... _ _ . <br />:. <br />PROTECTION <br />CRITERIA <br />LEGEND <br />. <br />OCCUPANCY <br />DISCHARGE PRESSURE <br />HOSE <br />ALLOWANCE <br />MAXIMUM SPRINKLER <br />SPACING <br />DESIGN BASIS <br />, <br />CLASSIFICATION <br />(# OPERATING SPRINKLERS - DESIGN AREA) (GPM) <br />(SQ FT) <br />SALES FLOOR/ INTERIOR GARDEN CENTER <br />30 PSI (2 AS-2S/1 L) <br />, - <br />CLASS I -IV ON SHELF TO 12 -0 (25 -0 CEILING HEIGHT), 5 0 AISLES; UL LLC TECHNICAL REPORT PROJECT <br />(SH - OPTION 2A) <br />18 PSI (9 AS-4S/2L & 1 S/1 L) <br />250 <br />140 <br />4788122552, NC27954 - TABLE 2 SUMMARY OF TESTS, TEST SRR 06151702 <br />SALES FLOOR/ INTERIOR GARDEN CENTER <br />25 PSI (2 AS-2S/l L) <br />CLASS I -IV ON SHELF TO 12'4" (25'-0" CEILING HEIGHT), 5'-0" AISLES; UL LLC TECHNICAL REPORT PROJECT <br />(RNC - OPTION 2B) <br />10 PSI (12 AS-4S/3L) <br />.._ <br />250 <br />140 <br />4788122552, NC27954 - TABLE 2 SUMMARY OF TESTS, TEST GONDOLA 10041702 <br />STOCKROOM -GM/GR (SL - OPTION 4) <br />12 PSI (2 AS-2S/1 L) <br />250 <br />100 <br />CLASS I -IV RACK STORAGE TO 15 -0 (18 -0 CEILING HEIGHT), 4 -0 I -6 AISLES, UL LLC TECHNICAL REPORT <br />7 PSI (12 AS-4S/3L) <br />- R 191702 / DRR 09191702 / MRR 09211702 <br />PROJECT 4788122552, NC27954 TABLE 2 SUMMARY OF TESTS, TESTS SRR 04 <br />CORRIDORS/TENANT SPACES/GROCERY PREP/FOOD <br />TENANT/OFFICES (MISCELLANEOUS STORAGE) <br />0.20/1500 SQ FT <br />250 <br />130 <br />CLASS i-IV TO 1U-0"; 13: TABLE 13.2.1 AND FIGURE 13.2.1 <br />ENTRY CANOPY (MISCELLANEOUS STORAGE) <br />0.2017 SPRINKLERS OPERATING <br />250 <br />130 <br />CLASS I -IV TO 8'-0", MISCELLANEOUS STORAGE; NFPA 13: FIGURE 13.2.1 CURVE OH2, TABLE 13.2.1 <br />. AND 13:11.2.3.4.2 AND A11.2.3.4.2 <br />RESTROOMS/BREAKROOMS (LIGHT HAZARD) <br />0.10/1500 SQ FT <br />100 <br />225 <br />LIGHT HAZARD, 13: 11.2.3.1.1, FIGURE 11.2.3.1.1 <br />. <br />AND TABLE 11.2.3.1.2 <br />ENTRY VESTIBULES (ORDINARY HAZARD GROUP 2) <br />MINIMUM 0.20/1500 SQ FT <br />250 <br />130 <br />ORDINARY HAZARD GROUP 1 (NO STORAGE), 13: 11.2.3.1.1, FIGURE 11.2.3.1.1, AND TABLE 11.2.3.1.2 <br />OR ENTIRE AREA <br />COOLERS/FREEZERS (MISCELLANEOUS STORAGE) <br />MINIMUM 0.20/1500 SQ FT <br />250 <br />130 <br />CLASS 1-111 TO 17-0" ON SINGLE ROW RACK, 13: TABLE 13.2.1 AND FIGURE 13.2.1 <br />OR ENTIRE AREA <br />TIRE STORAGE AREA (RUBBER TIRE STORAGE) <br />12 SPRINKLERS AT 15 PSI <br />250 <br />100 <br />RUBBER TIRES TO 13'-6"; ON -SIDE AND ON -TREAD ON FIXED RACKS WITHOUT <br />EACH OR ENTIRE AREA <br />I SOLID SHELVES; NFPA 13:TABLE 18.4(d) K25 ESFR SPRINKLERS <br />USED TIRE STORAGE (RUBBER TIRE STORAGE) <br />MINIMUM 0.19/1500 SQ FT <br />250 <br />100 <br />RUBBER TIRES TO 5'-0'; ON GRADE, ON TREAD AND ON SIDE; NFPA 13:TABLE 18.4(a) <br />OR ENTIRE AREA <br />GARDEN CENTER CANOPY (EXTRA HAZARD GROUP 1) <br />0.30/7 SPRINKLERS <br />OPERATING <br />500 <br />100 <br />CLASS ]-IV ON SHELF TO 12'-0"; NFPA 13:TABLE 13.2.1; 16.2.12 AND 11.2.3.4.2 <br />RC = RETAIL CEILNG/RNC = RETAIL NO CEILING <br />SL = STORAGE LOW/SH = STORAGE HIGH SRR = SINGLE ROW RACK <br />REFERENCE SPRINKLER PLANS AND SPRINKLER SYMBOL LEGEND FOR oPRINKLERS NECESSARY TO MEET THE DESIGN REQUIREMENTS DRR = DOUBLE ROW RACK <br />* = EXISTING DESIGN CRITERIA TO REMAIN MRR - MULTIPLE ROW RACK <br />OWNER FURNISHED SPRINKLERS AND SPRINKLER SYMBOL LEGEND <br />ACCESSORIES <br />SYMBOL <br />SIZE <br />K-FACTOR <br />FINISH <br />MFR <br />MAKE <br />S.I.N. <br />TEMP <br />STYLE <br />QTY <br />PARE <br />ESCH <br />ESCH <br />ESCH <br />SYMBOL <br />SIZE <br />MFR <br />MAKE <br />S.I.N. <br />FINISH <br />STYLE <br />TEMP <br />K-FACTOR <br />QTY <br />STYLE <br />FINISH <br />QTY <br />;% <br />VARIES <br />VARIES <br />VARIES <br />VARIES <br />VARIES <br />EXISTING <br />VARIES <br />VARIES <br />® <br />3/4" <br />16.8 <br />BRASS <br />TYCO <br />K17-231 <br />TY7158 <br />155 <br />UPRIGHT <br />222 <br />6 <br />-- <br />-- <br />-- <br />- <br />PENDENT <br />* <br />-3/w <br />16-.8 - <br />BRASS <br />TYCG <br />K17-231 <br />-TY7-lZ8 <br />-- 200 <br />AJPRIGHT <br />---6-- <br />--6 <br />-- <br />--- <br />_..