Laserfiche WebLink
. IT MUST BE NOTED AND UNDERSTOOD THAT THE VERY ESSENCE OF THIS WORK 15 FOR THE BENEFIT OF THE END USER BY EXPANDING, IMPROVING AND UPGRADING THE CURRENT CONDITIONS OF THE STORE, IT SHOULD FURTHER BE UNDERSTOOD, THAT ALL WORK WILL TAKE PLACE IN OPEN AND <br />OPERATING STORES AND THAT AS A SUPPLIER OF THE WORK SAID WORK MUST BE DONE IN A PLANNED MANNER, TO MINIMIZE DISRUPTION TO THE ON -GOING OPERATION OF THE STORES. <br />2. CONTRACTOR SHALL VERIFY WITH GOVERNING BUILDING AND HEALTH DEPARTMENTS CONDITIONS OF STORE OPERATION REQUIRED FOR REMODEL LOCATION TO REMAIN OPEN. IF REQUIRED BY GOVERNING BUILDING AND HEALTH OFFICIALS CONTRACTOR SHALL WORK WITH PROJECT ARCHITECT OF <br />RECORD AND PM FIRM TO DEVELOP AND PROVIDE A PROJECT SAFETY AND FOOD SANITATION ACTION PLAN. <br />3. UPON DETERMINATION BY THE LOCAL BUILDING AND HEALTH DEPARTMENT OFFICIALS THAT STORE OPERATIONS MUST CEASE OR BE ALTERED CONTRACTOR SHALL IMMEDIATELY NOTIFY 7-ELEVEN CM AND PM FIRM. <br />4. UPON RECEIPT OF 7-ELEVEN INVITATION TO BID CONTRACTOR SHALL SCHEDULE WITHIN ONE (1) WEEK OF RECEIPT OF THE INVITATION TO BID AN ON51TE INSPECTION OF PROPOSED REMODEL LOCATION. CONTRACTOR MUST PROVIDE MINIMUM FORTY-EIGHT (48) HOUR NOTIFICATION TO THE PM FIRM <br />OF THEIR PROPOSED SITE INSPECTION DATE. <br />5. AS A RESULT OF CONTRACTOR'S SITE INSPECTION, CONTRACTOR SHALL NOTIFY 7-ELEVEN CM AND PM FIRM OF ANY/ALL SITE CONDITIONS THAT MAY CONFLICT WITH THE APPROVED SOW OR DESIGN DRAWINGS OR REPRESENT A POTENTIAL UNFORESEEN CONDITION WITH THE REMODEL PROJECT's <br />APPROVED SOW AND DESIGN DRAWINGS. CONTRACTOR SHALL PROVIDE WRITTEN DESCRIPTION AND PHOTO DOCUMENTATION TO THE 7-ELEVEN CM AND PM FIRM, CONDITIONS THEY BELIEVE MAY / WILL RESULT IN ADDITIONAL WORK NOT COVERED WITHIN THE APPROVED PROJECT SOW OR DESIGN <br />DRAWINGS. <br />G. CONTRACTOR SHALL PARTICIPATE IN WEEKLY CONFERENCE CALLS, AS CONDUCTED BY 7-ELEVEN CM WITH PROJECT STAKE HOLDERS. <br />7. CONTRACTOR SHALL ATTEND ON51TE PRE -CONSTRUCTION MEETING AS SCHEDULED BY 7-ELEVEN CM. <br />8. CONTRACTOR SHALL APPLY FOR AND SECURE ALL REQUIRED BUILDING DEPARTMENT (INCLUDING ALL REQUIRED TRADE PERMITS) AND HEALTH DEPARTMENT PERMITS. CONTRACTOR SHALL COORDINATE PERMIT SUBMITTAL / APPROVAL ACTIVITIES THROUGH THE ARCHITECT OF RECORD AND PM FIRM. <br />CONTRACTOR RECOGNIZES THAT TIME 15 OF THE ESSENCE AND THAT THEY SHALL SUBMIT PERMIT APPLICATIONS FOR ALL BUILDING DEPARTMENT, (INCLUDING ALL REQUIRED TRADE PERMITS) AND HEALTH DEPARTMENT WITHIN I WEEK OF BEING AWARDED PROJECT CONTRACT. FURTHERMORE, IT IS REQUIRED <br />THAT