Laserfiche WebLink
PROTECTION CRITERIA LEGEND <br />HOSE <br />MAXIMUM SPRINKLER <br />OCCUPANCY <br />DISCHARGE PRESSURE <br />ALLOWANCE <br />SPACING <br />DESIGN BASIS <br />CLASSIFICATION <br />(# OPERATING SPRINKLERS - DESIGN AREA) <br />(GPM) <br />(SQ FT) <br />SALES FLOOR/ INTERIOR GARDEN CENTER <br />30 PSI (2 AS-2S/1 L) <br />CLASS I -IV ON SHELF TO 12'-0" (25'-0" CEILING HEIGHT), 5'-0" AISLES; UL LLC TECHNICAL REPORT PROJECT <br />(SH - OPTION 2A) <br />18 PSI (9 AS-4S/2L & 1 S/1 L) <br />250 <br />140 <br />4788122552, NC27954 - TABLE 2 SUMMARY OF TESTS, TEST SRR 06151702 <br />SALES FLOOR/ INTERIOR GARDEN CENTER <br />25 PSI (2 AS-2S/1L) <br />CLASS I -IV ON SHELF TO 12'-0" (25'-0" CEILING HEIGHT), 5'-0" AISLES; UL LLC TECHNICAL REPORT PROJECT <br />(RNC - OPTION 2B) <br />10 PSI (12 AS-4S/3L) <br />250 <br />140 <br />4788122552, NC27954 ; TABLE 2 SUMMARY OF TESTS, TEST GONDOLA 10041702 <br />12 PSI (2 AS-2S/1L) <br />CLASS I -IV RACK STORAGE TO 15-0 (18-0 CEILING HEIGHT), 4-0 /7-6 AISLES; UL LLC TECHNICAL REPORT <br />STOCKROOM -GM/GR (SL -OPTION 4) <br />7 PSI (12 AS-4S/3L) <br />250 <br />100 <br />PROJECT 4788122552, NC27954 - TABLE 2 SUMMARY OF TESTS, TESTS SRR 04191702 / DRR 09191702 / MRR 09211702 <br />CORRIDORS/TENANT SPACES/GROCERY PREP/FOOD <br />0.2011500 SQ FT <br />250 <br />130 <br />CLASS I -IV TO 10'-0"; 13: TABLE 13.2.1 AND FIGURE 13.2.1 <br />TENANT/OFFICES (MISCELLANEOUS STORAGE) <br />CLASS I -IV TO V-0", MISCELLANEOUS STORAGE; NFPA 13: FIGURE 13.2.1 CURVE OH2, TABLE 13.2.1 <br />ENTRY CANOPY (MISCELLANEOUS STORAGE) <br />0.20/7 SPRINKLERS OPERATING <br />250 <br />130 <br />AND 13:11.2.3.4.2 AND Al1.2.3.4.2 <br />225 <br />LIGHT HAZARD, 13: 11.2.3.1.1, FIGURE 11.2.3.1.1 <br />RESTROOMS/BREAKROOMS (LIGHT HAZARD) <br />0.1011500 SQ FT <br />100 <br />AND TABLE 11.2.3.1.2 <br />ENTRY VESTIBULES (ORDINARY HAZARD GROUP 2) <br />MINIMUM 0.20/1500 SQ FT <br />250 <br />130 <br />ORDINARY HAZARD GROUP 1 (NO STORAGE), 13: 11.2.3.1.1, FIGURE 11.2.3.1.1, AND TABLE 11.2.3.1.2 <br />OR ENTIRE AREA <br />COOLERS/FREEZERS (MISCELLANEOUS STORAGE) <br />MINIMUM 0.20/1500 SQ FT <br />250 <br />130 <br />CLASS 1-III TO 12'-0" ON SINGLE ROW RACK, 13: TABLE 13.2.1 AND FIGURE 13.2.1 <br />OR ENTIRE AREA <br />12 SPRINKLERS AT 15 PSI <br />250 <br />100 <br />RUBBER TIRES TO 13'-6"; ON -SIDE AND ON -TREAD ON FIXED RACKS WITHOUT <br />TIRE STORAGE AREA (RUBBER TIRE STORAGE) <br />EACH OR ENTIRE AREA <br />SOLID SHELVES; NFPA 13:TABLE 18.4(d) K25 ESFR SPRINKLERS <br />USED TIRE STORAGE (RUBBER TIRE STORAGE) <br />MINIMUM 0.19/1500 SQ FT <br />250 <br />100 <br />RUBBER TIRES TO 5'-0"; ON GRADE, ON TREAD AND ON SIDE; NFPA 13:TABLE 18.4(a) <br />OR ENTIRE AREA <br />GARDEN CENTER CANOPY (EXTRA HAZARD GROUP 1) <br />0.30/7 SPRINKLERS <br />500 <br />100 <br />CLASS I -IV ON SHELF TO 12'-0"; NFPA 13:TABLE 13.2.1; 16.2.1.2 AND 11.2.3.4.2 <br />OPERATING <br />RC = RETAIL CEILING/RNC = RETAIL NO CEILING SRR = SINGLE ROW RACK <br />SL = STORAGE LOW/SH = STORAGE HIGH DRR = DOUBLE ROW RACK <br />REFERENCE SPRINKLER PLANS AND SPRINKLER SYMBOL LEGEND FOR SPRINKLERS NECESSARY TO MEET THE DESIGN REQUIREMENTS MRR = MULTIPLE ROW RACK <br />* = EXISTING DESIGN CRITERIA TO REMAIN <br />OWNER FURNISHED SPRINKLERS AND <br />SPRINKLER SYMBOL LEGEND <br />ACCESSORIES <br />SYMBOL <br />SIZE <br />K-FACTOR <br />FINISH <br />MFR <br />MAKE <br />S.I.N. <br />TEMP <br />STYLE <br />QTY <br />SPARE <br />ESCH <br />ESCH <br />ESCH <br />SYMBOL <br />SIZE <br />MFR <br />MAKE <br />S.I.N. <br />FINISH <br />STYLE <br />TEMP <br />K-FACTOR <br />QTY <br />STYLE <br />FINISH <br />QTY <br />SYMBOL LEGEND <br />3/4" <br />16.8 <br />BRASS <br />TYCO <br />K17-231 <br />TY7158 <br />155 <br />UPRIGHT <br />222 <br />6 <br />--- <br />--- <br />--- <br />�!, <br />VARIES <br />VARIES <br />VARIES <br />VARIES <br />VARIES <br />EXISTING <br />PENDENT <br />VARIES <br />VARIES <br />O * <br />3/4" <br />16.8 <br />BRASS <br />TYCO <br />K17-231 <br />TY7158 <br />200 <br />UPRIGHT <br />6 <br />6 <br />--- <br />--- <br />--- <br />, 1' <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />SYMBOL <br />DESCRIPTION <br />PENDENT <br />O <br />3/4" <br />11.2 <br />BRASS <br />TYCO <br />ELO-231 <br />TY5131 <br />155 <br />UPRIGHT <br />1246 <br />24 <br />--- <br />- __ <br />- -- <br />• <br />MATCH <br />MATCH <br />MATCH <br />MATCH <br />MATCH <br />NEW <br />MATCH <br />MATCH <br />XX <br />HYDRAULIC REFERENCE NODE <br />EXISTING <br />EXISTING <br />EXISTING <br />EXISTING <br />EXISTING <br />PENDENT <br />EXISTING <br />EXISTING <br />0 * <br />3/4" <br />11.2 <br />BRASS <br />TYCO <br />ELO-231 <br />TY5131 <br />200 <br />UPRIGHT <br />47 <br />6 <br />--- <br />--- <br />--- <br />; ` <br />` <br />VARIES <br />VARIES <br />VARIES <br />VARIES <br />BRASS <br />UPRIGHT STING <br />VARIES <br />VARIES <br />C- <br />CAP <br />� <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />DEMO <br />UPRIGHT <br />DEMO <br />DEMO <br />p <br />RISER NIPPLE/DROP NIPPLE <br />3/4" <br />8.0 <br />BRASS <br />TYCO <br />TY-B <br />TY4151 <br />286 <br />UPRIGHT <br />5 <br />2 <br />--- <br />--- <br />--- <br />MATCH <br />MATCH <br />MATCH <br />MATCH <br />MATCH <br />NEW <br />MATCH <br />MATCH <br />® <br />SPRINKLER RISER <br />EXISTING <br />EXISTING <br />EXISTING <br />EXISTING <br />EXISTING <br />UPRIGHT <br />EXISTING <br />EXISTING <br />WHERE SPRINKLERS ARE CALLED OUT TO "MATCH EXISTING," THE CONTRACTOR 5-ram---F INSPECTOR'S TEST/AUXILIARY DRAIN <br />SHALL PROVIDE SPRINKLERS MANUFACTURED BY TYCO, WHICH ARE EQUIVALENT TO <br />SUBSTITUTIONS WILL NOT BE PERMITTED. REFERENCE SPECIFICATIONS APPENDIX B FOR ADDITIONAL <br />THE EXISTING TO REMAIN SPRINKLERS. SUBSTITUTIONS WILL NOT BE PERMITTED. FIRE DEPARTMENT CONNECTION <br />INFORMATION. <br />WHERE SPRINKLERS ARE INSTALLED BELOW OBSTRUCTIONS (REFRIGERATION PIPING, RTUs, CABLE <br />\ HANGER <br />TRAYS, ETC.) THESE SPRINKLERS SHALL BE REPLACED WITH SPRINKLERS MATCHING THE NEW <br />SPRINKLERS BEING INSTALLED AT THE ROOF DECK LEVEL. <br />TRAPEZE HANGER <br />* INTERMEDIATE TEMPERATURE SPRINKLERS TO BE FURNISHED BY OWNER FOR INSTALLATION BELOW <br />® NEW CONNECTION <br />SKYLIGHTS AND ON AIR FLOW SIDE (INTERMEDIATE-TEMERATURE ZONE) OF UNIT HEATERS PER NFPA <br />13. <br />NEW SPRINKLER PIPE <br />**HIGH TEMPERATURE SPRINKLERS TO BE FURNISHED BY OWNER FOR INSTALLATION AROUND UNIT <br />HEATERS. <br />- - - - EXISTING SPRINKLER PIPE <br />THE OWNER WILL FURNISH ONE (1 QTY) SPRINKLER WRENCH (TYPE 38) FOR INSTALLATION PURPOSES <br />FOR THE TY7258 WHEN INSTALLING WITH STYLE 30 ESCUTCHEONS. THE CONTRACTOR IS REQUIRED TO <br />X X-X- DEMOLISHED SPRINKLER PIPE <br />LEAVE THE OWNER FURNISHED SPRINKLER WRENCH INSIDE THE SPARE HEAD CABINET AFTER <br />INSTALLATION HAS BEEN COMPLETED. <br />PROVIDE ADDITIONAL SPRINKLERS AS REQUIRED <br />PER NFPA 13 IN EXISTING SPRINKLER CABINET <br />THE OWNER WILL FURNISH ONE (1 QTY) SPRINKLER WRENCH (TYPE 8) FOR INSTALLATION PURPOSES <br />FOR ANY NEW SPRINKLERS INSTALLED. <br />FOR THE TY7258 WHEN INSTALLING WITH STYLE 65/401 ESCUTCHEONS. THE CONTRACTOR IS REQUIRED <br />TO LEAVE THE OWNER FURNISHED SPRINKLER WRENCH INSIDE THE SPARE HEAD CABINET AFTER <br />INSTALLATION HAS BEEN COMPLETED. <br />THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE TO OWNER FURNISHED SPRINKLERS <br />DURING INSTALLATION. TO REPLACE DAMAGED SPRINKLERS CONTACT HAINES, JONES, CADBURY <br />1-800-459-7099. <br />THE OWNER WILL FURNISH ADDITIONAL SPRINKLERS FOR THE SPARES CABINET. INSTALL SPARE <br />SPRINKLER QUANTITY INDICATED ON CONTRACT DOCUMENTS PRIOR TO FIRE PROTECTION <br />CONSULTANT SITE OBSERVATION. <br />f- <br />2 w <br />� N <br />o <br />W <br />' N O <br />O N <br />N O <br />N <br />h <br />OVERALL FIRE SPRINKLER PLAN <br />1" = 40'-0" <br />UNDERGROUND PIPING SHOWN <br />FOR HYDRAULIC CALCULATION <br />PURPOSES ONLY. <br />SYSTEM IMPAIRMENT <br />SCOPE OF WORK <br />GENERAL NOTES <br />GENERAL NOTES CONT. <br />REQUIREMENTS <br />1. THE CONTRACTOR IS RESPONSIBLE FOR THE <br />1. CONTRACTOR TO FIELD VERIFY EXTENT OF WORK, <br />COORDINATION, VERIFICATION AND PROVISION OF A <br />2. UPGRADE THE EXISTING FIRE SPRINKLER SYSTEM IN <br />1. THE DESIGN SHOWN ON THESE CONTRACT <br />7. THE FIRE PROTECTION ENGINEER OF RECORD <br />FIRE WATCH SUBJECT TO THE REQUIREMENTS OF <br />THE GROCERY STOCKROOM, GENERAL <br />DOCUMENTS IS TO PROVIDE GUIDANCE FOR <br />SHALL NOT BE RESPONSIBLE FOR THE <br />THE LOCAL JURISDICTION. ALL FIRE WATCH COSTS <br />MERCHANDISING STOCKROOM, SALES FLOOR, <br />BIDDING. SUBMIT COMPLETE FIRE SPRINKLER SHOP <br />CONTRACTOR'S FAILURE TO CARRY OUT THE <br />INCURRED AS A RESULT OF THIS PROJECT SHALL BE <br />SEASONAL SHOP, BREAK ROOM AND VISION <br />DRAWINGS AS REQUIRED BY CONTRACT <br />CONSTRUCTION WORK IN ACCORDANCE WITH THE <br />INCLUDED IN THE PROJECT BID AS A SEPARATE LINE <br />CENTER. TO MEET THE DISCHARGE PRESSURE, <br />DOCUMENTS TO THE OWNERS DESIGNATED <br />CONTRACT DOCUMENTS, NOR SHALL THEY BE <br />ITEM. COORDINATION AND VERIFICATION AS TO <br />HOSE ALLOWANCE AND MAXIMUM SPRINKLER <br />REVIEWERS. BASE SPRINKLER DESIGN UPON <br />REQUIRED TO SUPERVISE THE CONDUCT OF THE <br />WHEN A FIRE WATCH MAY BE NEEDED SHALL BE THE <br />SPACING AS REFERENCED IN THE PROTECTION <br />THESE DRAWINGS AND AS REQUIRED BY THE <br />WORK, THE CONSTRUCTION PROCEDURES <br />RESPONSIBILITY OF THE GENERAL CONTRACTOR. <br />CRITERIA LEGEND. <br />SPECIFICATIONS. SHOP DRAWINGS MUST INCLUDE <br />FOLLOWED BY THE CONTRACTOR, <br />2. THE GENERAL CONTRACTOR SHALL REQUEST THE <br />3. INSTALL ONE PRV ON EACH SYSTEM RISER AND <br />ELEVATIONS, HANGER LOCATIONS, PIPE LENGTHS, <br />SUBCONTRACTORS, THEIR RESPECTIVE <br />STORE MANAGER TO NOTIFY ALARM CENTRAL OF <br />INSTALL AIR RELEASE VALVE ON EACH SYSTEM IN <br />DIMENSIONS, FABRICATIONS METHODS, MATERIAL <br />EMPLOYEES OR ANY OTHER PERSON AT THE JOB <br />THE SYSTEMS) BEING SHUT OFF FOR WORK AND <br />ACCORDANCE WITH THESE DRAWINGS.SITE <br />DATA ANDADDITIONAL INFORMATION NECESSARY <br />OTHER THAN THAT OF THE ENGINEERING <br />THE DURATION OF THE SHUT OFF. <br />4. THE EXISTING FIRE SPRINKLER SYSTEMS WILL BE <br />TO CLARIFY THE INTENT OF INSTALLATION. <br />FIRM'S EMPLOYEES. <br />3. THE GENERAL CONTRACTOR SHALL CALL DIRECT TO <br />MODIFIED AS INDICATED ON THE PROJECT <br />CONTRACTOR SHALL PROVIDE PIPE SIZE, <br />8. CONTRACTOR MUST REVIEW ALL CONSTRUCTION <br />THE FIRE DEPARTMENT AND ADVISE THAT THE FIRE <br />CONTRACT DOCUMENTS. THE SCOPE OF WORK <br />SPRINKLER SPACING, AND SYSTEM CONFIGURATION <br />DOCUMENTS PRIOR TO BID. SHOULD <br />ALARM SYSTEM IS IN TEST. <br />MAY INCLUDE THE MODIFICATION OF EXISTING <br />AS SHOWN. ALTERNATE MATERIALS MUST BE SENT <br />MODIFICATIONS TO THESE PLANS BECOME <br />4. AT THE END OF EACH NIGHTS WORK, THE GENERAL <br />BRANCHLINES, INSTALLATION OF NEW <br />TO THE FIRE PROTECTION ENGINEER OF RECORD <br />NECESSARY TO PROPERLY COORDINATE THE <br />CONTRACTOR SHALL CALL DIRECT TO THE FIRE <br />BRANCHLINES, MODIFICATION OF EXISTING RISER(S), <br />OR VIA THE RFI PROCESS AND MUST BE APPROVED <br />SYSTEM WITH ALL OTHER TRADES, IT WILL BE THE <br />DEPARTMENT AND ALARM CENTRAL TO ADVISE <br />THE REMOVAL AND INSTALLATION OF NEW <br />IN RECORD DOCUMENTS PRIOR TO BID. <br />CONTRACTOR'S RESPONSIBILITY TO OBTAIN <br />WORK IS COMPLETE. <br />SPRINKLERS, MODIFICATION OF EXISTING MAINS, <br />2. COORDINATE LOCATIONS OF FIRE PROTECTION <br />APPROVAL OF THE CHANGES FROM BOTH THE <br />5. (FIRST FIRE WATCH OPTION) A FIRE WATCH SHALL BE <br />INSTALLATION OF NEW MAINS, REPLACEMENT OF <br />COMPONENTS, INCLUDING PIPING, ALARMS, DRAINS, <br />AUTHORITY HAVING JURISDICTION AND THE <br />REQUIRED WHEN ANY FIRE PROTECTION SYSTEM IS <br />THE EXISTING BACKFLOW PREVENTOR. <br />TEST POINTS, ETC. WITH ARCHITECTURAL, <br />OWNER'S DESIGNATED REVIEW CONSULTANT IN <br />IMPAIRED OR OTHERWISE DOWN FOR ALTERATION. <br />5. ALL NEW PIPING SHALL HAVE HANGERS INSTALLED <br />STRUCTURAL, MECHANICAL, AND ELECTRICAL <br />ADDITION TO OBTAINING THE NECESSARY <br />THE APPROVED FIRE WATCH SHALL BE CONDUCTED <br />IN ACCORDANCE TO THE DETAILS LOCATED ON THE <br />COMPONENTS. OBSTRUCTION TO SPRINKLER <br />APPROVALS, THE CONTRACTOR MUST MAKE NOTE <br />BY A DEDICATED, TRAINED WALMART EMPLOYEE <br />FIRE PROTECTION DETAILS SHEET. <br />DISCHARGE MUST BE CONSIDERED DURING SHOP <br />OF ANY FIELD OR COORDINATION CHANGES ON THE <br />WHOSE SOLE RESPONSIBILITY WILL BE TO PERFORM <br />6. ALL 1-INCH ARMOVERS (IF APPLICABLE) SHALL HAVE <br />DRAWING PRODUCTION AND INSTALLATION; <br />INSTALLATION DRAWINGS, AND THEN MUST <br />HOURLY PATROLS OF THE PREMISES AND KEEP <br />A HANGER SECURED TO THE STRUCTURAL STEEL <br />ADDITIONAL SPRINKLERS MAY BE REQUIRED AT NO <br />PROVIDE A SET OF AS -BUILT DRAWINGS ONCE <br />WATCH FOR FIRES AND WILL NEED TO DOCUMENT <br />ONLY, NOT TO THE DECK WHEN THE LENGTH <br />ADDITIONAL COST TO OWNER. REFER TO <br />COMPLETE. <br />THEIR WALK AND REPORT BACK TO THE GENERAL <br />EXCEEDS 2 -0" WHERE STATIC PRESSURES ARE UP <br />SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br />RE <br />9. CONTRACTOR MUST VERIFY ALL DROP DOWN <br />CONTRACTOR AND WALMART MANAGEMENT. THIS <br />TO 100 PSI AND 1'-0" WHERE STATIC PRESSURES <br />3. CONTRACTOR MUST VISIT THE BUILDING SITE TO <br />LOCATIONS AT EXTERIOR WALLS WITH THE <br />PERSON SHALL BE PROVIDED WITH AT LEAST ONE <br />EXCEEDS 100 PSI. <br />DETERMINE THE FULL EXTENT OF THE EXISTING <br />PROJECT MANAGER PRIOR TO INSTALLATION. <br />APPROVED MEANS FOR NOTIFICATION TO THE FIRE <br />7, CEILING GRID SHALL BE PERMITTED TO BE REMOVED <br />FIRE PROTECTION WORK AND EXISTING <br />10, ALL PIPING MUST BE COORDINATED AROUND <br />DEPARTMENT. <br />IN AREAS WHERE REQUIRED IN ORDER TO <br />CONDITIONS, BECOME TOTALLY FAMILIAR WITH THE <br />FRAMING MEMBERS AND PROPERLY INSTALLED <br />6. (SECOND FIRE WATCH OPTION) A FIRE WATCH SHALL <br />COMPLETE THE WORK NEEDED SUCH AS DEMO AND <br />DISCONNECTIONS, REMOVALS, RELOCATIONS <br />INSIDE THE BAR JOIST. <br />BE REQUIRED WHEN ANY FIRE PROTECTION SYSTEM <br />INSTALLATION OF NEW MAINS OR LONG DROPS. IN <br />AND/OR RECONNECTIONS OF EXISTING FIRE <br />11. CONTRACTOR SHALL ROUTE PIPING AROUND ALL <br />IS IMPAIRED OR OTHERWISE DOWN FOR <br />THIS CASE THE CONTRACTOR SHALL BE <br />PROTECTION EQUIPMENT REQUIRED, AND <br />OBSTRUCTIONS AND PROVIDE SPRINKLER <br />ALTERATION. THE FIRE SPRINKLER CONTRACTOR <br />RESPONSIBLE FOR REPLACING DAMAGED CEILING <br />CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. <br />PROTECTION UNDER OBSTRUCTIONS, AS DETAILED <br />SHALL HIRE AN APPROVED OFF -DUTY FIRE FIGHTER <br />TILE OR GRID DURING THE INSTALLATION. ALL <br />NO EXTRA COMPENSATION WILL BE PAID FOR LACK <br />IN NFPA 13 STANDARDS AS PART OF THE FIELD <br />TO PERFORM THE REQUIRED FIRE WATCH. FIRE <br />REMOVED CEILING TILES MUST BE REPLACED AT <br />OF SUCH DETERMINATION, FAMILIARIZATION, <br />COORDINATION AT NO ADDITIONAL COST TO <br />WATCH PERSONNEL SHALL BE PROVIDED WITH AT <br />THE END OF BUSINESS DAY. AREAS LEFT EXPOSED <br />AND/OR ALLOWANCE. <br />OWNER. <br />LEAST ON APPROVED MEANS FOR NOTIFICATION OF <br />SUCH AS BUT NOT LIMITED TO REMOVED CEILING <br />4. SUBMIT A REQUEST FOR INFORMATION FOR <br />12. ALL SPRINKLER DEFLECTOR DISTANCE <br />THE FIRE DEPARTMENT AND THEIR SOLE DUTY SHALL <br />GRID AND CEILING TILES SHALL NOT BE PERMITTED. <br />QUESTIONS REGARDING THE FIRE PROTECTION <br />REQUIREMENTS SHALL BE IN ACCORDANCE TO THE <br />BE TO PERFORM CONSTANT PATROLS AND WATCH <br />8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />DOCUMENTS PER RFI PROCESS LOCATED IN THE <br />STANDARDS OUTLINED IN NFPA 13. <br />FOR THE OCCURRENCE OF FIRE. FOR HOT WORK <br />PURCHASING AND INSTALLING MATCHING CEILING <br />FIRE PROTECTION SPECIFICATIONS. <br />13. ALL PIPING PASSING THROUGH CMU WALLS SHALL <br />OPERATIONS, A FIRE WATCH SHALL BE POSTED FOR <br />TILES TO REPLACE ANY CEILING TILES THAT HAVE <br />5. NEUTRALIZATION WALLS, IF PROVIDED, ARE SHOWN <br />BE INSTALLED WITH ONE INCH CLEARANCE ON ALL <br />THE DURATION OF THE WORK AND 30 MINUTES <br />EMPTY HOLES DUE TO SPRINKLER REPLACEMENT. <br />ON THE ARCHITECTURAL DRAWINGS. REFER TO <br />SIDES. (CORE DIAMETER EQUAL TO PIPE +2"). ALL <br />THEREAFTER. <br />9. USE EACH EXISTING OUTLETS FOR ONE NEW ARM <br />MECHANICAL DRAWINGS FOR NEUTRALIZATION <br />CORES SHALL BE COORDINATED WITH STRUCTURAL <br />7. ONLY (1) ONE SYSTEM IS PERMITTED TO BE SHUT <br />OVER TO NEW SPRINKLER LOCATION UNLESS <br />WALL PENETRATION DETAIL. <br />REINFORCING. CONTRACTOR IS RESPONSIBLE FOR <br />DOWN AT ONE TIME. <br />HYDRAULICALLY CALCULATED. CONTRACTOR SHALL <br />6. PENETRATIONS OF "RATED ASSEMBLIES" SHALL BE <br />PROVIDING ALL CORING WITH PROPER CLEARANCE <br />8. ANY FIRE DEPARTMENT FEES FOR FAILURE TO <br />INSTALL 1" INCH MECHANICAL TEES IF ADDITIONAL <br />FIRE STOPPED WITH AN APPROVED MATERIAL PER <br />AT ALL CMU WALLS. GENERAL CONTRACTOR SHALL <br />FOLLOW PROCEDURES WILL BE AT THE GENERAL <br />OUTLETS ARE REQUIRED. AFTER THE DEMOLITION IS <br />METHODS REQUIRED BY PROJECT SPECIFICATIONS <br />BE RESPONSIBLE FOR PROVIDING A TWO INCH <br />CONTRACTORS EXPENSE. <br />COMPLETE, THE NEW SPRINKLER SYSTEM SHALL <br />AND THE AUTHORITY HAVING JURISDICTION. <br />CLEARANCE AROUND ALL PIPING PASSING <br />9. REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED <br />MEET ALL REQUIREMENTS OF NFPA 13. <br />THROUGH CONCRETE SLABS. THE SPRINKLER <br />AT ALL TIMES DURING CONSTRUCTION, DEMOLITION, <br />10. CONTRACTOR SHALL PROVIDE NEW SPRINKLERS AS <br />CONTRACTOR SHALL FILL ALL CLEARANCES WITH <br />REMODELING ALTERATIONS AND ADDITIONS <br />DUE TO PAINT, ETC.. <br />APPROVED MASTIC. <br />THE WALMART.. ALL EXITS SHALL NOT BE BLOCKED, <br />CONTRACTOR SHALL COORDINATE.NECESSARY <br />FIRE SPRINKLER PIPING AND <br />14. ON THE SALES FLOOR AND SEASONAL SHOP, PRIME <br />REDUCED OR OTHERWISE MADE INOPERABLE WHICH <br />11. THE CONTRACTOR IS RESPONSIBLE FOR <br />AL I PANT <br />AND ND PAINTAL L NEWLY INSTALLED PIPE, PIPE <br />ALSO INCLUDES THE EXIT ACCESS, THE EXIT AND <br />MAINTAINING THE FIRE LANES DURING THE <br />DEMOLITION <br />NOTES <br />FSUPPORTS TO MATCH EXISTING <br />EXIT DISCHARGE TO THE PUBLIC WAY. TEMPORARY <br />SPRINKLER SYSTEM UPGRADE PROCESS. THE <br />CEILING. <br />MEANS OF EGRESS ARE ALLOWED. <br />CONTRACTOR SHALL COORDINATE WITH THE STORE <br />15. PROVIDE FLUSHING CONNECTIONS IN ACCORDANCE <br />10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE <br />MANAGER A STAGING AREA FOR MATERIALS AND <br />1. CONTRACTOR MUST VISIT THE BUILDING SITE TO <br />WITH THE STANDARDS OUTLINED IN NFPA 13. <br />END OF EACH WORKDAY. <br />TOOLS TO BE USED FOR PROJECT PRIOR TO START <br />DETERMINE THE FULL EXTENT OF THE EXISTING FIRE <br />16. PROVIDE ALL NECESSARY OFFSETS, RISES OR <br />OF WORK. <br />PROTECTION WORK AND EXISTING CONDITIONS, <br />DROPS IN PIPING AND AUXILIARY DRAINS REQUIRED <br />12. THE SPRINKLER CONTRACTOR SHALL BE <br />BECOME TOTALLY FAMILIAR WITH THE <br />BY BUILDING CONDITIONS. <br />HYDROSTATIC TEST <br />RESPONSIBLE FOR PREPARING THE SHOP <br />DISCONNECTIONS, REMOVALS, RELOCATIONS <br />AND/OR RECONNECTIONS OF EXISTING FIRE <br />17. EXAMINE THE JOB CONDITIONS AND VERIFY ALL <br />MEASUREMENTS, DISTANCES, ELEVATIONS, <br />DRAWINGS, HYDRAULIC CALCULATIONS AND <br />APPROVAL (BY THE ENGINEER OF RECORD AND AHJ) <br />PROTECTION EQUIPMENT REQUIRED, AND <br />CLEARANCES, ETC. <br />AS WELL AS INSTALLATION. <br />CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. <br />18. ARCHITECTURAL AND ELECTRICAL BACKGROUND <br />13. THE SPRINKLER CONTRACTOR MUST FIRST SUBMIT <br />NO EXTRA COMPENSATION WILL BE PAID FOR LACK <br />INFORMATION IS SHOWN FOR COORDINATION <br />BUILDING SPRINKLER SYSTEM(S) INVOLVED IN THIS <br />DOCUMENTS, AS OUTLINED IN THE PROJECT <br />OF SUCH DETERMINATION, FAMILIARIZATION, AND/OR <br />PURPOSES ONLY. REFER TO THE CONTRACT <br />SCOPE OF WORK SHALL BE HYDROSTATICALLY TESTED <br />SPECIFICATIONS, TO THE FIRE PROTECTION <br />ALLOWANCE. <br />DOCUMENTS FOR LOCATIONS, SIZES AND <br />IN ACCORDANCE WITH NFPA 13. MOREOVER, THE <br />ENGINEER OF RECORD FOR APPROVAL. AFTER THE <br />2. UNLESS INDICATED OTHERWISE, DISCONNECT AND <br />QUANTITIES OF OTHER