___-- <br />x <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />- - <br />PENDENT <br />3/4" <br />11.2 <br />BRASS <br />TYCO <br />ELO-231 <br />I TY5131 <br />155 <br />UPRIGHT <br />1246 <br />24 <br />--- <br />--- <br />-- <br />• <br />MATCH <br />MATCH <br />MATCH <br />MATCH <br />MATCH <br />NEW <br />MATCH <br />MATCH <br />EXISTING <br />EXISTING <br />EXISTING <br />EXISTING <br />EXISTING <br />PENDENT <br />EXISTING <br />EXISTING <br />O* <br />3/4" <br />11.2 <br />BRASS <br />TYCO <br />ELO-231 <br />TY5131 <br />200 <br />UPRIGHT <br />47 <br />6 <br />--- <br />-- <br />--- <br />k_; <br />VARIES <br />VARIES <br />VARIES <br />VARIES <br />BRASS <br />EXISTING <br />UPRIGHT <br />VARIES <br />VARIES <br />X <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />SUBSTITUTIONS WILL NOT BE PERMITTED. REFERENCE SPECIFICATIONS APPENDIX B FOR ADDITIONAL <br />UPRIGHT <br />INFORMATION. <br />O <br />MATCH <br />MATCH <br />MATCH <br />MATCH <br />MATCH <br />NEW <br />MATCH <br />MATCH <br />EXISTING <br />EXISTING <br />EXISTING <br />EXISTING <br />EXISTING <br />UPRIGHT <br />EXISTING <br />EXISTING <br />WHERE SPRINKLERS ARE INSTALLED BELOW OBSTRUCTIONS (REFRIGERATION PIPING, RTUs, CABLE <br />TRAYS, ETC.) THESE SPRINKLERS SHALL BE REPLACED WITH SPRINKLERS MATCHING THE NEW <br />WHERE SPRINKLERS ARE CALLED OUT TO "MATCH EXISTING," THE CONTRACTOR <br />SPRINKLERS BEING INSTALLED AT THE ROOF DECK LEVEL. <br />SHALL PROVIDE SPRINKLERS MANUFACTURED BY TYCO, WHICH ARE EQUIVALENT TO <br />THE EXISTING TO REMAIN SPRINKLERS. SUBSTITUTIONS WILL NOT BE PERMITTED. <br />* INTERMEDIATE TEMPERATURE SPRINKLERS TO BE FURNISHED BY OWNER FOR INSTALLATION BELOW <br />SKYLIGHTS AND ON AIR FLOW SIDE (INTERMEDIATE-TEMERATURE ZONE) OF UNIT HEATERS PER NFPA <br />13. <br />**HIGH TEMPERATURE SPRINKLERS TO BE FURNISHED BY OWNER FOR INSTALLATION AROUND UNIT <br />HEATERS. <br />NOTE: EXISTING PENDENTS ARE WHITE 3/4" 155° <br />VIKING STD RESPONSE WITH WHITE ESCUTCHEONS. <br />THE OWNER WILL FURNISH ONE (1 QTY) SPRINKLER WRENCH (TYPE 38) FOR INSTALLATION PURPOSES <br />FOR THE TY7258 WHEN INSTALLING WITH STYLE 30 ESCUTCHEONS. THE CONTRACTOR IS REQUIRED TO <br />NEW PENDENTS TO BE TYCO W4251 3/4" WHITE 1550. <br />LEAVE THE OWNER FURNISHED SPRINKLER WRENCH INSIDE THE SPARE HEAD CABINET AFTER <br />ESCUTCHEONS TO BE WHITE 401 OR SEMI RECESSED <br />INSTALLATION AS BEEN COMPLETED. <br />DEPENDING ON LOCATION TO MATCH EXISTING. <br />THE OWNER WILL FURNISH ONE (1 QTY) SPRINKLER WRENCH (TYPE 8) FOR INSTALLATION PURPOSES <br />FOR THE TY7258 WHEN INSTALLING WITH STYLE 65/401 ESCUTCHEONS. THE CONTRACTOR IS REQUIRED <br />TO LEAVE THE OWNER FURNISHED SPRINKLER WRENCH INSIDE THE SPARE HEAD CABINET AFTER <br />INSTALLATION HAS BEEN COMPLETED. <br />THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE TO OWNER FURNISHED SPRINKLERS <br />DURING INSTALLATION. TO REPLACE DAMAGED SPRINKLERS CONTACT HAINES, JONES, CADBURY <br />1-800-459-7099. <br />THE OWNER WILL FURNISH ADDITIONAL SPRINKLERS FOR THE SPARES CABINET. INSTALL SPARE <br />SPRINKLER QUANTITY INDICATED ON CONTRACT DOCUMENTS PRIOR TO FIRE PROTECTION <br />CONSULTANT SITE OBSERVATION. <br />SYMBOL LEGEND <br />SYMBOL I DESCRIPTION <br />sHYDRAULIC <br />REFERENCE NODE <br />E- <br />CAP <br />Q <br />RISER NIPPLE/DROP NIPPLE <br />® <br />SPRINKLER RISER <br />I <br />INSPECTOR'S TEST/AUXILIARY DRAIN <br />`r� <br />FIRE DEPARTMENT CONNECTION <br />\ <br />HANGER <br />\-\\\ <br />TRAPEZE HANGER <br />® <br />NEW CONNECTION <br />NEW SPRINKLER PIPE <br />- - - - <br />EXISTING SPRINKLER PIPE <br />-X-X-X- <br />DEMOLISHED SPRINKLER PIPE <br />PROVIDE ADDITIONAL SPRINKLERS AS REQUIRED <br />PER NFPA 13 IN EXISTING SPRINKLER CABINET <br />FOR ANY NEW SPRINKLERS INSTALLED. <br />SYSTEM _IMPAIRMENT <br />SCOPE OF WORK <br />GENERAL NOTES <br />GENERAL NOTES CONT. <br />REQUIREMENTS <br />1. THE CONTRACTOR IS RESPONSIBLE FOR THE <br />1. CONTRACTOR TO FIELD VERIFY EXTENT OF WORK. <br />COORDINATION, VERIFICATION AND PROVISION OF A <br />2. UPGRADE THE EXISTING FIRE SPRINKLER SYSTEM IN <br />I. THE DESIGN SHOWN ON THESE CONTRACT <br />7. THE_FIRE PROTECTION ENGINEER OF RECORD <br />FIRE WATCH SUBJECT TO THE REQUIREMENTS OF <br />THE GROCERY STOCKROOM, GENERAL <br />DOCUMENTS IS TO PROVIDE GUIDANCE FOR <br />SHALL NOT BE RESPONSIBLE FOR THE <br />THE LOCAL JURISDICTION. ALL FIRE WATCH COSTS <br />MERCHANDISING STOCKROOM, SALES FLOOR, <br />BIDDING. SUBMIT COMPLETE FIRE SPRINKLER SHOP <br />CONTRACTOR'S FAILURE TO CARRY OUT THE <br />INCURRED AS A RESULT OF THIS PROJECT SHALL BE <br />SEASONAL SHOP, BREAK ROOM AND VISION <br />DRAWINGS AS REQUIRED BY CONTRACT <br />CONSTRUCTION WORK IN ACCORDANCE WITH THE <br />INCLUDED INTHE PROJECT BID AS A SEPARATE LINE <br />CENTER. TO MEET THE DISCHARGE PRESSURE, <br />DOCUMENTS TO THE OWNERS DESIGNATED <br />CONTRACT DOCUMENTS, NOR SHALL THEY BE <br />ITEM. COORDINATION AND VERIFICATION AS TO <br />HOSE ALLOWANCE AND MAXIMUM SPRINKLER <br />REVIEWERS. BASE SPRINKLER DESIGN UPON <br />REQUIRED TO SUPERVISE THE CONDUCT OF THE <br />WHEN A FIRE WATCH MAY BE NEEDED SHALL BE THE <br />SPACING A S REFERENCED I N THE PROTECTION <br />O <br />THESE DRAWINGS AND AS REQUIRED BY THE <br />WORK, THE CONSTRUCTION PROCEDURES <br />RESPONSIBILITY OF THEGENERAL CONTRACTOR. <br />CRITERIA LEGEND. <br />SPECIFICATIONS. NS SHOP DRAWINGS MUST INCLUDE <br />FOLLOWED BY THE CONTRACTOR, <br />2. THE GENERAL CONTRACTOR SHALL REQUEST THE <br />3. INSTALL <br />L ONE PRV ON EACH SYSTEM RISER AND <br />ELEVATIONS, HANGER LOCATIONS, PIPE LENGTHS, <br />SUBCONTRACTORS,. THEIR RESPECTIVE <br />STORE MANAGER T G O NOTIFY ALARM CENTRAL OF <br />INSTALL AIRRELEASE V HALVE ON EACH Y CH SYSTEM IN <br />DIMENSIONS,Y <br />METHODS MATERIAL <br />R PERSON AT THE JOB <br />EMPLOYEES OR AN OTHER <br />O <br />THE SYSTEM(S) BEING SHUT OFF FOR WORK AND <br />ACCORDANCE WITH THESE DRAWINGS. <br />DATA, AND ADDITIONAL INFORMATION NECESSARY <br />SITE OTHER THAN THAT OF THE ENGINEERING <br />THE DURATION OF THE SHUT OFF. <br />4. THE EXISTING FIRE SPRINKLER SYSTEMS WILL BE <br />TO CLARIFY THE INTENT OF INSTALLATION. <br />FIRM'S EMPLOYEES. <br />3. THE GENERAL CONTRACTOR SHALL CALL DIRECT TO <br />MODIFIED AS INDICATED ON THE PROJECT <br />CONTRACTOR SHALL PROVIDE PIPE SIZE, <br />8. CONTRACTOR MUST REVIEW ALL CONSTRUCTION <br />THE FIRE DEPARTMENT AND ADVISE THAT THE FIRE <br />CONTRACT DOCUMENTS. THE SCOPE OF WORK <br />SPRINKLER SPACING, AND SYSTEM CONFIGURATION <br />DOCUMENTS PRIOR TO BID. SHOULD <br />ALARM SYSTEM IS IN TEST. <br />MAY INCLUDE THE MODIFICATION OF EXISTING <br />AS SHOWN. ALTERNATE MATERIALS MUST BE SENT <br />MODIFICATIONS TO THESE PLANS BECOME <br />4. AT THE END OF EACH NIGHTS WORK, THE GENERAL <br />BRANCHLINES, INSTALLATION OF NEW <br />TO THE FIRE PROTECTION ENGINEER OF RECORD <br />NECESSARY TO PROPERLY COORDINATE THE <br />CONTRACTOR SHALL CALL DIRECT TO THE FIRE <br />LINES, MODIFICATION OF EXISTING RISERS}, <br />OR VIA THE RFI PROCESS AND MUST BE APPROVED <br />SYSTEM WITH ALL OTHER TRADES, IT WILL BE THE <br />DEPARTMENT AND ALARM CENTRAL TO ADVISE <br />THE RE <br />THE REMOVAL AND INSTALLATION OF NEW <br />IN RECORD DOCUMENTS PRIOR TO BID. <br />CONTRACTOR'S RESPONSIBILITY TO OBTAIN <br />WORK IS COMPLETE. <br />SPRINKLERS, MODIFICATION OF EXISTING MAINS, <br />2. COORDINATE LOCATIONS OF FIRE PROTECTION <br />APPROVAL OF THE CHANGES FROM BOTH THE <br />5. (FIRST FIRE WATCH OPTION) A FIRE WATCH SHALL BE <br />INSTALLATION OF NEW MAINS, REPLACEMENT OF <br />COMPONENTS, INCLUDING PIPING, ALARMS, DRAINS, <br />AUTHORITY HAVING JURISDICTION AND THE <br />REQUIRED WHEN ANY FIRE PROTECTION SYSTEM IS <br />THE EXISTING BACKFLOW PREVENTOR. <br />TEST POINTS, ETC. WITH ARCHITECTURAL, <br />OWNER'S DESIGNATED REVIEW CONSULTANT IN <br />IMPAIRED OR OTHERWISE DOWN FOR ALTERATION. <br />5. ALL NEW PIPING SHALL HAVE ANGERS INSTALLED <br />STRUCTURAL, MECHANICAL, AND ELECTRICAL <br />ADDITION TO OBTAINING THE NECESSARY <br />THE APPROVED FIRE WATCH SHALL BE CONDUCTED <br />IN ACCORDANCE TO THE DETAILS LOCATED ON THE <br />COMPONENTS. OBSTRUCTION TO SPRINKLER <br />APPROVALS, THE CONTRACTOR MUST MAKE NOTE <br />BY A DEDICATED, TRAINED WALMART EMPLOYEE <br />FIRE PROTECTION DETAILS SHEET. <br />DISCHARGE MUST BE CONSIDERED DURING SHOP <br />OF ANY FIELD OR COORDINATION CHANGES ON THE <br />WHOSE SOLE RESPONSIBILITY WILL BE TO PERFORM <br />6. ALL 1-INCH ARMOVERS (IF APPLICABLE) SHALL HAVE <br />DRAWING PRODUCTION AND INSTALLATION; <br />INSTALLATION DRAWINGS, AND THEN MUST <br />HOURLY PATROLS OF THE PREMISES AND KEEP <br />A HANGER SECURED TO THE STRUCTURAL STEEL <br />ADDITIONAL SPRINKLERS MAY BE REQUIRED AT NO <br />PROVIDE A SET OF AS -BUILT DRAWINGS ONCE <br />WATCH FOR FIRES AND WILL NEED TO DOCUMENT <br />ONLY, NOT TO THE DECK WHEN THE LENGTH <br />ADDITIONAL COST TO