Laserfiche WebLink
1 <br />2 <br />3 <br />4 <br />5 <br />0 <br />C <br />0 <br />A <br />0 <br />0 <br />O <br />N <br />O <br />N <br />Lo <br />N <br />III <br />r x II - <br />raw <br />— <br />REMOVE TEMPORARY UNIT AND I I x t 1 1 h <br />DUCTWORK UP TO POINT INDICATED 1 <br />OR I I(D) AHU-31 <br />- <br />I- <br />�i I I I I/ I <br />/♦ I I I I/ I II I/ \\I I I -- - I---- <br />- �L-------J i c_J II 1 �__ D <br />i L. AHU-3A P 2 <br />— <br />i? 4 3 1 y <br />—, y- <br />- 6 <br />L` -�-- 1,,11 I F-----+-------- 1 <br />I----------- <br />I i rF ----i -----iJ--- --- x I y--- -- � 1 <br />- I I I 1-----�---- T�=�- 1 <br />1 I I 1 <br />L=45s1 Lsss1 i i 1•issl hsa•i <br />r 1 I <br />I <br />I I <br />1 ! I I 8 <br />T-- <br />11N' Tr-f <br />I`y 11 ��� �I II BL J ' <br />ly <br />�� <br />I I i Y <br />From I F-iT Ei <br />�---) I I <br />I_ r--1 4 3 <br />-11 <br />�D+g <br />l' � I I Y —► I I I I - <br />I <br />T T <br />�i <br />i <br />4 L <br />x. R{ <br />LEVEL 1 DEMOLITION - PHASE 2 - DUCTWORK <br />1 �FE <br />� I I /♦ I _-i �i�l I I <br />I--4 I I I I <br />----� <br />IiC 11 IE �i------' -------------- I <br />0� <br />1 <br />_l <br />1 <br />—- <br />L! <br />T <br />- <br />, <br />1 <br />, <br />� <br />�` {= <br />- <br />I F <br />-----i <br />Fl <br />i <br />1 <br />SEEN A IL <br />- �IiI ti <br />V <br />go <br />ID <br />I01' <br />GENERAL HVAC DEMOLITION NOTES: <br />1. THE DEMOLITION PLAN IS INTENDED TO PROVIDE THE CONTRACTOR WITH A <br />GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS WITHIN THE PROJECT AREA, <br />EXISTING EQUIPMENT, STRUCTURE, DUCTWORK, ETC., LOCATED ON DRAWING <br />WERE DERIVED FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. <br />THIS DRAWING MAY NOT BE ALL INCLUSIVE OF SERVICES THAT EXIST IN THE <br />PROJECT AREA. CONTRACTOR SHALL VERIFY SERVICES AND LOCATIONS PRIOR TO <br />ANY DEMOLITION WORK. ANY DEVIATIONS IMPACTING WORK SHOWN ON THESE <br />DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT AND ENGINEER PRIOR TO <br />BEGINNING DEMOLITION. BEGINNING OF DEMOLITION SHALL SIGNIFY <br />CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS, THE CONTRACTOR IS <br />RESPONSIBLE FOR ALL REQUIRED DEMOLITION WHETHER SHOWN ON THE PLANS <br />OR NOT. <br />2. CONTRACTOR SHALL PERFORM A PRE -BID SURVEY TO FIELD -VERIFY AND <br />COORDINATE ALL DIMENSIONS PRIOR TO PROCUREMENT OR FABRICATION. FIELD <br />CONDITIONS SHALL GOVERN. COORDINATE THE WORK WITH OTHER TRADES <br />INVOLVED. COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE <br />BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, <br />PLUMBING.. AND ELECTRICAL CONDUIT. COST OF REROUTING DUCTWORK OR <br />PIPING DUE TO CONFLICTS WITH EXISTING CONDITIONS SHALL BE PAID BY <br />CONTRACTOR. <br />3. ALL MECHANICAL SYSTEMS SERVING OTHER SPACES OR FLOORS THAT RUN <br />THROUGH THE PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION SO <br />AS NOT TO CAUSE ANY DISRUPTION