CONTACTOR SHALL COMMUNICATE AND COORDINATE PERMIT APPROVAL STATUS WITH ARCHITECT AND PM FIRM. <br />9. CONTRACTOR SHALL IMMEDIATELY NOTIFY AND PROVIDE THE ARCHITECT OF RECORD AND PM FIRM OF ANY AND ALL PLAN CHECK REVIEW COMMENTS RETURNED TO THE PERMIT APPLICANT OF ALL PLAN INFORMATION CLARIFICATIONS OR PLAN CORRECTIONS REQUESTED OR REQUIRED BY THE BUILDING <br />DEPARTMENT OR HEALTH DEPARTMENT OFFICIALS. <br />10. CONTRACTOR SHALL DILIGENTLY WORK TO SECURE ALL REQUIRED PERMITS 3 WEEKS IN ADVANCE OF 7-ELEVEN'5 PUBLISHED REMODEL / EQUIPMENT INSTALLATION START DATE. CONTRACTOR SHALL IMMEDIATELY NOTIFY PM FIRM IF ANY INDICATIONS ARE GIVEN BY THE GOVERNING AUTHORITY / <br />JURISDICTION THAT THE PERMITS WON'T BE AVAILABLE BY THE PRESCRIBED DATE. <br />1 1. CONTRACTOR SHALL PAY FOR ALL REQUIRED PLAN REVIEW AND PERMIT FEES TO SECURE ALL BUILDING PERMITS, TRADE PERMITS AND HEALTH PERMITS. <br />12. CONTRACTOR SHALL PROVIDE OR SECURE ALL REQUIRED BUSINESS LICENSES, PROFESSIONAL LICENSES AND CERTIFICATIONS REQUIRED BY THE GOVERNING JURISDICTION. <br />13. CONTRACTOR SHALL VERIFY WITH ALL GOVERNING JURISDICTION DEPARTMENTS REQUIRED OPERATING INSURANCES AND LABOR LAW WORKMAN'S COMPENSATION REQUIREMENTS AND INSURANCES. CONTRACTOR RECOGNIZES THAT TIME 15 OF THE ESSENCE AND SHALL PROVIDE ALL CERTIFICATES OF <br />PROOF AS REQUIRED BY JURISDICTION OFFICIALS WITHIN A TIMELY MANNER THAT DOES NOT RESULT IN DELAYS AND ABILITY TO SECURE ALL PERMITS WITHIN THE REQUIRED 3 WEEKS IN ADVANCE OF PUBLISHED REMODEL INSTALLATION DATE.. <br />14. SHOULD SCOPE OF WORK CHANGES OCCUR DURING THE ON51TE PRE -CONSTRUCTION MEETING, CONTRACTOR SHALL PROVIDE WRITTEN DESCRIPTION OF OUT OF SCOPE ADDITIONAL WORK, PHOTO DOCUMENTATION OF AREA REQUIRING ADDITIONAL WORK, WRITTEN COST PROPOSAL, LEAD TIME TO <br />COMPLETE ADDITIONAL WORK AND IMPACT TO PERMITTING AND / OR THE PROJECT TIME LINE. <br />15. CONTRACTOR WILL PROVIDE PM FIRM, WITHIN 2 DAYS OF PRE -CONSTRUCTION MEETING DATE, ALL REQUESTED SOW REVISIONS INFORMATION. CONTRACTOR WILL NOT PROCEED WITH REQUESTED ADDITIONAL WORK RESULTING FROM PRE -CONSTRUCTION MEETING, WITHOUT WRITTEN AUTHORIZATION <br />FROM 7-ELEVEN CM OR PM FIRM. <br />G. CONTRACTOR SHALL WORK WITH 7-ELEVEN CM AND PM FIRM TO DEVELOP AN AGREED UPON REMODEL TIMELINE REFLECTING COMPLETION OF THE APPROVED SCOPE OF WORK. <br />17. CONTRACTOR SHALL SCHEDULE AND COORDINATE ALL WORK PROVIDED BY 7-ELEVEN 3KD PARTY SUPPLIERS. AS PER THE SOW, REMODEL PROJECT DRAWINGS AND PROJECT TIMELINE. <br />16. DURING THE EXECUTION OF PROJECT REMODEL, CONTRACTOR HEREBY AGREES THAT WHEN ADDITIONAL