OWNER. REFER TO <br />COMPLETE. <br />THEIR WALK AND REPORT BACK TO THE GENERAL <br />EXCEEDS WHERE STATIC PRESSURES ARE UP <br />SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br />9. CONTRACTOR MUST VERIFY ALL DROP DOWN <br />CONTRACTOR AND WALMART MANAGEMENT. THIS <br />AN <br />TO 100 PSI AN D 1'-0" WHERE STATIC PRESSURES <br />3. CONTRACTOR MUST VISIT THE BUILDING SITE TO <br />LOCATIONS AT EXTERIOR WALLS WITH THE <br />PERSON SHALL BE PROVIDED WITH AT LEAST ONE <br />EXCEEDS 100 PSI. <br />DETERMINE THE FULL EXTENT OF THE EXISTING <br />PROJECT MANAGER PRIOR TO INSTALLATION. <br />APPROVED MEANS FOR NOTIFICATION TO THE FIRE <br />7. CEILING GRID SHALL BE PERMITTED REMOVED <br />FIRE PROTECTION WORK AND EXISTING <br />10. ALL PIPING MUST BE COORDINATED AROUND <br />DEPARTMENT. <br />IN AREAS WHERE REQUIRED IN ORDERR TOO <br />CONDITIONS, BECOME TOTALLY FAMILIAR WITH THE <br />FRAMING MEMBERS AND PROPERLY INSTALLED <br />6. (SECOND FIRE WATCH OPTION) A FIRE WATCH SHALL <br />COMPLETE THE WORK NEEDED SUCH AS DEMO AND <br />DISCONNECTIONS, REMOVALS, RELOCATIONS <br />INSIDE THE BAR JOIST. <br />BE REQUIRED WHEN ANY FIRE PROTECTION SYSTEM <br />INSTALLATION OF NEW MAINS OR LONG DROPS. IN <br />AND/OR RECONNECTIONS OF EXISTING FIRE <br />11. CONTRACTOR SHALL ROUTE PIPING AROUND ALL <br />IS IMPAIRED OR OTHERWISE DOWN FOR <br />THIS CASE THE CONTRACTOR SHALL BE <br />PROTECTION EQUIPMENT REQUIRED, AND <br />OBSTRUCTIONS AND PROVIDE SPRINKLER <br />ALTERATION. THE FIRE SPRINKLER CONTRACTOR <br />RESPONSIBLE FOR REPLACING DAMAGED CEILING <br />CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. <br />PROTECTION UNDER OBSTRUCTIONS, AS DETAILED <br />SHALL HIRE AN APPROVED OFF -DUTY FIRE FIGHTER <br />TILE OR GRID DURING THE INSTALLATION. ALL <br />NO EXTRA COMPENSATION WILL BE PAID FOR LACK <br />IN NFPA 13 STANDARDS AS PART OF THE FIELD <br />TO PERFORM THE REQUIRED FIRE WATCH. FIRE <br />REMOVED CEILING TILES MUST BE REPLACED AT <br />OF SUCH DETERMINATION, FAMILIARIZATION, <br />COORDINATION AT NO ADDITIONAL COST TO <br />WATCH PERSONNEL SHALL BE PROVIDED WITH AT <br />THE END OF BUSINESS DAY. AREAS LEFT EXPOSED <br />AND/OR ALLOWANCE. <br />OWNER. <br />LEAST ON APPROVED MEANS FOR NOTIFICATION OF <br />SUCH AS BUT NOT LIMITED TO REMOVED CEILING <br />4. SUBMIT A REQUEST FOR INFORMATION FOR <br />12. ALL SPRINKLER DEFLECTOR DISTANCE <br />THE FIRE DEPARTMENT AND THEIR SOLE DUTY SHALL <br />GRID AND CEILING TILES SHALL NOT BE PERMITTED. <br />QUESTIONS REGARDING THE FIRE PROTECTION <br />REQUIREMENTS SHALL BE IN ACCORDANCE TO THE <br />BE TO PERFORM CONSTANT PATROLS AND WATCH <br />8, THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />DOCUMENTS PER RFI PROCESS LOCATED IN THE <br />STANDARDS OUTLINED IN NFPA 13. c) <br />FOR THE OCCURRENCE OF FIRE. FOR HOT WORK <br />PURCHASING AND INSTALLING MATCHING CEILING <br />FIRE PROTECTION SPECIFICATIONS. <br />13. ALL PIPING PASSING THROUGH CMU WALLS SHALL `- <br />OPERATIONS, A FIRE WATCH SHALL BE POSTED FOR <br />TILES TO REPLACE ANY CEILING TILES THAT HAVE <br />5. NEUTRALIZATION WALLS, IF PROVIDED, ARE SHOWN <br />BE INSTALLED WITH ONE INCH CLEARANCE ON A <br />THE DURATION OF THE WORK AND 30 MINUTES <br />EMPTY HOLES DUE TO SPRINKLER REPLACEMENT. <br />ON THE ARCHITECTURAL DRAWINGS. REFER TO <br />SIDES. (CORE DIAMETER EQUAL TO PIPE +2"). AL <br />THEREAFTER. <br />9. USE EACH EXISTING OUTLETS FOR ONE NEW ARM <br />MECHANICAL DRAWINGS FOR NEUTRALIZATION <br />CORES SHALL BE COORDINATED WITH STRUCTURAL <br />7. ONLY (1) ONE SYSTEM IS PERMITTED TO BE SHUT <br />OVER TO NEW SPRINKLER LOCATION UNLESS <br />WALL PENETRATION DETAIL. <br />REINFORCING. CONTRACTOR IS RESPONSIBLE FOR , <br />DOWN AT ONE TIME-.