My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (109)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (109)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 1:19:12 PM
Creation date
2/19/2025 8:37:49 AM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Berglund Construction
Building Plans - Permit #
738
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br />3 <br />4 <br />I I I _ =LI' I <br />5 <br />u <br />C <br />A <br />00 <br />v <br />m <br />O <br />O <br />CV <br />O <br />Q <br />00 <br />Q <br />Cl) <br />DESCRIPTION OF REQUIRED INFECTION <br />CONTROL RECAUTIONS - CLASS IV <br />DURING CONSTRUCTION: <br />1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING <br />DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. <br />2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, <br />PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK <br />AREA OR IMPLEMENT CONTROL CUBE METHOD (CART <br />WITH PLASTIC COVERING AND SEALED CONNECTION TO <br />WORK SITE HEPA VACUUM FOR VACUUMING PRIOR TO <br />EXIT BEFORE CONSTRUCTION BEGINS. <br />3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE <br />UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. <br />4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES. <br />5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL <br />TO PASS THROUGH THIS ROOM SO THEY CAN BE <br />VACUUMED USING A HEPA CLEANER BEFORE LEAVING <br />WORK SITE OR THEY CAN WEAR CLOTH OR PAPER <br />COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE <br />WORK SITE. <br />6.ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO <br />WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED <br />EACH TIME THE WORKER EXITS THE WORK AREA. <br />7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL <br />COMPLETED PROJECT IS INSPECTED BY THE OWNER'S <br />SAFETY DEPARTMENT AND INFECTION CONTROL <br />DEPARTMENT AND THROUGHLY CLEANED BY THE OWNER'S <br />ENVIRONMENTAL SERVICES DEPT. <br />UPON COMPLETION <br />1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE <br />SPREAD OF DIRT AND DEBRIS <br />2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN <br />TIGHTLY COVERED CONTAINERS. <br />3, COVER TRANSPORT RECETACLES OR CARTS. TAPE <br />COVERING UNLESS SOLID LID. <br />4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. <br />5. WET MOP AREA WITH DISINFECTANT. <br />6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE <br />WORK IS BEING PERFORMED. <br />�U <br />NOTE: THIS IS PARTIAL PLAN OF MECHANICAL AND <br />TOOLS SHOP LOCATED EAST OF BAKERY <br />7] 0 <br />PHASE 1 CONSTRUCTION <br />SCALE: 1/8" = V-0" <br />...............M.0 <br />OPEN AIR BREEZEWAY <br />PHASE 1 SEQUENCE NOTES <br />PH1-1 OWNER VACATES PHASE 1 AREA OF WORK AND REMOVES FURNISHINGS AND ACCESSORIES <br />PH1-2 CONTRACTOR RELOCATES MICROWAVE COUNTERTOP TO TEMPORARY LOCATION. <br />COORDINATE WITH OWNER FOR TEMPORARY LOCATION <br />PH1-3 CONTRACTOR INSTALLS DUST BARRIER PARTITIONS AND SETS UP ICRA <br />PH1-4 PROVIDE A HEPA UNIT WITH TEMPORARY EXHAUST. SEE MECHANICAL DRAWINGS. <br />PH1-5 CONTRACTOR PERFORMS DEMOLITION AND NEW CONSTRUCTION WORK IN PHASE 1 AREA OF WORK. <br />PH1-6 NIGHT WORK: INSTALLS PLASTIC MEMBRANE DUST BARRIER FOR OVERNIGHT ABOVE CEILING WORK <br />IN THIS AREA. REMOVE DUST BARRIER AND CLEAN SPACE BY 6 A.M. <br />PH1-7 CONTRACTOR SCHEDULES ACHA AND BUILDING DEPARTMENT INSPECTIONS <br />PH1-8 UPON INSPECTION APPROVALS, OWNER EQUIPS AND OCCUPIES PHASE 1 AREA OF WORK. <br />TAPE SEAL FULL PERIMETER <br />OF DOOR (BOTH SIDES) <br />UPGRADE EXISTING WALLS <br />TO 