WORK OUTSIDE OF THE APPROVED SOW IS REQUIRED, A CHANGE ORDER MUST BE CREATED. THE CONTRACTOR SHALL PROVIDE PM FIRM WRITTEN DESCRIPTION OF REQUESTED ADDITIONAL WORK, <br />PHOTO DOCUMENTATION OF AREA REQUIRING ADDITIONAL WORK, WRITTEN COST PROPOSAL, LEAD TIME TO COMPLETE ADDITIONAL WORK AND IMPACT TO PROJECT TIME LINE. CONTRACTOR WILL NOT PROCEED WITH REQUESTED ADDITIONAL WORK WITHOUT WRITTEN AUTHORIZATION FROM 7-ELEVEN CM <br />AND PM FIRM. CONTRACTOR ACCEPTS THAT TIME 15 OF THE ESSENCE AND WILL PROVIDE PM FIRM ON51TE SUPERVISION SAME DAY NOTIFICATION REQUESTED CHANGE ORDER UPON DISCOVERY OF NEED FOR ADDITIONAL WORK. <br />10. CONTRACTOR SHALL INCLUDE IN THEIR BID, TAKE ALL NECESSARY ACTIONS AND MAKE ALL NECESSARY PROVISIONS TO PROTECT STORE VISITORS AND EMPLOYEES FROM ENTERING WORK ZONE AREAS. BY EXAMPLE AND AS REQUIRED TO INSURE SAFETY: ERECTING BARRIERS, CONSTRUCTION "CAUTION <br />TAPE", MONITORING AND /OK OTHER MEANS NEEDED TO PROTECT THE PUBLIC FROM ANY POTENTIAL ACCIDENT AND INJURY. <br />20. ALL STORE AREAS WHERE CONSTRUCTION ACTIVITIES OCCUR SHALL BE DRAPED AND MADE SEPARATE FROM THE PUBLIC AND NON -REMODEL STORE AREAS. WHERE OVERHEAD WORK IS REQUIRED ALL STORE PRODUCT SHALL BE DRAPED WITH PLASTIC SHEETING TO PROTECT FROM CONSTRUCTION <br />DEBRIS, DUST OR OTHER POSSIBLE CONTAMINATES. CONTRACTOR SHALL PROVIDE STORE MANAGEMENT REASONABLE NOTIFICATION AND COORDINATE THE TIMING OF CLOSURES OR PUBLIC ACCESS TO WORK AREAS INCLUDED WITHIN THE APPROVED SOW. <br />2 1. IF ELECTRICAL OR PLUMBING SERVICE INTERRUPTION IS REQUIRED TO COMPLETE REMODEL WORK THE CONTRACTOR SHALL PROVIDE STORE MANAGEMENT NOTICE THE DAY PRIOR TO ANTICIPATED UTILITY SERVICE INTERRUPTION. <br />22. CONTRACTOR SHALL WORK WITH 7-ELEVEN CM AND PM FIRM TO DEVELOP AND PROVIDE PLAN FOR THE PLACEMENT OF ROLL -OFF DUMP5TEK AND STORAGE PODS/VEHICLES, THIS NEEDS TO INCLUDE PUBLIC SAFETY PLAN TO PROTECT THE GENERAL PUBLIC AGAINST ACCIDENT AND INJURY FOR THE <br />DURATION OF THE REMODEL PROJECT. CONTRACTOR SHALL SCHEDULE THE DELIVERY OF ROLL -OFF DUMP5TER, STORAGE POD UNITS/VEHICLES AND FORKLIFT ONE (I ) DAY IN ADVANCE OF 7-ELEVEN5 PUBLISHED REMODEL EQUIPMENT INSTALLATION START DATE AND SCHEDULE REMOVAL IN ADVANCE OF <br />PUNCH DATE. <br />23. CONTRACTOR SHALL NOTIFY 7-ELEVEN CM AND PM FIRM 48 HOURS IN ADVANCE OF 7-ELEVEN'5 PUBLISHED REMODEL EQUIPMENT INSTALLATION START DATE THE DELIVERY OF ROLL -OFF DUMP5TEK, STORAGE POD/5/VEHICLE5 AND FORKLIFT. <br />24. CONTRACTOR SHALL MONITOR ONSITE PARKING OF THEIR SUB -CONTRACTORS AND THIRD PARTY CONTRACTOR VEHICLES. CONTRACTOR SHALL LIMIT THE