<br />HVAC ABBREVIATIONS
<br />SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
<br />-TERMINAL UNIT, VARIABLE/CONSTANT AIR
<br />VOLUME WITH ELECTRIC HEAT AFD -ADJUSTABLE FREQUENCY DRIVE LID -LINEAR DIFFUSER
<br />-TERMINAL UNIT, VARIABLE/CONSTANT AIR AFF -ABOVE FINISHED FLOOR MBH -THOUSAND BTUs PER HOUR
<br />VOLUME WITH ELECTRIC HEAT AFR -ABOVE FINISHED ROOF MCA -MINIMUM CIRCUIT AMPS
<br />AHU -AIR HANDLING UNIT MOCP -MAXIMUM OVER CURRENT PROTECTION
<br />AP -ACCESS PANEL MOD -MOTOR OPERATED CONTROL DAMPER (MOD)
<br />BOP -BOTTOM OF PIPE NC -NORMALLY CLOSED
<br />-TERMINAL UNIT, VARIABLEICONSTANTAlR -BRAKE HORSEPOWER
<br />VOLUME, FAN POWERED BHP NO -NORMALLY OPEN
<br />BTU-BRITISH THERMAL UNIT NTS -NOT TO SCALE
<br />h -CENTER LINE OA -OUTSIDE AIR
<br />TERMINAL UNIT, VARIABLE/CONSTANT AIR -CFM (CUBIC FEET PER MINUTE) OAL -OUTSIDE AIR LOUVER
<br />VOLUME, FAN POWERED, WITH ELECTRIC CD -CEILING DIFFUSER PRV -PRESSURE REDUCING VALVE
<br />HEAT
<br />CT -COOLING TOWER PRS -PRESSURE REDUCING STATION
<br />-ELECTRIC DUCT HEATER -CONSTANT AIR VOLUME
<br />(W/ PANEL CLEARANCE) CV PSI -POUNDS PER SQUARE INCH
<br />z�' -CHANGE IN PRESSURE PSIG -PSI GAUGE
<br />9 -CHANGE IN TEMPERATURE PTAC -PACKAGED TERMINAL AIR CONDITIONER
<br />CFM -CUBIC FEET PER MINUTE PVC -POLYVINYL CHLORIDE PIPE
<br />-HYDRONIC REHEAT COIL CU -CONDENSING UNIT RA -RETURN AIR
<br />DDC -DIRECT DIGITAL CONTROLS RHC -REHEAT COIL
<br />DN -DOWN RHP -ROOFTOP HEAT PUMP
<br />❑ -INLINE CENTRIFUGAL FAN EAT -ENTERING AIR TEMPERATURE RPM -REVOLUTIONS PER MINUTE
<br />ESP -EXTERNAL STATIC PRESSURE RS/L -REFRIGERANT SUCTION & LIQUID LINES
<br />0® -PACKAGED TERMINAL AIR CONDITIONER EWT -ENTERING WATER TEMPERATURE RTU -ROOFTOP AIR HANDLING UNIT
<br />(PTAC) FCU -FAN COIL UNIT SA -SUPPLY AIR
<br />UP DN FD -FIRE DAMPER SP -STATIC PRESSURE
<br />- - -CHANGE OF ELEVATION FF -FINAL FILTERS TSP -TOTAL STATIC PRESSURE
<br />FLA -FULL LOAD AMPS UNO -UNLESS NOTED OTHERWISE
<br />I I -FLEXIBLE DUCT FPM -FEET PER MINUTE V/PH -VOLTS/PHASE
<br />GPM -GALLONS PER MINUTE VAV -VARIABLE AIR VOLUME
<br />-TRANSITION, CONCENTRIC KW -KILOWATT VFD -VARIABLE FREQUENCY DRIVE
<br />LAT -LEAVING AIR TEMPERATURE
<br />-TRANSITION, ECCENTRIC LWT -LEAVING WATER TEMPERATURE
<br />10x8-8PS -TRANSITION, SQUARE TO ROUND
<br />-SQUARE THROAT TEE
<br />CODES & STANDARDS
<br />FLORIDA BUILDING CODE - MECHANICAL 2017 EDITION
<br />12x8 -RADIUS TEE FLORIDA BUILDING CODE - PLUMBING 2017 EDITION
<br />FLORIDA BUILDING CODE - CHAPTER 13 FLORIDA ENERGY EFFICIENCY 2017 EDITION
<br />ASHRAE 90.1-2017
<br />NFPA-1, UNIFORM FIRE CODE, 2015 EDITION
<br />NFPA-17A, STANDARD FOR WET CHEMICAL EXTINGUISHING SYSTEMS
<br />-RECTANGLE-TO-ROUND TAKE -OFF NFPA-13, STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS, 2013 EDITION
<br />NFPA-25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FP SYSTEMS, 2014
<br />EDISITON
<br />NFPA-70, NATIONAL ELECTRICAL CODE, 2014 EDITION
<br />-STANDARD BRANCH TAKE -OFF NFPA-72, NATIONAL FIRE ALARM CODE, 2013 EDITION
<br />NFPA-90A, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS, 2015 EDITION
<br />NFPA-90B, STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR CONDITIONING SYSTEMS, 2015
<br />-SPIN-IN TAKE -OFF EDITION
<br />NFPA-99, STANDARD FOR HEALTH CARE FACILITIES, 2015 EDITION
<br />NFPA-101, FLORIDA SPECIFIC EDITION LIFE SAFETY CODE, 2015 EDITION
<br />RULE CHAPTER 69A-60 FAC, FLORIDA FIRE PREVENTION CODE, 2017 EDITION
<br />SMACNA, HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE DUCT
<br />HVAC EQUIPMENT TAGS
<br />SYMBOL DESCRIPTION
<br />TAG
<br />EQUIP. �� - P-TRAP A 200 -AIR DISTRIBUTION DEVICE
<br />CFM
<br />-TWO-WAY CHECK VALVE
<br />MV AHU NUMBER
<br />-MANUAL VENT
<br />AHU-1 -AIR HANDLING UNIT
<br />-PRESSURE GAUGE
<br />-RELIEF VALVE AHU NUMBER
<br />i—COILNUMBER
<br />rir
<br />FLOW METER RHC-1-1 REHEAT COIL
<br />-WATER METER
<br />-INLINE PUMP VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS
<br />TERMINAL UNIT TYPE AHU NUMBER
<br />c -INLINE PUMP VTU - VARIABLE TERMINAL UNIT
<br />CTU - CONSTANT TERMINAL UNIT TERMINAL NUMBER
<br />-VALVE ON RISER PTU - PARALLEL TERMINAL UNIT