- ------ -- - - <br />HYDRAULICA-LtY-CAt,CULAT€B--CONTRA-CTOR SttALL- <br />6. PENETRATIONS OF "RATED ASSEMBLIES" SHALL BE <br />PROVIDING ALL CORING WITH PROPER CLEARANCE ` <br />8. ANY FIRE DEPARTMENT FEES FOR FAILURE TO <br />INSTALL 1" INCH MECHANICAL TEES IF ADDITIONAL <br />FIRE STOPPED WITH AN APPROVED MATERIAL PER <br />- AT ALL CMU WALLS --GENERAL CONTRACTOR SHALL <L <br />FOLLOW PROCEDURES WILL BE AT THE GENERAL <br />OUTLETS ARE REQUIRED. AFTER THE DEMOLITION IS <br />METHODS REQUIRED BY PROJECT SPECIFICATIONS <br />BE RESPONSIBLE FOR PROVIDING A TWO INCH < <br />CONTRACTORS EXPENSE. <br />COMPLETE, THE NEW SPRINKLER SYSTEM SHALL <br />AND THE AUTHORITY HAVING JURISDICTION. <br />CLEARANCE AROUND ALL PIPING PASSING <br />9. REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED <br />MEET ALL REQUIREMENTS OF NFPA 13. <br />THROUGH CONCRETE SLABS. THE SPRINKLER <br />AT ALL TIMES DURING CONSTRUCTION, DEMOLITION, <br />10. CONTRACTOR SHALL PROVIDE NEW SPRINKLERS AS <br />CONTRACTOR SHALL FILL ALL CLEARANCES WITH <br />REMODELING OR ALTERATIONS AND ADDITIONS TO <br />THE WALMART. ALL EXITS SHALL NOT BE BLOCKED, <br />NECESSARY DUE TO PAINT, DAMAGE, ETC.. <br />CONTRACTOR SHALL COORDINATE. <br />FIRE SPRINKLER PIPING AND <br />APPROVED MASTIC. <br />14. ON THE SALES FLOOR AND SEASONAL SHOP, PRIME <br />REDUCED OR OTHERWISE MADE INOPERABLE WHICH <br />11. THE CONTRACTOR IS RESPONSIBLE FOR <br />AND PAINT ALL NEWLY INSTALLED PIPE, PIPE <br />ALSO INCLUDES THE EXIT ACCESS, THE EXIT AND <br />MAINTAINING THE FIRE LANES DURING THE <br />DEMOLITION NOTES <br />FITTINGS,AND SUPPORTS TO MATCH EXISTING C .. <br />EXIT DISCHARGE TO THE PUBLIC WAY. TEMPORARY <br />SPRINKLER SYSTEM UPGRADE PROCESS. THE <br />CEILING. <br />MEANS OF EGRESS ARE ALLOWED. <br />CONTRACTOR SHALL COORDINATE WITH THE STORE <br />15. PROVIDE FLUSHING CONNECTIONS IN ACCORDANCE <br />10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE <br />MANAGER A STAGING AREA FOR MATERIALS AND <br />1- CONTRACTOR MUST VISIT THE BUILDING SITE TO <br />WITH THE STANDARDS OUTLINED IN NFPA 13. <br />END OF EACH WORKDAY. <br />TOOLS TO BE USED FOR PROJECT PRIOR TO START <br />DETERMINE THE FULL EXTENT OF THE EXISTING FIRE <br />16. PROVIDE ALL NECESSARY OFFSETS, RISES OR <br />OF WORK. <br />PROTECTION WORK AND EXISTING CONDITIONS, <br />DROPS IN PIPING AND AUXILIARY DRAINS REQUIRED <br />12. THE SPRINKLER CONTRACTOR SHALL BE <br />BECOME TOTALLY FAMILIAR WITH THE <br />BY BUILDING CONDITIONS. <br />RESPONSIBLE FOR PREPARING THE SHOP <br />DISCONNECTIONS, REMOVALS, RELOCATIONS <br />17. EXAMINE THE JOB CONDITIONS AND VERIFY ALL <br />HYDROSTATIC TEST <br />DRAWINGS, HYDRAULIC CALCULATIONS AND <br />AND/OR RECONNECTIONS OF EXISTING FIRE <br />MEASUREMENTS, DISTANCES, ELEVATIONS, <br />APPROVAL (BY THE ENGINEER OF RECORD AND AHJ) <br />PROTECTION EQUIPMENT REQUIRED, AND <br />CLEARANCES, ETC. <br />AS WELL AS INSTALLATION. <br />CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. <br />18. ARCHITECTURAL AND ELECTRICAL BACKGROUND <br />BUILDING SPRINKLER SYSTEM(S) INVOLVED IN THIS <br />13. THE SPRINKLER CONTRACTOR MUST FIRST SUBMIT <br />NO EXTRA COMPENSATION WILL BE PAID FOR LACK <br />OF SUCH DETERMINATION, FAMILIARIZATION, AND/OR <br />INFORMATION IS SHOWN FOR COORDINATION <br />PURPOSES ONLY. REFER TO THE CONTRACT <br />SCOPE OF WORK SHALL BE HYDROSTATICALLY TESTED <br />DOCUMENTS, AS OUTLINED IN THE PROJECT <br />ALLOWANCE. <br />DOCUMENTS FOR LOCATIONS, SIZES AND <br />IN ACCORDANCE WITH NFPA 13. MOREOVER, THE <br />ESPECIFICATIONS, TO THE FIRE PROTECTION <br />ENGINEER RECORD FOR APPROVAL. AFTER THE <br />2. UNLESS INDICATED OTHERWISE, DISCONNECT AND <br />QUANTITIES OF OTHER TRADE WORK. <br />FOLLOWING TWO (2) HYDROSTATIC TESTS SHALL BE <br />IS <br />APPROVAL S GIVEN, THE CONTRACTOR MUST <br />REMOVE ALL EXISTING FIRE PROTECTION <br />19. SPRINKLER SPACING SHALL BE PER NFPA 13 <br />PERFORMED BY THE CONTRACTOR: <br />SUBMIT TO THE AUTHORITY HAVING JURISDICTION <br />COMPONENTS NOT INTENDED TO BE REUSED. <br />UNLESS OTHERWISE NOTED ON PLANS AND/ OR <br />1. THE FIRST HYDROSTATIC TEST SHALL BE <br />FOR INSTALLATION PERMIT. <br />3. DISCONNECT, RELOCATE, AND RECONNECT <br />PROTECTION CRITERIA LEGEND. <br />PERFORMED THE CONTRACTOR PRIOR TO <br />PRIOR <br />14. THE CONTRACTOR SHALL COORDINATE WITH THE <br />EXISTING FIRE PROTECTION SYSTEMS AND <br />20. INTERFACE SPRINKLER SYSTEM WITH FIRE <br />SCOPE <br />START OF SPRINKLER SYSTEM SC <br />STORE MANAGER ON THE AREA TO BE WORKED ON <br />EQUIPMENT WHERE REQUIRED. <br />PROTECTION SUPERVISORY SYSTEM. <br />WORK ("PRE -SCOPE HYDRO TEST"); AND <br />AT LEAST 24 HOURS IN ADVANCE. <br />4. NOTE CAREFULLY THAT THE FIRE PROTECTION <br />21. ALL MATERIALS SHALL BE UL LISTED OR FM <br />2. THE SECOND HYDROSTATIC TEST SHALL BE <br />15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />DRAWINGS ARE INTENDED TO INDICATE, ONLY <br />APPROVED. SPRINKLER PIPE SHALL