Laserfiche WebLink
I <br />© TRIM NAIL <br />INSTALLED THROUGH <br />FASCIA @ 16" O.C. MAX <br />70 STAPLESINSTALLED <br />THRU SOFFIT AT NAIL <br />HEM AND IN VALLEYS <br />® FASCIA­/J-CFV <br />DETAIL A <br />FASCIA <br />7O STAPLESINSTALLED @ <br />12" O.C. MAX (INTO <br />WOOD) IN J-CHANNEL <br />SLOT OR T-NAIL @ 12" <br />O.C. MAX. (INTO <br />CONCRETE/MASONRY) <br />}" MAX: <br />nPTAII n <br />J-L;HANNtL <br />FASCIA <br />FASCIA WOOD <br />BOARD BY OTHERS <br />(Z)STAPLESINSTALLED- <br />THRU SOFFITAND <br />J-CHANNEL AT NAIL <br />HEM AND IN VALLEYS <br />STAPLESINSTALLED @--r <br />12" O.C. MAX (INTO <br />EL 30 7DWOOD) IN J-CHANNEL <br />SLOT it <br />2X2 WOOD BATTEN @ <br />-STAPLES INSTALLED 7O <br />THRU SOFFIT AND <br />J-CHANNEL AT NAIL HEM <br />AND IN VALLEYS <br />#8X3" WOOD SCREW OR <br />TAPPING SCREW, <br />BATTEN ATTACHMENT <br />FASTENER SPACED 24" <br />MAX. O.C. <br />j 51k� OFFIT 1D <br />J-CHANNELQ3 <br />O STAPLESINSTALLED <br />THRU SOFFIT AND <br />J-CHANNEL AT NAIL <br />HEM AND IN VALLEYS <br />(D SOFFIT <br />O3 J-CHANNEIMAX. <br />DETAIL E <br />J-CHANNEL <br />TRUSS/FRAMING OVERHANG EAVE CONSTRUCTION <br />—SPAN 'L'—.- SPAN <br />EAVE WIDTH <br />(ROOF <br />OVERHANG) <br />BATTEN STRIP ANCHOR 12 <br />10d NAIL AT EACH <br />TRUSS/JOIST/ RAFTER <br />LOCATION NOT TO <br />EXCEED 24" O.C. INTO <br />FRAMING TRUSS/JOI <br />fBY OTHER <br />EMB. <br />WOOD BATTEN <br />0 DETAIL B <br />J-L;NANNtL <br />FASCIA <br />12 BATTEN STRIP ANCHOR <br />10d NAIL AT EACH <br />TRUSS/JOIST/ RAFTER <br />LOCATION NOT TO <br />EXCEED 24" O.C. INTO <br />7D STAPLESINSTALLED- <br />THRU SOFFIT AND <br />J-CHANNEL AT NAIL <br />HEM AND IN VALLEYS <br />11 1X2 WOOD BATTEN <br />WOOD BATTEN 10 <br />O S <br />tO <br />INSTALLATION SCREW, <br />BATTEN ATTCHMENT 88 <br />FASTENER SPACED 24" g0 <br />MAX O.C. <br />STAPLESINSTALLED @ <br />12" O.C. MAX (INTO <br />7D WOOD) IN J-CHANNEL <br />SLOT OR T-NAIL @ 12" <br />O.C. MAX. (INTO <br />CONCRETE/MASONRY) <br />CONCRETE/CMU OR <br />WOOD (NOTE 1) <br />EAVE WIDTH <br />(ROOF <br />OVERHANG) <br />CONCRETE; <br />CMU OR WOODAlUft <br />(NOTE:1) CONCRETE; <br />SOFFIT OFFIT CMU OR WOOD <br />SEE DETAIL'A' SEE DETAIL'E' SEE DETAIL'D' SEE DETAIL'E' (NOTEA) <br />EAVE CROSS-SECTION EAVE CROSS-SECTION <br />SINGLE SPAN W/J-CHANNEL SINGLE SPAN W/J-CHANNEL <br />J-CHANNEL @ WALL, FASCIA @ FASCIA END J-CHANNEL @ WALL AND FASCIA END <br />J-CHANNEL <br />J" 1 <br />DETAIL C <br />J-CHANNEL <br />BY OTHER <br />2 1/4" NSTALLATION SCREW, <br />EMB. BATTEN ATTCHMENT <br />FASTENER SPACED 24" Og <br />MAX O.C. <br />STAPLESINSTALLED @ <br />12" O.C. MAX (INTO <br />7D WOOD) IN J-CHANNEL <br />O SLOT OR T-NAIL @ 12" <br />O.C. MAX. (INTO <br />CONCRETE/MASONRY) <br />CONCRETE/CMU OR <br />WOOD (NOTE 1) <br />NOTE 1: MINIMUM SPRUCE -PINE -FIR <br />FRAMING OR CONCRETEIMASONRY. <br />BUILING CODE REQUIREMENTS FOR <br />SUBSTRATE MATERIAL MUST BE MET. <br />i>f>>i;?eft'• • • i• 3.519 <br />• ti>>>•t <br />375 <br />375 . <br />.4 3.625 3.625 3. <br />5 <br />i <br />O3 <br />12 +� <br />ci �U�I <br />DETAIL A <br />12" TRIPLE 4 FULL-0-VENT SOFFIT ECO <br />VINYL -NO. 639 <br />A R C H I T E C T <br />6 <br />G Design <br />i nrs�ann o�v�. <br />LONZ Z, FL32780 <br />PH: 407-7746078 <br />FAX: 407-774407E <br />wwwa bdes igngroup.com <br />AA #: 0003325 J <br />h <br />F <br />a <br />SU13DM & W <br />SILVERADO <br />LOT #11 <br />BLK #15 <br />PROJECT* <br />03719.001-11151 <br />MODEL.• <br />"2045-LANTANA" <br />GARAGE DWING: <br />RIGHT <br />PAGE: <br />SOFFIT <br />DETAILS <br />50 H <br />DATE• 03/02/21 <br />SCALE: 1 /4"= V— 0" <br />SD <br />