<br />-CAP STU - SERIES TERMINAL UNIT VTU 1 1
<br />7 -CONNECTION, BOTTOM
<br />-CONNECTION, TOP
<br />-COUPLING
<br />-ELBOW, 900
<br />-ELBOW, 450
<br />c -ELBOW, TURNED DOWN
<br />c- -ELBOW, TURNED UP
<br />HVAC GENERAL NOTES
<br />1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED
<br />DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED
<br />FOR EQUIPMENT FURNISHED.
<br />2. DIMENSIONS SHALL BE FIELD -VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR
<br />FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS
<br />SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO
<br />OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS
<br />INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE
<br />BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND
<br />ELECTRICAL CONDUIT.
<br />3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE
<br />SMACNA HVAC DUCT CONSTRUCTION STANDARD.
<br />4. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK.
<br />5. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.
<br />6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT
<br />FURNISHED.
<br />7. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL
<br />REFLECTED CEILING PLANS AND EQUIPMENT OF ALL TRADES.
<br />8. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 56"
<br />ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER
<br />EQUIPMENT, FURNITURE, AND DOOR SWINGS.
<br />9. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE
<br />ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION -FREE, RIGID INSTALLATION.
<br />10. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
<br />11. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE
<br />PAINTED FLAT BLACK.
<br />12. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
<br />13. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR
<br />PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED.
<br />14. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR
<br />OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
<br />15. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING
<br />VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL
<br />TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.
<br />16. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR -MOUNTED EQUIPMENT. REFER TO
<br />SPECIFICATIONS FOR DETAILED REQUIREMENTS.
<br />17. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS
<br />AND OTHER AIR DISTRIBUTION DEVICES.
<br />18, PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN, AIR
<br />HANDLING UNITS, AND FAN COIL UNITS.
<br />19. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE
<br />CONNECTED.
<br />20. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN NORMAL
<br />OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO SERVICES SHALL
<br />NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND
<br />PROPER COORDINATION WITH OTHER TRADES. PRE -WORK SHALL BE PERFORMED TO MAKE THE
<br />SHUTDOWN PERIOD AS BRIEF AS POSSIBLE.
<br />21. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR
<br />DISPOSED OF LEGALLY, AS DIRECTED BY OWNER.
<br />22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL
<br />FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.
<br />23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 26 CLEAR FROM ALL PLUMBING VENTS AND
<br />EXHAUST AIR DISCHARGE LOCATIONS.
<br />24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.
<br />25. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED 5 PSI,
<br />26. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED
<br />FULL SIZE TO THE NEAREST PLUMBING DRAIN.
<br />27. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR
<br />VENTS AT ALL HIGH POINTS IN CHILLED WATER AND HOT WATER PIPING.
<br />28. PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL
<br />SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT
<br />BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF
<br />THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING
<br />WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH NEC-110.26.