TRADE WORK. <br />FOLLOWING TWO (2) HYDROSTATIC TESTS SHALL BE <br />APPROVAL IS GIVEN, THE CONTRACTOR MUST <br />REMOVE ALL EXISTING FIRE PROTECTION <br />19. SPRINKLER SPACING SHALL BE PER NFPA 13 <br />PERFORMED BY THE CONTRACTOR: <br />SUBMIT TO THE AUTHORITY HAVING JURISDICTION <br />COMPONENTS NOT INTENDED TO BE REUSED. <br />UNLESS OTHERWISE NOTED ON PLANS AND/ OR <br />1. THE FIRST HYDROSTATIC TEST SHALL BE <br />FOR INSTALLATION PERMIT. <br />3. DISCONNECT, RELOCATE, AND RECONNECT <br />PROTECTION CRITERIA LEGEND. <br />PRIOR <br />PERFORMED BY THE CONTRACTOR PRIOR TO <br />14. THE CONTRACTOR SHALL COORDINATE WITH THE <br />EXISTING FIRE PROTECTION SYSTEMS AND <br />20. INTERFACE SPRINKLER SYSTEM WITH FIRE <br />START OF SPRINKLER SYSTEM SCOPE <br />STORE MANAGER ON THE AREA TO BE WORKED ON <br />EQUIPMENT WHERE REQUIRED. <br />PROTECTION SUPERVISORY SYSTEM. <br />WORK "PRE -SCOPE HYDRO TEST"); <br />( ) <br />AT LEAST 24 HOURS IN ADVANCE. <br />4. NOTE CAREFULLY THAT THE FIRE PROTECTION <br />21. ALL MATERIALS SHALL BE UL LISTED OR FM <br />2. THE SECOND HYDROSTATIC TEST SHALL BE <br />15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY <br />DRAWINGS ARE INTENDED TO INDICATE, ONLY <br />APPROVED. SPRINKLER PIPE SHALL BE <br />PERFORMED BY THE CONTRACTOR AFTER <br />DAMAGE TO ANY OF THE STORES CONTENTS <br />DIAGRAMMATICALLY, THE EXTENT AND THE GENERAL <br />MANUFACTURED TO STANDARDS RECOGNIZED BY <br />COMPLETION OF CONTRACT SCOPE WORK <br />(MERCHANDISE), OR THE BUILDING COMPONENTS AS <br />CHARACTER AND LOCATIONS OF THE WORK <br />NFPA 13., THREADED PIPE SHALL HAVE A <br />("POST -SCOPE HYDRO TEST"). <br />A RESULT OF THE WORK SHOWN ON THE CONTRACT <br />INCLUDED. PROVIDE ALL WORK OBVIOUSLY <br />CORROSION RESISTANCE RATING OF 1.0 OR <br />DOCUMENTS. <br />INTENDED, BUT HAVING MINOR DETAILS OMITTED OR <br />GREATER. CRIMP -TYPE COUPLINGS SHALL NOT BE <br />THE HYDROSTATIC TESTS ON EXISTING SPRINKLER <br />16. THE CONTRACTOR SHALL REPAIR ANY LEAKS OR <br />NOT SHOWN. COMPLETE AS REQUIRED TO <br />USED. THREADABLE THINWALL PIPE WITH <br />SYSTEM SHALL BE CONDUCTED AT A PRESSURE OF <br />REPLACE ANY LEAKING COMPONENTS AFFECTED BY <br />PERFORM THE FUNCTIONS INTENDED. FOLLOW THE <br />CORROSION RESISTANCE RATING OF LESS THAN 1.0 <br />200 PSI FOR 2 HOURS. NEW SYSTEMS SHALL <br />THIS SCOPE OF WORK AT NO ADDITIONAL COST TO <br />CONTRACT DOCUMENTS FOR BUILDING DETAILS <br />SHALL BE USED ONLY WITH ROLL GROOVE FITTINGS. <br />TESTED PER PRESSURE REQUIREMENTS OF NFPA 13. <br />THE OWNER. <br />AND FIT THE WORK OF THE FIRE PROTECTION <br />22, IF REQUIRED, PROVIDE 24 VOLT AC, ELECTRIC BELL, <br />DRAWINGS AND SPECIFICATIONS THERETO. <br />MODEL NO. PBA248, ELECTRIC BELL BY POTTER <br />THE CONTRACTOR SHALL NOT BE RESPONSIBLE FOR <br />5. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS <br />ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI, LOCATE <br />DAMAGE TO CONTENTS OR BUILDING OCCURRING <br />DURING THE "PRE-SCOPEHYDRO TEST" PROVIDED ALLJURISDICTION. <br />WATER SUPPLY <br />TO AN APPROVED DUMPING SITE AND CLEAN <br />FIRE PROTECTION ij ORK PRIOR HE PROJECT <br />AS REQUIRED BHAVINGY AUTHORITIES <br />PROVIDE DEE NEW DOUBLE POLE VANE <br />COMMERCIALLY REASONABLE MEASURES NECESSARY <br />COMPLETION. <br />TYPE FLOW DETECTOR, MODEL NO. VSR-F, BY <br />OR PRUDENT TO PROTECT CONTENTS OR BUILDING <br />INFORMATION <br />6. PERFORM ALL WORK ACCORDING TO THE PROJECT <br />POTTER ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI. <br />COMPONENTS WERE FOLLOWED FOR APPROPRIATE <br />PHASING SCHEDULE INFORMATION FOR THIS <br />SET ADJUSTABLE DELAYED SIGNAL AT 30 SECONDS. <br />TEST PROCESS. CONTRACTOR SHALL COMPLETE <br />TEST STATIC AT SRC: 55 PSI <br />PROJECT. PROVIDE ALL NECESSARY FIRE <br />MOUNT WATER FLOW INDICATORS NO HIGHER THAN <br />REPAIRS AND / OR REMEDIATION TO EXISTING <br />TEST RESIDUAL AT SRC: 50 PSI AT 1030 GPM <br />PROTECTION WORK, TEMPORARY AND/OR <br />6 FEET ABOVE FINISH FLOOR. <br />SYSTEMS REQUIRED AS A RESULT OF DEFICIENCIES <br />OTHERWISE, AND USE WHATEVER