ACCESS TO ON51TE PARKING AREA TO THE DELIVERY AND UNLOADING OF TOOLS AND MATERIALS AND IN KIND AT THE END OF WORK DAY. <br />25. CONTRACTOR SHALL 150LATE AFTER 7PM THE NIGHT PRIOR TO START OF REMODEL ACTIVITIES THE "APPROVED PARKING" AREA FOR THE DUMP5TEK, STORAGE POD UNITS AND FORKLIFT. THE "APPROVED PARKING" AREA SHALL BE IDENTIFIED WITH TRAFFIC SAFETY CONES, YELLOW CAUTION <br />CONSTRUCTION ZONE TAPE AND SIGNS INDICATING "DANGER DO NOT ENTER CONSTRUCTION ZONE" <br />2G. CONTRACTOR SHALL BE RESPONSIBLE FOR THE RECEIVING OF ALL REMODEL EQUIPMENT AS SET FORTH WITHIN THE APPROVED PROJECT SOW AND SHALL PROVIDE PROPER EQUIPMENT HANDLING AND STORAGE TO PREVENT DAMAGE AND THEFT FOR THE DURATION OF REMODEL ACTIVITIES, <br />CONCLUDING ON THE PUBLISHED DATE OF PUNCH VERIFICATION MEETING. <br />27. CONTRACTOR SHALL COORDINATE WITH PM FIRM'5 ON51TE SUPERVISION WRITTEN VERIFICATION OF THE RECEIPT OF ALL APPROVED PROJECT SOW EQUIPMENT, <br />28. CONTRACTOR SHALL IMMEDIATELY NOTIFY PM FIRM'S ONSITE SUPERVISION OF ANY VISUAL OR CONCEALED DAMAGE, CONTRACTOR SHALL PROVIDE PHOTO DOCUMENTATION OF ANY VISUAL OR CONCEALED DAMAGE. <br />2E�. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE INSTALLATION OF ALL APPROVED SOW EQUIPMENT INCLUDING RECEIVING, STORAGE, UNCRATING, PLACEMENT, FINAL ELECTRICAL AND/OR PLUMBING CONNECTIONS, STARTUP TO <br />CONFIRM EQUIPMENT IS OPERATIONAL AND THE REMOVAL AND DISPOSAL OF ALL PACKING AND CRATING MATERIALS. <br />30. CONTRACTOR SHALL IDENTIFY ALL EXISTING EQUIPMENT AND COUNTERS THAT HAVE BEEN IDENTIFIED FOR REUSE. CONTRACTOR SHALL SECURE ALL EXISTING EQUIPMENT AND COUNTERS THAT HAVE BEEN IDENTIFIED FOR REUSE TO <br />PREVENT ACCIDENTAL DISPOSAL AND/OR DAMAGE. IN THE EVENT OF ACCIDENTAL DISPOSAL OR DAMAGE OF EXISTING EQUIPMENT AND COUNTER THE CONTRACTOR SHALL REPLACE AND/OR REPAIR ALL, AS REQUIRED. <br />3 1 . WITH REGARD TO REFRIGERATION EQUIPMENT CONTRACTOR AND THEIR REFRIGERATION INSTALLATION CONTRACTOR SHALL PERFORM ALL SERVICES AND WORK IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL CODES AND <br />REGULATIONS. <br />32. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REASONABLE REPAIR OR REPLACEMENT (MATERIAL * LABOR) OF ANY AND ALL EXISTING WALL, FLOOR AND CEILING AREAS AS A RESULT OF REMOVAL OF EXISTING EQUIPMENT OR <br />COUNTERS. IF REPAIRS OR REPLACEMENT REPRESENT EXCESSIVE WORK OR REVEAL UNFORESEEN CONDITIONS THE CONTRACTOR SHALL CREATE A CHANGE ORDER TYPICAL TO THE PROCESS AS DEFINED WITHIN GENERAL <br />REQUIREMENTS ITEM NO. 13 <br />33. CONTRACTOR SHALL PROVIDE PROFESSIONALLY PRINTED EXTERIOR SIGNS COMMUNICATING TO THE PUBLIC THAT STORE IS UNDER REMODEL. 