Laserfiche WebLink
1 I 2 I <br />3 I <br />4 I <br />5 <br />C <br />0 <br />A <br />a <br />rn <br />0 <br />N <br />0 <br />N <br />O <br />N <br />N <br />Ci <br />-CEILING DIFFUSER, ROUND NECK <br />(CEILING DIFFUSERS ARE 4-WAY THROW UNO) <br />(0) -ROUND DIFFUSER <br />-CEILING RETURN <br />® -CEILING EXHAUST <br />-CEILING DIFFUSER, RECTANGULAR OR <br />SQUARE NECK (CEILING DIFFUSERS <br />ARE 4-WAY THROW UNO) <br />-SUPPLY REGISTER OR GRILLE <br />(VERTICAL MOUNT, SIDEWALL) <br />-RETURN/EXHAUST REGISTER OR GRILLE <br />(VERTICAL MOUNT, SIDEWALL) <br />Al -REVISION REFERENCE <br />-DETAIL REFERENCE: TOP -DETAIL#, <br />M-1 BOTTOM -DRAWING# SHOWN ON <br />T-THERMOSTAT/TEMPERATURE SENSOR <br />®-HUMIDISTAT/HUMIDITY SENSOR <br />-DUCT SMOKE DETECTOR <br />�♦ -CONNECT TO EXISTING <br />Q--� -DEMOLISH TO POINT INDICATED <br />M-- -MOTORIZED CONTROL DAMPER <br />f�— -TEMPERATURE SENSOR <br />©— -PRESSURE SENSOR <br />-BACKDRAFT DAMPER <br />0 -NEUTRAL RELATIVE PRESSURE <br />0 -POSITIVE RELATIVE PRESSURE <br />-NEGATIVE RELATIVE PRESSURE <br />-SHEET NOTE CALLOUT <br />-- -SHEET NOTE CALLOUT <br />�► -SHEET NOTE CALLOUT <br />-CEILING MOUNTED ACCESS DOOR <br />-SQUARE THROAT ELBOW <br />W/TURNING VANES <br />-RADIUS ELBOW <br />RECTANGULAR/ROUND BRANCH TAKE -OFF <br />OR ROUND/ROUND BRANCH TAKE -OFF <br />O -EXHAUST DUCT UP THROUGH SLAB W/ <br />FAN ON ROOF ABOVE <br />O -EXHAUST FAN ON ROOF W/ DUCT DOWN <br />THROUGH ROOF <br />IPTION <br />CWJ <br />-CONDENSER WATER SUPPLY <br />CWR <br />-CONDENSER WATER RETURN <br />CHWS <br />-CHILLED WATER SUPPLY <br />CHWR <br />-CHILLED WATER RETURN <br />CD <br />-CONDENSATE <br />CR <br />-CONDENSATE RETURN <br />PC <br />-PUMPED CONDENSATE <br />HWR <br />-HOT WATER RETURN <br />HWS <br />-HOT WATER SUPPLY <br />HPS <br />-HIGH PRESSURE STEAM SUPPLY <br />MPS <br />-MEDIUM PRESSURE STEAM SUPPLY <br />LPS <br />-LOW PRESSURE STEAM SUPPLY <br />HPR <br />-HIGH PRESSURE STEAM RETURN <br />MPR <br />-MEDIUM PRESSURE STEAM RETURN <br />LPR <br />-LOW PRESSURE STEAM RETURN <br />RL <br />-REFRIGERANT LIQUID <br />IRS <br />-REFRIGERANT SUCTION <br />-TEE, OUTLET DOWN <br />-TEE, OUTLET UP <br />D D <br />—� <br />-45° PIPE RISE (R) / DROP (D) <br />PIPE ANCHORS <br />-CONCENTRIC REDUCER <br />> <br />11 <br />-ECCENTRIC REDUCER <br />HVAC SYMBOL LEGEND <br />SYMBOL <br />DESCRIPTION <br />-FIRE DAMPER <br />1 <br />(WITH ACCESS PANEL) <br />-FIRE & SMOKE DAMPER <br />(WITH ACCESS PANEL) <br />-EXISTING FIRE DAMPER TO REMAIN <br />-EXISTING FIRE & SMOKE DAMPER TO REMAIN <br />SA 1 <br />-SOUND ATTENUATOR <br />-MOTOR OPERATED CONTROL DAMPER (MOD) <br />M <br />F <br />-AIR FLOW MEASURING STATION <br />-MANUAL BALANCING DAMPER <br />-DOOR GRILLE <br />-UNDERCUT DOOR <br />® <br />-ACCESS DOORS, VERTICAL OR HORIZONTAL <br />-STAINLESS STEEL DUCTWORK <br />-FLEXIBLE CONNECTION <br />12x8 e <br />-FLAT OVAL DUCT <br />24x12 <br />-NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN <br />2412 <br />-EXISTING DUCTWORK TO REMAIN <br />2412 <br />-EXISTING DUCTWORK TO BE REMOVED <br />2412 <br />-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST <br />DOWN UP W/IN FLOOR <br />DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING <br />-DUCT ELBOW, EXHAUST <br />-DUCT ELBOW, NEGATIVE PRESSURE, RETURN <br />-DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE <br />B-RECTANGULAR <br />DUCT SECTION UP, POSITIVE PRESSURE, <br />SUPPLY OR OUTSIDE AIR <br />-RECTANGULAR DUCT SECTION UP, <br />NEGATIVE PRESSURE, RETURN <br />-RECTANGULAR DUCT SECTION UP, EXHAUST <br />O-ROUND <br />DUCT SECTION UP <br />O-FLAT <br />OVAL DUCT SECTION UP <br />HVAC PIPING SYMBOL LEGEND <br />-FLOW DIRECTION <br />-GATE VALVE <br />-BALL VALVE <br />-CALIBRATING BALANCING VALVE <br />-BUTTERFLY VALVE <br />-GAS COCK <br />-UNION <br />-STRAINER <br />-CONTROL VALVE <br />-SOLENOID VALVE <br />-PSI REG. <br />-CHECK VALVE <br />-FLOW SWITCH <br />-SLOPE DIRECTION (DOWN) <br />-FLEX CONNECTION <br />-O.S.&Y. GATE VALVE <br />-STEAM TRAP <br />-THREE-WAY CONTROL VALVE <br />-THERMOMETER <br />NOTE; SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT <br />HVAC ABBREVIATIONS <br />SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION <br />-TERMINAL UNIT, VARIABLE/CONSTANT AIR <br />VOLUME WITH ELECTRIC HEAT AFD -ADJUSTABLE FREQUENCY DRIVE LID -LINEAR DIFFUSER <br />-TERMINAL UNIT, VARIABLE/CONSTANT AIR AFF -ABOVE FINISHED FLOOR MBH -THOUSAND BTUs PER HOUR <br />VOLUME WITH ELECTRIC HEAT AFR -ABOVE FINISHED ROOF MCA -MINIMUM CIRCUIT AMPS <br />AHU -AIR HANDLING UNIT MOCP -MAXIMUM OVER CURRENT PROTECTION <br />AP -ACCESS PANEL MOD -MOTOR OPERATED CONTROL DAMPER (MOD) <br />BOP -BOTTOM OF PIPE NC -NORMALLY CLOSED <br />-TERMINAL UNIT, VARIABLEICONSTANTAlR -BRAKE HORSEPOWER <br />VOLUME, FAN POWERED BHP NO -NORMALLY OPEN <br />BTU-BRITISH THERMAL UNIT NTS -NOT TO SCALE <br />h -CENTER LINE OA -OUTSIDE AIR <br />TERMINAL UNIT, VARIABLE/CONSTANT AIR -CFM (CUBIC FEET PER MINUTE) OAL -OUTSIDE AIR LOUVER <br />VOLUME, FAN POWERED, WITH ELECTRIC CD -CEILING DIFFUSER PRV -PRESSURE REDUCING VALVE <br />HEAT <br />CT -COOLING TOWER PRS -PRESSURE REDUCING STATION <br />-ELECTRIC DUCT HEATER -CONSTANT AIR VOLUME <br />(W/ PANEL CLEARANCE) CV PSI -POUNDS PER SQUARE INCH <br />z�' -CHANGE IN PRESSURE PSIG -PSI GAUGE <br />9 -CHANGE IN TEMPERATURE PTAC -PACKAGED TERMINAL AIR CONDITIONER <br />CFM -CUBIC FEET PER MINUTE PVC -POLYVINYL CHLORIDE PIPE <br />-HYDRONIC REHEAT COIL CU -CONDENSING UNIT RA -RETURN AIR <br />DDC -DIRECT DIGITAL CONTROLS RHC -REHEAT COIL <br />DN -DOWN RHP -ROOFTOP HEAT PUMP <br />❑ -INLINE CENTRIFUGAL FAN EAT -ENTERING AIR TEMPERATURE RPM -REVOLUTIONS PER MINUTE <br />ESP -EXTERNAL STATIC PRESSURE RS/L -REFRIGERANT SUCTION & LIQUID LINES <br />0® -PACKAGED TERMINAL AIR CONDITIONER EWT -ENTERING WATER TEMPERATURE RTU -ROOFTOP AIR HANDLING UNIT <br />(PTAC) FCU -FAN COIL UNIT SA -SUPPLY AIR <br />UP DN FD -FIRE DAMPER SP -STATIC PRESSURE <br />- - -CHANGE OF ELEVATION FF -FINAL FILTERS TSP -TOTAL STATIC PRESSURE <br />FLA -FULL LOAD AMPS UNO -UNLESS NOTED OTHERWISE <br />I I -FLEXIBLE DUCT FPM -FEET PER MINUTE V/PH -VOLTS/PHASE <br />GPM -GALLONS PER MINUTE VAV -VARIABLE AIR VOLUME <br />-TRANSITION, CONCENTRIC KW -KILOWATT VFD -VARIABLE FREQUENCY DRIVE <br />LAT -LEAVING AIR TEMPERATURE <br />-TRANSITION, ECCENTRIC LWT -LEAVING WATER