BE <br />PERFORMED BY THE CONTRACTOR AFTER <br />DAMAGE TO ANY OF THE STORES CONTENTS <br />DIAGRAMMATICALLY, THE EXTENT AND THE GENERAL <br />MANUFACTURED TO STANDARDS RECOGNIZED BY <br />COMPLETION OF CONTRACT <br />CSCOPE OF WORK <br />(MERCHANDISE), OR THE BUILDING COMPONENTS AS <br />CHARACTER AND LOCATIONS OF THE WORK <br />NFPA 13., THREADED PIPE SHALL HAVE A <br />POST -SCOPE HYDRO TEST'). <br />A RESULT OF THE WORK SHOWN ON THE CONTRACT <br />INCLUDED. PROVIDE ALL WORK OBVIOUSLY <br />CORROSION RESISTANCE RATING OF 1.0 OR <br />DOCUMENTS. <br />INTENDED, BUT HAVING MINOR DETAILS OMITTED OR <br />GREATER. CRIMP -TYPE COUPLINGS SHALL NOT BE <br />THE HYDROSTATIC TESTS ON EXISTING SPRINKLER <br />16. THE CONTRACTOR SHALL REPAIR ANY LEAKS OR <br />NOT SHOWN. COMPLETE AS REQUIRED TO <br />USED. THREADABLE THINWALL PIPE WITH <br />SYSTEM SHALL BE CONDUCTED AT A PRESSURE OF <br />REPLACE ANY LEAKING COMPONENTS AFFECTED BY <br />PERFORM THE FUNCTIONS INTENDED. FOLLOW THE <br />CORROSION RESISTANCE RATING OF LESS THAN 1.0 <br />200 PSI FOR 2 HOURS. NEW SYSTEMS SHALL <br />THIS SCOPE OF WORK AT NO ADDITIONAL COST TO <br />CONTRACT DOCUMENTS FOR BUILDING DETAILS <br />SHALL BE USED ONLY WITH ROLL GROOVE FITTINGS. <br />TESTED PER PRESSURE. REQUIREMENTS OF NFPA 13. <br />THE OWNER. <br />AND FIT THE WORK OF THE FIRE PROTECTION <br />22. IF REQUIRED, PROVIDE 24 VOLT AC, ELECTRIC BELL, <br />DRAWINGS AND SPECIFICATIONS THERETO. <br />MODEL NO. PBA248, ELECTRIC BELL BY POTTER <br />THE CONTRACTOR SHALL NOT BE RESPONSIBLE FOR <br />5. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS <br />ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI, LOCATE <br />DAMAGE TO CONTENTS OR BUILDING OCCURRING <br />TO AN APPROVED DUMPING SITE AND CLEAN ALL <br />AS REQUIRED BY AUTHORITIES HAVING <br />DURING THE "PRE -SCOPE HYDRO TEST" PROVIDED ALL <br />WATER SUPPLY <br />FIRE PROTECTION WORK PRIOR THE PROJECT <br />JURISDICTION. PROVIDE NEW DOUBLE POLE VANE <br />COMMERCIALLY REASONABLE MEASURES NECESSARY <br />COMPLETION. <br />TYPE FLOW DETECTOR, <br />OR PRUDENT TOPRO ECT CONTENTS OR BULD NG <br />INFORMATION <br />6. PERFORM ALL WORK ACCORDING TO THE PROJECT <br />POTTER E ECTRIC S GNAL OF ST.00UIS, MISSOURI. <br />COMPONENTS WERE FOLLOWED FOR APPROPRIATE <br />- <br />PHASING SCHEDULE INFORMATION FOR THIS <br />SET ADJUSTABLE DELAYED SIGNAL AT 30 SECONDS. <br />- <br />TEST STATIC AT SRC: 55 PSI <br />TEST PROCESS. CONTRACTOR SHALL COMPLETE <br />PROJECT. PROVIDE ALL NECESSARY FIRE <br />MOUNT WATER FLOW INDICATORS NO HIGHER THAN <br />REPAIRS AND / OR REMEDIATION TO EXISTING <br />PROTECTION WORK TEMPORARY AND/OR <br />6 FEET ABOVE FINISH FLOOR <br />POINT OF CONNECTION SYSTEMS REQUIRED AS A RESULT OF DEFICIENCIES TEST RESIDUAL AT SRC. 50 PSI AT 1030 GPM OTHERWISE, AND USE WHATEVER MEANS 23. ALL SPRINKLER SYSTEMS THAT ARE TO BE <br />O IDENTIFIED DURING PRE -SCOPE TESTING AS AN INFORMATION DERIVED FROM A WATER REPORT BY NECESSARY, TO CONFORM TO THE REQUIRED MODIFIED SHALL BE HYDROSTATICALLY TESTED PER <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ♦ ADDITIONAL SERVICE. (CUHACI & PETERSON) FROM A FLOW TEST CONSTRUCTION PHASING OF THE PROJECT. NFPA 13 PRIOR TO SPRINKLER SYSTEM <br />. I THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE 11 12 STATIC /RESIDUAL HYDRANT FOR DAMAGE CONTENTS OR BUILDING OCCURRING CONDUCTED O 00 AM EST. N11/05/20. THE TEST WAS CONDUCTED 7. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR MODIFICATION AND SHALL BE RE -HYDROSTATICALLY <br />I I <br />REPLACING ITEMS DAMAGED DURING DEMOLITION TESTED AFTER COMPLETION OF WORK. <br />I I DURING THE "POST -SCOPE HYDRO TEST" PROCEDURE AND CONSTRUCTION. 24. DO NOT HANG OR SUPPORT ANY LOADS OR MAKE <br />I ORIGINATING IN EXISTING OR NEW SYSTEM FLOW TEST ELEVATION: 100.0 FT AMSL 8. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH ANY ATTACHMENTS TO THE METAL ROOF DECK OR <br />COMPONENTS. CONTRACTOR SHALL COMPLETE BUILDING PAD ELEVATION: 100.0 FT AMSL ADJACENT SURFACES LEFT UNUSED AFTER EXISTING JOIST BRIDGING. <br />1 REPAIRS AND / OR REMEDIATION TO EXISTING SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND 25. SAMMY SCREWS ARE NOT PERMITTED. <br />I SYSTEMS REQUIRED AS A RESULT OF DEFICIENCIES THE WATER SUPPLY IS MODIFIED BY THE FOLLOWING: VACATED FROM THESE HOES. 26. CEILING FLANGES ARE NOT PERMITTED. <br />II IDENTIFIED DURING POST -SCOPE TESTING AT NO 9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND 27. PROVIDE RETAINING STRAPS ON HANGERS WHERE <br />I FLOW HYDRANT 1,C,2'g(:3 4 5 6 C7) 8(:9(10) 13 14 15 ADDITIONAL COST TO WALMART. + 0.0 PSI DUE TO ELEVATION DIFFERENCE MAINTAINING FIRE DEPARTMENT ACCESS ROADS REQUIRED. <br />f 11 � _ I WHEN CONDUCTING HYDROSTATIC TESTING ON BETWEEN TEST AND BUILDING THROUGHOUT THE PROJECT. 