7-ELEVEN CM SHALL PROVIDE APPROVED GRAPHICS AND SIGN TEXT. SIGNS SHALL BE <br />33. 1 . 2 EACH 24" X 3G" RIDGED SIGNS TO BE MOUNTED TO A -FRAME SIGN STAND <br />33.2. 1 EACH 45" X 9G" VINYL BUILDING BANNER <br />33.3. UPON COMPLETION OF REMODEL ACTIVITIES ALL FFf-E AND PRODUCT SHALL BE WIPED CLEAN, REMODEL AREAS SHALL RECEIVE A MORE THOROUGH CLEANING INCLUDING BUT NOT LIMITED TO CLEANING OF INTERIOR WALLS, FLOOR, <br />CEILING AND UNDER NEW AND EXISTING CABINETS. <br />34. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL BUILDING, AND HEALTH DEPARTMENT PERMIT INSPECTIONS ACCORDING TO THE APPROVED PROJECT TIME LINE. CONTRACTOR SHALL PROVIDE 7-ELEVEN AND PM FIRM WRITTEN AND <br />PHOTO CONFIRMATION OF ALL JURISDICTION REQUIRED APPROVALS AND SIGN -OFFS. <br />35. CONTRACTOR SHALL HAVE ROLL -OFF DUMP5TEK, STORAGE POD UNIT/5 AND FORKLIFT REMOVED FROM REMODEL LOCATION NO LATER THAN SCHEDULED PUNCH VERIFICATION MEETING DATE OR IN ACCORDANCE WITH LOCAL BUILDING <br />DEPARTMENT REQUIREMENTS RELATED TO SECURING FINAL INSPECTIONS. <br />3G. CONTRACTOR SHALL ATTEND PUNCH VERIFICATION WALK THROUGH AS SCHEDULED BY 7-ELEVEN CM. <br />37. DURING THE EXECUTION OF PUNCH VERIFICATION MEETING IF WORK OUTSIDE OF THE APPROVED SOW IS REQUESTED, A CHANGE ORDER MUST BE CREATED. FOR THIS ADDITIONAL WORK, OTHERWISE DESIGNATED AS AN "OUT OF SCOPE <br />PUNCH ITEM", THE CONTRACTOR SHALL PROVIDE PM FIRM WRITTEN DESCRIPTION, PHOTO DOCUMENTATION, WRITTEN COST PROPOSAL, AND LEAD TIME TO COMPLETE ADDITIONAL WORK. CONTRACTOR WILL NOT PROCEED WITH <br />REQUESTED "OUT OF SCOPE PUNCH ITEM" WITHOUT WRITTEN AUTHORIZATION FROM 7-ELEVEN CM AND PM FIRM. CONTRACTOR ACCEPTS THAT TIME 15 OF THE ESSENCE AND WILL PROVIDE PM FIRM TARGET DATE FOR COMPLETION OF ANY <br />"OUT OF SCOPE PUNCH ITEM" WORK. <br />38. CONTRACTOR SHALL RESOLVE ANY PUNCH VERIFICATION ITEM WITHIN 48 HOURS OF PUNCH MEETING DATE UNLESS OTHERWISE AGREED UPON BY 7-ELEVEN CM AND PM FIRM OR WHERE EQUIPMENT OR MATERIALS ARE REQUIRED TO <br />COMPLETE PUNCH ITEMS AND AVAILABILITY OF EQUIPMENT OR MATERIALS EXCEEDS THE 48 HOURS PUNCH COMPLETION WINDOW. FURTHERMORE. CONTRACTOR AND PM FIRM SHALL PROVIDE COMPLETION DATES FOR ALL PUNCH <br />VERIFICATION ITEMS AT CLOSE OF PUNCH VERIFICATION MEETING. <br />39. CONTRACTOR AND PM FIRM SHALL PROVIDE FULL PHOTO DOCUMENTATION OF ALL COMPLETED PUNCH VERIFICATION ITEMS. <br />40. CONTRACTOR SHALL BEADLE TO INVOICE 70% OF THEIR CONTRACT AMOUNT UPON COMPLETION OF THE PUNCH VERIFICATION MEETING. <br />41. THE FINAL 30% BALANCE 15 BILLABLE UPON: <br />41 . 