MEANS <br />23. ALL SPRINKLER SYSTEMS THAT ARE TO BE <br />IDENTIFIED DURING PRE -SCOPE TESTING AS AN <br />INFORMATION DERIVED FROM A WATER REPORT BY <br />NECESSARY, TO CONFORM TO THE REQUIRED <br />MODIFIED SHALL BE HYDROSTATICALLY TESTED PER <br />ADDITIONAL SERVICE. <br />CI & FROM A FLOW TEST <br />CONSTRUCTION PHASING OF THE PROJECT. <br />NFPA 13 PRIOR TO SPRINKLER SYSTEM <br />THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE <br />CONDUCTED ON 11/05/20. THE TEST WAS CONDUCTED <br />DON 1 /05 <br />CONDUCTED <br />7• CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR <br />MODIFICATION AND SHALL BE RE -HYDROSTATICALLY <br />FOR DAMAGE TO CONTENTS OR BUILDING OCCURRING <br />AT 10:00 AM EST. <br />REPLACING ITEMS DAMAGED DURING DEMOLITION <br />TESTED AFTER COMPLETION OF WORK. <br />DURING THE "POST -SCOPE HYDRO TEST" PROCEDURE <br />AND CONSTRUCTION. <br />24. DO NOT HANG OR SUPPORT ANY LOADS OR MAKE <br />ORIGINATING IN EXISTING OR NEW SYSTEM <br />FLOW TEST ELEVATION: 100.0 FT AMSL <br />8. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH <br />ANY ATTACHMENTS TO THE METAL ROOF DECK OR <br />COMPONENTS. CONTRACTOR SHALL COMPLETE <br />BUILDING PAD ELEVATION: 100.0 FT AMSL <br />ADJACENT SURFACES LEFT UNUSED AFTER EXISTING <br />JOIST BRIDGING. <br />REPAIRS AND / OR REMEDIATION TO EXISTING <br />SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND <br />25. SAMMY SCREWS ARE NOT PERMITTED. <br />SYSTEMS REQUIRED AS A RESULT OF DEFICIENCIES <br />THE WATER SUPPLY IS MODIFIED BY THE FOLLOWING: <br />VACATED FROM THESE HOLES. <br />26. CEILING FLANGES ARE NOT PERMITTED. <br />IDENTIFIED DURING POST -SCOPE TESTING AT NO <br />9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND <br />27. PROVIDE RETAINING STRAPS ON HANGERS WHERE <br />ADDITIONAL COST TO WALMART. <br />+ 0.0 PSI DUE TO ELEVATION DIFFERENCE <br />MAINTAINING FIRE DEPARTMENT ACCESS ROADS <br />REQUIRED. <br />WHEN CONDUCTING HYDROSTATIC TESTING ON <br />BETWEEN TEST AND BUILDING <br />THROUGHOUT THE PROJECT. <br />28. CONTRACTOR IS TO COORDINATE FINAL SPRINKLER <br />EXISTING SYSTEMS AS REQUIRED BY NFPA 13, <br />5.0 PSI WALMART SAFETY FACTOR <br />10. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE <br />HEAD LOCATIONS AND PIPE ROUTING SUCH THAT <br />CONTRACTOR SHALL TAKE SUCH ACTIONS AS MAY BE <br />DEMOLITION SHALL BE LEFT IN SERVICE. <br />THEY DO NOT INTERFERE WITH NOR RECEIVE <br />NECESSARY TO REDUCE POTENTIAL DAMAGE TO <br />DESIGN STATIC AT SRC: 50 PSI <br />11. THE CONTRACTOR SHALL PROPERLY NOTIFY THE <br />DAMAGE FROM THE NORMAL OPERATIONS OF THE <br />CONTENTS AND BUILDING DURING EXECUTION OF <br />DESIGN RESIDUAL AT SRC: 45 PSI AT 1030 GPM <br />LANDLORD. THE LESSOR AND THE ADJACENT <br />AREA. <br />SCOPE OF WORK, INCLUDING BUT NOT LIMITED TO THE <br />TENANTS A MINIMUM OF 48 HOURS IN ADVANCE <br />FOLLOWING: <br />BEFORE PROCEEDING WITH THIS WORK. ALL WORK <br />1. USE OF LOW CAPACITY PRESSURE PUMP TO <br />SHALL BE SCHEDULED IN ADVANCE. <br />INCREASE PRESSURE IN SYSTEM AT <br />INCREMENTAL RATE TO LIMIT SURGES IN <br />APPLICABLE CODES <br />SYSTEM; AND <br />AIR RELEASE VENT <br />GENERAL UNDERGROUND <br />2. PROVISION OF WORK STAFF DEDICATED TO <br />MONITORING THE IMPACTED SYSTEM AREA <br />NOTES <br />DURING PRESSURE APPLICATION AND DURING <br />CODE STANDARD EDITION <br />HYDROSTATIC TEST FOR SIGNS OF SYSTEM <br />ONE AIR VENT MUST BE INSTALLED ON ALL WET TYPE <br />NFPA 13 2013 <br />COMPROMISE (MINIMUM 1 PERSON / 20,000 SQ. <br />FIRE PROTECTION SYSTEMS INCLUDING SYSTEMS NOT <br />1. ALL UNDERGROUND IS SHOWN FOR HYDRAULIC <br />2014 <br />FT. AREA) ; AND <br />AFFECTED BY THE REMODEL SCOPE OF WORK. EACH <br />REFERENCE ONLY. <br />NFPA 25 <br />FFPC 6TH <br />3. MAINTAINING DEDICATED PERSON AT SYSTEM <br />AIR VENT IS TO BE INSTALLED AT THE HIGHEST POINT <br />2. SEE CIVIL DRAWINGS FOR EXACT LOCATIONS IF <br />CONTROL VALVE IN CONSTANT <br />OF THE SYSTEM AND PREFERABLY ON THE MAINS. THE <br />AVAILABLE. <br />COMMUNICATION WITH SYSTEM MONITORS TO <br />CONTRACTOR IS RESPONSIBLE