28. CONTRACTOR IS TO COORDINATE FINAL SPRINKLER <br />• C�)- <br />_ SYSTEM 3�- I7----- OINTiNG SYSTEMS AS REQUIRED BY NFPA 13,RACTOR SALL TAKESCH ACTIONS AS MAY BE -5.0 PSI WALMART SAFETY FACTOR 10EMOLITION SHALNKLER LnBE EFT IN SERVICE S NOT ASSOCIATED TH THE HEATEYD LOCATIONS AND PIPE ROUTING SUCH DO NOT IINTRFERE WIH NORECEVEHAT <br />I T . 7.894 SQ PT. I NECESSARY TO REDUCE POTENTIAL DAMAGE TO DESIGN STATIC AT SRC: 50 PSI 11. THE CONTRACTOR SHALL PROPERLY NOTIFY THE DAMAGE FROM THE NORMAL OPERATIONS OF THE <br />_ RISERS CONTENTS AND BUILDING DURING EXECUTION OF DESIGN RESIDUAL AT SRC: 45 PSI AT 1030 GPM LANDLORD. THE LESSOR AND THE ADJACENT AREA. <br />I I , I -' - -"� ` I I I I I I I SCOPE OF WORK, INCLUDING BUT NOT LIMITED TO THE TENANTS A MINIMUM OF 48 HOURS IN ADVANCE <br />, I , FOLLOWING: BEFORE PROCEEDING WITH THIS WORK. ALL WORK <br />it , 1., USE OF LOW CAPACITY PRESSURE PUMP TO SHALL BE SCHEDULED IN ADVANCE., <br />I BREAK j I OTHERS t , INCREASE PRESSURE IN SYSTEM AT <br />I I INCREMENTAL RATE TO LIMIT SURGES IN <br />H - - I - - I -_ ___ _ _ -I -- i -1 - r- AIR RELEASE VENT GENERAL UNDERGROUND APPLICABLE CODES <br />SYSTEM; AND <br />2. PROVISION OF WORK STAFF DEDICATED TO <br />, (: ' MONITORING THE IMPACTED SYSTEM AREA NOTES <br />DURING PRESSURE APPLICATION AND DURING <br />2 HYDROSTATIC TEST FOR SIGNS OF SYSTEM ONE AIR VENT MUST BE INSTALLED ON ALL WET TYPE CODE STANDARD EDITION <br />FP 2 COMPROMISE (MINIMUM 1 PERSON / 20,000 SQ. FIRE PROTECTION SYSTEMS INCLUDING SYSTEMS NOT 1. ALL UNDERGROUND IS SHOWN FOR HYDRAULIC NFPA 13 2013 <br />FT. AREA); AND AFFECTED BY THE REMODEL SCOPE OF WORK. EACH REFERENCE ONLY. NFPA 25 2014 <br />1 1 1 I I I 1 I I I FFPC 6TH <br />- - - - - - - - <br />I i I <br />SYSTEM 5 <br />SYSTEM 4 <br />SYSTEM 2 <br />I II <br />SYSTEM 1 <br />E INSTALLED <br />3. MAINTAINING DEDICATED PERSON AT SYSTEM <br />CONTROL VALVE IN CONSTANT <br />AIR VENT IS TO BE INSTALLED AT THE HIGHEST POINT <br />OF THE SYSTEM AND PREFERABLY ON THE MAINS. THE <br />Z. SEE CIVIL DRAWINGS FOR EXACT LOCATIONS IF <br />AVAILABLE. <br />COMMUNICATION WITH SYSTEM MONITORS TO <br />CONTRACTOR IS RESPONSIBLE FOR LOCATING THE <br />3. NO NEW WORK UNLESS OTHERWISE NOTED. <br />SHUT OFF TEST PUMP AND DRAIN SYSTEM IN <br />HIGHEST POINT OF EACH SYSTEM AND INSTALLING THE <br />EVENT OF SYSTEM FAILURE OR LEAK; AND <br />4. PROVISION OF READY SUPPLIES PRIOR TO <br />START OF TESTING TO FACILITATE DAMAGE <br />AIR VENT IN AN ACCESSIBLE LOCATION. IF THE AIR <br />VENT IS TO BE INSTALLED ABOVE AN EXISTING CEILING <br />THE CONTRACTOR MUST PROVIDE SIGNAGE PER NFPA <br />CONTACT INFORMATION <br />PLACARD INFORMATION <br />MINIMIZATION IN EVENT OF SYSTEM FAILURE <br />13. REF 3-FP3. <br />DOCUMENTS INCLUDE JURISDICTIONAL REQUIREMENTS <br />(TARPS / PLASTIC SHEETING, WET / DRY <br />VACUUM ETC.); AND <br />5. COVERING HIGH VALUE EQUIPMENT PRIOR TO <br />PROVIDED BY THE FOLLOWING CONTACTS: <br />THE FOLLOWING INFORMATION MUST BE SHOWN ON <br />TESTING; AND <br />6. LIMITATION OF TESTING TO ONE SYSTEM AT A <br />TIME; AND <br />7. TESTING OF SYSTEMS DURING OFF HOURS / <br />I <br />THE PLACARDS FOR EACH UL PERFORMANCE BASE <br />DESIGNS. USE A PLACARD FOR EACH CALCULATED <br />DESIGN. PLACARDS SHALL BE ENGRAVED METAL <br />SIGNS. REFERENCE SPECIFICATIONS FOR ADDITIONAL <br />CIT OF ZEPHYRHILLS FIRE DEPARTMENT: <br />BRIAN SWARTOUT, FIRE CHIEF ' <br />(813) 780-0020 <br />WITH <br />1 1 OVERNIGHT. INFORMATION. PLACARDS TAT AR <br />E - - 145,631 SQ �T - - 45,019 SQ FT- - fi-44,264 SQ FT- ---t - 39,153 SQ FT- - ,- <br />INDICATION MIC. I (MICROBIO OGICAi I THERE IS NO LLY INFLUENCED <br />D - - i - - I - I - - - I - I I - I - _ I - - I _ -I - I - I CORROSION) IN THE EXISTING BUILDING. <br />( )-- i <br />GROCERY I GM <br />I I I I I I I I I I I <br />� - -- - _ - - - - - - -- -1--- <br />, 1 <br />l <br />- <br />I I I I I I I I I y I \ I _ - <br />- --- --I I <br />;l <br />iI 1 RELOCATE EXISTING 4" MAIN M . <br />VISION r <br />I i I FP2 + r� <br />B - - - I- - - - - - - . <br />T 1- 7------- "- - ; <br />1 � - - - -,,7,F - DEMOLISH EXISTING PIPING AND <br />�I L <br />_:. - -- _ _ ... _ I. SPRINKLER IN THIS AREA. CUT AND CAP <br />-- - - <br />t . <br />- -- <br />Ai \- * __ EXISTING PIPING.: -----_.