1 . SATISFACTORY COMPLETION OF ALL ITEMS ON THE PUNCH VERIFICATION LIST. INCLUDING COMPLETE PHOTO DOCUMENTATION OF ALL IN SCOPE OF WORK PUNCH VERIFICATION LIST. <br />41.2. SUBMISSION OF CONTRACTOR AND ALL SUBCONTRACTOR FINAL LEAN WAIVERS. <br />4 1 .3. COPIES OF PERMITS INDICATING APPROVED BY ALL RELATED BUILDING AND HEALTH DEPARTMENTS. <br />43. UNDERSTANDING THE PROVISIONS ABOVE, IT MUST BE FURTHER NOTED THAT TIME IS OF "ESSENCE AND CRITICAL" TO THE SUCCESS OF THIS UNDERTAKING. THIS WORK IS INTENDED TO BE COMPLETED IN A PERIOD OF 1-2 DAYS AND 15 NOT <br />TO EXCEED 2 DAYS (THE SPECIFIC DURATION WILL BE AGREED UPON BY SITE IN ADVANCE OF 155UING THE CONTRACT) TO SUPPORT BOTH THE MINIMAL DISRUPTION TO THE STORE AND YET COMPLETING ALL WORK EXPEDITIOUSLY. <br />44. ALL WORK AND WORKMANSHIP PROVIDED 15 EXPECTED TO BE TO THE HIGHEST LEVEL OF THE TRADE / INDUSTRY, COMPLIANT TO ALL APPLICABLE CODES AND JURISDICTIONAL REQUIREMENTS ULTIMATELY RESULTING IN A FINISHED <br />OFFERING THAT MEETS OR EXCEEDS THE EXPECTATIONS OF THE 7-ELEVEN CONSTRUCTION, THE END USER AND THEIR CLIENTS. <br />45. GENERAL CONTRACTOR TO ENSURE THAT ALL ELECTRICAL WIRES AND RECEPTACLES LOCATED UNDER COFFEE ISLANDS ARE TIED AND MOUNTED OFF OF THE GROUND AS REQUIRED. <br />4G. LOCATION, REMOVAL, AND MOUNTING OF ALL SHELVING UNITS IN BACKKOOM5 AND STORAGE AREAS NEEDS TO BE EVALUATED, SALVAGED AND RELOCATION COORDINATED WITH STORE MANAGER WHENEVER POSSIBLE TO ACCOMMODATE <br />REQUIRED REFRIGERATION/FREEZER UNITS. <br />47. CONTRACTOR IS TO EVALUATE THE NEED AND LOCATION FOR NEW ELECTRICAL SUB -PANELS AND/OR PANEL RECONFIGURATION, CLEAN-UP AND RELABELING FOR EACH LOCATION. ALL MUST BE FIELD VERIFIED. <br />48. BOOSTER PUMPS, CONDENSATE PUMPS, AND 5D2 BACKFLOW PREVENTER5 ARE TO BE ORDERED AND INSTALLED BY THE GENERAL CONTRACTOR FOR EVERY SITE, AS THEY WILL BE REQUIRED FOR CONSTRUCTION AND THE INCORPORATION OF NEW EQUIPMENT. <br />812 5. CROWLEY IUD #A, <br />CROWLEY, TX 7G03G <br />(61 7)297-8575 <br />z <br />W <br />W <br />W <br />u <br />QD <br />� LU <br />Ln > <br />Ln <br />z <br />W <br />J Ln <br />LL.1 co <br />Ln <br />co <br />J <br />ll_ <br />02 1 3/02/2 1 I SCOPE WALK REV151ON I GH <br />0 I 21221211 REVISION I I A <br />ID 1 0211 112 11 INITIAL DE51GN I AS 1 <br />►ml em 0 m-grewl <br />PROJECT: <br />DATE: <br />SCALE: <br />DRAWN BY: <br />CHECKED BY: <br />COPYRIGHT: <br />STORE NUMBER: <br />Revision I By <br />7-1 1 WIN COFFEE <br />02/09/202 1 <br />N/A <br />AS <br />KJ K <br />POWERHOUSE 2020 <br />I G533 <br />G-003 <br />SHEET 3 OF <br />fl <br />