FOR LOCATING THE <br />3, NO NEW WORK UNLESS OTHERWISE NOTED. <br />SHUT OFF TEST PUMP AND DRAIN SYSTEM IN <br />HIGHEST POINT OF EACH SYSTEM AND INSTALLING THE <br />EVENT OF SYSTEM ORIF <br />NO <br />AIR VENT INNINSTALLEID BLE THE AIR <br />CONTACT INFORMATION <br />4. PROVISO OF REA YILURE SUPPLI SLPRIOR <br />VT IS TO EAD <br />ABOVEAAN EXISTING CEILING <br />START OF TESTING TO FACILITATE DAMAGE <br />THE CONTRACTOR MUST PROVIDE SIGNAGE PER NFPA <br />PLACARD INFORMATION <br />MINIMIZATION 1N EVENT OF SYSTEM FAILURE <br />13. REF 3-FP3. <br />(TARPS / PLASTIC SHEETING, WET / DRY <br />DOCUMENTS INCLUDE JURISDICTIONAL REQUIREMENTS <br />VACUUM ETC.); AND <br />PROVIDED BY THE FOLLOWING CONTACTS: <br />5. COVERING HIGH VALUE EQUIPMENT PRIOR TO <br />THE FOLLOWING INFORMATION MUST BE SHOWN ON <br />TESTING; AND <br />THE PLACARDS FOR EACH UL PERFORMANCE BASE <br />CIT OF ZEPHYRHILLS FIRE DEPARTMENT: <br />6. LIMITATION OF TESTING TO ONE SYSTEM AT A <br />DESIGNS. USE A PLACARD FOR EACH CALCULATED <br />BRIAN SWARTOUT, FIRE CHIEF <br />TIME- AND <br />DESIGN. PLACARDS SHALL BE ENGRAVED METAL <br />(813) 780-0020 <br />7. TESTING OF SYSTEMS DURING OFF HOURS / <br />SIGNS. REFERENCE SPECIFICATIONS FOR ADDITIONAL <br />OVERNIGHT. <br />INFORMATION. PLACARDS THAT ARE INSTALLED WITH <br />THERE IS NO INDICATION OF MIC <br />(MICROBIOLOGICALLY INFLUENCED <br />CORROSION) IN THE EXISTING BUILDING. <br />OLISH EXISTING PIPING AND <br />NKLER IN THIS AREA. CUT AND CAP <br />TING PIPING. RELOCATE AND <br />VIDE NEW SPRINKLER COVERAGE AS <br />UIRED IN NEW BUILDING LAYOUT <br />INFORMATION WRITTEN PERMANENT MARKER WILL <br />NOT BE ACCEPTED. <br />SYSTEM #: X AREA: X <br />SPRINKLERS CALCULATED: X <br />SPRK END HEAD PRESSURE: X <br />HOSE DEMAND: X <br />SYSTEM FLOW DEMAND: X <br />SYSTEM PRESSURE DEMAND: X <br />SYSTEM SAFETY FACTOR: X <br />INSTALLING CONTRACTOR: X <br />UL PERFORMANCE BASE DESIGN <br />PROJECT 4788122552, NC27954 <br />SHEET INDEX <br />FP1 <br />OVERALL FIRE SPRINKLER PLAN <br />FP2 <br />ENLARGED FIRE SPRINKLER PLAN <br />FP2.1 <br />OPERATIONAL FLEXIBILITY FIRE SPRINKLER <br />PLAN SYSTEM 1 <br />FP2.2 <br />OPERATIONAL FLEXIBILITY FIRE SPRINKLER <br />PLAN SYSTEM 2 <br />FP2.3 <br />OPERATIONAL FLEXIBILITY FIRE SPRINKLER <br />PLAN SYSTEM 3 <br />FP2.4 <br />OPERATIONAL FLEXIBILITY FIRE SPRINKLER <br />PLAN SYSTEM 4 <br />FP2.5 <br />OPERATIONAL FLEXIBILITY FIRE SPRINKLER <br />PLAN SYSTEM 5 <br />FP3 <br />FIRE PROTECTION DETAILS <br />REVI EW DATE S/ �- <br />CITY OF UFE S <br />FIRE AND LIFE SAFETY EXAMINER_, <br />ALL WORK SHALL COMPLY WITH <br />NFFA CODES AND STANDARDS STORE ADDRESS <br />7631 GALL BLVD <br />ZEPHYRHILLS, FL <br />EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />EXACT "AS -BUILT" CONDITIONS. CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE <br />x <br />in w a uv��u�lQ <br />Coow <br />a <br />E d Z Z Z <br />0 <br />W N�OJpOZO W VOZN� <br />���acnaa=Q�oog <br />O <br />gU- qW?-` <br />O �qwWfO <br />[�?�o �:5wl= TzwrF- <br />00Z90"MOD <br />Z°j��a50;:,o <br />a� <br />aOholr, Z~Jw�Uw <br />I- <br />z <br />D <br />U) <br />z <br />O <br />U <br />m <br />a <br />N <br />0 0 <br />CD O J <br />0 O u- <br />u rn <br />N <br />O <br />O O <br />oa T0 CV <br />M <br />Z O <br />04 <br />W N <br />O = F- <br />(vn� 1w <br />N <br />w <br />m <br />z <br />m <br />O <br />CHECKED BY: <br />AV <br />DRAWN BY: <br />PO <br />PROTO CYCLE: <br />09/25/20 <br />DOCUMENT DATE: <br />11/06/20 <br />i <br />PAUIL <br />j,%GENSF4 F �i <br />Q No 52186 <br />STATE OF <br />,• AtORIDP <br />F •• <br />as- <br />7/20/2021 <br />OVERALL <br />FIRE <br />SPRINKLER <br />PLAN <br />SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES <br />PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING <br />SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY. NO ADDITIONAL SHEET: <br />DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF FP1 <br />EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO <br />FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. <br />