TO THESE OTHER SPACES DURING THE <br />DEMOLITION OF THE EXISTING DUCTWORK. <br />4. TEMPORARY MECHANICAL SERVICES SHALL BE PROVIDED WHEN NEW WORK <br />AFFECTS SERVICES NEEDING TO REMAIN ACTIVE. COORDINATE SERVICE <br />INTERRUPTIONS WITH OWNER AT LEAST TWO WEEKS IN ADVANCE. <br />5. ALL EQUIPMENT REMOVED UNDER THIS PROJECT SHALL BE DOUBLE -BAGGED AND <br />DISPOSED OF UNLESS OTHERWISE NOTED. <br />6. CONTRACTOR SHALL REMOVE OR RELOCATE EXISTING CONTROLS WHERE <br />NECESSARY. REMOVED CONTROLS SHALL BE RETURNED TO OWNER, <br />7. PROPERLY REMOVE AND DISPOSE OF ALL EXISTING TO -BE -REMOVED HVAC <br />DUCTWORK, PIPING AND AIR DISTRIBUTION DEVICES. CONSULT WITH OWNER AND <br />OBTAIN OWNER'S APPROVAL PRIOR TO DISPOSAL OF REMOVED MATERIAL. <br />8. PATCH HOLES LEFT IN WALLS AND FLOOR AFTER REMOVAL OF EXISTING <br />DUCTWORK, CONDUIT, ETC., TO MATCH NEW EXISTING CONSTRUCTION AND FIRE <br />RATING. THIS INCLUDES ANY EXISTING OPENINGS IN RATED WALLS OR FLOORS. <br />9. PROVIDE PRE -CONSTRUCTION TEST & BALANCE FOR SUPPLY, RETURN AND <br />EXHAUST OF EXISTING MECHANICAL EQUIPMENT SERVING PROJECT AREA. INCLUDE <br />FLOW AND STATIC PRESSURE IN MAIN DUCTS. FAN STATIC PRESSURE, MOTOR HP <br />AND FLA, PRESSURE DROP ACROSS COILS AND FILTERS, AND CHILLED WATER <br />FLOW. <br />10. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING THE AIR HANDLER AND <br />DUCTWORK SERVING THE AREA PRIOR TO FINAL TEST AND BALANCE, CLEANING OF <br />THE AIR HANDLER AND DUCTWORK SHALL CONSIST OF REPLACING THE FILTERS. <br />11. ALL EXISTING AIR DISTRIBUTION DEVICES LOCATED WITHIN PROJECT AREA SHALL <br />BE FITTED WITH TEMPORARY CONSTRUCTION FILTERS THROUGHOUT PROJECT <br />DURATION TO HELP PREVENT ACCUMULATION OF DUST IN DEVICES AND <br />DUCTWORK. <br />12, CAP ALL DEMOLISHED BRANCH DUCT AT DUCT MAIN. CAP AND SEAL OPENINGS <br />DURING ENTIRE RENOVATION OF THE HVAC DUCTWORK. <br />13. ALL EXISTING AND/OR NEW WALL; CEILING AND FLOOR PENETRATIONS TO THE <br />SPACE SHALL BE CAULKED AND SEALED AIR TIGHT AND VAPOR TIGHT AFTER <br />DEMOLITION AND PRIOR TO NEW CONSTRUCTION BY AN APPROVED CONTRACTOR. <br />14. ALL NEW AND EXISTING HEATING HOT WATER PIPING TO THE SPACE SHALL BE <br />INSULATED WITH NEW APPROVED INSULATION, MINIMUM 1" THICK. <br />15. MINIMUM DUCT SIZE IS 10" X 6" EXCEPT WHERE SPECIFICALLY INDICATED <br />OTHERWISE. <br />0 HVAC DEMO KEY NOTES: <br />10 PROVIDE A TEMPORARY HEPA FILTERED NEGATIVE AIR FAN FOR <br />CONSTRUCTION AREA. MAINTAIN A MINIMUM 0.03" NEGATIVE PRESSURE IN THIS <br />AREA RELATIVE TO THE ADJACENT SPACES. PROVIDE VISUAL DISPLAY OF <br />AIRFLOW DIRECTION. PROVIDE ADDITIONAL NEGATIVE AIR MACHINES AS <br />REQUIRED TO ACHIEVE MINIMUM NEGATIVE PRESSURE. PROVIDE TEMPORARY <br />DUST BARRIER PARTITIONS. ALL EXISTING RETURN REGISTERS AND OPENINGS <br />LOCATED WITHIN THE RENOVATION AREA SHALL BE SHUT AND TAPED CLOSED, <br />ISOLATING THE RENOVATION AREA FROM THE AIR HANDLER SYSTEM. ALL <br />EXISTING EXHAUST