TEMPERATURE <br />10x8-8PS -TRANSITION, SQUARE TO ROUND <br />-SQUARE THROAT TEE <br />CODES & STANDARDS <br />FLORIDA BUILDING CODE - MECHANICAL 2017 EDITION <br />12x8 -RADIUS TEE FLORIDA BUILDING CODE - PLUMBING 2017 EDITION <br />FLORIDA BUILDING CODE - CHAPTER 13 FLORIDA ENERGY EFFICIENCY 2017 EDITION <br />ASHRAE 90.1-2017 <br />NFPA-1, UNIFORM FIRE CODE, 2015 EDITION <br />NFPA-17A, STANDARD FOR WET CHEMICAL EXTINGUISHING SYSTEMS <br />-RECTANGLE-TO-ROUND TAKE -OFF NFPA-13, STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS, 2013 EDITION <br />NFPA-25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER -BASED FP SYSTEMS, 2014 <br />EDISITON <br />NFPA-70, NATIONAL ELECTRICAL CODE, 2014 EDITION <br />-STANDARD BRANCH TAKE -OFF NFPA-72, NATIONAL FIRE ALARM CODE, 2013 EDITION <br />NFPA-90A, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS, 2015 EDITION <br />NFPA-90B, STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR CONDITIONING SYSTEMS, 2015 <br />-SPIN-IN TAKE -OFF EDITION <br />NFPA-99, STANDARD FOR HEALTH CARE FACILITIES, 2015 EDITION <br />NFPA-101, FLORIDA SPECIFIC EDITION LIFE SAFETY CODE, 2015 EDITION <br />RULE CHAPTER 69A-60 FAC, FLORIDA FIRE PREVENTION CODE, 2017 EDITION <br />SMACNA, HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE DUCT <br />HVAC EQUIPMENT TAGS <br />SYMBOL DESCRIPTION <br />TAG <br />EQUIP. �� - P-TRAP A 200 -AIR DISTRIBUTION DEVICE <br />CFM <br />-TWO-WAY CHECK VALVE <br />MV AHU NUMBER <br />-MANUAL VENT <br />AHU-1 -AIR HANDLING UNIT <br />-PRESSURE GAUGE <br />-RELIEF VALVE AHU NUMBER <br />i—COILNUMBER <br />rir <br />FLOW METER RHC-1-1 REHEAT COIL <br />-WATER METER <br />-INLINE PUMP VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS <br />TERMINAL UNIT TYPE AHU NUMBER <br />c -INLINE PUMP VTU - VARIABLE TERMINAL UNIT <br />CTU - CONSTANT TERMINAL UNIT TERMINAL NUMBER <br />-VALVE ON RISER PTU - PARALLEL TERMINAL UNIT <br />-CAP STU - SERIES TERMINAL UNIT VTU 1 1 <br />7 -CONNECTION, BOTTOM <br />-CONNECTION, TOP <br />-COUPLING <br />-ELBOW, 900 <br />-ELBOW, 450 <br />c -ELBOW, TURNED DOWN <br />c- -ELBOW, TURNED UP <br />HVAC GENERAL NOTES <br />1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED <br />DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED <br />FOR EQUIPMENT FURNISHED. <br />2. DIMENSIONS SHALL BE FIELD -VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR <br />FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS <br />SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO <br />OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS <br />INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE <br />BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND <br />ELECTRICAL CONDUIT. <br />3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE <br />SMACNA HVAC DUCT CONSTRUCTION STANDARD. <br />4. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK. <br />5. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS. <br />6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT <br />FURNISHED. <br />7. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL <br />REFLECTED CEILING PLANS AND EQUIPMENT OF ALL TRADES. <br />8. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 56" <br />ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER <br />EQUIPMENT, FURNITURE, AND DOOR SWINGS. <br />9. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE <br />ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION -FREE, RIGID INSTALLATION. <br />10. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. <br />11. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE <br />PAINTED FLAT BLACK. <br />12. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT. <br />13. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR <br />PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED. <br />14. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR <br />OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT. <br />15. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING <br />VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL <br />TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT. <br />16. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR -MOUNTED EQUIPMENT. REFER TO <br />SPECIFICATIONS FOR DETAILED REQUIREMENTS. <br />17. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS <br />AND OTHER AIR DISTRIBUTION DEVICES. <br />18, PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN, AIR <br />HANDLING UNITS, AND FAN COIL UNITS. <br />19. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE <br />CONNECTED. <br />20. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN NORMAL <br />OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO SERVICES SHALL <br />NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND <br />PROPER COORDINATION WITH OTHER TRADES. PRE -WORK SHALL BE PERFORMED TO MAKE THE <br />SHUTDOWN PERIOD AS BRIEF AS POSSIBLE. <br />21. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR <br />DISPOSED OF LEGALLY, AS DIRECTED BY OWNER. <br />22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL <br />FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS. <br />23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 26 CLEAR FROM ALL PLUMBING VENTS AND <br />EXHAUST AIR DISCHARGE LOCATIONS. <br />24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK. <br />25. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED 5 PSI, <br />26. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED <br />FULL SIZE TO THE NEAREST PLUMBING DRAIN. <br />27. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR <br />VENTS AT ALL HIGH POINTS IN CHILLED WATER AND HOT WATER PIPING. <br />28. PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL <br />SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT <br />BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF <br />THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING <br />WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH NEC-110.26. <br />MECHANICAL DRAWING INDEX <br />SHEET <br />DESCRIPTION <br />ISSUED <br />M001 <br />GENERAL INFORMATION - HVAC <br />Yes <br />MD101 <br />LEVEL 1 DEMOLITION PLAN - PHASE 1 - DUCTWORK <br />Yes <br />MD102 <br />LEVEL 1 DEMOLITION PLAN - PHASE 2 - DUCTWORK <br />Yes <br />M101 <br />LEVEL 1 RENOVATION PLAN - PHASE 1 - DUCTWORK <br />Yes <br />M102 <br />LEVEL 1 RENOVATION PLAN - PHASE 2 - DUCTWORK <br />Yes <br />M201 <br />LEVEL 1 RENOVATION PLAN - PHASE 1 & 2 - PIPING <br />Yes <br />M221 <br />MECHANICAL ROOF PLAN <br />Yes <br />M301 <br />MECHANICAL SCHEDULE <br />Yes <br />M401 <br />MECHANICAL DETAILS <br />Yes <br />M402 <br />MECHANICAL DETAILS <br />Yes <br />M501 <br />I MECHANICAL CONTROLS <br />Yes <br />DUCT PRESSURE CLASS &LEAK <br />TESTING REQUIREMENTS <br />STATIC -PRESSURE CLASSES: <br />A. SUPPLE DUCTS (UPSTREAM FROM AIR TERMINAL UNITS): 4 INCH WG. <br />B. SUPPLY DUCTS (DOWNSTREAM FROM AIR TERMINAL UNITS): 1 INCH WG. <br />C. RETURN DUCTS (NEGATIVE PRESSURE): 3 INCH WG. <br />D. EXHAUST DUCTS (NEGATIVE PRESSURE): 21NCH WG. <br />LEAKAGE CLASS: DUCT LEAKAGE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH SMACNA HVAC AIR <br />DUCT LEAKAGE TEST MANUAL AND IN ACCORDANCE WITH THE APPLICABLE ENERGY CODE. IN ADDITION TO <br />REQUIREMENTS FROM THE ENERGY CODE,100% OF DUCTWORK MAINS SERVING CRITICAL SPACES INCLUDING <br />PHARMACIES AND OPERATING ROOMS SHALL BE TESTED. SUBMIT TESTING DATA TO ENGINEER FOR <br />REVIEW/APPROVAL. <br />A. ROUND SUPPLY AIR DUCT: 3CFM/100 SQ. FT. AT 4 INCH WG. <br />B. FLAT -OVAL SUPPLY AIR DUCT: 3 CFM/100 SQ. FT. AT 4 INCH WG. <br />C. RECTANGULAR SUPPLY AIR DUCT: 6 CFM/100 SQ. FT. AT 3 INCH WG. <br />D. FLEXABLE SUPPLY AIR DUCT: 6 CFM/100 SQ. FT. AT 1 INCH WG. <br />1715 N. Westshore Blvd., Suite 600 <br />Tampa„ Florida 33607-3999 <br />904-256-2500 Fax 904-256-2503 <br />www.rsandh.com <br />FL Cert. Nos. AAC001886 * IB26000956 <br />5620 * LCC000210 * GB238 <br />TLC <br />ENGI_NEERI_N_G <br />S O L U T I G N S® <br />255 S. Orange Avenue <br />Suite 1600 <br />Orlando, FL 32801 <br />P 407.841.9050 <br />www.tic-engineers.com <br />COA 15 <br />0 Copyright 2019 TLC Engineering Solutions, Inc. <br />TLC Project No.: 119333 <br />THINK. LISTEN. CREATE. <br />PROJECT TITLE: <br />KITCHEN RENOVATION <br />ADVENTHEALTH ZEPHYRHILLS <br />PROJECT ADDRESS: <br />7050 Gall Blvd. Zephyrhills, FL 33541 <br />Aaron Lee Johnson, P.E. <br />Florida License #71576 <br />4:1 Q`� •' G•E.N 8 *-. tR <br />� No 71576 <br />r <br />A <br />D�• QTA.Qjgjoly 91 �Q <br />Trol dowment has Olen etectroncOy <br />swed and sea w by The M&Vk ual <br />v <br />nameda dated Diptai Y .` <br />uwV . <br />Sor=re vnnted oopes of tM . <br />`G0.03.25 <br />C)♦ <br />O <br />docunent are not conadered s9ned % r�la x! "s�7 <br />w+d somi. and me epnahxo must betJt�kC <br />wnt,od on any eactrorK ccoes <br />:54-04'00' <br />r <br />N <br />w <br />G <br />O <br />t� <br />F— <br />Z <br />w <br />J <br />U <br />zU <br />REVISIONS <br />NO, DESCRIPTION DATE <br />DATE ISSUED: 03/20/2020 <br />REVIEWED BY: ALJ <br />DRAWN BY: LLP <br />DESIGNED BY: LLP <br />PROJECT NUMBER: <br />504- 0226- 000 <br />0 2019 RS&H, INC. <br />SHEET TITLE: <br />GENERAL <br />INFORMATION - HVAC <br />SHEET ID: <br />M001 <br />PROJECT STATUS: <br />CONSTRUCTION <br />DOCUMENTS <br />Copyright 0 2018. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the <br />expressed written consent of this corporation is prohibited. All rights reserved. <br />I'% <br />u <br />4 <br />5 <br />