<br />MECHANICAL DRAWING INDEX
<br />SHEET
<br />DESCRIPTION
<br />ISSUED
<br />M001
<br />GENERAL INFORMATION - HVAC
<br />Yes
<br />MD101
<br />LEVEL 1 DEMOLITION PLAN - PHASE 1 - DUCTWORK
<br />Yes
<br />MD102
<br />LEVEL 1 DEMOLITION PLAN - PHASE 2 - DUCTWORK
<br />Yes
<br />M101
<br />LEVEL 1 RENOVATION PLAN - PHASE 1 - DUCTWORK
<br />Yes
<br />M102
<br />LEVEL 1 RENOVATION PLAN - PHASE 2 - DUCTWORK
<br />Yes
<br />M201
<br />LEVEL 1 RENOVATION PLAN - PHASE 1 & 2 - PIPING
<br />Yes
<br />M221
<br />MECHANICAL ROOF PLAN
<br />Yes
<br />M301
<br />MECHANICAL SCHEDULE
<br />Yes
<br />M401
<br />MECHANICAL DETAILS
<br />Yes
<br />M402
<br />MECHANICAL DETAILS
<br />Yes
<br />M501
<br />I MECHANICAL CONTROLS
<br />Yes
<br />DUCT PRESSURE CLASS &LEAK
<br />TESTING REQUIREMENTS
<br />STATIC -PRESSURE CLASSES:
<br />A. SUPPLE DUCTS (UPSTREAM FROM AIR TERMINAL UNITS): 4 INCH WG.
<br />B. SUPPLY DUCTS (DOWNSTREAM FROM AIR TERMINAL UNITS): 1 INCH WG.
<br />C. RETURN DUCTS (NEGATIVE PRESSURE): 3 INCH WG.
<br />D. EXHAUST DUCTS (NEGATIVE PRESSURE): 21NCH WG.
<br />LEAKAGE CLASS: DUCT LEAKAGE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH SMACNA HVAC AIR
<br />DUCT LEAKAGE TEST MANUAL AND IN ACCORDANCE WITH THE APPLICABLE ENERGY CODE. IN ADDITION TO
<br />REQUIREMENTS FROM THE ENERGY CODE,100% OF DUCTWORK MAINS SERVING CRITICAL SPACES INCLUDING
<br />PHARMACIES AND OPERATING ROOMS SHALL BE TESTED. SUBMIT TESTING DATA TO ENGINEER FOR
<br />REVIEW/APPROVAL.
<br />A. ROUND SUPPLY AIR DUCT: 3CFM/100 SQ. FT. AT 4 INCH WG.
<br />B. FLAT -OVAL SUPPLY AIR DUCT: 3 CFM/100 SQ. FT. AT 4 INCH WG.
<br />C. RECTANGULAR SUPPLY AIR DUCT: 6 CFM/100 SQ. FT. AT 3 INCH WG.
<br />D. FLEXABLE SUPPLY AIR DUCT: 6 CFM/100 SQ. FT. AT 1 INCH WG.
<br />1715 N. Westshore Blvd., Suite 600
<br />Tampa„ Florida 33607-3999
<br />904-256-2500 Fax 904-256-2503
<br />www.rsandh.com
<br />FL Cert. Nos. AAC001886 * IB26000956
<br />5620 * LCC000210 * GB238
<br />TLC
<br />ENGI_NEERI_N_G
<br />S O L U T I G N S®
<br />255 S. Orange Avenue
<br />Suite 1600
<br />Orlando, FL 32801
<br />P 407.841.9050
<br />www.tic-engineers.com
<br />COA 15
<br />0 Copyright 2019 TLC Engineering Solutions, Inc.
<br />TLC Project No.: 119333
<br />THINK. LISTEN. CREATE.
<br />PROJECT TITLE:
<br />KITCHEN RENOVATION
<br />ADVENTHEALTH ZEPHYRHILLS
<br />PROJECT ADDRESS:
<br />7050 Gall Blvd. Zephyrhills, FL 33541
<br />Aaron Lee Johnson, P.E.
<br />Florida License #71576
<br />4:1 Q`� •' G•E.N 8 *-. tR
<br />� No 71576
<br />r
<br />A
<br />D�• QTA.Qjgjoly 91 �Q
<br />Trol dowment has Olen etectroncOy
<br />swed and sea w by The M&Vk ual
<br />v
<br />nameda dated Diptai Y .`
<br />uwV .
<br />Sor=re vnnted oopes of tM .
<br />`G0.03.25
<br />C)♦
<br />O
<br />docunent are not conadered s9ned % r�la x! "s�7
<br />w+d somi. and me epnahxo must betJt�kC
<br />wnt,od on any eactrorK ccoes
<br />:54-04'00'
<br />r
<br />N
<br />w
<br />G
<br />O
<br />t�
<br />F—
<br />Z
<br />w
<br />J
<br />U
<br />zU
<br />REVISIONS
<br />NO, DESCRIPTION DATE
<br />DATE ISSUED: 03/20/2020
<br />REVIEWED BY: ALJ
<br />DRAWN BY: LLP
<br />DESIGNED BY: LLP
<br />PROJECT NUMBER:
<br />504- 0226- 000
<br />0 2019 RS&H, INC.
<br />SHEET TITLE:
<br />GENERAL
<br />INFORMATION - HVAC
<br />SHEET ID:
<br />M001
<br />PROJECT STATUS:
<br />CONSTRUCTION
<br />DOCUMENTS
<br />Copyright 0 2018. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the
<br />expressed written consent of this corporation is prohibited. All rights reserved.
<br />I'%
<br />u
<br />4
<br />5
<br />
|