- vI I , ---- -- - <br />- - <br />FUTURE' � ! I i I I Hl <br />I ! ; i , I - I . <br />--- F77 <br />L LHEALTH ONCE THE SPRINKLER PROTECTION IS REMOVED, <br />(: A - - - - --1:1 - - - -_I - - %THERE SHALL NO OCCUPANCY OR STORAGE IN THIS <br />I.j ­ MONEY CTR! _ AREA <br />I <br />NEW HEALTH CLINIC IS NOT A PART OF THIS PERMIT. 1 <br />_.s <br />UNDERGROUND PIPING SHOWN RELOCATE EXISTING INSPECTORS TEST AND ADD A . <br />L, 0 20' 40' 60' FOR HYDRAULIC CALCULATION DRUM DRIP CHAMBER AND A SECOND VALVE. <br />' i �L�� z PURPOSES ONLY. <br />OVERALL FIRE SPRINKLER SCALE: 40'4' <br />z <br />} <br />-.. . <br />•- - - . . <br />. <br />__ - <br />INFORMATION WRITTEN PERMANENT MARKER WILL <br />NOT BE ACCEPTED. <br />SYSTEM #: X AREA: X <br />SPRINKLERS CALCULATED: X <br />SPRK END HEAD PRESSURE: X <br />HOSE DEMAND: X <br />SYSTEM FLOW DEMAND: X <br />SYSTEM PRESSURE DEMAND: X <br />SYSTEM SAFETY FACTOR: X <br />INSTALLING CONTRACTOR: X <br />UL PERFORMANCE BASE DESIGN <br />PROJECT 4788122552, NC27954 <br />SHEET INDEX <br />FP1 <br />OVERALL FIRE SPRINKLER PLAN <br />FP2.1 <br />OPERATIONAL FLEXIBILITY FIRE SPRINKLER <br />PLAN SYSTEM 1 <br />FP2.2 <br />OPERATIONAL FLEXIBILITY FIRE SPRINKLER <br />PLAN SYSTEM 2 <br />FP2.3 <br />OPERATIONAL FLEXIBILITY FIRE SPRINKLER <br />PLAN SYSTEM 3 <br />FP2.4 <br />OPERATIONAL FLEXIBILITY FIRE SPRINKLER <br />PLAN SYSTEM 4 <br />FP2.5 <br />OPERATIONAL FLEXIBILITY FIRE SPRINKLER <br />PLAN SYSTEM 5 <br />FP3 <br />FIRE PROTECTION DETAILS <br />THESE LAYOUT DRAWINGS WERE PREPARED BY THE <br />SPRINKLER CONTRACTOR BASED ON THE DESIGN <br />DOCUMENTS PROVIDED BY THE ENGINEER OF <br />RECORD, ADD 1 PLANS DATED 1-27-21 <br />EXISTING CONDITIONS WERE TAKEN FROM <br />ORIGINAL DRAWINGS AND MAY NOT REFLECT <br />EXACT "AS -BUILT" CONDITIONS_ CONTRACTOR <br />SHALL FIELD VERIFY ALL EXISTING CONDITIONS <br />PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR <br />tHA,LL CAREFULLY COORDINATE NEW WORK AND <br />DEM N WITH ALL OTHER DISCIPLINES AND <br />EXISTING C S. _ . <br />STORE ADDRESS <br />7631 GALL BLVD <br />ZEPHYRHILLS, FL <br />EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE <br />TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES <br />NOT RELIEVE THE RESPONSIBILITY OF PERFORMING <br />THE WORK PROPERLY. NO ADDITIONAL <br />COMPENSATION SHALL BE ALLOWED BECAUSE OF <br />CONDITIONS THAT OCCUR DUE TO FAILURE TO <br />FAMILIARIZE,WORKERS WITH THIS KNOWLEDGE. <br />�-1 <br />= co <br />h- <br />f <br />3Q <br />. 4 3-: <br />--� <br />i <br />9O <br />J <br />�jJ <br />v <br />J <br />- LL <br />x <br />v� <br />J <br />.� Q <br />QQ <br />W <br />h- � <br />Scn <br />Nw <br />��ft <br />YO <br />go <br />�w <br />3LL <br />a a: <br />Q z <br />U) <br />J <br />�� `p <br />,- -) 6,� <br />� <br />�© ©J <br />O % <br />L"L" <br />-�� <br />- <br />U) <br />,N <br />J <br />R� <br />a) <br />9or <br />O <br />O <br />mO <br />n <br />J i <br />J <br />0 <br />z <br />cM ^,, <br />a <br />CD <br />- A== <br />1w <br />N <br />� � <br />- <br />6 ID <br />I <br />v, <br />9' <br />i V <br />R2 <br />w <br />M <br />2 <br />z <br />O <br />ISSUE BLOCK � <br />ADD#1 <br />L. - - - t­ I ­ --d <br />-. ------ .. - <br />CHECKED BY: <br />RT � <br />DRAWN BY: <br />EG j <br />PROTO CYCLE: <br />.- <br />DOCUMENT DATE: <br />7-9-21 <br />Z <br />O <br />ON <br />d- <br />U) <br />P-4 <br />M <br />_ <br />M . <br />Z <br />~ <br />tY <br />N <br />Lj <br />E--i <br />X <br />I-1 <br />H h-q <br />W <br />OW <br />04 <br />U <br />z <br />0) <br />t- <br />o <br />� co <br />co <br />0000 <br />`_ <br />OO <br />H <br />� <br />O4 ­400 <br />04 <br />P'Ow <br />x� <br />� <br />04 P -, <br />M O <br />0_0 <br />p-I 04 <br />o FT" <br />z <br />PLI <br />a, <br />W <br />o 04 <br />a <br />� <br />H <br />W <br />.J <br />LLJ <br />�- <br />Pr, <br />o <br />v <br />OVERALL <br />FIRE <br />SPRINKLER <br />PLAN <br />SHEET: <br />FP1 <br />