1-HOUR RATED <br />EXISTING 2HR FIRE WALL. <br />DECOMMISSION THIS WALL <br />TAPE SEAL FULL PERIMETER <br />OF DOOR (BOTH SIDES) <br />EXISTING 1HR FIRE WALL. <br />DECOMMISSION THIS WALL <br />DEMO AND NEW <br />CONSTRUCTION WORK IN <br />RETAIL AREA. <br />NEW EQUIPMENT PER FOOD <br />SERVICE CONSULTANT <br />DRAWINGS. <br />EXISTING 1 HR FIRE WALL. <br />DECOMMISSION THIS WALL <br />PHASING PLAN LEGEND <br />EXISTING ITEM TO REMAIN <br />- — — — = EXISTING ITEM TO BE DEMOLISHED <br />SCOPE OF WORK <br />EXISTING TO REMAIN/ NOT IN <br />CONTRACT <br />I.C.R.A DUST BARRIER LEGEND <br />TEMPORARY CONSTURCTION DUST <br />BARRIER WALL - SEE DETAIL A-501 <br />TEMPORARY PLASTIC MEMBRANE DUST <br />BARRIER: <br />USED IN SERVERY FOR WORK RELATED <br />TO NEW DUCTWORK. EXTEND PLASTIC <br />MEMBRANE FROM FLOOR TO CEILING. <br />SEAL TIGHT DURING CONSTRUCTION. <br />PATH OF CONTRACTOR ACCESS FROM <br />EXTERIOR DOOR TO ENTRY DOOR OF <br />CONSTRUCTION ANTE ROOM. PROVIDE <br />STICKY MATTS ON BOTH SIDES OF ANTE <br />CONTRACTOR ACCESS ROOM DOOR. A DIFFERENTIAL <br />PRESSURE GAUGE ADJACENT TO THE <br />%10 ANTE ROOM DOOR, AND A HEPA <br />VACUUM INSIDE OF THE <br />CONSTRUCTION ANTE ROOM. REFER TO <br />OWNER'S ICRA PERMIT FOR ADDITIONAL <br />REQUIREMENTS <br />NIGHT SHIFT WORK AREA: INSTALL <br />PLASTIC MEMBRANE DUST BARRIER <br />FOR OVERNIGHT ABOVE CEILING WORK <br />IN THIS AREA. COORDINATE ACCESS TO <br />- EACH SPACE WITH OWNER AND SAFETY <br />OFFICER AND FOLLOW OWNER'S ICRA <br />PROTOCOLS FOR ABOVE CEILING <br />WORK. REMOVE DUST BARRIER AND <br />CLEAN SPACE BY 6 A.M. <br />l_ _I[ 2, NEGATIVE PRESSURE HEPA FILTER <br />LHJ L y MACHINE. SEE MECH. DWGS <br />NOTE: <br />THE PRIMARY AND FIRST INSPECTION OF AN ICRA IS THE <br />RESPONSIBILITY OF THE FACILITY. PROCEDURES INCLUDE A <br />PERMIT AND DAILY INSPECTION THAT IS TO BE LOGGED IN. AT <br />THE 80%, FACILITY MUST PROVIDE A COPY OF THE ICRA LOG <br />AND PERMIT (SIGNED BY FACILITY AND CONTRACTOR) TO ARCH <br />REVIEWER (AT THE INITIAL MEETING) BEFORE CONDUCTING <br />THE SURVEY OF THE AREA FOR ICRA COMPLIANCE. <br />CONTRACTOR TO PROVIDE TEMPORARY EXIT SIGNS AND <br />FIRE EXTINGUISHERS AS REQUIRED. <br />1715 N. Westshore Blvd., Suite 600 <br />Tampa„ Florida 33607-3999 <br />904-256-2500 Fax 904-256-2503 <br />www.rsandh.com <br />FL Cert. Nos. AAC001886' IB26000956 <br />5620' LCC000210 * GB238 <br />Advent Health <br />PROJECT TITLE: <br />KITCHEN RENOVATION <br />ADVENTHEALTH ZEPHYRHILLS <br />PROJECT ADDRESS: <br />7050 Gall Blvd. Zephyrhills, FL 33541 <br />SEAL <br />F.F(0��o <br />�00—JIN A-/4t . <br />AR95652 <br />�F V <br />� •. .\�. <br />�sTFoEC': oG�� <br />Igitally signed by Yoo-Jln <br />Kim <br />DN:c=uS. <br />Yoo-Jin KiM E=yoo-linkim0r ndh com. <br />O=RSH, CN=Yoo-Jin Kim <br />Date: 2020.04.08 <br />09'34.54-04'00' <br />vi 1—ivn- <br />REVISIONS <br />NO. DESCRIPTION DATE <br />DATE ISSUED: 03/20/2020 <br />REVIEWED BY: YK <br />DRAWN BY: YK/KN <br />DESIGNED BY: JS <br />PROJECT NUMBER: <br />504- 0226- 000 <br />© 2019 RS&H, INC. <br />SHEET TITLE: <br />PHASING PLANS <br />SHEET ID: <br />PH001 <br />PROJECT STATUS: <br />CONSTRUCTION <br />DOCUMENTS <br />M <br />N <br />to <br />v <br />0 <br />0 <br />0 <br />M <br />cm <br />W <br />0 <br />0 <br />U <br />Z <br />W <br />J <br />V <br />Q <br />U <br />Q <br />Copyright © 201 & This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the <br />expressed written consent of this corporation is prohibited. All rights reserved. <br />E <br />3 <br />4 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.