Laserfiche WebLink
BUILDING EAVE HEIGHT <br />@ THIS SIDE OF BUILDING <br />22' 0" <br />BUILDING EAVE HEIGHT <br />20' 9" @ THIS SIDE OF BUILDING — <br />19' 0 3/4" Lik TOP OF OPENINGS _ I I I I <br />TOP OF OPENINGS 19' 0 3/4" <br />Tl/ Ll I <br />12' 0 3/4" MEZZANINE FINISH FLOOR <br />MEZZANINE FINISH FLOOR 12' 0 3/4" <br />r� <br />Q c0 • <br />c <br />M N V <br />Z LLu-2- <br />zd� do <br />— �LL <br />� Q� � <br />Q O�Ub' <br />�4 <br />c(l LL <br />Lu <br />Hu <br />m0. w- <br />BOTTOM OF MEZZANINE <br />BOTTOM OF MEZZANINE <br />10' 0" FLOOR JOIST SYSTEM <br />FLOOR JOIST SYSTEM <br />10 0" <br />W <br />— <br />_ <br />Q <br />---- <br />Z <br />24" DEEP WOOD FLOOR TRUSSES 16" OC <br />7 <br />N <br />R-19 FIBERGLASS INSULATION <br />TOP OF OPENINGS 8' 0" <br />> <br />_ <br />SECURE FLOOR GIRDER TO STEEL COLUMN <br />WITH SIMPSON LSTA24 FLAT STRAP. USE 1/4"X1" <br />6" STRUCTURAL LOAD BEARING STEEL <br />CA; <br />A <br />SDS SCREWS IN COLUMN AND 10DX1 1/2" NAILS <br />STUD WALL WITH 1/2" GYPSUM BOARD <br />N <br />GIRDER <br />ob <br />IN <br />ON INTERIOR FACE <br />O <br />O <br />O <br />ti <br />k0 <br />I� <br />SECURE PSL POST TO FLOOR WITH SIMPSON <br />O <br />LTT20B TIE DOWN, FILL NAIL HOLES TO POST <br />WITH 10DX1 1/2" NAILS AND TO FLOOR WITHob <br />m <br />5/8"X6" EXPANSION BOLT <br />} <br />m <br />N <br />Z <br />O <br />0101, BUILDING FINISH FLOOR <br />BUILDING FINISH FLOOR 0' 0" <br />QQ <br />Zco <br />— — <br />— <br />Q <br />p <br />O <br />CUT BUILDING SECTION <br />NOT TO SCALE <br />12 <br />1 <br />� <br />BUILDING EAVE HEIGHT <br />< <br />22' 0" @ THIS SIDE OF BUILDING <br />loll <br />W <br />BUILDING EAVE HEIGHT <br />R-19 FIBERGLASS INSULATION INSTALLED CONTINUOUS BETWEEN @ THIS SIDE OF BUILDING 20' 9" <br />PURLING THEN SECOND LAYER R-11 INSULATION INSTALLED ON TOP — <br />OF PURLING THE OPPOSITE DIRECTION WITH TOTAL R-30 INSULATION <br />O <br />TOP OF OPENINGS <br />19' 0 3/4" <br />TOP OF OPENINGS 19' 0 3/4" <br />0 <br />O <br />m <br />J <br />U <br />Q <br />Q <br />Q <br />LL <br />~ <br />IN— <br />J <br />Q <br />= <br />W <br />U <br />J <br />LL <br />U <br />J <br />Q <br />U) <br />R-13 FIBERGLASS INSULATION <br />R-13 FIBERGLASS INSULATION STORAGE AREA 42" HIGH RAILING WITH BALUSTERS <br />LL <br />z <br />J <br />J <br />J <br />PACED MAXIMUM 4" APART TYPICAL <br />ALL AREAS <br />cc 10 <br />3/4" T&G PLYWOOD GLUED AND <br />NAILED 4" OC WITH 1 OD NAILS <br />i <br />'v <br />� •_ <br />T <br />1� <br />12' 0 3/4" MEZZANINE FINISH FLOOR <br />MEZZANINE FINISH FLOOR 12' 0 3/4" <br />FLOOR TRUSS GIRDER NOTE: <br />— <br />— <br />U <br />� <br />u- <br />N <br />SECURE FLOOR GIRDER TO STEEL COLUMN ALL AREAS IN WAREHOUSE IS H-3 HAZARDOUS AREA <br />Q <br />O <br />BOTTOM OF MEZZANINE <br />WITH SIMPSON LSTA24 FLAT STRAP. USE 1/4"X1" BOTTOM OF MEZZANINE <br />10, 0" FLOOR JOIST SYSTEM <br />SIDS SCREWS IN COLUMN AND 10DX1 1/2" NAILS DUE TO CHEMICALS USED IN PRODUCTS MANUFACTURED JOIST SYSTEM 10, 0" <br />_ <br />_FLOOR <br />IN GIRDER AND BOTTLED IN THESE AREAS <br />W <br />24" DEEP WOOD FLOOR TRUSSES 16" OC <br />NZ <br />L.L <br />8' 0" TOP OF OPENINGS — <br />O <br />4" SQUARE STEEL COLUMN <br />AI 1 \A/nnn \AC77AAl10.IC CI nnD 1AICT %A/nnr% r%Cf'VlAIL` <br />0' 0" BUILDING FINISH FLOOR <br />CUT BUILDING SECTION <br />NOT TO SCALE <br />BUILDING FINISH FLOOR 0101, <br />ARKAY ENGINEERING INC. i <br />STRUCTURA/P.. <br />RICHARD L. KI <br />FLORIDA LICE7296 <br />1 HERBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS <br />WERE PREPARED BY ME OR UNDER MY DIRECT SUPERVISION <br />ARE IN COMPLIANCE WITH CHAPTER 16, SECTION 1609 OF THE <br />FLORIDA BUILDING CODE 2017 6TH ADDITION AND ASCE 7-10 <br />FOR 139 MPH WIND ZONE RISK CATEGORY II <br />ARKAY # 17915 <br />