REGISTERS LOCATED WITHIN THE RENOVATION AREA SHALL <br />BE PROVIDED WITH TEMPORARY CONSTRUCTION FILTERS. ROUTE TEMPORARY <br />120 FLEXIBLE DUCT FROM DISCHARGE OF HEPA UNIT TO OUTSIDE OF <br />DEMOLITION BOUNDARY. PROVIDE 2 SETS OF HEPA FILTERS - ONE HEPA FILTER <br />AT NEGATIVE AIR FAN, AND ONE HEPA FILTER AT DISCHARGE INTO CLEAN <br />CORRIDOR. <br />O PROVIDE AN INCLINED MANOMETER, DIFFERENTIAL PRESSURE TYPE, WITH <br />WHITE FACE GAUGE AND BLACK LETTERS WITH MAXIMUM PRESSURE RANGE OF <br />0.1" W.G. THIS SHALL BE USED BY THE CONTRACTOR TO RECORD. ON A DAILY <br />BASIS, THE NEGATIVE PRESSURE IN THE RENOVATION AREA RELATIVE TO THE <br />ADJACENT SPACES. <br />O PROVIDE TEMPORARY CONSTRUCTION BARRIER AS SHOWN IN ARCHITECTURAL <br />DRAWINGS. <br />0 PROVIDE PORTABLE DUST ENCLOSURE. <br />O DEMOLISH EXISTING AHU AND ASSOCIATED CHWS & CHWR, HHWS & HHWR <br />PIPING, CONDENSATE DRAIN PIPING, ELECTRICAL CONDUCTOR, CONDUIT AND <br />DISCONNECT/STARTER. DEMOLISH EXSITING OUTSIDE AIR AND SUPPLY <br />DUCTING. <br />(D DEMOLISH DUCTWORK AND ALL ASOCIATED AIR TERMINALS TO POINT <br />INDICATED. CAP AND SEAL AIRTIGHT WHERE NECESSARY <br />0 DEMOLISH AND CAP EXISTING PIPING AT POINT INDICATED. <br />® DEMOLISH EXISTING EXHAUST DUCT AND EXHAUST FAN ON ROOF. PREPARE <br />FOR NEW FAN <br />O9 REPLACE STEAM PIPING WITH NEW, SEE PIPING PLAN FOR NEW CONNECTION <br />AND SIZE. <br />All <br />1715 N. Westshore Blvd., Suite 600 <br />Tampa., Florida 33607-3999 <br />904-256-2500 Fax 904-256-2503 <br />www.rsandh.com <br />FL Cert. Nos. AA0001886"IB26000956 <br />5620 ` LCC000210' GB238 <br />TLC <br />ENGINEERING <br />5C) LU 1 1 U__ N S <br />255 S. Orange Avenue <br />Suite 1600 <br />Orlando, FL 32801 <br />P 407.841.9050 <br />www.tic-engineers.com <br />COA 15 <br />© Copyright 2019 TLC Engineering Solutions, Inc. <br />TLC Project No.: 119333 <br />PROJECT TITLE: <br />KITCHEN RENOVATION <br />ADVENTHEALTH ZEPHYRHILLS <br />PROJECT ADDRESS: <br />7050 Gall Blvd. Zephyrhills, FL 33541 <br />Aaron Lee Johnson, P.E. <br />Florida License #71576 <br />E <br />♦♦`��� _E <br />Q •. i <br />No 71576 ' <br />O STATE OF ' 44/ <br />Digit�(lY•.� d <br />o <br />111�♦ <br />M <br />DaW..'2020.03.25 <br />21:29:01-04100' <br />o <br />O <br />U <br />z <br />w_ <br />J <br />U <br />Q <br />REVISIONS <br />NO. DESCRIPTION <br />DATE <br />_ <br />DATE ISSUED: 03/20/2020 <br />REVIEWED BY: <br />ALJ <br />DRAWN BY: <br />LLP <br />DESIGNED BY: _ <br />LLP <br />PROJECT NUMBER: <br />504- 0226- 000 <br />0 2019 RS&H, INC. <br />SHEET TITLE: <br />LEVEL 1 DEMOLITION <br />PLAN - PHASE 2 - <br />DUCTWORK <br />SHEET ID: <br />MD102 <br />PROJECT STATUS: <br />CONSTRUCTION <br />DOCUMENTS <br />Copyright © 2018. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the <br />expressed written consent of this corporation is prohibited. All rights reserved. <br />SCALE: 1 /8" = l'-0" <br />E <br />.17 <br />4 <br />61 <br />1 <br />